Loading...
HomeMy WebLinkAboutContract 49809 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.A (� WHEREAS, Crystal Lake Development, LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Marine Creek Ranch Section 4 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contr City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Marine Creek Ranch Section 4 CITY SECRETARY CFA Official Release Date: 02.20.2017 Page 2 of 2 FT.WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) 0, Sewer (A-1) ; Paving (B) ®!, Storm Drain (B-1) 0, Street Lights & Signs (C) 0. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 4 CFA Official Release Date: 02.20.2017 Page 3 of 3 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 4 CFA Official Release Date: 02.20.2017 Page 4 of 4 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims,suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 4 CFA Official Release Date: 02.20.2017 Page 5 of 5 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 4 CFA Official Release Date: 02.20.2017 Page 6 of 6 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 4 CFA Official Release Date: 02.20.2017 Page 7 of 7 Cost Summary Sheet Project Name: Marine Creek Ranch Section 4 CFA No.: 2017-129 City Project No.: 1.01052 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 92,695.50 2.Sewer Construction $ 117,829.00 Water and Sewer Construction Total $ 210,524.50 B. TPW Construction 1.Street $ 311,185.50 2.Storm Drain $ 58,432.00 3.Street Lights Installed by Developer $ 24,699.06 4. Signals $ - TPW Construction Cost Total $ 394,316.56 Total Construction Cost(excluding the fees): $ 604,841.06 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 4,210.49 D. Water/Sewer Material Testing Fee(2%) $ 4,210.49 Sub-Total for Water Construction Fees $ 8,420.98 E. TPW Inspection Fee(4%) $ 14,784.70 F. TPW Material Testing(2%) $ 7,392.35 G. Street Light Inspsection Cost $ 987.96 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 23,165.01 Total Construction Fees: $ 31,585.99 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 604,841.06 Completion Agreement=100%/Holds Plat $ 604,841.06 x Cash Escrow Water/Sanitary Sewer-125% $ 263,155.63 Cash Escrow Paving/Storm Drain=125% $ 492,895.70 Letter of Credit=125%w/2yr expiration period 1 $ 756,051.33 City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 4 CFA Official Release Date: 02.20.2017 Page 8 of 8 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Crystal Lake Development,LLC Jesus J. Chapa Assistant City Mana er Date: e: John Cockerham Recommended by: Title: Manager Date: 9/act /a017 Wendy Ch' Babulal,EMBA, P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department