HomeMy WebLinkAboutContract 32927 CITY SECRETARY CONTRACT NO. -- c / %coperm CONTRAMOR SPECIFICATION + +Rl._Wws WNDINGCo, AND ®..o....� i:MN XINAC-45q S OFFICS CONTRACT DOCUMENTS + ria copy FOR SURFACE WEDGE MILLING (2006-1) AT VARIOUS LOCATIONS IN THE CITY OF FORT WORTH , TEXAS TPW PROJECT NO . GS93-020930580050 2006 MIKE MONCRIEF CHARLES BOSWELL MAYOR CITY MANAGER ROBERT D . GOODE , P . E . , DIRECTOR DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS A. DOUGLAS RADEMAKER, P .E . , DIRECTOR DEPARTMENT OF ENGINEERING PREPARED BY DEPARTMENT OF ENGINEERING ENGINEERING SERVICES DIVISION EXHIBIT "A" '�P.�E•�F.r�,`1�1' f* : i .. I.Nj ..J:. 86823 S City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 11/1512005 DATE: Tuesday, November 15, 2005 LOG NAME: 20SUR/ WEDG06-1 REFERENCE NO.: **C-21146 SUBJECT: Authorize Execution of Contract with Dustrol, Inc., for Surface Wedge Milling (2006-1) at Various Locations RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with Dustrol, Inc., in the amount of$105,600.00 for Surface Wedge Milling (2006-1) at various locations for one year. DISCUSSION: As part of the Annual Major Maintenance Program, the Transportation and Public Works Department contracts out the wedge milling process to prepare asphalt streets for the In-house Asphalt Overlay Program. This contract provides for 150,000 linear feet of wedge milling and 7,000 square yards of full surface milling for streets in the in-house program. The contract is for one year, but may be extended for one additional year, if mutually agreed to by the contractor and the City. The City also reserves the right to increase or decrease quantities of individual pay items within the contract, provided that the total contract amount remains within plus or minus 25% of the contract award. This project was advertised for bid in the Commercial Recorder on August 18 and 25, 2005. On September 22, 2005 the following bids were received: BIDDERS AMOUNT Dustrol, Inc. $105,600.00 Tex Op Construction $137,500.00 Dustrol, Inc., is in compliance with the City's MfWBE Ordinance by committing to 13% MIWBE participation. The City's goal on this project is 13%. This project is located in all COUNCIL DISTRICTS. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Contract Street Maintenance Fund. TO Fund/Account/Centers FROM Fund/Account/Centers GS93 541200 020930580050 $105,600.00 Submitted for City Manager's Office by: Marc Ott (8476) Originating_Department Head: Robert Goode (7804) Additional Information Contact: George Behmanesh (7914) SPECIFICATIONS AND CONTRACT DOCUMENTS FOR SURFACE WEDGE MILLING (2006-1) AT VARIOUS LOCATIONS IN THE CITY OF FORT WORTH, TEXAS PROJECT NO. GS93-020930580050 2006 bA A. DOUGLAS RADEMAKER, P.E. DATE DIRECTOR, DEPARTMENT OF ENGINEERING GEORGE A. EHMANESH, P.E. DATE ASSISTANT DIRECTOR TRANSPORTATION AND PUBLIC WORKS DEPARTMENT 00 KIM, P.E. DATE ENGINEERING MANAGER WATER DEPARTMENT TABLE OF CONTENTS 1. Notice to Bidders 2. Special Instructions to Bidders 3. Prevailing Wages Rates 4. Proposal S. Vendor Compliance to State Law 6. Minority and Women Business Enterprise Specifications 7. Special Provisions 8. Contractor Compliance With Worker's Compensation Law 9. Certificate of Insurance 10. Equipment Schedule 11. Experience Record 12. Performance Bond 13. Payment Bond 14. Contract 15. Notice of Construction 16. Details l NOTICE TO BIDDERS Sealed proposals for the following project: SURFACE WEDGE MILLING (2006-1) AT VARIOUS LOCATIONS Project No . GS93-020930580050 Addressed to Mr. Charles R. Boswell, City Manager of the City of Fort Worth, Texas will be received at The Purchasing Office until 1 : 30 P.M. , September 22 , 2005 and then publicly opened and read aloud at 2 : 00 P.M. Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas , 76102 . A pre-bid conference will be held at 9 : 00 A.M. , September 2 , 2005 in the Transportation and Public Works Conference Room 270 , 2nd floor, Municipal Building. Prospective bidders may purchase Set(s) of Specifications and Contract Documents for a non-refundable fee of twenty dollars ($20 . 00) per set. For additional information, contact Mr. Riad Nusrallah (817) 392-2729. CHARLES R. BOSWELL Robert D. Goode, Director City Manager Transportation and Public Works PUBLICATION: By: 414 August 18 , 2005 NajN. Fares, P .E . , August 25 , 2005 Infrastructure Manager, TPW SPECIAL INSTRUCTIONS TO BIDDERS 1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of Fort Worth, in an amount of not less than 5 percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeit in the event the successful bidder fails to execute the contract documents within ten days after the contract has been awarded. To be an acceptable surety on the bid bond, the surety must be authorized to do business in the state of Texas. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 2. PROPOSAL: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided,without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. 3. ADDENDA: Bidders are responsible for obtaining all addenda to the Contract Documents prior to the bid receipt. Information regarding the status of addenda may be obtained by contacting the Department of Engineering Construction Division at (817) 871-7910. Bids that do not acknowledge all applicable addenda will be rejected as non- responsive. SPECIAL INSTRUCTIONS TO BIDDERS - I - 4. AWARD OF CONTRACT: The contract, if awarded, will be awarded to the lowest responsive bidder. The City reserves the right to reject any or all bids and waive any or all irregularities. No bid may be withdrawn until the expiration of forty-nine (49) City business days from the date that the M/WBE UTILIZATION FORM,PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") is received by the City. 5. PAYMENT, PERFORMANCE AND MAINTENANCE BONDS: The successful bidder entering into a contract for the work will be required to give the City surety in a sum equal to the amount of the contract awarded. The successful bidder shall be required to furnish bonding as applicable in a sum equal to the amount of the contract awarded. The form of the bond shall be as herein provided and the surety shall be acceptable to the City. All bonds furnished hereunder shall meet the requirements of Chapter 2253 of the Texas Government Code, as amended. A. If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump sum. Payment shall not be made for a period of 45 calendar days from the date the work has been completed and accepted by the City. B. If the contract amount is in excess of$25,000, a Payment Bond shall be executed, in the amount of the contract, solely for the protection of all claimants supplying labor and material in the prosecution of the work. C. If the contract amount is in excess of$100,000, a Performance Bond shall be executed, in the amount of the contract conditioned on the faithful performance of " the work in accordance with the plans, specifications, and contract documents. Said bond shall solely be for the protection of the City of Fort Worth. D. A Two-year Maintenance Bond is required for all projects to insure the prompt, full and faithful performance of the general guarantee as set forth in Paragraph 7 of the Special Provisions. To be an acceptable surety on the performance, payment and maintenance bonds, the surety must be authorized to do business in the state of Texas and meet all requirements of Texas Insurance Code, section 7.19-1. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. No sureties will be accepted by the City that are at the time in default or delinquent on any bonds or which are interested in any litigation against the City. Should any surety on the contract be determined unsatisfactory at any time by the City, notice will be given to the contractor to that effect and the contractor shall immediately provide a new surety satisfactory to the City SPECIAL INSTRUCTIONS TO BIDDERS -2- 6. LIQUIDATED DAMAGES: The Contractor's attention is called to Part 1 - General Provisions, Item 8, Paragraph 8.6, Standard Specifications for Street and Storm Drain Construction of the City of Fort Worth, Texas, concerning liquidated damages for late completion of projects. 7. EMPLOYMENT AND NON-DISCRIMINATION: The Contractor shall not discriminate against any person(s)because of sex, race, religion, color or national origin and shall comply with the provisions of sections 13A-21 through 13A-29 of the Code of the City of Fort Worth(1986), as amended, prohibiting discrimination in employment practices. 8 WAGE RATES: All bidders will be required to comply with provision 5159a of "Vernons Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates as established by the City of Fort Worth, Texas, and set forth in Contract Documents for this project. 9. FINANCIAL STATEMENT: A current certified financial statement may be required by the Department of Engineering Director for use by the CITY OF FORT WORTH in determining the successful bidder. This statement, if required, is to be prepared by an independent Public Accountant holding a valid permit issued by an appropriate State Licensing Agency. 10. INSURANCE: Within ten days of receipt of notice of award of contract, the Contractor must provide, along with executed contract documents and appropriate bonds, proof of insurance for Workers Compensation (statutory); Comprehensive General Liability ($1,000,000 per occurrence, $2,000,000 aggregate); and Automobile Insurance ($1,000,000 each accident on a combined single basis or$250,000 property damage/$500,000 bodily injury per person per occurrence. A commercial business policy shall provide coverage on "any auto", defined as autos owned, hired, and non- owned). Additional lines of coverage may be requested. If such a request is made after bid opening, Contractor shall be entitled to additional compensation equal to 110% of the additional premium cost. For worker's compensation insurance requirements, see Special Instructions to Bidders - Item 16. ADDITIONAL INSURANCE REQUIREMENTS: A. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers' compensation insurance policy. B. Certificates of insurance shall be delivered to the City of Fort Worth, contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on the contracted project. C. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. D. Each insurance policy shall be endorsed to provide the City a minimum thirty J days notice of cancellation, non-renewal, and/or material change in policy terms ,���� SPECIAL INSTRUCTIONS TO BIDDERS 6'L� 3 ._ or coverage. A ten days notice shall be acceptable in the event of non-payment of premium. E. Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A: VII or equivalent measure of financial strength and solvency. F. Deductible limits, or self-funded retention limits, on each policy must not exceed $10,000.00 per occurrence unless otherwise approved by the City. G. Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. The City must approve in writing any alternative coverage. H. Workers' compensation insurance policy(s) covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. I. City shall not be responsible for the direct payment of insurance premium costs for contractor's insurance. J. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self-funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. K. In the course of the project, Contractor shall report, in a timely manner, to City's officially designated contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which could result in a property loss. L. Contractor's liability shall not be limited to the specified amounts of insurance required herein. M. Upon the request of City, Contractor shall provide complete copies of all insurance policies required by these contract documents. 11. NON-RESIDENT BIDDERS: Pursuant to Texas Government Code, art. 2252.002, the City of Fort Worth will not award this contract to a non-resident bidder unless the non- resident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder to obtain a comparable contract in the state in which the non- resident's principal place of business is located. "Non-resident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company of majority owner has its principal place of business in this state. SPECIAL INSTRUCTIONS TO BIDDERS -4- "Texas resident bidder" means a bidder whose principal place of business is in this state, and includes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if the project is funded in whole or in part with federal funds. The appropriate blanks of the Proposal must be filled out by all non-resident bidders in order for its bid to meet specifications. The failure of a non-resident contractor to do so will automatically disqualify that bidder. 12. MINORITY/WOMEN BUSINESS ENTERPRISE: In accordance with City of Fort Worth Ordinance No. 11923, as amended by Ordinance No. 13471, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. You may obtain a copy of the Ordinance from the Office of the City Secretary. The M/WBE Utilization Form, Prime Contractor Waiver Form and the Good Faith Effort Form, as applicable, must be submitted no later than 5:00 p. in. five (5) City business days after the bid opening date, exclusive of the bid opening date. The bidder shall submit the documentation at the reception area of the Department of Engineering ("Managing Department"), 2nd floor, City Hall, and shall obtain a receipt. Failure to comply shall render your bid non-responsive. Upon contract execution between the City of Fort Worth and the successful bidder, now known as Contractor, a pre-construction meeting will be scheduled at which time the Contractor is required to submit either Letters of Intent or executed agreements with the M/WBE firm(s) to be utilized on this project. Such Letters of Intent or executed agreements shall include the following information: 1. Name of Contract 2. Name of M/WBE firm utilized 3. Scope of Work to be performed by the MIWBE firm 4. Monetary amount of work to be performed by the M/WBE firm 5. Signatures of all parties A notice to proceed will not be issued until the signed letter(s) or executed agreement(s) have been received. Throughout the duration of this project, the Contractor comply with the M/WBE Ordinance by complying with the following procedures: • A M/WBE Participation Report Form must be submitted monthly until the contract is completed. The first report will be due 30 days after commencement of work. The monthly report MUST have an original signature to ensure accountability for audit purposes. • Reports are to be submitted monthly to the M/WBE Office, regardless of whether or not the M/WBE firm has been utilized. If there was no activity by an M/WBE in a particular month, place a "0" or "no participation" in the spaces provided, and provide SPECIAL INSTRUCTIONS TO BIDDERS -5- a brief explanation. • The Contractor shall provide the M/WBE Office proof of payment to the M/WBE subcontractors and suppliers only. The M/WBE Office will accept the following as proof of payment: 1. Copies of submitted invoices with front and back copies of canceled check(s), OR 2. A notarized letter explaining, in detail: a Subcontractor/supplier Scope of Work b. Date when services were received from subcontractor/supplier c. Amounts paid to the subcontractor/supplier d. Original signatures from both parties must be included on this letter. • If the Contractor foresees a problem with submitting participation reports and/or proof of payment on a monthly basis, the M/WBE Office should be notified. If the Contractor wishes to change or delete an M/WBE subcontractor or supplier, adhere to the following: 1. Immediately submit a Request for Approval of Change Form to the M/WBE Office explaining the request for the change or deletion. 2. If the change affects the committed M/WBE participation goal, state clearly how and why in documentation. a. All requests for changes must be reviewed and pre-approved by the M/WBE Office. b. If the Contractor makes change(s)prior to approval, the change will not be considered when performing a post compliance review on this project. • Upon the Contractor's successful completion of this project, and within ten days after receipt of final payment from the City of Fort Worth, The Contractor will provide the M/WBE Office with a Final Participation Report Form to reflect the total participation from ALL subcontractors/suppliers utilized on the project. • All forms are available at the M/WBE Office, 3rd floor- City Hall. For additional information regarding compliance to the M/WBE Ordinance, call (817) 871-6104. Upon request, Contractor agrees to provide to Owner Complete and accurate information regarding actual work performed by a Minority/Women Business Enterprise (M/WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an M/WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud SPECIAL INSTRUCTIONS TO BIDDERS -6- will result on the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three years. 13. AMBIGUITY: In case of ambiguity or lack of clearness in stating process in the proposal, the City reserves the right to adopt the most advantageous construction thereof or to reject the proposal. 14. PROGRESS PAYMENTS, FINAL PAYMENT, PROJECT ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment(less 5% retainage) from the city for each pay period. b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. c. The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed, as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed. e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding(i) final quantities, or(ii) liquidated damages, city shall make a progress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages, the parties shall attempt to resolve the differences within 30 calendar days. 15. AIR POLLUTION WATCH DAYS: The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through October 31, with 6:00 a.m. - 10:00 a.m. being critical because emissions from this time period have enough time to bake in the hot atmosphere that leads to early afternoon ozone formation. The Texas Commission on Environmental Quality(TCEQ), in coordination with the National Weather Service, will issue the AIR POLLUTION WATCH by 3:00 p.m. on the afternoon prior to the WATCH day. On designated AIR POLLUTION WATCH DAYS, the Contractor shall bear the responsibility of being aware that such days have been designated AIR POLLUTION WATCH DAYS and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1-hour, or if equipment is new and certified by EPA as "Low SPECIAL INSTRUCTIONS TO BIDDERS -7- Emitting", or equipment burns Ultra Low Sulfur Diesel(ULSD), diesel emulsions, or alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated AIR POLLUTION WATCH DAY, that day will be considered as a weather day and added onto the allowable weather days of a given month. 16. WORKERS COMPENSATION INSURANCE COVERAGE: Contractors compliance with Workers Compensation shall be as follows: A. Definitions: Certificate of coverage ("certificate") -A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity employees providing services on a project, for the duration of the project. Duration of the project- includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ("subcontractor" in 406.096) - includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation,providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The contractor shall provide coverage,based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must,prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The contractor shall obtain from each person providing services on a project, and provide to the City: SPECIAL INSTRUCTIONS TO BIDDERS -8- (1) a certificate of coverage, prior to that person beginning work on the project, so the City will have on file certificates of coverage showing.coverage for all persons providing services on the project; and (2) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. E. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: (1) provide coverage,based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; (2) provide to the contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (3) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (4) obtain from each other person or entity with whom it contracts, and provide to the contractor: (a) a certificate of coverage, prior to the other person or entity beginning work on the project; and (b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter. SPECIAL INSTRUCTIONS TO BIDDERS -9- (6) notify the governmental entity in writing by certified mail or personal delivery, within ten days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (7) contractually require each person with whom it contracts, to perform as required by paragraphs (1) - (7), with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by workers' compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-Insurance Regulation. Providing false of misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties or other civil actions. K. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the City to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the City. "The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Workers' Compensation Act or other Texas Workers' Compensation commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at (512) 440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." 