Loading...
HomeMy WebLinkAboutContract 47047-A1 N 12 PM O � Cb CONTRACT N0 - co 53 �a p AMENDMENT TO JOB ORDER CONTRACT(JOC) o SERVICES CONTRACT ce) Cb a ' v T NDMENT TO JOB ORDER CONTRACT (JOC) SERVICES CONTRACT ("Amendment") is `tic a tered into by and between the CITY OF FORT WORTH("City"), a Texas home rule municipal `torpor Pion, acting by and through h /L (/',rkt, its duly authorized Assistant City Manager, and JAVIER VILLAGONEZ D/B/A GTO CONSTRUCTION ("Contractor"), each individually referred to as a "party"and collectively referred to as the"parties." WHEREAS, City and Contractor entered into a Services Agreement, dated September 25, 2015, Fort Worth City Secretary Contract No. 47047 (the "Contract"), for Contractor to provide certain lead remediation for City and the parties desire to amend the Contract; WHEREAS,the Contract details certain set prices in its Attachment C (the"Price Schedule")for services provided by Contractor to City; and WHEREAS, the United States Federal Government has promulgated certain rules that have changed the requirements for lead remediation resulting in a need to change the Price Schedule. NOW THEREFORE, the parties hereby enter into this Amendment as follows: 1. The parties hereby agree to amend the Agreement by replacing the Price Schedule with the new price schedule attached hereto as Exhibit A. 2. Except as provided for above with the replacement of the Price Schedule, all other terms and conditions of the Contract remain in full effect. 3. This Amendment contains the entire understanding and agreement between City and Contractor, their assigns and successors in interest, as to the matter contained herein. Any prior or contemporaneous oral or written agreement is hereby declared null and void to the extent in conflict with any provision of this Amendment. 4. This Amendment may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute one and the same instrument. (signature page follows) OFFICIAL RECORD Cly SECRETARY �i FT. 1�'&1�am TX AMENDMENT TO JOB ORDER CONTRACT(JOC)SERVICES CONTRACT Page I of 2 ACCEPTED AND AGREED: CITY OF FORT WORTH: JAVIER VILLAGOMEZ D/B/A GTO CONSTRUCTION By: I,�__ By: s Name: e: Javier V mez Assistant City Manager Title: �E5 j tkE r\k Date: �q Date: �4 -- Z2 APPROVAL RECOMMENDED: ATTEST: By: By: Title: Z .� itle: ATTEST: �0 oRr� By: ;- . ama Ke: ser Title: City Secretary AS CONTRACT COMPLIANCE MANAGER: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: am e: —2" a, Title: APPROVED AS TO FORrm AND LEGALITY: By: N me: Assistant City Attorney OFFICIAL RECORD CITY SECRETARY CONTRACT AUTHORIZATION: FT.WORTH,TX M&C: r ' is AMENDMENT TO JOB ORDER CONTRACT(JOC)SERVICES CONTRACT Page 2 of 2 ATTACHMENT C RFP Lead Contra rtors-owcing Material Labor Unit Item I Cost Unit Cost Cost Negotiated Price 1.Set up of Interior Containment $ 200.00 EA $ 220.00 EA $ 420.00 2.Set up of Mini Containment $ 75.00 EA $ 125.00 EA $ 200.00 3.Set up of Exterior Containment $ 160.00 EA $ 140.00 EA $ 300.00 4.Removal of hazardous lead dust per room $ 50.00 EA $ 75.00 EA $ 125.00 1.Fascia board $ 1.25 LF $ 2.00 LF $ 3.25 2.Soffit $ 1.50 LF $ 2.00 LF $ 3.50 3.Wood deck $ 1.00 SF $ 1.75 SF $ 2.75 4.Roof Replacement $ 110.00 SQ $ 90.00 SQ $ 200.00 5.Vinyl Soffit $ 2.20 LF $ 3.30 LF $ 5.50 6.Replace 1"x 12"trim $ 2.00 LF $ 3.00 LF $ 5.00 7.Replace 1"x 8"trim $ 1.80 LF $ 2.70 LF $ 4.50 8.Replace 1"x 6"trim $ 1.60 LF $ 2.40 LF $ 4.00 9.Replace 1"x 4"trim $ 1.40 LF $ 2.10 LF $ 3.50 10.Replace 1"x 2"trim $ 0.90 LF $ 1.35 LF $ 2.25 1.Remove ceiling $ 1.25 SF $ 2.75 SF $ 4.00 2.Replace wooden posts 4"x4" $ 20.00 EA $ 30.00 EA $ 50.00 3.Replace wooden posts 4"x6" $ 25.00 EA $ 30.00 EA $ 55.00 4.Enclose ceilin with 5/16"Hardipanel Siding $ 1.50 SF $ 3.50 SF $ 5.00 1.Wet scrape and encapsulate $ 2.00 SF $ 3.00 SF $ 5.00 2.Remove/replace damaged wood