a� �J. Z1j Signature DouglaY W. Wiersig, P.E. Y Name: Director Transportation& Public Works Department Contract Compliance Manager: Approved as to Form & Legality: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Richard A. McCracken requirements. Assistant City Attorn M&C No. ltd f+` N 1�I' Y�� ,�c ✓ G� (,/d-�'� Date: N/j�"' Name: Janie Morales Form 1295: _ Title: Development Manager ATTEST: RT Majk J. kayser U City Secretary City of Fort Worth,Texas TEXT OFFICIAL RECORD Standard Community Facilities Agreement-Marine Creek 12aii6h Section 4 CITY SECRETARY CFA Official Release Date: 02.20.2017 FT.WORTH,Tx Page 9 of 9 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement ISI Location Map Exhibit A: Water Improvements Water Cost Estimate ® Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 4 CFA Official Release Date:02.20.2017 Page 10 of 10 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 1.01 052 None City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 4 CFA Official Release Date: 02.20.2017 Page 11 of 11 c w HaR[NE CREEK t M c� V & �w Ksrinel Ernk as reek g 9A 10 7 9•rkr Creep NorFe Ci k 12 516 H H6L Ffl S TE f �� tHVCst cDL E HILL r '4/( MARIroE iJarior CW 7 dPCREEK bbrthaast C pus RIDGf LAKE SQPW RIDGE 82 O LOCATION MAP MAPSCO NO. 46H COUNCIL DISTRICT 2 BLOCK 1, LOTS 1X, 2-8, 9X, 10-22 AND 23X BLOCK 2 LOTS 1X AND 2-19 BEING 10.130 ACRES OF LAND LOCATED IN THE JOSEPH BOMAN SURVEY, ABSTRACT NO. 79, CITY OF FORT WORTH, TARRANT COUNTY, TEXAS 38 BUILDABLE LOTS, 4 PRIVATE OPEN SPACE LOTS OWNER/DEVELOPER: CRYSTAL LAKE DEVELOPMENT, LLC. 3825 CAMP BOWIE BLVD. FORT WORTH, TX 76107 PRELIMINARY PLAT CASE NUMBER: PP-16-073 TEL: (817) 665-2321 CASE NAME. MARINE CREEK RANCH CONTACT: RANDY LOCKHART PHASE: SECTION 4 DATE: 0s/0112017 m l m � PROJECT �: 2552-0e-01 1I/IARl_NE` GRE'E'K RANCH myc�os�ae+mannss+assoCi3teS DRAWN BY.• M. BIGGERSTAFF S.EC'TION 4 .4 A "'w'y'"D km*w"sid1ia""V It"raglsbaWm aua4a° t-1759 PLAT INFORMATION 1 0 0 .a a I 0 b,a m CHECKED BY: A. TAYLOR & VICINITY MAF a'tI"9I I•"as 76010 611—a 09-1671 SHEET NO: 1 OF 7 1 a 1 517-176-6757 a 0...m a t a x 0 a.c 0 r0 !L 1 VA HOA EX. 8" MWLWfR WATER LINE . / x fir/�, ( / FLM OODFLAEASEMENT J CAR A SLOE 12WO PRrcr A \ APPRQ9IAM LOCAFKW GE 11AYtlCC CREEK RANCH P ` raj.EAR noao^LAN PER GC/ 2 1 \ Y r]RM YAP 46439C016a f 1 DAM0 SEPIEM6ER 24 2000 EX. FIRE ! / �\ / HYDRANT ) ,o •.ti•"'^may / \ APPROJPMAtE LOCAROR ar � t IW YEAR K RANCH PER /j a \ MA100 CREEK RA+MX RECOPY EX. 16" q ,TLOGD ASS PREPARED D j / OpUtGY ASSOpA YES OAtED, WATER LINE N a \ MARC a 2017 �.. 