HomeMy WebLinkAboutContract 46695-CO1 CITY SECRETARY CONTRACT NO. ORTWORTH- City of Fort Worth Change Order Request Project Namel Coma Ground Tank S Rehabilitation Cly Sac# 46695 ClWftjed#(s)j Fort Worth Water Dept Pr*d#02314); MWnfe w Maetoo Tame Inc.( A*ctDewkAm I Rapek oW repallating of OWN VxM storage tank Hlaetua Tetcaa lrtc Change Order 4 Date 1/18/2016 C4 P mjsd Mgr. Fartda S 5oderya,PE CIV kspeft David Hemarrdw Dept Walar Contract Thne Totals (CD) Ork*w Contract Amount $1,488,675.00 $1,488,675.00 150 Extras to Date $0.00 g0 Credits to Date PendMg Charge Orders(In M&C Process) Contract Cost to Deb $Iig 675.00 $1488,675.00 240 ount of Change Order 419,27620 -$19,276.20 0 Revised Contract Amount 1,4 ,398.80 $1,469,398.80 240 Odg W Funds Available for Change Orders $0.00 Ramairtrg Funds Available for tie CO $0.00 Additional FwWq(it necessary) CHAMGE ORDERS ba QATE jtltK;LWM THIS ONLY AS%OF ORIGNAL CONTRACT -1.20% WALLOWAKECONTRACTAM UNT(ORIGNALCONTRACT COST+2M $1,860,843.75 AVMTM FORCHAMORM This Charge Order covers multiple items and alminstkm of a few bid Items. IF Note,Tone Extension of 90 days is also included in this Charge Order. �"�� 0��► ' The additional details may be found in the subsequent pages. ci9 �g QQ i moo° A b • --� ��; o tO�o�f1UVV�O 1AN 2 2 2016 ' Maky f Kayse ity Seca:•etaty It is understood and agreed that the acceptm of this Change Order by fie contrador oonskABs an a000rd and satisfaction and represents payment in full(boor time and money)for all costs wising oul of,or incidental lo,the above Change Order. Qmkw ot'a Name a Mmko for e Blastco Texas Inc Stave Wissing/Vidinia Harp 1/18/16 DeOa Nirav Patel/CP NawW C p. }VC{cL,1 1/18/2016 Farids S.Goderya,PE "Lb Awir d Direclor Dale I k Andrew T Cronberg,PE r John Robert Carma ! 16 Amd"CIVAlb 4Atttritilwt Data Doug Black / 6 Jesus J Chapa _/ M&C Number WA M&C Data Approved WA I Rr 110Rr' �J"t i.t T` , Y m FORT WORTH City of Fort Worth Change Order Additions Project Name Como Ground Storage Tank GS Repair&Rehabilitation City Sec# 46695 Client Project# Fort Worth Water Dept(Project#02314); Kleinfelder ;Blastco Texas Inc.4465 Project Description Repair and repainting of existing ground storage tank Contractor Blastco Texas Inc Change Order# 0 Date I 1/18/2016 City Project Mgr. Farida S Goderya,PE City Inspector F David Hemandez Kleinfelder ADDITIONS unit Unitos o a Flush rain Installation Water . :Rx weld at exis ig manway ater . 3 PCM#I, Repair Existing weld on 4"patch plate Water 1.00 LS $250.00 $250.00 Seal weld the exterior cornice in two locations Water 5 PCM#3:Blast and paint the exterior cornice Water 1.00 LS $75,500.00 $75,500.00 6 PCM#3:Cut off Rafter End Water 83.00 EA $75.00 $6,225.00 Water $117,723.80 Sub ota -tions Change Order Additions Page 2 of 3 ( Y FORT WORTH City of Fort Worth Change Order Deletions Project Name Como Ground Storage Tank(GST)Repair&Rehabilitation City Sec# 46695 Client Project# Fort Worth Water Dept(Project#02314); Kleinfelder( ;Blastco Texas Inc.4465 Project Description Repair and repainting of existing ground storage tank Contractor Blastoo Texas Inc Change Order# 0 Date 1/18/2016 City Project Mgr, Farida S Goderya,PE City Inspector I David Hernandez Kleinfelder DELETIONS ITEM DESCRIPTION DEP I Qty Unit Unit Cost Total Bid Item No.12(Remove&Replace some of Existing Circle Beams) 1 Water 250.00 LF $200.00 $50,000.00 2 Bid Item No.14(Wall Plate Patch Repair) Water 1,500.00 SF $38.00 $57,000.00 3 Bid Item No.15(Corrosion Pit Welding Repairs) Water 100.00 GAL $300.00 $30,000.00 Water $137,000.00 Sub Total Deletions $137,000.00 Change Order Deletions Page 3 of 3 PROPOSED CONTRACT MODIFICATION (PCM)#1 PROJECT: 6.0 MG Como Ground Storage Tank PROJECT NUMBER: OWNER: City of Fort Worth 02314 CONTRACTOR: Blastco Inc. ENGINEER: Kleinfelder DESCRIPTION:Additional Welding Repairs PCM No:1 NOTIFICATION TO OWNER: The Contractor proposes to make the additions,modifications or deletions to the Work described in the Contract Documents as shown in Attachment"A". We request that you take the following action within 10 calendar days: o Notify us that you concur that this change does not require a change in Contract time or amount.A Field Order will be issued. • Review the Price/Credit Proposal with detailed cost breakdown of labor,materials,equipment and all other costs related to this change.Impacts on Contract Time shall be shown in a revised schedule, Included with the submitted proposal.Two(2)additional days to complete the improvements. o Proceed with the change. Payment will be made at the unit price bid. o Proceed with the change under the time and materials provisions of the Contract. Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. By: Blastco Inc. Date: 8/07/2015 OWNERS'S RESPONSE: We respond to your request as follows: o We propose that this is a no cost or time change. Issue Field Order. • We accept the attached Price/Credit Proposal with detailed cost breakdown for performing the described change. o We are proceeding with the change at the unit price bid. o We are proceeding with the change under the time and materials provisions of the Contract. By: City of Forth Worth Date: 8/10/2015 ACTION TAKEN: o Proposed Contract Modification rejected. See comments. o Field Order will be issued. • Change Order will be issued By: Kleinfelder Inc. Date: 8/10/2015 AdditionaliNotes: The installation to be per AWWA D100.0 including"Full Penetration Welding".Two(2)additional days will be added to the contract schedule to complete the PCM#1 improvements. AUTHORIZED: Date: 9/22/15 Blastco Inc. Date: 1 2,-L) 1 1 City of FortWorth `�v-r�► G���r-} Blastco A TF Warren Company Monday,August 10,2015 CP Nawal Kleinfelder 7805 Mesquite Bend Suite 100 Irving,TX 75063 Phone: 972-868-5900 cnawal@kleinfelder.com Re: Como Ground Storage Tank Repair and Repainting Dear Mr. Nawal, We are pleased to provide a proposal for the above project. A. Scope of Work—Additional Welding Repairs • Repair cracked welds on existing manway and reinforcing pad by gouging existing weld two inches beyond crack and install new weld. Pricing: $1,000.00 • Remove existing manway and re-weld back in place. Pricing: $2,070.00 • Remove existing 4'patch plate. Cut out an 8'x8'section in the shell and install new 8'x8' piece of 1-3/8"plate flush with shell. Pricing: $1,200.00 • Repair existing weld on 4'patch plate. Pricing: $250.00 If you have any questions, please do not hesitate to call. Sincerely, Steve Wissing 2 m Steve Wissing General Manager r, Blastco Texas Inc. Phone:281-590-3200 Email:Steve.Wissing@tfwarren.com 5514 East Hampton Drive,Houston,Texas 77039 Phone: 281-590-3200 fax: 281-590-3234 www.blastco-texas.com PROPOSED CONTRACT MODIFICATION (PCM)#2 PROJECT: 6.0 MG Como Ground Storage Tank PROJECT NUMBER: OWNER: City of Fort Worth 02314 CONTRACTOR: Blastco Inc. ENGINEER: Kleinfelder DESCRIPTION:12"Flush Drain Installation PCM No:2 NOTIFICATION TO OWNER: The Contractor proposes to make the additions,modifications or deletions to the Work described in the Contract Documents as shown in Attachment"A". We request that you take the following action within 10 calendar days: o Notify us that you concur that this change does not require a change in Contract time or amount.A Field Order will be issued. • Review the Price/Credit Proposal with detailed cost breakdown of labor,materials,equipment and all other costs related to this change.Impacts on Contract Time shall be shown in a revised schedule, Included with the submitted proposal. o Proceed with the change. Payment will be made at the unit price bid. o Proceed with the change under the time and materials provisions of the Contract. Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. By: Blastco Inc. Date: 8/7/2015 OWNERS'S RESPONSE: We respond to your request as follows: o We propose that this is a no cost or time change. Issue Field Order. • We accept the attached Price/Credit Proposal with detailed cost breakdown for performing the described change. o We are proceeding with the change at the unit price bid. o We are proceeding with the change under the time and materials provisions of the Contract. By: City of Fort Worth Date: 8/10/2015 ACTION TAKEN: o Proposed Contract Modification rejected. See comments. o Field Order will be issued. • Change Order will be issued. By: Kleinfelder Inc. Date: 8/10/2015 Additional Notes: The installation to be per AW WA D100.0 including"Full Penetration Welding". AUTHORIZED: Date: 9/22/15 Blastco Inc. Date; City of Fort Worth Blastco A TF Warren Company Wednesday,August 12,2015 CP Nawal Kleinfelder 7805 Mesquite Bend Suite 100 Irving,TX 75063 Phone:972-868-5900 cnawalCDkleinfelder.com Re: Como