Loading...
HomeMy WebLinkAboutContract 49794 q r FOpTW�Fl�N STANDARD COMMUNITY FACILITIES AGREEMENT £ THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. J ! I1 WHEREAS, D.R. Horton—Texas, LTD, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as Hawthorne Meadows Phase 3 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meadows Phase 3 OFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 2 of 11 CITY SECRETARY FT. WORTH, TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®, Sewer(A-1) ®, Paving(B) 0, Storm Drain(B-1) ®, Street Lights & Signs (C)M. E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meadows Phase 3 CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. L City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meadows Phase 3 CFA Official Release Date: 02.20.2017 Page 4 of 11 J Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused. in whole or in part. by the alleged negligence of the City of Fort Worth. its Qfflcers, servants, or employees. Nt Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such iniuries, death or damages are caused. in whole or in nam by the alleged negligence gf the City of Fort Worth, its officers. servants. or emplovees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meadows Phase 3 CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meadows Phase 3 CFA Official Release Date: 02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meadows Phase 3 CFA Official Release Date: 02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Hawthorne Meadows Phase 3 CFA No.: 2017-096 City Project No.: 100958 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A.Water and Sewer Construction 1. Water Construction $ 205,921.50 2.Sewer Construction $ 195,882.00 Water and Sewer Construction Total $ 401,803.50 B. TPW Construction 1.Street $ 402,966.75 2.Storm Drain $ 17,323.00 3.Street Lights Installed by Developer $ - 4. Signals $ - TPW Construction Cost Total $ 420,289.75 Total Construction Cost(excluding the fees): $ 822,093.25 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 8,036.07 D. Water/Sewer Material Testing Fee(2%) $ 8,036.07 Sub-Total for Water Construction Fees $ 16,072.14 E. TPW Inspection Fee(4%) $ 16,811.59 F. TPW Material Testing(2%) $ 8,405.80 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H.Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 25,217.39 Total Construction Fees: $ 41,289.53 Choice Financial Guarantee Options,choose one Amount (IM,ark onell Bond=100% $ 822,093.25 x Completion Agreement= 100%/Holds Plat $ 822,093.25 Cash Escrow Water/Sanitary Sewer=125% $ 502,254.38 Cash Escrow Paving/Storm Drain=125% $ 525,362.19 Letter of Credit=125%w/2yr expiration period $ 1,027,616.56 City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meadows Phase 3 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER D.R. Horton—Texas, LTD., a Texas Limited Partnership By: D.R. Horton, Inc., Jesus J. Chapa a Delaware Corporation, Assistant City Manager its Authorized Age t Date: _ 12- //r , 1-2 Recommended by: Name: Mark P. Allen 4CL Title: Assistant Vice President 'I ti Wendy C -Babulal, EMBA, P.E. Date: Development Engineering Manager Water Department ATTEST: (Only if required by Developer) CLu , �.