13'SANrARY 5[IIER[SY7. - �(SECLwO Lor+S.0 Aoor 2 EX, S" _ I WATTS BAR t" N MARINE CREEKRANO+ WATER LINE 1 !Z COURT \ uR A.anE 12M PRMT N � V q Mm OPEN.9-Aa FIRE f HYDRANT O a ` e9l rBY R'PARAIE k tilt rs•ssE yWCJ'5 tilt {{ AYLORSVILL£DRIVE 1 ( O1 oP�L•N�snnCC AtE MDA/ fSY 13'DF.Br SEPARATE \ DEVELa�ER ++sr1RAKENr � -�""" 2W ACae53 M(T..00.'S /a m'"s eLECDSER IM VICE Ca M CREEK RANCH !I Wt.17M,is 57 D7/io27ee7 I PR rcr • IOL OomFr. to S \ 2b'SAJRrANY SENR El �`— WL 14565.IC Sol \\ VOL "2""m MS NOTE MM, ALL WATER LINES ARE 8" UNLESS OTHERWISE NOTED LEGEND 200 0 100 200 +00 y WATER LINE T FIRE HYDRANT ►� GA TE VALVE SERVICES 1 inch = 200 ft. DATE: 09/01/2017 MAR-TATE CR.EE7K PROJECT g 2652-08-01 R."l-11 AI CH DRAWN BY. M. BIGGERSTAFF ,SEC'170N ' - r,7Wrdlo^twnbr:r-27se CHECKED BY A. TAYLOR R 2 a" ®111n 011 cost e e 7.m l+x+^ 78010 EXHIBIT "A (� e17-+et-lerl SHEET NO. 2 OF 7 1..: e17-2r+-e7er t^^.mm+l+xa+.e�m MARINE CREEK RANCH SECTION 4 9/1/2017 CFA PROJECT QUANTITY MATRIX UNIT 1:WATER SHEET N0. ITEM TOTAL UNIT PRICE ITEM TOTAL COST ITEM NO. BID ITEM UNIT 5 1 TRENCH SAFETY L.F. 1,525 1,525 $ 0.10 $ 152.50 2 DUCTILE IRON FITTINGS W/RESTRAINT TON 0.5 0.5 $ 8,600.00 $ 4,300.00 3 8"PVC WATER PIPE L.F. 1,505 1,505 $ 24.60 $ 37,023.00 4 8"DIP WATER L.F. 20 20 $ 35.00 $ 700.00 5 FIRE HYDRANTASSEMBLY EA. 4 4 $ 3,300.00 $ 13,200.00 6 1"WATER SERVICE EA. 38 38 $ 840.00 $ 31,920.00 7 8"GATE VALVE EA. 3 3 $ 1,300.00 $ 3,900.00 8 CONN.TO EX.8"WATER MAIN EA. 2 2 is 750.00 $ 1,500.00 UNIT TOTAL $ 92,695.50 YAM HOAI t Iff DEVELOPER ty OPEN SPACE \ FLOODPLAIN FASEPAENT J CAO.A.SLOE 12" \ PFrcr f/-._\` O YAR04E CREEK RANGE \ IAOp ROODPLAW PER / C4 12014882 ; YYY row ww 48439MI60K oplorry " DAIED SEPTENWR A.7009 A • �\ APPROXAMIE LOCAMW Or l 800 TEAR FLCREEZOM-LAW PER / '• " 4 FLOOD STLDY�A ar DOHA RAMAR04 A 20 DA RD' . 1• \1 \ 15'SANrARY SERER ESYE ML \ y OzN \ y � 4 " 2 LOT•SIL BOCK R pp " AIAMNE CREEK RANCH \ CAR A.SILF 12800 Y i WATTS BAR Pprcr COURT uO 'J Y a o • EX. 18" �VAM HGA/ Y SANITARY 11CVELR'ER —" — D"E"SPACE SEWER LINE 15,Sw SEPARA 7E Y J J . • • ) • RISTRfgIENi •� �� TAYLORSWLLE DRW 1p 15'SSE EswT PRIMAK HOA 15 VY - ENSPACE D .E. O _ r at YAlE HOA/ •ESMT 13 OwSB=ARA rE DPER SPACE r�_ - z= -: s YARp�CI�£K RANGI — 1 VOL17O/9 TEXAS ELECRRC 310071501R3R \— mn-w-rrr aTtr 1a 21D6 P6 5ro PRTn _ DRTCI •. - JO'SARRARr sERER rswr �� _•.. 1 V10L.14M PC.So r ML.1.164 PG I® 6Rrcr ` LEGEND • SANITARY SEWER MANHOLE 8" SANITARY SEWER SANITARY SEWER SERVICE 200 0 100 200 400 QS EX. SANITARY SEWER MANHOLE —SS— EX. SANITARY SEWER LINE inch = 200 ft. DATE: 0910112017 �m a MARINE' CRETE'I PROJECT 1. 2652-08-01 RAN,r-vH -25 DRAWN BY.