siding $ 1.30 LF $ 3.00 LF $ 4.30 3.Wet scrape,prime,paint exterior(Wood Siding Clapboard) $ 1.50 SF $ 3.00 SF $ 4.50 4.Wet scrape,prime,paint exterior(Cement Siding Tile) $ 1.50 SF $ 2.00 SF $ 3.50 5.Remove/replace cement siding tile $ 14.58 EA $ 4.00 EA $ 18.58 6.Install vinyl siding $ 1.50 LF $ 3.00 SF $ 4.50 7.Replace 1"x 4"trim $1.40 LF $ 2.10 LF $ 3.50 1.Replace interior window trim $ 1.00 LF $ 1.50 LF $ 2.50 2.Replace exterior window trim $ 1.00 LF $ 2.00 LF $ 3.00 3.Remove,wet scrape,reinstall old windows $ 3.00 UI $ 3.50 UI $ 6.50 4.Install new windows(Vinyl) $ 3.10 UI $ 2.00 UI $ 5.10 5.Install new windows(Wood) $ 9.00 UI $ 3.00 UI $ 12.00 6.Install Picture Window $ 1.60 UI $ 2.00 UI $ 3.60 7.Replace window sill $ 6.00 LF $ 9.00 LF $ 15.00 8.Replace Vx 8"trim $ 1.80 LF $ 2.70 LF $ 4.50 1.Abate friction points $ 100.00 EA $ 200.00 EA $ 300.00 2.Install new prehung interior 24"flush door $ 120.00 EA $ 180.00 EA $ 300.00 2.Install new prehung interior 30"flush door $ 131.00 EA $ 125.00 EA $ 256.00 3.Install new prehung interior 32"flush door $ 102.40 EA $ 153.60 EA $ 256.00 4.Install new prehung interior 36"flush door $ 131.00 EA $ 125.00 EA $ 256.00 4.Install new prehung interior 24"6 panel door $ 102.40 EA $ 153.60 EA $ 256.00 5.Install new prehung interior 30"6 panel door $ 131.00 EA $ 125.00 EA $ 256.00 6.Install new prehung interior 32"6 panel door $ 102.40 EA $ 153.60 EA $ 256.00 7.Install new prehung interior 36"6 panel door $ 131.00 EA $ 125.00 JEA $ 256.00 8.Replace 36"prehung wooden exterior door $ 450.00 EA $ 300.00 JEA $ 750.00 9.Replace 36"prehung metal exterior door $ 350.00 EA $ 300.00 JEA $ 650.00 10.Replace 32"prehung metal exterior door $ 350.00 EA $ 300.00 EA $ 650.00 11.Replace 32"prehung wooden exterior door $ 400.00 EA $ 300.00 EA $ 700.00 12.Replace 1"x 8"trim $ 2.00 LF $ 3.00 LF $ 5.00 13.Replace 1"x 6"trim $ 1.80 LF $ 2.70 LF $ 4.50 14.Replace 1"x 4"trim $ 1.60 LF $ 2.40 LF $ 4.00 15.Replace interior doorjamb $ 80.00 EA $ 120.00 EA $ 200.00 16.Replace exterior doorjamb $ 100.00 EA $ 150.00 EA $ 250.00 17.Replace threshold $ 31.00 EA $ 44.00 EA $ 75.00 1.New 1/4"sheetrock drywall $ 1.25 SF $ 2.50 SF $ 3.75 2.New 3/8"sheetrock drywall $ 1.50 SF $ 2.50 SF $ 4.00 3.New 1/2"sheetrock drywall $ 1.50 SF $ 2.50 SF $ 4.00 4.New pre-finished wooden wall paneling $ 1.25 SF $ 2.25 SF $ 3.50 5.Wet-scrape,prime and paint interior components $ 1.50 SF $ 2.00 SF $ 3.50 1.Remove/replace wall cabinets $ 45.00 LF $ 65.00 LF $ 110.00 2.Remove/replace base cabinets $ 70.00 LF $ 60.00 LF $ 130.00 3.Remove/replace bathroom vanity base $ 350.00 EA $ 150.00 EA $ 500.00 4.Replace shelf $ 1.50 LF $ 6.50 LF $ 8.00 1.Remove baseboard 2"and replace with like materials $ 1.50 LF $ 1.50 LF $ 3.00 2.Remove baseboard 4"and replace with like materials $ 1.50 LF $ 2.00 LF $ 3.50 3.Remove baseboard 6"and replace with like materials $ 1.50 LF $ 2.00 LF $ 3.50 4.Paint and stabilize baseboard $ 2.00 LF $ 2.00 LF $ 4.00 5.Install new vinyl sheet floor covering $ 2.50 SF $ 2.25 SF $ 4.75 6.Sand,seal and varnish wood floors $ 2.50 SF $ 4.00 SF $ 6.50 7.Install new carpet and pad $ 13.00 YD $ 12.00 YD $ 25.00 1.Remove soil-up to 3" $ 8.50 SY $ 8.50 $ 17.00 2.Backfilling with new soil and sod $ 16.00 YD $ 10.00 $ 26.00 3.Labor rate for carpentry services $ 45.00 HR $ 45.00 4.Markup percentage for equipment,parts and supplies 20.00% EA 5.Labor rate for master plumber $ 90.00 HR $ 90.00 6.Labor rate for HVAC service $ 85.00 HR $ 85.00 7.Clean horizontal surfaces with 3 bucket system $ 100.00 EA $ 175.00 EA $ 275.00 8.HEPA vac paint chips SF $ 1.25 SF $ 1.25 9.Clean window sill and trough $ 35.00 EA $ 35.00 and 1.Packing and storage of all household items $ 200.00 EA $ 700.00 EA $ 900.00 2.Storage fees per week $ 55.00 EA EA $ 55.00 3.Moving and covering interior furniture $ 20.00 HR $ 20.00