17. AGE DISCRIMINATION: In accordance with the policy("Policy") of th Executive Branch of the federal government, contractor covenants that neither it nor any officers, Ss,t LJ members, agents or employees who engage in the performance of this contract shall, in', �; # SPECIAL INSTRUCTIONS TO BIDDERS _ gyp_ connection with such employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against any person because of their age except on the basis of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents or employees acting on their behalf, shall specify in solicitations or advertisements for employees to work on those contract a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirement. Contractor warrants that it will fully comply with the Policy and will defend, indemnify and hold City harmless against any and all claims or allegations filed by third parties against City arising out of Contractor's alleged failure to comply with the Policy in the performance of this contract. 18. DISCRIMINATION DUE TO DISABILITY: In accordance with the provisions of the Americans with Disabilities Act of 1990 ("ADA"), Contractor warrants that it will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms or conditions of employment for applicants for employment with, or current employees of, Contractor. Contractor warrants that it will fully comply with the ADA's provisions and any other applicable federal, state, or local laws concerning disability and will defend, indemnify and hold City harmless against any and all claims or allegations filed by third parties against City arising out of Contractor's alleged failure to comply with the ADA in the performance of this contract. END OF SECTION SPECIAL INSTRUCTIONS TO BIDDERS - 11 - s CITY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATES FOR 2003 CLASSIFICATION RATE CLASSIFICATION RATE AIR TOOL OPERATOR $9.00 MILLING MACHINE OPERATOR $8.62 ASPHALT RAKER $9.55 MIXER(OVER 16 CF) $10.30 ASPHALT SHOVELER $8.80 MOTOR GRADER OPERATOR(FINE $11.97 GRADE) BATCHING PLANT WEIGHER $11.51 MOTOR GRADE OPERATOR $10.96 CARPENTER $10.30 PAVEMENT MARKING MACHINE $7.32 CONCRETE FINISHER(PAVING) $10.50 ROLLER,STEEL WHEEL $9.06 (PLANT-MIX PAVEMENTS) CONCRETE FINISHER(STRUCTURES) $9.83 ROLLER,STEEL WHEEL(OTHER $8.59 (FLATWHEEL OR TAMPING) CONCRETE RUBBER $8.84 ROLLER,PNEUMATIC SELF- $8.48 PROPELLED SCRAPER ELECTRICIAN $15.37 SCRAPER $9.63 FLAGGER $7.55 TRACTOR-CRAWLER TYPE $10.58 FORM BUILDER(STRUCTURES) $9.83 TRACTOR-PNEUMATIC $9.15 FORM LINER(PAVING&CURB) $9.00 TRAVELING MIXER $8.83 FORM SETTER(PAVING&CURB) $9.24 WAGON-DRILL,BORING MACHINE $12.00 FORM SETTER(STRUCTURES) $9.09 REINFORCING STEEL SETTER $13.21 (PAVING) LABORER,COMMON $7.32 REINFORCING STEEL SETTER $13.31 (STRUCTURAL) LABORER,UTILITY $8.94 STEEL WORKER-STRUCTURAL $14.80 MECHANIC $12.68 SPREADER BOX OPERATOR $10.00 OILER $10.17 WORK ZONE BARRICADE $7.32 SERVICER $9.41 TRUCK DRIVER-SINGLE AXLE $8.97 (LIGHT) PAINTER(STRUCTURES) $11.00 TRUCK DRIVER-SINGLE AXLE $9.02 (NAVY) PIPELAYER $8.98 TRUCK DRIVER-TANDEM AXLE $8.77 (SEMI-TRAILER) BLASTER $11.50 TRUCK DRIVER-LOWBOY/FLOAT $10.44 ASPHALT DISTRIBUTOR OPERATOR $10.29 TRUCK DRIVER-TRANSIT MIX $9.47 ASPHALT PAVING MACHINE $10.30 TRUCK DRIVER-WINCH $9.00 BROOM OR SWEEPER OPERATOR $8.72 VIBRATOR OPERATOR(HAND $7.32 TYPE) BULLDOZER $10.74 WELDER $11.57 CONCRETE CURING MACHINE $9.25 CONCRETE FINISHING MACHINE $11.13 CONCRETE PAVING JOINT MACHINE $10.42 CONCRETE PAVING JOINT SEALER $9.00 CONCRETE PAVING SAW $10.39 CONCRETE PAVING SPREADER $10.50 SLIPFORM MACHINE OPERATOR $9.92 CRANE,CLAMSHELL,BACKHOE, $11.04 DERRICK,DRAGLINE,SHOVEL FOUNDATION DRILL OPERATOR $10.00 (CRAWLER MOUNTED) FOUNDATION DRILL OPERATOR $11.83 (TRUCK MOUNTED) FRONT END LOADER $9.96 Special Instructions to Bidders Pagel of i P R O P O S A L TO: MR. CHARLES BOSWELL Fort Worth, Texas City Manager Fort Worth, Texas FOR: SURFACE WEDGE MILLING (2006-1) AT VARIOUS LOCATIONS TPW PROJECT NO. GS93-020930580050 Pursuant to the foregoing "Notice to Bidders", the undersigned has thoroughly examined the plans and specifications, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labor, equipment, and materials necessary to fully complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Director of the Transportation and public Works Department of the City of Fort Worth. Total quantities given in the bid proposal may not reflect actual quantities; however, they are given for the purpose of bidding on and awarding the contract. The City also reserves the right to increase or decrease quantities of individual pay items within the contract provided that the total contract amount remains within plus or minus (±) 25% of the contract award. The contractor is not entitled to any additional compensation or renegotiation of individual pay item bid prices. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish Performance, Payment and Maintenance Bonds acceptable to and approved by the City of Fort Worth for performing and completing the said work within the time stated and for the following sums, to-wit: SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID S.P. 1 150,000 L.F. Wedge Milling 2" to 0" Depth 5.0' Wide @ Dollars & f;f4y � Cents Per L.F. $ �� $ S.P. 2 100 EA. Butt Joint-Milled @ Q�j�l/G�C�rC� ✓es+Cfr,` ,`✓dollars & �, Cents Per EA. S.P. 3 7000 S.Y. 2" Surface Milling @ 6)-9 e— Dollars & :ac/-'O Cents Per S.Y. $ 1. d $ P-1 SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID S.P. 4 8 EA. Remobilize ion @ Dollars & ZC r Cents Per EA. $ $ 3 ,J7 TOTAL BID -� $ P-2 This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04 (F) of the Texas Limited Sales, Excise and Use Tax Act. Taxes. All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under House Bill 11, enacted August 15, 1991. The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29) , prohibiting discrimination in, employment practices. The undersigned agrees to complete all work covered by these contract documents within One(1) year from and after the date for commencing work as set forth in the written Work order to be issued by the Owner, and to pay not less than the "Prevailing Wage Rates for Street, Drainage and Utility Construction" as established by the City of Fort Worth, Texas. Within Ten (10) Calendar Days of receipt of notice of acceptance of this bid, the undersigned will execute the formal contract and will deliver an approved Surety Bond for the faithful performance of this contract. The attached deposit check in the sum of Dollars ($ ) is to become the property of the City of Fort Worth, Texas, or the attached Bidder's Bond is to be forfeited in the event the contract and bond are not executed within the time set forth, as liquidated damages for delay and additional work caused thereby. I (we) , acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration in preparation of the foregoing bid: Respectfully submitted, Addendum No. 1 (Initials) IN Addendum No. 2 (Initials) Company Name Addendum No. 3 (Initials) By: Signature IAN HANSEN VICE-PRESIDENT Printed Name of Principal Address: (Seal) email address: 1((Y)(2S( t3@duS-(r0 oo Date: Telephone: 21-7 q J$ i P-3 VENDOR COMPLIANCE TO STATE LAW The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to non-resident bidders. This law provides that, in order to be awarded a contract as low bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal place of business are outside of the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required too underbid a non-resident bidder in order to obtain a comparable contract in the State in which the non-resident's principal place of business is located. The appropriate blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state or non- resident contractors to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Non-resident vendors in (give State), our principal place of business, are required to be percent lower than resident bidders by State law. A copy of the Statute is attached. Non-resident vendors in K,4 KI_5/4 9 (give State), our principal place of business, are not required to underbid resident bidders. B. Our principal place of business or corporate offices are in the State of Texas. Bidder: J 7-Iia (� C Utz 140 N S L Company By: (Please print) 4 Address Signature ale /I City State Zip Title(Please print) f THIS FORM MUST BE RETURNED WITH YOUR QUOTATION { I ` RECEIVED SEP 2 ? 2,n05 FORT WORTH City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is$25,000 or more,the M/WBE goal is applicable. If the total dollar value of the contract is less than $25,000, the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. M/WBE PROJECT GOALS The City's MBE/W BE goal on this project is %of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal,or 2. Good Faith Effort documentation, or; 3. Waiver documentation, or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. stated goal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no M/WBEparticipation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontracting/supplier work: opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S MNVBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions, please contact the M[WBE Office at(817)392-6104. Rev.5/30/03 i ATTACHMENT 1A RECEIVED SEP 2 ? 20Q,5 Page 1 of 4 FORT WORTH City of Fort Worth Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime U-S/ �L NG M/W/DBE NON-M/W/DBE PROJECT NAME: 10 BID DATE ���� (a�X06 l PQ - 2.� -,95- City's MIWBE Project Goal: Prime's M/WBE Project Utilization: PROJECT NUMBER 13 % % GS-93-D),0 o!D W OSO Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1 s` tier, a payment by a subcontractor to its supplier is considered 2nd tier ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise (DBE) is synonymous with Minority/Women Business Enterprise (M/WBE). If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement. Rev.5/30/03 i ATTACHMENT 1A FORT WORTH Page 2 of 4 WCUP7Primes are required to identify ALL subcontractors/suppliers,regardless of status;i.e., Minority,Women and non-M/WBEs. Please list M/WBE firms first,use additional sheets if necessary. Certification N (check one) o SUBCONTRACTOR/SUPPLIER T n Company Name i N T Detail Detail Address M W C X M Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r B B R O B E E C T E A gREND,6 RIc9 TRuCX/NG T t1" LIA 0� T jJDEI�'1 15.1 W , M6114 6©�.o ph n On�t�ta19� TR u as �r g17. q qq- 0836 F"'/ Z��;7x � T�� I�oN►2 `9 917- 40- 931 FAX Rev.5/30/03 i ATTACHMENT 1A FORT WORTH Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers,regardless of status;i.e., Minority,Women and non-M/WBEs. Please list M/WBE firms first,use additional sheets if necessary. Certification r (check one) SUBCONTRACTOR/SUPPLIER T r Company Name i N T Detail Detail Address e M W C X ? Subcontracting Work Supplies Purchased Dollar Amount r hone/Fax Tele T D ti P E E R O E C T E A Rev.5/30/03 i ATTACHMENT 1A FORT WORTH RECEIVED SP� 7 � ��. _;��5 Page 4 of 4 --�J Total Dollar Amount of M/WBE Subcontractors/Suppliers $ I3't '7;'8 Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ 3 7;9 The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the MAW/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. Z4,4 e� r n /`i9Nl�i W I CK� Authors ed Signa re Printed Signature DI✓15 /0nl lNl411l/ rz All ") :.