-M. BIGGERSTAFF SE'CTIQN 4 fll d",s t,�ti# r�liin7a ,zs�o%iat �•,;1,..,.,: u,�rt�o L�D�m..ldw.aA..c1v 1•q�•irOtl'01 NWAW.t-2m WASTEWATER 2 00 vast s b,r1R CHECKED BY. A. TAYLOR ariingten• texas 76010 EXHIBIT "A-1" etT-4eq-igTt SHLE. NO: 3 OF 7 r.K: 817-:74-8757 srr.mreoleKrs.eol* MARINE CREEK RANCH SECTION 4 9/1/2017 CFA PROJECT QUANTITY MATRIX UNIT 2:SANITARY SEWER SHEET NO.SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST ITEM NO. BID ITEM UNIT 6 7 1 POST CCTV INSPECTION L.F. 1712 1,712 $ 1.50 $ 2,568.00 2 MANHOLE VACUUM TESTING EA. 10 10 $ 110.00 $ 1,100.00 3 TRENCH SAFETY L.F. 1712 1,712 $ 1.00 $ 1,712.00 4 CONCRETE ENCASEMENT FOR UTILITY PIPES C.Y. 2.21 2.21 $ 300.00 $ 663.00 5 4"SEWER SERVICE EA. 38 38 $ 625.00 $ 23,750.00 6 8"SEWER PIPE L.F. 1632 1632 $ 33.00 $ 53,856.00 7 8"SEWER PIPE,CSS BACKFILL L.F. 80 80 $ 43.00 $ 3,440.00 8 4'MANHOLE EA. 9 9 $ 2,500.00 $ 22,500.00 9 4'EXTRA DEPTH MANHOLE V.F. 14 14 $ 110.00 $ 1,540.00 10 CONCRETE COLLAR EA. 3 3 $ 400.00 $ 1,200.00 11 CONST.5'MH OVER EX.18"VC PIPE EA. 1 1 $ 5,500.00 $ 5,500.00 UNIT TOTAL $ 117,829.00 `. , y VA TE NDA \ \ PROP. 5' i' DEVELOPER SIDEWALK / � ,,/ "Si� j" oPEN SPACE ` / $ FLOODPLMN EASEYENT- CAR A,RW 12000 ,�i aRrcr TYPE P-1 O \\ RAMP bfARqC LRE£f(RANCH ' / \ 1 /-IADo A'R n LOD PLA"'rt R aI oatmt.et: j7 \ �! FWW YAP 48439CO16d! aParCT `r �j r DATED SEPTEMBER 21L xm \1 \ \ OF l0CAD0N TOO TEAR nDDPPER 4 CREEK RANCH E I FLOOD PREPARED 8Y oCWARASSOCIATES DATED A 2017 y ... EX. 4' \ \ 1 „ SIDEWALK fir• \ m'swrARYQRuEsuE m _ (SECDrp rRACn � �1 7 I (�� m V0.alta PG Ma➢ 2 TYPE P-I\ � .... RAMP Lor.sr.aD«l 4ACAR .SLAX 28W I:A9 A.SiaE 17x00 m j J WATTS BAR PRrcr 1 ! covRr "Q1 PROP. 5am ' � A y SIDEWALK Nar/ �.' OPEN SPACE \ sw ESWT or SEPARATE J I r , a , • \ wSrRtIYERr _� �� �� iAYtORS1RLLE DMVE \ m ctg_ PRIYAIE ROA ,]'� / PE S R D.E. �M Ol OPEN SPACE s- DE 15' / T 15'oz.or \ TYPE P-1 OPEN SPACE Z �--��— - - RAMP— — =� ____ 5/ ACCESS EW i.Na s / rcxAs EEECfAC STA'IAr,',1E OOt �EARrM£CRlElC RANCH f 9U.masa Pfi 97 /. — CLQ oRICT'EOa atIcT wwvarcr r ancr \ 7 wO.�rc14 s,o - / 70•S:NI,1 P SERER[9,T PROP. 5' -`'— KL 1: m 436 531 \\ SIDEWALK LEGEND Orrcr 29' B—B PAVEMENT, 6" CONC., 50' ROW 37' B—B PAVEMENT, 10' 200 0 100 zoo +00 CONC., 110' ROW 4" CONC. SIDEWALK 1 inch = 200 ft. (DEVELOPER) DATE: 09/01/2017 m(m a 11�'ARIME CHHH K PROJECT 1: 2652-08-01 RANCH r?1�rcfiSki� f11C:iT?r±1v"e:;.aN'-1C""�1Ps DRAWN BY. M. BIGGERSTAFF SHCET7IQ1'V 4t c" 4 meq w"wNdLwo-malslw tbp registration mr4m f-2759 CHECKED Y. A. TAYLOR WAVING 200 east ob,am „ arlieglae, teees 76010 .EXHIBIT TIB 617-seq-ia7i SHEET NO. 4 OF 7 tef: 617-274-6757 eetr.mmotefof.com MARINE CREEK RANCH SECTION 4 9/1/2017 CFA PROJECT QUANTITY MATRIX UNIT 4:PAVING SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST ITEM NO. BID ITEM UNIT 16 1 17 18 19 29 1 REMOVE CONC