Loading...
HomeMy WebLinkAboutContract 45291-CO4 CITY SECRVAW FORT WORTH$ City of Fort WorthCONMZ I- c( Change Order Request ProjectNamel Eastern Hills Drainage System Improvements Phase 2 CitySec# 1 45291 ClieotJroject#(s) CP01363 P227-204280136387 FID=59651-0200431-5740010--C01363-CO2887-- Pro t � tion DOE 7072-Eastern Hills Drainage System Improvements Phase 2 Pr"� Contractorl S.J.Louis Construction of Texas,Ltd. Change Order# ® Date 3/3/2016 City Project Mgr.1 Debbie J.Willhelm CityInspector I Randy Horton Dept. TPW Water Sewer Contract Time Totals CD Original Contract Amount $2,690,105.72 $2,690,105.72 365 Extras to Date $518,226.00 $518,226.00 285 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $3,208,331.72 $3,208,331.72 650 Amount of Proposed Change Order $31,150.79 $0.00 $0.00 $31,150.79 77 Revised Contract Amount $3,239,482.51 $3,239,482.51 727 Original Funds Available for Change Orders $125,000.00 $0.00 $0.00 $125,000.00 Remaining Funds Available for this CO $0.00 $0.00 $0.00 $0.00 Additional Funding(if necessary) $0.00 $0.00 $0.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 20.42% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $3,362,632.15 This change order is considered a reconciliation change order and also provide compensation for the following additional work: 1. Concrete Ramp with retaining walls for maintenance access to drainage channel. 2. Pipe/structure removals not identified in the original bid documents. 0� "00040OO � 3. Replace Cedar Rail Fence and Landscaping at Yolanda Pond Access. 4. Encasement of exposed sanitary sewer services in drainage channel. a 5. Reconciliation of quantities for various bid items(overruns and underruns). $ 77 addition s are requested for this cha ge order. ���"000000a ° OFFICIAL ECOIRR �XAS CITY SECRETARY C, FSeaetOry T.WORTH,TX Maty J. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. S.J. Louis Construction of Texas, Ltd to DAM o ut- -b t t6 M&C Number N/A M&C Date Approved NIA FORT WORTH City of Fort worth , Change Order Additions Project Name Eastern Hills Drainage System Improvements Phase 2 City Sec# 45291 Client Project# CP 01363 P227-204280136387 FID=59651-0200431-5740010--C01363-CO2887-- Project Description DOE 7072-Eastern Hills Drainage System Improvements Phase 2 Contractor S.J. Louis Construction of Texas, Ltd. Change Order# ® Date 1 3/3/2016 City Project Mgr. Debbie J.Willhelm City Inspector F—gandy Horton ADDITION5 Qty Unit Unitos o a 11 "DIP Water, Backfill TP LF New Water Valve o lar TPW 5. E 3 Concrete Collar( TPW 10.00 EA5'500.00 $5,000.00 New DIP Sanitary Sewer Encasement-Channel TPW 2.0 TP 45 18"Storm Abandonment Plug TPW 5.00 E 300.00 8 Remove urb Inlet TPW EA 5 62 Temporary Asphalt Paving Repair TPW 17.00 LF 18.00 hain Link,Aluminum TPW 2 . LF 5. 64 ate, Steel T_PW 2.00 EA $900.05 66 Topsoil TPW CY $15.00 67 Block Sod Placement TP ,522.00 SY 2.50 7 "RCP,Class III TPW 7. LF Tf5TM $1,113 75 36"RCP,Class III TPW 2.00 LF $172.00 76 ' RCP,Class III TP 0 LF 84 10'Curb Inlet TPW 5. EA 5,4 85 0'Curb Inlet TPW 1.00 7, 93 Non-Standard Item-Vibration Monitoring&Foundation Survey TPW 1.00 LS $1,000.00 100 Irrigation Repair Around Inlets(As Necessary) TP E $350.00— 12T 54"RCP,ClassIll TPW 22. LF New Remove Existing ' RCP TPW 396.00F New Remove Small Storm Drain Structure TPW 1.00 E $750.0 New Modified Storm Drain Collars TPW 10.00 EA 50 .0 New Redi-Rock Channel Access Ramp with retaining walls TPW 1. 0 LS _Tf9_,6_24_.7 $19,624 New Timber Rail Landscaping Yolanda Access TPW 1.00 LS 300.00 $6,500.7 102 Remove Concrete Driveway JTPW 1 5,754.851 SF 0.50 103 Remove Asphalt Driveway JTPW 1 18.00 SF $0.501 Change Order Additions Page 1 of 1 104 Remove Concrete Curb&Gutter TPVV 4,688.85 LF $1.00 1 2 "Concrete Driveway TP F 5. 113 6"Concrete Curb&Cutter TPW 20.0 LF 27.0 --T2-9—TxDOT Retaining Wall TPW 75. F 5. New Yellow Pavement Markings with TY 11-AA11-AA TPW 2,250.00L 55 $3,487 New Driveway Address Numbers Driveway) TPW 37.00 EA $15.00 ew Additional ree Trimming for Equpiment TPW 1.00 LS5. . TPW $133,709.73 Water $0.00 Sewer $0.00 Sub Total Additions Change Order Additions Page 2 of 1 FORT WORTH City of Fort worth Change Order Deletions Project Name I Eastern Hills Drainage System Improvements Phase 2 City Sec# 45291 Client Project# I CP 01363 P227-204280136387 FID=59651-0200431-5740010--C01363-CO2887-- Project Description FDOE 7072-Eastern Hills Drainage System Improvements Phase 2 Contractor S.J. Louis Construction of Texas,Ltd. Change Order# Date 3/312016 City Project Mgr. Debbie J.Willhelm City InspectorRand Horton DELETIONS y rn U ni os Total emporary Asphalt Paving Repair TPW 702.00 1 "Waterline Lowering TP 3. EA 1 , 0 — s32,71111 Trench afety TPW 832.00LF 01 44 Storm Line Grouting TPW 13.00CY TUT 59 Concrete Riprap TPW 51.0 SY 5 .0 -U s2,856 6 10'Wide Asphalt Pvmt Repair,Residential TPW 63.00 LF 50. 0 . 9 Trench a ety TPW 362.0 LF 0.01 88 2 'Type 2 Inlet TP E ,3 0. 97 Non-Standard Item-Tensar C35TTqM TPW 1,1 .00 S 1.0 $1,182 9 Non Standard Item-Install 2'Brick Wall w oncrete Foundation TP -O 0 LF 1 5 Dia Jacking Pipe(B TO ) TPW 6.00 L 1,200.00 125 Access Ramp to Pond TPW 0,25 T9,M70 $7,900.77 106 Pavement Pulverization TPW $2.50 Cement TPTN 115.0 1 8"Cement Treatment P 910 ,000 Y 1 "Asphalt Pvmt Type D TP 1,900.00 Y 9.40 117 EFL Raised Marker Y II-C-R P E $10.00- TPW $102,558.94 Water $0.00 Sewer $0.00 Sub Total Deletions 102,558.94 Change Order Deletions Page 1 of 1 MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO N/A Total $0.00 MIWBE Breakdown for Previous Change Orders Co# DATE AMOUNT 1 7/30/2014 $4,000.00 2 1/6/2015 $46,875.00 3 $0.00 Total $50,875.00