�. Title Coft6d Na /Title(if different) igw1„ yyC. 917—y30-39Sl 817-y9J-4Sy �Ax Company Name Telephone and/or Fax F 0 . 17 rwi ck-e Astral . copyl Address E-mail Address R()AN 0 s-p1-, -2 ��as City/State/Zip Date Rev.5/30/03 ATTACHMENT 1B FFO R T WO RT H Page 1 of 1 City of Fort Worth RECEIVED �;' �`�P ,�' Prime Contractor Waiver Form � PRIME COMPANY NAME: LCheck applicable block to describe U 51 !-�o L WC, rime PROJECT NAME: l� 1 M/W/DBE NON-M/W/DBE BID DATE S g,)w City's M/WBE Project Goal: PROJECT NUMBER If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1 C. This form is only applicable if bDih answers are yes. Failure to complete this-form;in Its:entiretyand be received.by the°Managing Department on or before 5:00 p.m:;five'(5) City bu"sinessdays after bid opening, exclusive of the bid opening tlate will result in the bid' being considered non-responsive to bid specifications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, NO this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/WBE(s) on this contract, the payment therefore and any proposed changes to the original M/WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the M/WBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3)years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one 1 year. l Autho ed igna re Printed Signature 1� I VIS)()N PkIve(,:e tZ Title Co tact Na (if different) �g5T-�ZOL4 IPI C, 917-g3o-3q S17�y91-�:35`I Company Name Phone Number Fax Number F-0 . 90K I�1 rwiCke(� c_uS "ro�. C)M. Address Email Address R 7X ;626S�,�T. City/State/Zip Date Rev.5130/03 ED DOCURKHTATMA RECEN T Transportation & PubHc Works ® icW Date: 9 127 I 05 OfficiW Time: 9 : 20 -21 RAIOISMUOLL Bid Date: SEPTEMBER 27, 2005 Project Name: SURFACE WEDGE MILLING 2006-1 Project Manager: RAQ NURIALL H Forms Submitted By Name: Company: DUSTROL, INC. Received By. U SPECIAL PROVISIONS FOR: H.M.A.C. SURFACE OVERLAY (2006-1) AT VARIOUS LOCATIONS TPW PROJECT NO. GS93-020930580050 1. SCOPE OF WORK: The work covered by these details and specifications consists of wedge milling and surface milling of existing pavement as described in the Special Provisions of these specifications. The contractor shall haul-off and dispose the milled material to the city yard. The work also consists of all other miscellaneous items of construction to be performed as outlined in the details and specifications which are necessary to satisfactorily complete the work. Work will be per as needed basis as requested by the Street Superintendent or his designated representative. The Contractor shall mobilize within four (4) working days of receiving request from the Street Superintendent or his designated representatives. Street locations and limits will be assigned on the request. If the contractor fails to begin the work within four (4) working days, a $500 dollars liquidated damage will be assessed per day per street. The contract is for one (1) year but may be extended for one additional year if mutually agreeable to the Contractor and the City of Fort Worth. The contract amount will remain the same as bid amount unless the Contractor can provide proof of increases in labor, material, insurance, etc. , which exceed five (5) percent. Payroll records and/or receipts of materials shall be submitted to the City in order to substantiate increase approvals. At the sole discretion of the City, the City reserves the right to add, delete or substitute streets in this contract. The City also reserves the right to increase or decrease quantities of individual pay items within the contract provided that the total contract x amount remains within plus or minus (±) 25% of the contract award. The contractor is not entitled to any additional compensation or renegotiation of individual pay item bid prices. The contractor is encouraged to conduct site visits and survey all these possibilities. The contractor shall verify these locations with the Construction Engineer. All short cul-de-sac streets and turnouts that intersect with a street to be repaired shall be included in this contract, even though they may not be listed on a Work Order due to their size. Total quantities given in the bid proposal may not reflect actual quantities, but represent the best estimate based on a reasonable effort of investigation; however, they are given for the purpose of bidding on and awarding the contract. SP-1 r r During construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. 2. BID SUBMITTALS FOR CONTRACT AWARD: The City reserves the right to require contractor who is the apparent low bidder(s) for a project to submit such information as the City, in sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract documents at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non-responsive" and rejecting bids or voiding contract as appropriate and as determined by the Director of the Department of Engineering. Affected contractors will be notified in writing of a recommendation to the City Council. 3. LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor' s particular attention is directed to the requirements of Item 7, "Legal Relations and Responsibilities to the Public" of the "Standard Specifications for Street and Storm Drain Construction". 4. MATERIAL STORAGE: Material shall not be stored on private property unless the Contractor has obtained permission from the property Owner. 5. PROTECTION OF EXISTING UTILITIES AND IMPROVEMENTS: The Contractor shall take adequate measures to protect all existing structures, improvements and utilities, which may be encountered. 6. CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor Covenants and agrees to indemnify City's Engineer and Architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of City, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the City from and against any and all injuries to City's officers, servants and employees and any damage, loss or destruction to property of the City arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence or alleged negligence of City, its officers, servants or employees. SP-2 I In the event City receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to City satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides City with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if deemed appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7. WORKING DAYS: The Contractor agrees to complete the Contract within the allotted period of time. If the Contractor fails to complete the work within the number of days specified, liquidated damages shall be charged, as outlined in Part 1, Item 8, Paragraph 8.6, of the "General Provisions" of the Standard Specification for Construction of the City of Fort Worth, Texas. 8. EARLY WARNING SYSTEM FOR CONSTRUCTION: Time is of the essence in the completion of this contract. In order to insure that the contractor is responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule, the following process shall be applicable: The work progress on all construction projects will be closely monitored. On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the contractor is less than the percentage of time allowed by 20% or more (example: 10% of the work completed in 30% of the stated contract time as may be amended by change order) , the following proactive measures will be taken: A. A letter will be mailed to the contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the contract time. In the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. B. The Project Manager and the Directors of the Department of Engineering, and Department of Transportation and Public Works will be made aware of the situation. If necessary, the City Manager's Office and the appropriate city council members may also be informed. C. Any notice that may, in the City's sole discretion, be required to be provided to interested individuals will distributed by the Engineering Department's Public Information Officer. D. Upon receipt of the contractor's response, the appropriate City departments and directors will be notified. The Engineering Department's Public Information Officer will, if SP-3 3 necessary, then forward updated notices to the interested individuals. E. If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract, the bonding company will be notified appropriately. 9. RIGHT TO ABANDON: The City reserves the right to abandon, without obligation to the Contractor, any part of the project, or the entire project, at any time before the Contractor begins any construction work authorized by the City. 1O.CONSTRUCTION SPECIFICATIONS: This contract and project are governed by the two following published specifications, except as modified by these Special Provisions: STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION-CITY OF FORT WORTH and STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION-NORTH CENTRAL TEXAS. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. A copy of these specifications may be purchased at the office of the Department of Engineering, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, Texas 76102. The specifications applicable to each pay item are indicated in the call-out for the pay item by the designer. If not shown, then applicable published specifications in any of these documents may be followed at the discretion of the Contractor. 11. TRAFFIC CONTROL: The contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the "Street Use Permit" a traffic control plan is required. The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways", codified as Article 6701d Vernon's Civil Statues, pertinent sections being Section Nos. 27, 29, 30 and 31. A traffic control plan shall be submitted for review to Mr. Charles R. Burkett, City Traffic Engineer @817-392-8770 at leastl0 working days prior to the preconstruction conference. Although work will not begin until the traffic control panel has been reviewed, the Contractor's time will begin in accordance with the time frame established in the Notice to the Contractor. The Contractor will not remove any regulatory sign, instructional SP-4 sign, street name sign, or other sign which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, Signs and Markings Division (phone number 871-7738) , to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be re-installed, the Contractor shall again contact the Signs and Markings Division to re-install the permanent sign and shall leave his temporary sign in place until such re-installation is completed. The Contractor shall limit his work within one continuous lane of traffic at a time to minimize interruption to the flow of traffic upon the approval of the City Engineer. Work shall not be performed on certain locations/streets during peak traffic periods" as determined by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas." See Special Instructions to Bidders Item No. 15, for further work time restrictions on "Air Pollution Watch Day" with substantial use of motorized equipment. 