CURB&GUTTER L.F. 72 72 456 600 S 20.00 $ 12,000.00 2 HYDRATED LIME TN 51 58 11 120 $ 155.00 $ 18,600.00 3 6"LIME TREATMENT S.Y. 2,830 3,202 6,032 $ 3.20 $ 19,302.40 4 8"LIME TREATMENT S.Y. 602 602 $ 3.20 $ 1,926.40 5 6"CONC.PAVEMENT S.Y. 2,513 2,994 5,507 $ 37.40 $ 205,961.80 6 10"CONC.PAVEMENT S.Y. 509 509 $ 68.10 $ 34,662.90 7 4"CONC.SIDEWALK S.F. 362 663 1,025 $ 5.00 $ 5,125.00 8 REMOVE SIDEWALK S.F 159 162 321 $ 2.00 $ 642.00 9 BARRIER FREE RAMP TYPE P-1 EA, 2 4 6 $1,600.00 $ 9,600.00 10 FURNISH/INSTALL ALUM SIGN GROUND MOUNT E.A. 6 6 $ 425.00 $ 2,550.00 11 REMOVE B"PVMT MARKING L.F. 50 50 $ 10.00 $ 500.00 12 8"SLD PVMT MARKING(HAS)(W) L.F. 100 100 $ 2.75 $ 275.00 13 REFL RAISED MARKER TY 1-C EA 4 4 $ 10.00 $ 40.00 UNITTOTAL 1$ 311,185.50 )) . "17 x� O HOA I` DCWLOPER / k.y`/ OPEN SPACL \ a / / FLOODPLAIN EASCA"r-/ V CAB.A.SLAX 12WO PRIG A APPPOAWA IE LOCA DON OF YARWE CREEK RAOKN.' I \ 100 YEAR nOOOFtA N PLR Ccl a�n1�'cr�b71 �..` f/ \ FIRM YAP 4e41DC0160r 1.,y,✓.- 7r DAffD SFPnDMM 29t MOP \ t b APPROAVAIE LOCAROH OF r1 n \ 100 YEAR FLOOOPLAW PER MARNE CREEK RANCH SECRON C N4 /FLOOD SYLOY PREPARED BY OONA10 ASSOC1ADAMO, MARCH 610101 7 t \ N \ 11 L_ \ ( M Q \ 77` (SECOND Or,CSYi. VOL er1A PO.w10 mv/ M v O W H j WATTS BAR N \ A!R ROD(K (j YARMELor CREEK RAkpN COURT CAa A SLAX 128M PRICT I -- �— WL OPEN� 15,Cu tNLETS `j�•SSE Eswr By O - SLPARA,E g 21'RCP g affie RCP 4 TAYLORSVILLE DRIVE 15 Cu 16' HEADWALL O� `ffi 4Xer INLETS SO. Q SDMH — �Z VAR HOA/ ESYr H'O.E.0Y SEPARA>E \\ I OPEM SPACE wsrmwralr /— 10'AL(YSS ME No,S Trx"ELm"C FRNcr Co. ".ir4 VJ0CREE;7 RAIMpFI 1 VOL 1700.1C S7 RIIOR-OF-MY CC/D7IJ077eer ___.. a"`o Vol.11Oa1 P6�10 PRrcr --=_ �Y, �- — 10`SA1•TARY FUER ESI1fVOL 1421,4 M 4" \\ VOL 145K Pa 502 OR/C7 LEGEND EXISTING STORM SEWER LINE PROPOSED STORM SEWER LINE 200 0 100 200 400 0 STORM MANHOLE r CURB INLET 1 inch = 200 ft. D A TE: 0913 17 m1mla PRLY. A. —o1 MARINE' CREEK RANCH rnyc®side+n-finds-,sssubat®s DRAFF SECTION 4 �� °"' movb"A- te'"'w tbv.ro°btrotion.umber.t-nsY CHLOR STORM DRAINAGE 200 ee■t ebreEXHIBIT IIB-111 ertl 1 2-1 1e0,etr-46y-tart Sh7 (..: e17-274-e757 •••.mmele■ol.eom MARINE CREEK RANCH SECTION 4 9/1/2017 CFA PROJECT QUANTITY MATRIX UNIT 3:STORM DRAIN SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST ITEM NO. BID ITEM UNIT 26 1 TRENCH SAFETY L.F. 408 408 $ 0.50 $ 204.00 2 MEDIUM STONE RIPRAP,DRY S.Y. 182 182 $ 48.00 $ 8,736.00 3 4'STORM JUNCTION BOX E.A. 1 1 $ 4,100.00 $ 4,100.00 4 21"RCP,CLASS III L.F. 99 99 $ 65.00 $ 6,435.00 5 24"RCP,CLASS III L.F. 309 309 $ 73.00 $ 22,557.00 6 24"FLARED HEADWALL,1 PIPE EA. 1 1 $ 2,400.00 $ 2,400.00 7 10'CURB INLET EA. 4 4 $ 3,500.00 $ 14,000.00 UNIT TOTAL $58,432.00 ME HOADMOPER / J ghlr OPEN SPAS �\ r., f / t ~ S$ FLOODPLAINEASEMENT._/ \ CAAB.S.A.A SL17606 PRTCrRTLr MARRBr CREEEE aAHd!