-J Signature Douglas W. Wiersig, P.E. Name: Director Transportation & Public Works Department Contract Compliance Manager: Approved as to Form &Legality: By signing, I acknowledge that I am the person responsible for the monitoring and / administration of this contract, including ensuring all performance and reporting Richard A. McCracken requirements. Assistant City Attorne M&C No. Date: Form 1295: N'�4- Na e: Janie Morales Title: Development Manager ATTES . SOF FORT ;O Ary J. Kayser City Secretary Z City of Fort Worth,Texas "'AS Standard Community Facilities Agreement-Hawthome Meadows Phase 3 OFFICIAL RECORD CFA Official Release Date: 02.20.2017 CITY SECRETARY Page 9 of 11 FT.WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A:Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ❑ Exhibit C: Street Lights and Signs Improvements 0 Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meadows Phase 3 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100958 None City of Fort Worth,Texas Standard Community Facilities Agreement-Hawthorne Meadows Phase 3 CFA Official Release Date: 02.20.2017 Page 11 of 11 •.................... ............................... .............................................. Q 00GOLDEN TRIgNG �a0 9 BOULEVARD LE o =� z O W BONDS w RANCH E BONDS 35W ROAD m RANCH ROAD L..'L 0p HERITAGE TRACE m< a0 BOULEVARD Q� 81 PROJECT 156 287 LOCATION 0 Lo Wo 2 o� LL J O NORTH tiT PARKWAY HARMON ROAD �I 4w o4b, • a ' o ' o LL `a HAWTHORNE OWNER/ DEVELOPER: I�!II PELOTON III" LAMO /OL V710M/ NORTH MEADOWS D.R. HORTON 9800 HILLWOOD PARKWAY NOT TO SCALE SUITE 250 6751 NORTH FREEWAY PHASE 3 FORT WORTH, 6131 FPHO E:817-562-3350ORT WORTH,TX 7 DATE:JUNE,2017 � 3 .......................L'OT t OX ... .... .... ...... ---- --- --- .. ...... -------------------- ---- --------------- PRIV TE LOT 41X, OPEN SAPACE _;, 19 Q<Gy 9 � ' 41\\ PRIVATE OPEN 51 40 SPACE LOT 50X. -_._. 4 1 P 52411 •1` �j�j'�• f 1� 39 /•/qs PRIVATE OPEN SPACE 1 1 1 \ 18 18 17 / GO. 37 38 4 pN�SF (2) 53 I 15 13 \ 14 \ Cw 36 LOT 8X PRIVATE \ 54 E OO OPEN SPACE \ 35 34 8 \,l 55 11 32 33 - 7 7 I - 56 10_. 31 13 I 30 56XP LV6TP -i\I LOT 9X PRIVATE 9 6 OPEN SPACE 14 - `1 - OPEN SPACE 12 15---- © :i 10 5 4 21 16 PHASE 2 4 3 , _.._.. 10._...._ / i PHASE 3 12 3 w i1 0 �s 17 ---.-- - i ---- ---- FIDDLENECK 29 28 27 26 O7 13 2 z 18 _ STREET 25 14 1 19 / it �.. O 0, 20 Q1i w_ __ 24 15 w._..wx \Nest KI ROAD presid e{N- 41 LOT 9X W I 1 2 3 4 5 6 7 23 16 ZI 'MTU TRIVE �""•Pp °1331T4 PRIVATE OPEN �_� s J 1 12 1 St,#C t,C• ' SPACE Q11D D 9 22 17 Q 2 �co n-Iftco 21 LU:1 14 13 12 11 10 9 8 1 3 -- �&AKIPOSA _. 