12.PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION: Prior to beginning construction on any street in this contract, the contractor shall, prepare and deliver a Notice of Construction/Flyer of the pending construction to the front door of each residence or business that will be impacted by construction. Notice of Construction/Flyer shall be posted two (2) days prior to beginning any construction activity along each street. The Notice of Construction/Flyer shall be prepared on the Contractor's letterheads and shall include the same information as what is in the provided sample. In addition, a copy of the Notice of Construction/Flyer shall be delivered to the City inspector for his review prior to being distribution. The contractor will not be allowed to begin _ construction on any street until the flyer is delivered to all residents of the street. All work involved with the notification of construction/flyer shall be considered subsidiary to the contract price and no additional compensation shall be made. 13.PAYMENT: The Contractor will receive bi-weekly payment (minus 5% SP-5 retainage) from the City for all work for each pay period. Payment of the remaining amount shall be made with the final payment, and upon acceptance of the project. See Special Instructions to Bidders Item No. 14 for further requirements. 14.DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Engineer and if by him found correct shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay is caused by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approval of the City and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. 15.DETOURS AND BARRICADES: The Contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. Contractor shall protect construction, as required by Engineer, by providing barricades. Barricades, warning and detour signs shall conform to the Standard Specifications "Barriers and Warning and/or Detour Signs", Item 524, and/or as shown on the plans. Construction signing and barricades shall conform with the latest edition of the "Texas Manual on Uniform Traffic Control Devices, Vol. No. 1". 16.DISPOSAL OF SPOIL/FILL MATERIAL: Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of the Department of Engineering acting as the City of Fort Worth's Flood Plain Administrator ("Administrator") , of the location of all sites where the contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinance of the City of Fort Worth (Ordinance No. 10056) and a flood plain permit issued. All disposal sites must be approved by the Administrator to ensure the filling is not occurring within a flood plain without a permit. A flood plain permit can be issued upon SP-6 f approval of necessary engineering studies. No fill permit is required if disposal sites are not in a flood plain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary engineering studies, shall be at Contractor's expense. In the event that the Contractor disposes of spoil/fill material at a site without a fill permit or a letter from the Administrator approving the disposal site, upon notification by the Director of the Department of Engineering, Contractor shall remove the spoil/fill material at its expense and dispose of such materials in accordance with the Ordinance of the City and this section. 17.FINAL CLEAN-UP: Final cleanup work shall be done for this project as soon as the work has been completed. No more than seven days shall elapse after completion of construction before the roadway and right- of-way is cleaned up to the satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work before acceptance by the City or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. 18.PROPERTY ACCESS: Access to adjacent property shall be maintained at all times unless otherwise directed by the Engineer. 19.SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES: The following procedures will be followed regarding the subject item on this contract: 1) A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING --UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES. " 2) Equipment that may be operated within ten feet of high voltage lines shall have an insulating cage-type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hood connections. 3) When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (TU Electric Service Co.) which will erect temporary mechanical barriers, de- energize the line, or raise or lower the line. The work done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an ate .log of— c,` 2 SP-7 .r cy . all such calls to TU Electric Service Company, and shall record action taken in each case. 4) The Contractor is required to make arrangements with the TU Electric Service Company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. 5) No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3) . 20.RIGHT TO AUDIT: Contractor agrees that City shall, until the expiration of three (3) years after final payment under this contract is made by City, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of Contractor involving transactions relating to this contract. Contractor agrees that City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that City shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine any directly pertinent books, documents, papers and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with Article VI. City shall give the subcontractor reasonable advance notice of intended audits. Contractor and subcontractor agree to photocopy such documents as may be requested by City. City agrees to reimburse Contractor and/or subcontractor for the cost of copies at the rates as contained in the Texas Administrative Code at the time payment is made. NON-PAY ITEM NO. 1 - SPRINKLING FOR DUST CONTROL: All applicable provisions of Standard Specifications Item No. 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered incidental to this contract. NON-PAY ITEM NO. 2 - STORM DRAIN INLET PROTECTION: All surface/wedge milling streets with storm drain inlets shall use inlet y protection for sediment control, in accordance with the Standard Specifications for Public Works Construction-North Central Texas. SP-8 r The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. PAY-ITEM NO. 1 - WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE: 1. Description This item shall consist of milling the existing pavement from the lip of gutter at a depth of 2" and transitioning to match the existing pavement (0" cut) at a minimum width of 51 . The existing pavement to be milled will either be asphalt, concrete, or brick pavement. The removal and disposal of the milled materials shall be as directed by the Engineer. The milled surface shall provide a smooth surface free from gouges, ridges, oil film, and other imperfections of workmanship and shall have a uniform textured appearance. In all situations where the existing H.M.A.C. surface contacts the curb face the wedge milling shall include the removal of the existing asphalt covering the gutter up to and along the face of curb. The wedge milling operations for this project will be as directed by the Street Superintendent, TPW, or his designated representative. This contract is for one (1) year. The Contractor shall mobilize within fou4 (4) working days receiving request from Street Superintendent or his designated representative to wedge mill the requested street. Should the contractor fail to meet this condition, liquidated damage of $500.00 per day per street will be assessed. The wedge milling operation for each street shall be performed in a continuous manner along both sides of the street. Details of milling locations are at the back of this document. The Street Services, TPW, will overlay the street. No wedge milling to be done without .the approval of the Street Superintendent or his designated representative. Contractor shall be responsible for notifying, 48 hours in advance, the residents on the street and tag any car that is parked within the limit of work. Subsidiary to this pay item, contractor shall haul-off and dispose all milled material to the City yards. 2. Equipment The equipment for removing the pavement surface shall be a power operated milling machine or other equal or better mechanical means capable of removing, in either one pass or two passes, the necessary pavement thickness in a five-foot minimum width. The equipment shall be self-propelled with sufficient power, traction and stability to maintain accurate depth of cut and slope. The machine shall be equipped with an integral loading and reclaiming means to immediately remove material being cut from the surface of the SP-9 roadway and discharge the cuttings into a truck, all in one operation. Adequate back-up equipment (mechanical street sweepers, loaders, water truck, etc.) and personnel will also be provided to keep flying dust to a minimum and to insure that all cuttings are removed from street surface daily. Stockpiling of planed material will not be permitted on the project site unless designated by the Engineer. The machine shall be equipped with means to control dust created by the cutting action and shall have a manual system providing for uniformly varying the depth of cut while the machine is in motion thereby making it possible to cut flush to all inlets, manholes, or other obstructions within the paved area. The speed of the machine shall be variable in order to leave the desired grid pattern specified under Surface Texture. The unit price bid per linear feet shall be full compensation for all labor, material, equipment, tools, and incidentals necessary to complete the work. PAY-ITEM NO. 2 - BUTT JOINTS - MILLED: Description: This item requires the contractor to mill "butt joints" into the existing surface, in association with the wedge milling operation (PAY ITEM NO. 11) to the depth and at locations as described below. The butt joint will provide a full width transition section, whereby the new overlay shall maintain constant depth at the point the new overlay is terminated and the new surface elevation matches the existing pavement. The construction activities, performance standards and equipment needed for the butt joints milling operations shall be governed by the special provisions of Pay Item No. 11 - Wedge Milling. The configuration of the butt joints is described in more detail below. General details of butt joint locations - along with wedge milling in general - are shown in plan form at the back of this document. Construction Details: Prior to the milling of the butt joints, the contractor shall consult with the construction Engineer for proper location of these