Ground Storage Tank Repair and Repainting Dear Mr. Nawal, We are pleased to provide a proposal for the above project, A. Scope of Work—Install a 12"flush drain in lieu of proposed drainpipe relocation Material Cost Difference $1,912.00 Labor Cost Difference $1,000.00 15%Mark Up $436.80 Total Additional Costs $3,348.80 �r— If you have any questions,please do not hesitate to call. Sincerely, Steve W sling Steve Wissing General Manager Blastco Texas Inc. Phone:281-590-3200 Email: Steve.Wissing@ttwarren.com 5514 East Hampton Drive.Houston.Texas 77039 11honc: 281-590-3200 Fax: 281-590-3234 wwwAastco-texas.com PROPOSED CONTRACT MODIFICATION(PCM)##3 PROJECT: 6.0 MG Como Ground Storage Tank PROJECT NUMBER: OWNER: City of Fort Worth 02314 CONTRACTOR: Blastco Inc. ENGINEER: Kleinfelder DESCRIPTION:Structural Improvements PCM No:3 NOTIFICATION TO OWNER: The Contractor proposes to make the additions,modifications or deletions to the Work described in the Contract Documents as shown in Attachment"A". We request that you take the following action within 10 calendar days: o Notify us that you concur that this change does not require a change in Contract time or amount.A Field Order will be issued. • Review the Price/Credit Proposal with detailed cost breakdown of labor,materials,equipment and all other costs related to this change.Impacts on Contract Time shall be shown in a revised schedule, included with the submitted proposal. o Proceed with the change. Payment will be made at the unit price bid. o Proceed with the change under the time and materials provisions of the Contract. Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. By: Blastco Inc. Date: 10/14/2015 OWNERS'S RESPONSE: We respond to your request as follows: o We propose that this is a no cost or time change. Issue Field Order. • We accept the attached Price/Credit Proposal with detailed cost breakdown for performing the described change. o We are proceeding with the change at the unit price bid. o We are proceeding with the change under the time and materials provisions of the Contract. By: City of Fort Worth Date: 10/14/2015 ACTION TAKEN: o Proposed Contract Modification rejected. See comments. o Field Order will be issued. • Change Order will be issued. By: Kleinfelder Inc. Date: 8/10/2015 Additional Notes: The installation to be per AWWA D100.0 including"Full Penetration Welding". AUTHORIZED: Date: Blastco Inc. Date: City of Fort Worth Blastca <1 A TF Warren Company Wednesday, October 14,2015 Seal Weld @ 2 Location: $30,330.00 Remove and Install with Farida Goderya, PhD, PE Primer and Int. Coating : $75,500.00 Sr. Prof Engineer I Facilities Project Manager Fort Worth Water Department 83 Rafters (End Cut Off): $6,225.00 Office: 817-392-8214 Cell:817-851-4910 Farida.Goderya@fortworthtexas.gov Total: $112,055.00 Re: Como Ground Storage Tank Repair and Repainting Dear Ms. Goderya, We are pleased to provide a proposal for the above project. A. Scope of Work—Additional Welding Repairs • Seal weld the four locations at the exterior cornice around the entire perimeter of the tank. Pricing: $30/LF—2,022 LF Total $60,660.00 • Apply sika flex to the four locations at the exterior comice around the entire perimeter of the tank. Pricing: $15,150.00 • Apply 100%solids epoxy seam sealer to the four locations at the exterior cornice around the entire perimeter of the tank. Pricing: $20,200.00 • Remove face of existing cornice • Blast the interior to an SSPC-SP6 and apply one coat of Tnemec 94-1-12O at 2.5-3.5 mils DFT and one intermediate coat of Tnemec 73 Endurashield. Pricing: $75,500.00 • Re-install the cornice face plate in like kind to what is existing by tack welding in place. Pricing: $25,000.00 • Cut off the ends of the rafters as needed so there Is a 60 to IT overhang. Pricing: $75/rafter *Blastco is requesting 60 days be added to the contract for the additional work and delays. If you have any questions, please do not hesitate to call. Blastco has stated they have cut off 83 rafter ends. 5514 East Hampton Drive,Houston,Texas 77039 Phone: 281-590-3200 Fax: 281-590-3234 www.blastco-texas.com Sincerely, Steve Wissing Steve Wissing General Manager Blastco Texas Inc. Phone: 281-590-3200 Email: Steve.Wissing@tfwarren.com 5514 East Hampton Drive,Houston,Texas 77039 Phone: 281-590-3200 Fax: 281-590-3234 www.bl&ox.o-texas.com