Loading...
HomeMy WebLinkAboutContract 26134 AMENDMENT NO. 6 STATE OF TEXAS § CITY SECRETARY CONTRACT NO.- � (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and AB&A, Inc. (formerly Poe Engineers) (Engineer) made and entered into City Secretary Contract No. 20986, (the Contract) which was authorized by the City Council by M&C C-14781 on the 18`h day of April, 1995; and amended by the City Council on March 13, 1997, by M&C C-15937 (Amendment No. 1) and then by Amendment No. 2 for $4,234.02 by Administrative Order and then by Amendment No. 3 by the City Council on November 3, 1998, by M&C C-17094 and then Amendment No. 4 for $2,741.12 by Administrative Order, and then Amendment No. 5 for $7,261.61 by Administrative Order, and WHEREAS, the Contract involves engineering services for the following project. Engineering Contract for the design of airport facilities for the Taxiway Alpha. (A) WHEREAS, it has become necessary to amend said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, Section 1 of the Contract is amended to include additional engineering services specified in a proposal letter dated July 28, 2000, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $2,663.22. 2. Article III of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$561,661.00. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. p EXECUTED on this the 8 day of , 2000, in Fort Worth, Tarrant County,Texas. 1,I)MCNA EEO ED CNN 2GEFAEY APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. Mike Goomer Director, Department of Assistant City Manager Engineering AB&A, Inc. (formerly Poe Engineers) ENGINEER ST: L \ - loria Pe on, City Secretary 84-Db 133y:4 - �/cf/Zeou Name: Marcelino Z. Arredondo President /y0 m ,C P'oo U P 9 AB&A, Inc. (formerly Poe Engineers) Contract Authorization Date APPR^vVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney ECOR© 08/01/2000 15:45 817-536-9401 ARREDONDO BRUNZ ASSC PAGE 02 I ' l I ! T r i C A Arredondo, Brunz & Associates, Inc. 2001 Beach Street Stitte 524 Fort Worth,TX 76103 July 28,2000 Gopal Sahu,P.E. City of Fort Worth Department of Engineering 1000 Throclanorton Street Fort Worth,Texas 76102 RE: Meacham Taxiway"A" Amendment# 5 Revision to Sign Dear Mr.Sahu: I We have contacted.ZRHD, the subprovider for electrical items on the subject projoct,and together we have assembled the following costs to complete the sign revisions. These revisions are outside the scope of the original Taxiway "A" contract. We therefore request that Amendment # 5 be issued to cover this cost AB&A Principal 1 hr. @ S47.12 = $ 47.12 Project Manager 7 hrs. @ $36.42 - $254.94 Technician 4 Ctrs. @ $20.14 - $ 80.56 Clerical 8 hra. @ $11.74 S 93.92 $476.54 (2.9932) = S 1,426.36 ZRHD $500.00 x 1.1 S 550.00 I EXPENSES I( I Plan Sheet 43 Copies @ $1.50 = $ 64.50 12 Standard Letter 43 Copies @ $0.10 -° $ 51.60 Postage 20 Mailed @ $2.00 S 40.00 $156.10 x 1.1 — S 171.71 Total Revisions $2,663,22 If you have any further questions please tali. Sincerel , Weldon I1.Jana06P � Q O � r'�( U�rPMD Project M (817) 536-9400 • Fax (817) 536-9401 • Toil Free 1-(6- - civil -( -civil a structural - municipal surveying planning I