joints and verify that the selected limits of the projects street are correct. The general locations for butt joints are at all beginning and ending points of streets listed in the project and as more graphically detailed at the back of this specification book. The joints are also required on both sides of all railroad tracks and concrete valley gutters, bridge decks and culverts and all other items which transverse the street and end the continuity of the asphalt surface. Each butt joint shall be 20 feet long and milled out across the full width of the street section to a tapered depth of 2". This milled area shall be tapered within the 20 feet to a depth from 0" to 2" at a line adjacent to the beginning and ending points or intermediate transverse items. This butt joint - when overlayed - will consist of an asphalt section that will transition the new overlay to match SP-10 t the existing pavement elevation. The contractor shall provide a temporary wedge of asphalt at all butt joints to provide a smooth ride over the bump. Measurement and Payment: Butt joints as prescribed above, will be measured by the unit of each butt joint milled. The disposal of excess material involved will not be measured for payment. Each butt joint-milled, measured as above, complete-in place-in accordance with these specifications, will be paid for at the unit price shown in the proposal for 'Butt Joints". The unit price bid per each shall be full compensation for all milling, including material haul-off, tools, labor, equipment and incidentals necessary to complete the required work. PAY ITEM NO. 3- 2" SURFACE MILLING: This item shall consist of milling the existing pavement at a depth of 2". All applicable provisions of Item No. 1 "Wedge Milling" shall apply. The unit price bid per square yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. PAY ITEM NO. 4- MOBILIZATION: This item shall compensate the Contractor to mobilize personnel, equipment, supplies, and material to wedge mill the requested streets. Contractor will be paid one mobilization per request. Each request will consist of one or several streets. Moving of the equipment, labor, and material from one street to other within a request will not be considered as a separate mobilization. Mobilization shall take place within the 72 hours of the notice given by the street superintendent or his designated representatives. The unit price per bid per each will be full compensation for all labor, equipment, material, tools and all incidentals necessary to complete the work. END OF SECTION SP-11 CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A. Labor Code §406.96 (2000), as amended, Contractor certifies that it provides workers' compensation insurance coverage for all of its employees employed on City of Fort Worth Project Surface Wedge Milling 2006-1 at Various Locations and City of Fort Worth Project No. GS93-020930580060. CONTRACTOR: DUSTI OL, INIC./ Name: BRIAN HANSIEN VICE-PRESIDENT Title: Date: STATE OF Tf-)(A& § JU-/- § COUNTY OF § Before me, the undersigned authority, on this day personally appeared known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of U)Gc, -Prc.�1 dek) for the purposes and consideration therein expressed and in the capacity therein stated. Given Under My Hand and Seal of Office this-aX day of NO Y&M&/ , 200� LISA A. FIESER Notary Public-State of Kan as ` o ary Public in and for the State of My App'.. Expires "0 T-eaca's���-5 t Client#: 11338 DUSTINC g[RQnA CERTIFICATE OF LIABILITY INSURANCE 1DATE 1/22/50m) PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION IMA of Kansas, Inc.(Wichita) ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE PO Box 2992 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Wichita,KS 67201 316 267-9221 INSURERS AFFORDING COVERAGE INSUREDDustrINSURER A: Zurich American Insurance Company P 0 Box 309 ol,Inc. INSURER B: The Insurance Co.of the State of PA P O B INSURER C: Towanda,KS 67144-0309 INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. NSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LTR DATE MM/DD/YY DATE MM/DD LIMITS A GENERAL LIABILITY GL0370702503 05/01/05 05/01/06 EACH OCCURRENCE $1,000,000 X COMMERCIAL GENERAL LIABILITY FIRE DAMAGE(Anyone fire) $300,000 CLAIMS MADE Fx_]OCCUR MED EXP(Any one person) $10,000 PERSONAL&ADV INJURY $1,000,000 GENERAL AGGREGATE $2 000 000 GEN'L AGGREGATE LIM ITAPPLIES PER: PRODUCTS -COMP/OPAGG s2,000,000 POLICY FX PRO- JECT X LOC A AUTOMOBILE LIABILITY TAP370702703 05/01/05 05/01/06 COMBINED SINGLE LIMIT A X ANY AUTO BAP370702603 05/01/05 05/01/06 (Ea accident) $1,000,000 ALL OWNED AUTOS BODILY INJURY $ SCHEDULED AUTOS (Per person) X HIRED AUTOS BODILY INJURY $ X NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ B EXCESS LIABILITY 46056418 05/01/05 05/01/06 EACH OCCURRENCE s2,000,000 XI OCCUR CLAIMS MADE AGGREGATE s2,000,000 $ DEDUCTIBLE $ X RETENTION $O $ A WORKERS COMPENSATION AND WC370702803 05/01/05 05/01/06 XORSLATU- OER EMPLOYERS'LIABILITY E.L.EACH ACCIDENT $500,000 E.L.DISEASE-EA EMPL OYEEI$500,000 E.L.DISEASE-POLICY LIMIT $500,000 OTHER DESCRIPTION OF OPERATIONS/LOCATIONSNEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS Project:Surface Wedge Milling(2006-1)at Various Locations. Workers'Compensation Deductible of$250,000/claim;General Liability$100,000 BI&PD/Occ Deductible. Certificate Holder is primary,non-contributory additional insured on General Liability and Auto Liability,if required by written contract. Waiver of Subrogation in favor of Certificate Holder applies to Workers'Compensation,if required by (See Attached Descriptions) CERTIFICATE HOLDER I 1ADDmONALINSURED;INSURER LETTER: CANCELLATION SHOULD ANYOF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION City of Fort worth DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TOMAIL30DAYS WRITTEN Transportation and Public Workds Dept. NOTICE TOTHE CERTIFICATE HOLDERNAMED TOTHE LEFT,BUTFAILURE TODOSOSHALL 1000 Throckmorton St. IMPOSE NO OBLIGATION OR LIABILITYOF ANYKIND UPON THE INSURER,ITS AGENTS OR Fort Worth,TX 76102 REPRESENTATIVES. AUTHORIZED REPIJESENTATIVE o� 0#-t ACORD 25S(7/97)1 of 3 #S276910/M251505 PKB © ACORD CORPORATION 1988 I IMPORTANT If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer,and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. i ACORD25-S(7/97)2 of 3 #S276910/M251505 DESCRIPTIONS (Continued from Page 1) contract and allowed by law. AMS 25.3(07/97)3 of 3 #S276910IM251505 STATE OF TEXAS CLAIM NOTICE ENDORSEMENT To be attached to and form a part of Bond 8783001 In accordance with Section 2253.021(f) of the Texas Government Code and Section 53.202(6) of the Texas Property Code any notice of claim to the named surety under this bond(s) should be sent to: Colonial American Casualty & Surety Company and Fidelity and Deposit Company of Maryland 1400 American Lane, Tower 1, 19th Floor Schaumburg, IL 60196-1056 Telephone: (847)605-6000 Bond# 8783001 PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, (1) Dustroll, Inc. as Principal herein, Colonial American Casualty & surety company and and (2) Pi rjplii-�7 ; nrj T)�p--J4- Gga+aq;y @9 a corporation organized and existing under the laws of the State of(3) Maryland as surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the amount of One Hundred Five Thousand, Six Hundred Dollars Dollars $ 106,600.00 for the payment whereof, the said Principal and Surety bind themselves and their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, the Principal has entered into a certain written contract with the Obligee dated the 15th day of November-, 2005, which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied at length, for the following project: SURFACE WEDGE MILLING . 2006-1 AT VARIOUS LOCATIONS Project No. GS93-020930680050. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant (as defined in Chapter 2253, Texas Government Code, as amended) supplying labor or materials in the prosecution of the work under the contract, then this obligation shall be void; otherwise, to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute, to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument, SIGNED and SEALED this 15th day of November 2005. DUSTROL, INC. PRINCIPAL ATTEST: By: Name: PRIAN "ANSEN 4r&incipaGI) Secretaryt ?�1(`E-PRESIDENT Title: (S E A L) Address: r ma k 56C7 ��, � �`1r•�f�l Witness as�toPr�incipal���� Colonial American Casualty and Surety Company anc Fidelity and Deposit Company of Maryland SURETY ATTES By: � C c:, Y-� Name:Erica M. Plummer ,qeGretapy- Wi, ness, Sandra J. Shryack Attorney in Fact PO Box 2992 (S E A L) Address: Wichita, KS 67201 Witness as to Surety D. Westmoreland Telephone Number: 316-266-6338 NOTE: (1) Correct name of Principal (Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by the Attomey-i n-Fact. The date of bond shall not be prior to date of Contract. Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND COLONIAL AMERICAN CASUALTY AND SURETY COMPANY KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND,and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,corporations of the StaNafl aryland,by WILLIAM J.MILLS,Vice President, and GREGORY E.MURRAY,Assistant Secretary, inity granted by Article Vl, Section 2, of the By-Laws ol'said Companies, which are set forth on•t {{ie� e�si e ei'eo a e hereby certified to be in full force and effect on the date hereof,does hereby norm ;jJ,6 k44t�nd a n f(C , ,JR,Scott T.POST, Richard K. STONE,Bret S.BURTON,Jana o a�n a ,, �}�'iIn H.HEFFEL and Erica M. PLUMMER,all of Wichita,Kansas, rt andla lea`� rney-in-Fact, to make,execute, seal and deliver,for, and on its beha s r#i H `it's a f4h an all bonds and undertakings,and the execution of such bonds or under t fir urs anc�y efi�th{ � s7'all be as binding upon said Companies, as fully and amply, to all intents and purpo`s,�sll, if Tieexecuted and acknowledged by the regularly elected officers of the Company at its offic v �~ Rigre� in their own proper persons. This power of attorney revokes that issued on behalf of W. C. COHEN,JR, %j5 t1T OST,Richard K. STONE,Bret S.BURTON,Jana M.FORREST,Sandra J. SHRYACK, Emily R. TERHUNE,Tim H. HEFFEL,Erica M.PLUMMER,dated November 2,2004. The said Assistant Secretary does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article VI, Section 2,of the By-Laws of said Companies,and is now in force. IN WITNESS WHEREOF, the said Vice-President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seals of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,this 22nd day of June,A.D. 2005. ATTEST: FIDELITY AND DEPOSIT COMPANY OF MARYLAND COLONIAL AMERICAN CASUALTY AND SURETY COMPANY ',gyp oj?ta�gs'iA 10 1 l By: Gregory E. Murray Assistant Secretary William J. Mills Vice President State of Maryland 1 ss: City of Baltimore f On this 22nd day of June, A.D. 2005, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, came WILLIAM J. MILLS, Vice President, and GREGORY E. MURRAY, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Companies aforesaid,and that the seals affixed to the preceding instrument is the Corporate Seals of said Companies, and that the said Corporate Seals and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. '�1¢<.f.