9 -i,I 20 19 10 LANE co 5 9 ;OPEN SPC ------ —�— 7 l E OL D IVE 6 7 3 4 5 6 7 8 9 10 11 12 8 6 v O 7 8 ry 1� O 5 i - -_m. m 10 ' g Prep� 53p25 4-- za 23 22 21 20 19 18 17 16 15 14 13 9 6\ns Ti?CS. - yl __..__ GHOST FLOWER I 3 � 1 10 5 - -_..DRIVE 2 -� _f..n — 4 `- 10 24 23 22 21 20 19 18 17 16 15 L4 13 12 - 1 `--- T LOT 1X PRIVATF� t 11 3 OPEN SPACE ' _ Ill I I LEGEND PROPOSED GATE VALVE PROPOSED SEPERATE CONTRACT �W EXIST GATE VALVE NOTES: 1. ALL PROPOSED WATER LINES ARE 8" PROPOSED FIRE HYDRANT UNLESS OTHERWISE NOTED : o PROPOSED FIRE HYDRANT 2. PROPOSED WATERLINES BY SEPERATE CONTRACT WILL BE CONSTRUCTED BY 'w EXIST FIRE HYDRANT THE SAME CONTRACTOR AT THE SAME TIME AS THIS CONTRACT(HAWTHORNE MEADOWS EXHIBIT A - WATER PHASE 2, CPN 100958, CFA 2017-096) ....... ... ............ ........-------- .....-----.... . ...................... .......... -- ......------------ . ..... - zoo' HAWTHORNS 0 NORTH OWNER/ DEVELOPER: IMI PELOTON "lob LAMO {OL V710Mt D.R. HORTON MEADOWS 9800 HILLWOOD PARKWAY SUITE 250 2 PHASE 3 F6751 ORT WORTH FRE 76131 FORT WORTH,TX 76177 F GRAPHIC SCALE PHONE:817-562-3350 (SHEET 2 OF 6) m DATE:JUNE 2017 :......-- ...•ta,,,,-.........••••••............................. .. .... ...............--•-- ••....... PRIVATE '� ''. ��/ /�jf`\ \, OPEN SPACE 19 \ 9 `., �+ y5+/.,' \ 41 LOT 41 X, 51 • I t \ !• ., `-y�'�—,SPA ATE OPEN ``•. \, \", , CE ---_--_--- '• `GY�.. /• ysx,ids , aoP LOT 5oX, 39 w.,, /� PRIVATE OPEN SPACE F' 52 1 17 18 gsx G` km P `, 1 • < 53 UJ: 15 18 ;\\G 37 s�' �SEZf ` __-_--'--- 14 �' `'S��%G'�J 36 '� LOT 8X PRIVATE V• 54 ' 13 fix / 35 0��:�� OPEN SPACE 3455 ssx .i 3 �� 1 32 \ �� 7 O I — --1�4 �-- �ssx _►'' \ 31 i \ •• I 56 10 30 14 13 AT A\ \It \�„,,''� LOT 9X PRIVATE 9 • 6 Y OPENPC f —— �/ �1` OPEN SPACE I '---------- ' --'_---`' 12 II� 10 ••• ' 5 u a , ®` 15 �.. '-----------� • ! 2O I i 18 11 ji �( PHASE 2 I 4 ___---3-------' k 7 1 ---, �f'10 ' 17 PHASE 3 3 - ----------- i FIDDLENECK -_---- -- I I29 28 27 26O 2 I $IREET 13 2 18 1 I a�--"---_----, 2514 X. 19 Jif i ss„ ` �. _.._..OI m I 20t —• ------— .\ Ir.. .KI .R .D •1 24 15 �I 9 Presha r���}41 �'ImI I' + 2 3 4 5 6 23 16 wl Lf21VEp jgy3 1 PRIVATE LOT 9OPEN #i l I) _ 7 _j I Zo 1 ' 121nS C.R '+"G 21 SPACE i I' D D 9 22 17 Q, — t w1i L m m • I 2 . -------------- I I' N 21 18 g• 11 I j LA d 3 ___—; MAKIPosA w 14 13 12 11 10 9 8 • i E 20 19 10 , __ I O 1 ' m9 Imo. ,� 11 I _.. .. .O ..D-IAsk TSXPRLVAT�Iss - .._ 5 L ;OPEN SPACE_I .......... 2 _. -------`-- 7 VE - 1 ---------i y 3 4 5 6 7 8 9 10 11 12 i a 8 Ii I X I' 2 10 7 r-------E \Nest 7 5\a\O fi s I. m m 8 --— PrePhast�53(.)2E' O 42a 23 221.21].20 19 18 17 16 15 14 13 9 r ' ER ---3---jiN �_ _.._.. .. .. ..�! 