HomeMy WebLinkAboutContract 48943 M 9 SECR AR r OOMMACTX90. Developer and Project Information Cover Sheet: Developer Company Name: North Fort Worth Storage,LLC Address, State,Zip Code: 500 Sacramento Dr. ,Austin,TX,78704 Phone&Email: 940-390-6083, dyer.eng@gmail.com Authorized Signatory, Title: Jack Dyer,President Project Name: Willow Springs Storage Addition Brief Description: Water Project Location: Willow Springs Road Plat Case Number: FS-16-130 Plat Name: Willow Springs Storage Addition Mapsco: 19B Council District: 7 City Project Number: 100537 CFA Number: 2016-111 DOE Number: None To be completed b ff Received by: U Date: 7 �S c� AP/1 4 2017 -41 OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement-Willow Springs Storage Addition CFA Official Release Date: 01.03.2017 FT.WORTH,TX Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, North Fort Worth Storage, LLC, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Willow Springs Storage Addition ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section 1I, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Springs Storage Addition CFA Official Release Date:01.03.2017 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) M Sewer(A-1) ❑,Paving (B) ❑, Storm Drain(B-1) ❑, Street Lights & Signs (C) ❑. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured,licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Springs Storage Addition CFA Official Release Date:01.03.2017 Page 3 of 11 iii. To require the contractor(s)it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Springs Storage Addition CFA Official Release Date: 01.03.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees, Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Springs Storage Addition CFA Official Release Date:01.03.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Springs Storage Addition CFA Official Release Date:01.03.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Springs Storage Addition CFA Official Release Date: 01.03.2017 Page 7 of 11 Cost Summary Sheet Project Name: Willow Springs Storage Addition CFA No.: 2016-111 City Project No.: 100537 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 77,510.00 2. Sewer Construction $ - Water and Sewer Construction Total $ 77,510.00 B. TPW Construction 1.Street $ - 2.Storm Drain $ - 3.Street Lights Installed by Developer $ - 4. Signals $ - TPW Construction Cost Total $ - Total Construction Cost(excluding the fees): $ 77,510.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 1,550.20 D. Water/Sewer Material Testing Fee(2%) $ 1,550.20 Sub-Total for Water Construction Fees $ 3,100.40 E. TPW Inspection Fee(4%) $ - F. TPW Material Testing(2%) $ G. Street Light Inspsection Cost $ H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ - Total Construction Fees: $ 3,100.40 Choice Financial Guarantee Options,choose one Amount (Mark one) Bond=100% $ 77,510.00 x Completion Agreement=100%/Holds Plat $ 77,510.00 Cash Escrow Water/Sanitary Sewer=125% $ 96,887.50 Cash Escrow Paving/Storm Drain=125% $ - Letter of Credit=125%w/2yr expiration period $ 96,887.50 City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Springs Storage Addition CFA Official Release Date: 01.03.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER North Fort Worth Storage, LLC Jesus J. Chapa Assistant City Manager Date: - ?� ) Name: Jack Dyer Title: President Recommended by: n/1011011 0 �A a Date: ATTEST: (Only if required by Developer) Wendy Chi-Badulal,EMBA, P.E. Development Engineering Manager Water Department Signature Q) Name: Douglas W. Wiersig, P.E. Director Contract Compliance Manager: Transportation&Public Works Department By signing, I acknowledge that I am the Approved as to Form &Legality: person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Richard A. McCracken Assistant City Attprney M&C No. ^l P� _ n �]1) CA Date: S t I l 1 Name: c f �� Form 1295: N� - Title: ATT OF FORT ary J. Kayser City Secretary RECORD OFFICIAL AS CITY SECRETARY City of Fort Worth,Texas F.I..WORTH TX Standard Community Facilities Agreement-Willow Springs Storage Addition CFA Official Release Date: 01.03.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvements Cx� Water Cost Estimate ❑ Exhibit A-1: Sewer Improvements El Sewer Cost Estimate Exhibit B: Paving Improvements El Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate El Exhibit C: Street Lights and Signs Improvements El Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Springs Storage Addition CFA Official Release Date: 01.03.2017 Page 10 of 11 ATTACHW.NT"I" Changes to Standard Agreement Community Facilities Agreement City Project No. 100537 None City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Springs Storage Addition CFA Official Release Date: 01.03.2017 Page 11 of 11 . i Yr I � l, I IN I' , - -►--------4 O ) .k TV I Id Rig Ha� tN . i P-d RKM Utility Services, Inc. 1805 Royal lane Suite 107 / Dallas TX 75229 Contact: Bryan Piper;Vice President Phone: 972-241-2621 Email dgulley@rkmtexas.com Quote To: North Fort Worth Storage,LLC Job Name: Willow Springs Storage Addition(Lot 1,Bloc 7065 Confederate Parkway Date of Bid: September 30,2016. Fort Worth,Texas 76108 Date of Plans: Preliminary Plans(not for construction) Phone: Engineer:Jack Dyer Email mwells62@yahoo.com PE Serial No.86238 Attention:MIke Wells Date:09/06/16 Offsite 12"Waterline Extension ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT WATER IMPROVEMENTS 1 12"PVC Waterline 404.00 LF 103.00 41,612.00 2 8"PVC Waterline 20.00 LF 50.00 1,000.00 3 36X12 Tapping Saddle w/ 12"Gate Valve 1.00 EA 13,700.00 13,700.00 4 Fire Hydrant Assembly 1.00 EA 5,300.00 5,300.00 5 12"Gate Valve 1.00 EA 3,500.00 3,500.00 6 6"Gate Valve 1.00 EA 1,700.00 1,700.00 7 1"Domestic Service(10 LF) 1.00 EA 1,250.00 1,250.00 8 Testing(Pressure&Chlorination) 424.00 LF 2.50 1,060.00 9 Trench Safety 424.00 LF 4.00 1,696.00 10 Silt Fence 848.001 LF 1 4.001 3,392.00 11 Traffic Control 1.00 LS 3,300.00 3,300.00 Subtotal Water Improvements $77,510.00 GRAND TOTAL $77,510.00 NOTES: 1. Engineering,Layout&Soil Testing by others. 2. All City Permits and Inspection Fee's to be paid by owner. 3. Excess utility spoils to be stockpiled within 100'of ditchline. 4. RKM reserves the right to make changes to our bid as reflected by the final and approved drawings. 5. This quote excludes dewatering other than normal working condition pumping. 6. One move-in.Additional move-ins at$7,500.00 each. 7. Insurance Limits$5,000,000.00 8. Quote is on a unit price basis,any work not specifically quoted or qualified is excluded. 9. Owner to provide RKM with a Tax Exempt Cert. 10. Native backfill over pipe embedment. 11. No Topsoil,grass or Landscaping included. 12. No cleaning of existing systems included. 13. No SWPPP design or submittals or Inspections included. Page 1 of 2