�ilit,{•;`ill Maria D.Adamski Notary Public My Commission Expires: July 8, 2007 f POA-F 076-6692A Bond# 8783001 PERFORMANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, (1) Dustrol, Inc. as Principal herein, Colonial American casualty & Surety Company and and (2) 7i rlAl i i-Nr anri Tl p c't n i ry g a corporation organized under the laws of the State of (3) Maryland and who is authorized to issue surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the sum of One Hundred Five Thousand, Six Hundred Dollars Dollars ($105,600.00) for the payment of which sum we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Principal has entered into a certain written contract with the Obligee dated the 15th day of November , 2005, a copy of which is attached hereto and made a part hereof for all purposes, for the construction of SURFACE WEDGE MILLING 2006-1 AT VARIOUS LOCATIONS Project No. GS93-020930580085. NOW, THEREFORE, the condition of this obligation is such, if the said Principal shall faithfully perform the work in accordance with the plans, specifications, and contract documents and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default, then this obligation shall be void; otherwise, to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of such statute, to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. SIGNED and SEALED this 15th day of November , 2005. z�l 4 c DUST f OL, INC. PRINCIPAL ATTEST: By: �(Q � Name: BRIAN �akNilPN ri cipal) SeeFetary Title: VICE-PRESIDENT (S E A L) Address: , u=' 30--�_ 7I V'J 4itni1s=s as to Principal Colonial American Casualty and Surety Company ar Fidelity and Deposit Company of Maryland SURETY f ATTE By: Eu p Name: Erica M. Plummer �o iess, an ra S ryac Attorney in Fact (S E A L) AddressPO Box 2992 Wichita, KS 67201 L Witness as to Surety D. Westmoreland Telephone Number: 316-266-6338 NOTE: (1) Correct name of Principal (Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by the Attomey-in-Fact. The date of bond shall not be prior to date of Contract. Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND COLONIAL AMERICAN CASUALTY AND SURETY COMPANY KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,corporations of the Stta�raf aryland, by WILLIAM J. MILLS,Vice President,and GREGORY E. MURRAY,Assistant Secretary, in Pt ia�i�.�Qatrkity granted by Article Vl, Section 2, of the By-Laws of said Companies, which are set forth on•x0(rJ to\sie reffn,pae hereby certified to be in full force and effect on the date hereof,does hereby nomi tr,;�*�ii �j�iLL tt nd a N'JR,Scott T.POST, Richard K.STONE,Bret S.BURTON,Jana 1\I. anera ` ;t=itm H. HEFFEL and Erica M. PLUMMER,all of Wichita,Kansas,4A' tt� itd'ahctlaIaa`� }� }rd�t6iney-in-Fact,to make,execute, seal and deliver, for, and on its behalf.�s t`r t 'cJ� �i s acl Lpdi�d� ' Vany aria all bonds and undertakings,and the execution of such bonds or unde�tl€� � urs ance,ofths � t1e� nt ,`sFiall be as binding upon said Companies,as fully and amply, to all intents and purpo��ste ?� i�du�lexecuted and acknowledged by the regularly elected officers of the Company at its offic -ip ire} d._'_In their own proper persons. This power of attorney revokes that issued on behalf of Y W.C. COHEN,JR, %c 5 - TJOST,Richard K. STONE,Bret S. BURTON,Jana M.FORREST, Sandra J. SHRYACK, Emily R. TERHUNE,Tim H. HEFFEL,Erica M. PLUMMER,dated November 2,2004. The said Assistant Secretary does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article VI, Section 2,of the By-Laws of said Companies,and is now in force. IN WITNESS WHEREOF, the said Vice-President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seals of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,this 22nd day of June,A.D. 2005. ATTEST: FIDELITY AND DEPOSIT COMPANY OF MARYLAND COLONIAL AMERICAN CASUALTY AND SURETY COMPANY Pt0 OEPpsrf G► 1(j� 8EAL _ a By: Gregory E. Murray Assistant Secretary William J. Mills Vice President Slate of Maryland 1 ss: City of Baltimore f On this 22nd day of June, A.D. 2005, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, came WILLIAM J. MILLS,Vice President, and GREGORY E. MURRAY, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Companies aforesaid,and that the seals affixed to the preceding instrument is the Corporate Seals of said Companies, and that the said Corporate Seals and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. +i��s7uuryrr Maria D.Adamski Notary Public My Commission Expires: July 8,2007 POA-F 076-6692A 8783001 Bond# MAINTENANCE BOND THE STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL BY THESE PRESENTS: That Dustrol, Inc. ("Contractor"), as principal, and, Colonial American Casualty and SurPt- z C'nm anv and F;rlol i:Ly aAd peigGsI4 y Geffip ny eg ma3F , .,nd a r z corporation organized under the laws of the State of Maryland ("Surety"), do hereby acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant County, Texas, the sum of One ` Hundred Five Thousand, Six Hundred_Dollars Dollars ($105,600.00), lawful money of the United States, for payment of which sum well and truly be made unto said City and its successors, said Contractor and Surety do hereby bind themselves, their heirs, executors, administrators, assigns and successors, jointly and severally. This obligation is conditioned, however, that: WHEREAS, said Contractor has this day entered into a written Contract with the City of Fort Worth, dated the 15th of November , 20 05, a copy of which is hereto attached and made a part hereof, for the performance of the following described public improvements: SURFACE WEDGE MILLING 2006-1 AT VARIOUS LOCATIONS the same being referred to herein and in said contract as the Work and being designated as project number(s) GS93-020930580050 and said contract, including all of the specifications, conditions, addenda, change orders and written instruments referred to therein as Contract Documents being incorporated herein and being made a part hereof; and, WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during a period of after the date of the final acceptance of the work by the City; and WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of 2 (Two)Years ; and WHEREAS, said Contractor binds itself to repair or reconstruct the Work in whole or in part at any time within said period, if in the opinion of the Director of the City of Fort Worth Department of Engineering, it be necessary; and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to repair or reconstruct said Work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said Work in accordance with all the terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwise, this Bond shall be and remain in full force and effect, and the City shall have and recover from Contractor and Surety damages in the premises as prescribed by said Contract. This obligation shall be a continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. IN WITNESS WHEREOF, this instrument is executed in 6 counterparts, each of which shall be deemed an original, this 15th day of November , A.D. 2005. GW"'j` l G'L' I iV e PRINCIPAL , ATTEST: By: Name: , R13U1.N 14ANSFN (KWipal) Secretary ViCL--PrdESV-)LENT Title: (S E A L) Address: 1 ox Ll 1-/ �iVne s as to Principal Colonial American Casualty and Surety Company and Fidelity and Deposit Company of Maryland SURETY , ATTEST: By: Name: Erica M. Plummer See 9fJt Witne s, S dra J. Shryack Attorney in Fact (S E A L) Address: Po Box 2992 Wichita, KS 67201 316-266-6338 Witness as to SuretyD. Westmoreland Telephone Number: NOTE: (1) Correct name of Principal (Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of bond shall not be prior to date of Contract. n -T Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND COLONIAL AMERICAN CASUALTY AND SURETY COMPANY KNOW ALL MEN BY THESE PRESENTS:That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND,and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,corporations of the S t p��aryland,by WILLIAM J. MILLS, Vice President, and GREGORY E. MURRAY,Assistant Secretary, in p,ur r 'ivtNc�rity granted by Article �,� -� - Vl, Section 2, of the By-Laws of said Companies, which are set forth oedyl44sr�de liereo t fide hereby certified to be in full force and effect on the date hereof, does hereby nomi ;- 'Q r to lend a I( ` � ,JR,Scott T.POST, Richard K.STONE,Bret S.BURTON,Jana 1L � an � im H.HEFFEL and Erica M. PLUMMER,all of Wichita,Kansas,` l A "d]il9­1\ �t }r t�r ey-in-Fact,to make,execute, seal and deliver, for, and on its beha� s ti its i s a t�ta did lAhy anc all bonds and undertakings,and the execution of such bonds or under �w ance of;thcyshall be as binding upon said Companies,as fully and amply, to all intents and purpdslz ,-a�rt lberA 4Nr_-ddlyexecuted and acknowledged by the regularly elected officers of the Company at its offic�fin(t 4#,Qre\}�&, in their own proper persons. This power of attorney revokes that issued on behalf of W. C. COHEN,JR, scr-�'DOST,Richard K. STONE,Bret S.BURTON,Jana M.FORREST, Sandra J. SHRYACK, Emily R. TERHUNE,Tim H. HEFFEL,Erica M.PLUMMER,dated November 2, 2004. The said Assistant Secretary does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article VI, Section 2,of the By-Laws of said Companies,and is now in force. IN WITNESS WHEREOF, the said Vice-President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seals of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,this 22nd day of June,A.D. 2005. ATTEST: FIDELITY AND DEPOSIT COMPANY OF MARYLAND COLONIAL AMERICAN CASUALTY AND SURETY COMPANY 'gy'D DUOS, �� jcAfOD'vf � www C ° P SEAL By: Gregory E. Murra_,Assistant Secretary William J. Mills Vice President State of Maryland City of Baltimore SS: On this 22nd day of June, A.D. 2005, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, came WILLIAM J. MILLS, Vice President, and GREGORY E. MURRAY, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Companies aforesaid,and that the seals affixed to the preceding instrument is the Corporate Seals of said Companies, and that the said Corporate Seals and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. 9",� ! r Maria D.Adanrski Notary Public My Commission Expires: July 8,2007 POA-F 076-6692A ZURDCH THIS IMPORTANT DISCLOSURE NOTICE IS PART OF YOUR BOND We are making the following informational disclosures in compliance with The Terrorism Risk Insurance Act of 2002. No action is required on your part. Disclosure of Terrorism Premium The premium charge for risk of loss resulting from acts of terrorism (as defined in the Act) under this bond is $_waived . This amount is reflected in the total premium for this bond. Disclosure of Availability of Coverage for Terrorism Losses As required by the Terrorism Risk Insurance Act of 2002, we have made available to you coverage for losses resulting from acts of terrorism (as defined in the Act) with terms, amounts, and limitations that do not differ x materially as those for losses arising from events other than acts of terrorism. 