HomeMy WebLinkAboutContract 47982-AR2 F_o R r VVc)P,jr H City of Fort Worth CITY SECRETARY014 r — --_' Construction Allowance Request CONTRACT N0. 10 Project Namel Northside II 48-Inch Water Transmission Main Phase II,Part 2 City Sec No. 47982 Project No.(s)l 56005/0600430/C01783 M&C C-27822 City Proj.No. 2304 Project Description: Installation of 48-inch Water main from Wagley Robertson Rd.to Park Hlls Ln.down Old Decatur Rd. Contractor: S.J.Louis Construction of Texas,Ltd. Allowance No: 0 Date: 1 8/31/2017 City Project IVIgr.1 Robert Sauceda City Inspector: I Raymond Brice Phone Number: 817-392-2387 Phone Number: 817-392-8452 Paving and Contract Time Dept. Water Drainage Totals (Calender days) Original Contract Amount $11,391;347.00 $2,829,076.00 $14,220,423.00 540 Extras to Date 10 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $11,391,347.00 $2,829,076.00 $14,220,423.00 550 Amount of Proposed Allowance Allocation $7,560.00 $0.00 $7,560.00 Revised Contract Amount $11,391,347.00 $2,829,076.00 $14,220,423.00 550 Original Allowance Available for Allocation $300,000.00 $100,000.00 $400,000.00 Allowance Funds Previously Allocated $92,469.25 $0.00 $92,469.25 Remaining Allowance Funds $207,530.75 $100,000.00 $307,530.75 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.05% MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $17,775,528.75 Despite the presence of traffic message boards informing motorists of one way traffic on a segent of Old Decatur Road,several instances of near head on collisions by drivers going the wrong way have occured on the road. One way traffic was necessary to facilitate the installation of a 48-inch water main on Old Decatur Road. In an attempt to enforce one way traffic and prevent traffic fatality,staff recommends that Fort Worth Police be hired to patrol and enforce one way traffic the roadway at the rate of$60/hr for 7 days (in two shifts Monday through Sunday;9/25-10/1)as follows: QM 3 4 2shifts(7amto4pm)and (4pmto11pm)= 18 �. S $60/hr x 18 hrs/day x Mays=$7,560.00. CP A by. o /!.%� o J. Kayser, Cita} .S It is understood and agreed that the acceptance of this Constructs equest by the contrac an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request. rJntrac#o€s ;ditft Contractor Name Contractor f Date __ _ ouis of Construction,Ltd. Justin Whitman �y �� ' 7 _se L7 r 0Av-40 �_V K O, r`a� IL 1MAO A416iL G�..17-17 /100,4 4 <l >1io L -Assistant0 r * Date =17—/7 _AOSW City A _ l� Assistant City Manager ate t7:3 - � � t •k: OItTH TX P,-F WORTH City of Fort Worth W Construction Allowance Request Project Name Northside If 48-Inch Water Transmission Main Phase II,Part 2 City Sec No. 47982 Project No.(s) 56005/0600430/C01783 DOE No.= City Proj.No. 2304 Project Installation of 48-inch Water main from Wagley Robertson Rd.to Park His Ln.down Old Decatur Rd. Description Contractor S.J. Louis Construction of Texas,Ltd. Allowance No: 1—J Date: 8/3112017 City Project Mgr. Robert Sauceda City Inspector Raymond Brice CONSTRUCTION ALLOWANCE ITEMS TO BE ADDETED OMRIPTIUR —7—DEPT Unit Unit Cost Total 44 Allowance No. 2 Water 1.00 LS $7,560.00 $7,560.00 Water $7,560.00 Paving and Drainage Page 1 of 1 lAdditions Sub Total $7,560.00 FORT WORTH City of Fort Worth Construction Allowance Request Project Name Northside II 48-Inch Water Transmission Main Phase II,Part 2 City Sec No. 47982 Project No.(s) 56005/0600430/C01783 DOE No. C-27822 City Proj.No. 2304 Project Description Installation of 48-inch Water main from Wagley Robertson Rd.to Park Hlls Ln.down Old Decatur Rd. Contractor S.J. Louis Construction of Texas,Ltd. Allowance No: 0 Date 8131/2017 City Project Mgr. Robert Sauceda City Inspector Raymond Brice CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Water Paving and Drainage Page 3 of 4 IDeletions Sub Total MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 4 of 4 Sholola, Tony From: Mark Ailara <MarkA@SJLouis.Com> Sent: Thursday, September 21, 2017 6:28 PM To: Sholola, Tony Cc: Sauceda, Robert;Johnson, David R.;Justin Whitman;Salazar, Ralph Subject: RE: Police Presence on Old Decatur Tony, As discussed,the cost for Patrol Officer coverage for Public Safety and Enforcement for the North Old Decatur Road $60/hour 2 shifts—1'shift(7 am—4 pm), 2n,shift(4 pm—11 pm)= 18 hours 7 days—Monday through Sunday $60 x 18 x 7=$7,560.00 Subcontract will be made for Officer Rafael Salazar#3369 Please let me know if you have any questions Thank you, Mark Mark Ailara Asst. Construction Manager S.J. Louis Construction of Texas, LTD. 520 South 6th Ave. Mansfield,TX 76063 marka@silouis.com C 817-247-7025 "Blame No One,Expect Nothing,Do Something" From:Sholola,Tony [mailto:Tony.Sholola@fortworthtexas.gov] Sent:Thursday,September 21,2017 2:19 PM To: Mark Ailara<MarkA@SJLouis.Com> Cc:Sauceda, Robert<Robe rt.Sa uced a @fortwo rthtexas.gov>;Johnson, David R.<David.Johnson2@fortworthtexas.gov>; Justin Whitman<JustinW@SJLou is.Com> Subject: Police Presence on Old Decatur Mark: As we discussed this morning, please contact Officer Salazar with regards to hiring off-duty FW police officers to enforce the one way traffic message boards and signs on Old Decatur Road for a seven day period within the hours of 7:00 AM 1 to 4:00 PM and also from 4:00 PM to 11:00 PM.The City will reimburse SA for this expense. My understanding is that the going rate is$50.00 per hour. Hopefully after the week of police presence,folks will pay heed to the one way signs. We appreciate your cooperation with this matter. z FORTWORTH Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Roberto C. Sauceda,RE Name of Employee Water Department-En ing eering Department Senior Professional En ig neer Title 817-392-2387 Phone 7 Z--� /-�' Date OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX WATER DEPARTMENT ENGINEERING AND FwAL SERVICES THE Crry of Forty WmTH * 1000 TmommoRTorq Sart * Pow WoffM,TExAs 76102 817-392-8240 * FAx 817-392.8195 Q Printed on—yckd Paper