„�• /' / \ , �-lA Anoaa L, PER CC/D715D1ABtt ..�, f \ v FNL MAP 48430=60K (pR2i 7^ -._Y/ h DArEO SEPIE&WR 20.7000 . 1 \ APP90J6r7AR LOCAROH Or 100 YEAR FLOOOPLARI PER \ MARM9 CREEK RANCH SECROM •FLOOD SYWY PREPARED By DONAWAY ASSOCIARS DATED MARCH A.7017 If SAN7ARt SFROt ESY7. '. WL 4714% rr l0!•S;BLOCK l •�.,1 7 WATTS BAR COURT \ Y RM RANCH CAR A.RJW 12OW x t \ PRICr OO• w 1J u n a \ • YAR MOA/ SEPARA TE x �" 1{i a J ! . 7 • MIRIAfEN7 " e Agr 518 X TAnoRSHLLE DRIVE 'sur C / PMVA IE IIQA 15• DEVELOPER AE. i OPEN SPACE Z : HWJ • O . 7 • I WILE SY¢PARAR \I DEVELOPER / [SM NSAR/MEM! \ OPEN SPACE MARNIE CREEK RANCH — I 70•AOF55 ESM&NO 3 TEXAS ELECMC SERMLY CO VOL ESS P4 37 /� Oq 071J0775B7 . RNOW-OE-WAY \ . ?!04 PG 710 PRiCr m- Y `• i r 2wSAMrARr SLIER ES WT \\ ORRT ig Ak 7 LE ND 200 0 100 zoo 400 X STREET LIGHTS 0 EX. STREET LIGHTS 1 inch = 200 ft. DATE: os/or/tor 7 A MARINE CREEK m ma PROJECT : 2652-08-01 ;_; /�r l� 174V+"rwSkf? �nCit�ni��,ass�c�alE�s DRAM 8Y.• M. BIGGERSTAFF ,�',.d!' i C.`1•'ION 4• L O R'�0 R' 'Rn ms's° �r6{strglIm nMnb•r.1-2759 CHECKED BY: A. TAYLOR ,=TREET LIGHTS 200 6R•E Bsr•., EXHIBIT "C" Orlinq 7- 9-1 7ae�e ei7-4eq-�a7� SHEET NO: 6 OF 7 (O•: a,7-776-8757 mn<-!Pr ca \ 2 VA rE MOA/ Of OKR Wow spAa /�(�. s \� � ' ted'/ . ` FLOCOPLAW EASEMENT- ` STREET NAMES &` ,r3�aN CAB.A2A 178W PRrSTOP SIGN \� Is \\ APPROAINATC LOCA nM OF NAlUNE taRE'CX RANPJ/. 1 //-too YEAR nOODPLA PCR C'ornftot•B17 \ �C FARM UM 48119COI OK OPRrrT r ti-,•/ p DATED MPMANUR 9A 7OD9 r \ . APPROWAIE LOCAROR tX o » N \ 100 YEAR x RAN PER ` r YW~CREEK RANpf mcnDAMD+! 1 FLOOD SRIDY PREPARED BY Z \ III Al&2012 OARD- 1 N "AWN 8 10t7 (wrcomoSE°ER rx E5.?. WoL e7rs a�u f \ . WATTS BAR Lor sic BLOCK x 1 1i CO(/RT \ MARWEA.SUOC CREEK>rMIDD w 1 � • PRrcr t a 1 W1-1 & STREET NAMES & # vAIr New/ • " A o W13-1 P SIGNS STOP SIGN �� STREET NAMES & (R1-1) I STOP SIGN i (R1— B ESMr I) rs• B ° Y <N SEPARA iF W rr ■ a e . r • WS/Rf.MrENr as 8 Rg TAYLORSWLLE STREET NAME SIGN 15's9E - DRrW / • $ PRIVATE IMOA 15OEM oz.' M j O OPEN sPACf — r i t i a a . r • r ft 000Pt' y(O� - — , VA IE WA/ CSV 10'BE D" IE \\ . OEt4[u'ER / � OPEN SPACE 10'ACCLSS[WE Nus / 1ExAS Ei.EC1pC SETINL'E OQ AIARM%rE CREEK RAAK71 ti.. 3 baA flmiso PC. a,-1 —/ AKNT-Or-w fl/PTJ017687 .t pa \ ' 'W13-1P SIGNS— ' m'sAwr srEsrr KY.:4m PFc Dat 5w \\ SIGNS—_ WLr•ZOS Pu•88 Mxrrcr ♦\ LEGEND Zoo o loo Zoo 400 STREET SIGNS 1 inch = 200 ft. DATE: 09/01/2017 m�m a .MARINE CREEK PROJECT 2652-08-01 RANCH DRAWN BY. M. 1GGGERSTAFF SECTION .4 " wvkw*fd—@ft ww"associates aw txteit»°hq MWIYIJYIO lutd•np•trrailtecp,n 