4 Disclosure of Federal Share of insurance Company's Terrorism Losses P The Terrorism Risk Insurance Act of 2002 establishes a mechanism by which the United States government will p share in insurance company losses resulting from acts of terrorism (as defined in the Act) after a insurance company has paid losses in excess of an annual aggregate deductible. For 2002, the insurance company deductible is 1%of direct earned premium in the prior year; for 2003, 7%of direct earned premium in the prior year; for 2004, 10°o of direct earned premium in the prior year; and for 2005, 15°o of direct earned premium in the prior year. The federal share of an insurance company's losses above its deductible is 90%. In the event the United States government participates in losses, the united States government may direct insurance companies to collect a terrorism surcharge from.policyholders. The Act does not currently provide for insurance industry or United States government participation in terrorism losses that exceed $100 billion in any one calendar year. Definition of Act of Terrorism i The Terrorism Risk Insurance Act defines "act of terrorism" as any act that is certified by the Secretary of the Treasury, in concurrence with the Secretary of State and the Attorney General of the United States: I. to be an act of terrorism; 2. to be a violent act or an act that is dangerous to human life,property or infrastructure; 3. to have resulted in damage within the United States, or outside of the United States in the case of an air carrier(as defined in section 40102 of title 49, United 17 States Code) or a United States flab vessel (or a vessel based principally in the United States, on which United States income tax is paid and whose insurance coverage is subject to regulation in the United States), or the premises of a United States mission; and t 4. to have been committed by an individual or individuals acting on behalf of any foreign person or foreign interest as part of an effort to coerce the civilian population of the United States or to influence the policy or affect the conduct of the United States Government by coercion. But,no act shall be certified by the Secretary as an act of terrorism if the act is committed as part of the course of a war declared by Congress (except for workers' compensation) or property and casualty insurance losses resulting from the act, in the aggregate, do not exceed $5,000,000. These disclosures are informational only and do not modify your bond or affect your rights under the bond. Copyright Zurich American Insurance Company 2003 `L j s n 0050749.doc CITY OF FORT WORTH, TEXAS CONTRACT THE STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS: COUNTY OF TARRANT This agreement made and entered into this the 15th day of November , 20 05 by and between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under and by virtue of a special charter adopted by the qualified voters within said City on the 11th day of December, A.D., 1924, under the authority (vested in said voters by the "Home Rule" provision) of the Constitution of Texas, and in accordance with a resolution duly passed at a regular meeting of the City Council of said city, and the City of Fort Worth being hereinafter termed Owner, and Dustrol, Inc. HEREINAFTER CALLED Contractor. WITNESSETH: That said parties have agreed as follows: 1. That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: SURFACE WEDGE MILLING 2006-1 AT VARIOUS LOCATIONS Designated as project number, GS93-020930580050 2. That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents prepared by the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein. r � C-1 3. The Contractor hereby agrees and binds himself to commence the construction of said work within ten (10) days after being notified in writing to do so by the Transportation and Public Works Department of the City of Fort Worth. 4. The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Transportation and Public Works Department of the City of Fort Worth and the City Council of the City of Fort Worth within a period of ONE YEAR If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided in the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of $ 210.00 per working day, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency. 5. Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications, and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete the same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if, in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said Plans and Specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. 6. Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such iniury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to i C-2 property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such iniury or damage is caused in whole or in part by the negliqence or alleged negliqence of Owner, its officers, servants or employees. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7. The Contractor agrees, on the execution of this Contract, and before beginning work, to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful performance of the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials furnished in the prosecution of the work, such bonds being as provided and required in Texas Government Code Section 2253, as amended, in the form included in the Contract Documents, and such bonds shall be 100 percent (100%) of the total contract price, and the said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth. 8. Said City agrees and binds itself to pay, and the said agrees to receive, for all of the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates NIA shall be ONE HUNDRED FIVE THOUSAND, SIX HUNDRED DOLLARS $105,600,00 C-3 f 9. It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or assigned to anyone else by said Contractor without the written consent of the Director of the Transportation and Public Works Department. 10. The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto and made a part hereof the same as if it were copies verbatim herein. 11. The Contractor shall procure and shall maintain during the life of this contract insurance as specified in paragraph 8 of Special Instruction to Bidders of this contract documents. 12. It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with references to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of the same. N WITNESS WHEREOF, the City of Fort Worth has caused this instrument to be signed in Six 6 counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in Six (6), counterparts with its corporate seal attached. C-4 i i Done in Fort Worth, Texas, this the 15u' day of November , 20 05 . CITY,QF FORT WORTH ASST CI MANAGER APPROVED: DIRECTOR, TRANSPORTATION AND DUB T r OL, INC. UBLIC WORKSINC. ATTEST: (Contractor) CITY SECR TARY (SEAL) BY: Contrct- hu ho iz tion. (Representative) — Date MAN HANSEN VIAE-PI°4 'S, F---'N I (TITLE) 4 D P-r)y ;--2)CO APPROVED AS TO FORM & (Address) LEGA (City/State/Zip) ASSISTANT CITY ATTORNEY November 1960 Revised May 1986 Revised September 1992 Revised January 1993 Revised April 1999 Revised June 1999 Revised June 2001 C-5 k 1 1 (To be printed on Contractor's Letterhead) Date: Project Name: Project No: Street Rehabilitation of treet ame Project limits from to Street Name) treet ame NOTICE OF CONSTR CION This notification is to inform you that the construction on the street-will begin approximately TWO (2) DAYS ri FROM THE DATE OF THIS NOTICE: The phases on this project are as follows but not limited to nor will all phases effect your homes frontage: PHASE 1: Under a contract with the City of Fort Worth, our company will be Wedge Milling the named street(a 5- foot strip of pavement along the curb and gutter will be milled 2 inches deep at the curb and gutter, tapering to 0 inches toward the center of the roadway). PHASE 2: Within two working days after the completions of the wedge milling, an application of the asphalt overlay will be performed by the City of Fort Worth. (a 2 inches thick layer of asphalt pavement will be placed over the full width of the road.After compaction,the roadway work will be completed and open to traffic). If you have questions concerning PHASE 1,please call the Contractor's Superintendent and/or the City Inspector p If you have questions concerning PHASE 2, please call the City Inspector only I' MR. nAT(8l 7) r (Contractor's Superintendent) MR. AT(817) 871-8100 City Inspector r For emergencies after 4:30 P.M. or on Weekends,Please call(817)871-8100 To help us do a quality job in the improvements to your street: Please! • Prevent lawn sprinklers from wetting the street • Remove any vehicles, trailers,etc. that may interfere with the construction process • Do not park your vehicles on the street from 7: AM to 7: PM rd Please note: Failure to remove vehicles may result in your vehicle being towed at owner' j O H o °' 7 t _ � W m Z ?- O = Lr n O O Z ti — W H >- Z O v o O --� J WI-NNa W Q W F-Ow ix pt-t- W W 10 WaQ2W f' v w cc N tL' W }.ZWSJ- > J N W a:J-to t� Q CJ 0 V1 m N S O Z =V V W F-c Q. ,KW r k. .W W ` m W W O y W < W O 2 1lova1N00 Nt lON 101fa1N00 Nt LON - !II II III �!I III u. III - III .,' �-•• III i:•1 III •• Itll '' .:. .. fi.l u• Ili III Y . illl III III III .69 as all IIII III IIP II 111 IA III ..• ,.. III •'• spa III Ill Iti • ii fli . •.! i•• its !11 III • "' 'l 111 IPI III ,;, 'vis PII; Ip III lI �II Ili III c'� 1011,so _ IIP PII .�I 0 8, .. IIP •;!i IIS III •, Ga. . •" ,11 III fe III •�• .11 tll IIP '•' .il ill • of IIIIleIli • soIIPoff 4' ill '. Illi II ►•.. • III ill • Ill l �� • • I'I •u (!i •• ..• •.- • IPI III 111 "' • .:• III P III • lee11 it III III le. •. Ilt '�� Ii. - F let. rn 1 W (Y Z = Q Y W t F- Ct W O 1- 2Co Q vlmv oW J W _ 0- -j _W on ti 2 m O Q It W N W t V WW 1= HZJ QW jr CC H 2 W0 _ t� Z Z 4J W F—f- f.. m Z CY O N = 1- W d.Cr IC O' !- Z C31- } C! W— D m • _ Iii W W V ' V W 0 � O Q o V # w W J O W � � ?� Z p Z > c� _ O < W o t _j Hum OZ k H = W Z W Z z S O W J, 0 4n t- Z Z W 0 } O J ca t•-3 O cn -j U. x O 90 so rn 'Q Ww p y '�W W Z J O W O D = 4 ala m¢ d Z ana •W W _ (' s O w Z J a. . (!t •ii t •II I•I • Ill "t Mal �� idsIII � • , JII :i• CJI ��� � Vit, •, 1 III If ,•f t��l�.� !. 111 -:•: • ' ����!� 111JillI . irr • • • 1Ji III • .•. i:. ►It � r•'f Irr fl• !!f• kee. _ -�:�! III ... t��! � • gas i • J .• � ~� '�' ��� III ..t �� t �. �' 1 � • 1 ► :il�� Ili Il :fr