1 10 -5-- GHOST - GH FLOW -----a' I �% .. .. . .— -- --. IVE AOL 2 -ME ALI E T -IL� —f--••— — 11 a 10 24 23 22 21 20 19 18 17 16 15 14 13 12 4 _...e,OTPRIvAI i` H H H Hm m m m mH M H H HCH HmHm d c+s I 1 1,Y-r LEGEND PROPOSED SEWER LINES Q� EXIST SEWER LINES NOTE:ALL PROPOSED SANITARY SEWER ;d LINES ARE 8" UNLESS OTHERWISE NOTED EXHIBIT Al - WASTEWATER V OWNER/ DEVELOPER: Ii!II PELOTON HAWTHORNS — 0 Nonni 200” 1WL� M Ne SOLUT108 MEADOWS D.R. HORTON 9800 HILLWOOD PARKWAY SUITE 2506751 NORTH FREEWAY r PHASE 3 FORT WORTH,Tx 61 1 FORT WORTH, 76177 GRAPHIC SCALE PHONE:817-562-3350 0F.1F Ji!biF 7i?If _ .............. ............. ... .•--------._.........------------.------......----........----•, PKLOT41X. 1-1 OPEN SPACE 19G`• •`` 9 \\�'�a /%. �` 41 �'`�r PRIVATE OPEN 51 40 \ SPACE •.` ' ''.t P LOT 50X. �> 39 `., dd:�„ /yqS PRIVATE OPEN SPACE 52 C 17 . G,O `.., 3e .'"` ., , 0 53 �' , 16 �5l- ` 37 14 15 fr 36 ` LOT aX PRIVATE \ 51 �• ' 13 r 55 '� 35 OO OPEN SPACE W 34 ' 8 33 7 ------ - �-- \\ \'.\ 32 \ . O I 10 56 31 y I { 30 _, \ \\, - • 'L07 L _ S6XPR- _ LOT 9X PRIVATE 9 ' ' 6 OPEN SPACE 13 4 14 tl It \-_- OPEN SPACE 1 ------.------ ----- i a •. -__--- "-- I 1s © 12 t It 10 1 5 W. 4 21 16 :,_--. 1t 1, PHASE2 1 4 3 10 1 PHASE 3 12 3 r,,.--"-""----- • 5 FIDDLENECK ' --" 29 28 27 26 Qi 1 2 $IREET _i I 13 1 225 a. i 14 1 1 { 1s 1 gl 1 _.l ' 20 \ , - 24 15 �1 •---_ _ g5t ��I it-- -KI •R 07"" D - ` presidasll 441 LOT 9X WII Ij 1 2 3 4 5 6 7 23 16 Z' DA1�U - - RIVEhst#b21GT• PRIVATE OPEN �,i _ { 1- JI 1 r �.R• P1 SPACE �II iL> D 9 : 22 17 Q, 2 �- ---. { • N _, 11 N w 21 18 X.: 3 ___-_____� MAKIPOSA w`Ia 13 12 11 10 9 8 E s �} 1• { I J 2,(� 19 10 a ' 4 11 ' I . _. _.. .. _. .. -._.-J.._..- ------------------ _- - .r 1 ' 56 s44nVMT \ T -OP—E—T-ACEE O -D ____--"---'- 2 4 5 7 8 9 12 a 7 - -- --s Test cn ' sa`sL \G3 0 258 m 4 1 20 19 18 17 16 15 14 135 m I' ^ 23222 9 j II -- -- GHOST FLOWER WER 3 i`_ — — — — — 1 10 s { QR 2 Ir..... .. .. .._.. .. .. .._..- ------ -- �\ II I ME ALI E T IL 11 A { 70 1: ' ---- 1 1 1{ 24 23 22 21 20 19 18 17 16 15 14 13 12 1 60T 1X PRIVATE' 11 3 ! - OPEN SPACE - _. .._..dl..--...1{��-. a- w -a sig _ �.� w w wr www .ams+_ d I I 1 1 LEGEND 29' B-B/50' ROW(TYP) SIDEWALK BY DEVELOPER —————— SIDEWALK BY HOMEBUILDER NJH.C. RAMPS BY DEVELOPER Y EXHIBIT B - PAVING HAWTHORNE OWNER/DEVELOPER: �Ii,,l,�,I PELOTON ,•,•, LAND SOLUTIONS 0 NORTH 2O0' D.R. HORTON MEADOWS 9800 HILLWOOD PARKWAY SUITE 250 6751 NORTH FREEWAY FORT WORTH,TX 76177 z PHASE 3 FORT WORTH,TX 76131 PHONE:817-562-3350 GRAPHIC SCALE (SHEET 4OF =' r.......i.............td'"Imt...................... ..... ..._... ... ._.. ................._.................. ............. PRIVATE 1 ` LOT, \ > \\ /J4IX, ' OPEN SPACE �r 19 -:- 1 ' 9 PRIVATE/ ��\ 41 51 ATE OPEN 40 =`s��� SPACE -___-_---__1' TE OPEN --- \ 18 O « 39 PRIVATE SPACE Y Y 52 EX INL T®\ 16 \ 17 'S <�l 3e §�p� f < 53 X 24" 37 \ •1 r` 21" 5 �� �� tiAs 14 \ ' s"+` 36 - LOT 8X PRIVATE E2 �\\� , 54 12 \ 13 ` `' f s.! 5 /�� OPEN SPACE ��\ r' 4'x4'spx �. `� �� 341 3 24""HDWL 8 -55 -- �- 1_�" \ 33 ^� 11 10 —• 'r 1 31 I 30 X, ET 24" CLnj�L- 13 ,\, _,j LOT 9X PRIVATE 9 �- -F= - �J�'L1" 6 OPEN SPACE 14 /� 1 1\ _ OPEN SPACE I - - --{ '--. 