9rRtTrt9 tboe re*trotbn number. f-1759 CHECKED er. A. rAnoR STREET SIGNS 190 east 9bro. EXHIBIT "C-1" erlingi De. 19- 78010 817-169-11671 SHEET NO: 7 OF 7 lo.: 817-174-8757 0—Rt tie l k.6i.to MARINE CREEK RANCH SECTION 4 9/1/2017 CFA PROJECT QUANTITY MATRIX UNIT 5:STREET LIGHTING SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST ITEM NO. IBID ITEM UNIT 29 1 2"CON DT PVC SCH 80(T) L.F. 180 180 $ 13.43 $ 2,417.40 2 Rdwy Illum Assmbly TY 8,11,and D-25 EA. 6 6 $ 1,755.00 $ 10,530.00 3 LED Lighting Fixture EA. 6 6 $ 366.00 $ 2,196.00 4 6-6-6 Triplex Alum Elec Conductor L.F. 180 180 $ 3.37 $ 606.60 5 Rdwy Illum Foundation TY 1 E.A. 6 6 $ 1,491.51 $ 8,949.06 UNIT TOTAL $ 24,699.06 Developer and Project Information Cover Sheet: _ _.... _.... ... ................... ..._.. ..........__.. . ......... __................... _..............._.................._...._........................ : Developer Company Name: Crystal Lake Development,LLC __....._....................._......_..................._..J�,_......_...... ....... .._...._...._...... ..... ...... ..... ....... ._................. ......_........._.__..__........................ ......_........... ............. ..... ._....... ........ .............. ............ .._..........._............ ._..... ...._.._._........_........... ........_. Address, State,Zip Code: 382 Camp Bowie Blvd,Fort Worth, TX 76107 Phone&Email: 817665-2321 Authorized Signatory,Title: John Cockerham,Manager Project Name: Marine Creek Ranch Section 4 Brief Description: Water, Sewer, Paving, Storm Drain, Street Lights Project Location: East of Huffines Blvd&North of Lamb Creek Dr. j.._......__..................._..............'-.....,............._.._............_..,......_.._..................................i....._......._...._.__.._................................_.................._......;.__..._...__........._..................................._......................_..................._................................................._.._........-_.................................... Plat Case Number: ' None Plat Name: None __.._.._............... -_._....__._... ....._....._.....__.._,......._._......_.................._.._.................... _....__ .__...._._......_............................................._......................................._............_.._.................. __._......_.. -- Mapsco: 46H Council District: 2 CFA Number: 2017-129 ' City Project Number: 101052 To be completed b tall Received by: i Date: 34 Ss� 0 Q RECEIVED OCT 192017 N r C'YOFFORTWORTH y� CIIYSECRETARY �8�8SbEZ %,�a City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 4 CFA Official Release Date:02.20.2017 Page 1 of 1