Loading...
HomeMy WebLinkAboutContract 47001-CO1 CITY SECRETAW _ RTWORTH® City of Fort Worth CONTRACT NO. L -a Change Order Request Breakdown tL' PWJect -pmel Transportation Connections for Pedestrians and Bicycles City Sec# 1 47001 Client Project#(s)l 01734(DOE#7318) Contractor The Fain Froup PM Clarence Bryant Inspectorl Daniel Steinshouer Change Order Submittal# Date 111212016 Dept. Park and Rec Contract Time Totals CD Original Contract Amount $1,438,687.96 $1,438,687.96 250 Extras to Date $0.00 Credits to Date $0.00 Pending Change Orders(in M&C Process) $0.00 Contract Cost to Date $1,438,687.96 $1,438,687.96 250 Amount of Proposed Change Order $24,595.12 $24,595.12 14 Revised Contract Amount $1,463,283.08 $1,463,283.08 264 Original Funds Available for Change Orders $89,827.00 $89,827.00 Remaining Funds Available for this CO $89,827.00 $89,827.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.71% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,798,359.95 Oakland Blvd.Railroad Crossing Bid alternate 1 and associated costs for railroad insurance,contractors pollution liablility insurance,and UPRR flagging fee. Contractor will construct new sidewalk(parallel to Oakland Boulevard)for safe pedestrian crossing at existing railroad tracks. UPRR will install concrete panels at the tracks. A r6e* `~ 7� A.0 ° Mary J. s 4 C sea wmy °°� °$0-1 �FaCAS OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX FORTWORTH City of Fort Worth Change Order Additions Project Name Trampottabon Connections for Pedestrians and acycies City Sec# 47001 Client Project# 01734 7318 The Faln Froup PMJ Clarence Bryant Inspector Daniel Sleinshotw Change Order SubmiOal# 0 Date 1112/2016 ADDITIONS ITEM DESCRIPI IUN DEPT Qty Unit nrTatai WATION(SPECIAL) a a ec 019:25 BACKFILLING PAVEMENT EDGES(TY A) Ta-rF and Rec 5. CY 0247-226 FL BS(CMP IN PLC)(TY A GR )(7') Park and Rec —3. Y 17. 053-2 5 CONC SIDEWALKS(') Park and Rec Y 2.00 06 1 ALUMINUM SI (TY A) Park and Rec 000 EA .00 0197W BLOCK SODDING pads and Rec 18.0000D000 Y $5.50 0644-2001 IN SM RD N UP 8 AM TY BWG()SA( ) Park and Rec 4.00000000 EA $626.00 8 REFL PAV MRK TY I(W)24'(SLD)(i MIL) Pa-K and Rec ---8.00-06W L .00 EFL PAV MRK TY I(W)(BIKE RR CROSSING)( MIL) FaRk and Rec 2.00 EA 06. 5 PAVEMENT SEALER FOR MRKS( ') Park and Rec L 50 067W2-2-27 PAVEMENT SEALER FOR MRK (SYMBOL) Park and Rec 2. ---93-00 -97-XW PAV SURF PREP FOR MRK(24') Park and Rec 8.00000000 L W7972W PAV SURF PREP FOR MRK(BIKE RR IN ) Park and Rec ---72-.500-00 EA 23. 3267-2019 D HM ( )TY- SA -A 58-8 Park and Rec 1. 000 TON 3.00 RAILROAD INSURANCE Park and Rec 1. 0 L 5 MIL/$10 MIL CONTRACTORS POLLUTION LIABILITY Park and Rec 1.00 L 3 5.5 UPRR FLAGGING FEE Park and Rec 5.000DW DAY $1,065.75 Park and Rec $24,595.12 Sub Tout Additions ,b95. Change Order Additions Page 1 of 1 Fo�rr Wow City of Fort Worth T Change Order Deletions Project Nave J TmmWMmCwnectkm for Pedestr m mdBcydn City Sec# 47001 Client Project# 1 01734 #7318 Wtlrador� The Fan Fmup PM Clarence Bryant Inspector Daniel Stainshouer Change Order Submittal# 0 Date 1/1212116 DELETIONS ITEM GKIP I ION DEPT Qty Unit I Unit Cost Total Park and Rec 30.00 Sub Total Deletions Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Buyers Barricades Barricades Cowtown Redi-Mix Concrete $400.00 Striping Technology Striping Total Highway Maintenance LLC Paving markings Total $400,00 Previous Change Orders Ccs# DATE AMOUNT Total $0.04 Page 2 of 3 FORT WORTHO-) City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: COSub-01 Change Order No.: Pa - COApp01 Date Started: 1/20/2016 { City Sec. No.: 47001 Date Due: 2/1/2016 Project Name: 01734 - Transportation Connections for Bicycles & Pedestrians 01734 DOE Numbers: Project Numbers: 7318 Project Sidewalk infills, striping, and signage Description: City Project Mgr.: Clarence Bryant City Inspector: Daniel Steinshouer Contractor: Clint Symank - The Fain Group COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Department: Cost($) Fund Account Center: Requested Days: PARD $ 24,595.12 31001-0800450-5740010-- 14 e,"OI?3+- toS880 -- Total: $ 24,595.12 Total Requested Days: 14 Approval Status: Page 3 of 3 Approved: Yes Comments: Verified Funding User: Nannette Long Date: 2016-01-21 8:15 PM Approved: Yes Comments: Change Order Verified User: Perla Banda Date: 2016-01-21 2:20 PM Approved: Yes Comments: Verified with contractor User: Clarence Bryant Date: 2016-01-21 2:23 PM Approved: Yes Comments: User: Joel McElhany Date: 2016-01-28 3:30 PM Approved: Yes Comments: This CO was anticipated at award of contract. CFW needed RR agreement to do the work. User: Richard Zavala Date: 2016-01-28 3:36 PM Approved: Yes Comments: User: Doug Black Date: 2016-01-29 4:27 PM Approved: Yes Comments: User: Susan Alanis Date: 2016-01-29 4:35 PM Action Required: Page I of 3 Links 1 fortworthgov/PACS/01734 -Transportation Connections for Bicycles &Pedestrians/Part I/Contractor/Change Orders/CO- 1/01734-Change Order Breakdown-I-rev12i52015.xls Attachments 10) No Attachments have been added to this form.