15 © I �i It 10' INLET 10 j 5 W. 4 ' ----I EX 3�" EX 10'INLET i 11 ; 3 -' 4 -- 1s 7 EX 1 '1 11 EX 21" PHASE 2 I I 10 1 PHASE 3 12 I 3 0.- 17 29 28 7 O7 I 2 2 2-5'X4' 1a ._L.2 26 13 25 14 1-6'X4• r r I -�p�o�n�_.o� — 1 O� I I 19 1 r ♦ _1 � 20 est iN �r - KI ROD "1 I �- — — ' Pre24 is sha54-3 8441 LOT 9X w i ii 2 3 4 5 6 7 23 16 Z URA �RIVE2�nS �b21. G T• PRIVATE OPEN + + _ I J I I • �"'R• 21 SPACE I' D y 9 22 17 Q, �------.___a EX 24" I 1L m cn w' 2 2�=_ 11 N W : 21 18 g• 9 is 14 13 12 11 [1.0 9 8 I 3 ------- ----- C 15' 20 19 10�EX 21"t m! ,E 24" —.. - .. ..J L..._.. -------p 40 LLQQ—T�xer�V - a�'' REMOVE 24" HDWL AND PLUG 1 5 9 i YOPEN SPAC •• •_ ` Jff5. .. � DR VE — 1 - -- 7 1 w �7 1 1 i E2X 1" 6 • 2 ----- X. 1 • EX 39" t_- ---y 1 i 1 3 4 5 6 7 8 9 10 11 12 o�. a a 6 11 x = 10 7 r----"-- 'Nest O 5 - ! jo -- m m 8 —� Pry das 5 25 021 G�, 4 z4 23 22 21 20 19 18 17 16 15 14 13 9 ! VIS EX 0(2 t: -- EX 30" i it EX 21" --"----- —3 EX 10. I 5 10 1 - • r _ --t REMOVE 21"HDWL AND PLUG Y ----------i X 21" EX 1 " E _ T I T -IL- — — — — '• 11 9 4 10 E \ E 1X 10 # 11 24 23 22 21 20 19 18 17 16 15 14 13 12 --""-- 40T 1X PRIVKT l I: 11 3 ' —.. I NN SPACE w w H wNN ri_Fa� 1 1 It 1 1 LEGEND --�— PROPOSED STORM DRAIN INLET 0 EXIST STORM DRAIN INLET PROPOSED STORM DRAIN MANHOLE ' PROPOSED STORM DRAIN HEADWALL EXHIBIT B1 — STORM DRAINAGE OWNER/ DEVELOPER: IilII PELOTON o NORTM 200' HAWTHORNE IW LAND SOLU.I0N4 MEADOWS D.R. HORTON 9800HILLWOODPARKWAY SUITE 250 6751 NORTH FREEWAY FORT WORTH,TX 76177 GRAPHIC SCALE PHASE 3 FORT WORTH,TX 76131 PHONE:817-562-3350 (SHEET 5 OF 61c CATL-.JUNE.2717 s ---...... ------------------------------------------------------------- -----------------...._. ...--------- -----.. �i�\\ LOT 41 X, OPEN SPACE 19 9 41 ,�"------�_-{ A� / F`--PRIVATE OPEN 51 \ 1 ••` °. /�, �,,.\ 40 •`\ ♦ SPACE --------_.—� •• LOT 50X, \ /J��� �+ 39 \.� •'+e PRIVATE OPEN SPACE ' 52 17 38 7 53 16 37 PH4 14 �* 36 \` y LOT 8X PRIVATE j 54 13 f� i 35 Q7 �� OPEN SPACE 34 �' \ 6 55 \QQ�\ \\� 32 33' `.� \y 7 O, i 1_"-------�I /-- 56 10 31 30 \ 13 \ LOT 9X PRIVATE 9 6 Y 56X-PRI N sPACE — — 14 1 It / OPEN SPACE 1 15 ,2 i 10 © j 5 „u. a II n 1 t II 11 1 4 co: 16 ) I! /^ PHASE 2n 30. I i 10 ' 1 PHASE 3 12 1 3 t7 --` --- / i29 28 [2� 26O 113 1 2 est 18 II1 25 2 § i11q.41 — 14 j 1 of , �Sp2T. ` J• I _ 20 24 15 1 1 1 Lorsx .KI .R .D `LLIj Ii 1 2. 3 4 5 6 7 +� 23 16 WI Z !bAl'U L�DRIVE • 12 PRIVATE OPEN �• I• 1 21 SPACE �I IL 22 17 Q� j 2 M m ; at Ij N w ; 21 18 `- W. �; 14 13 12 11 10 9 8 1 3 J• �-20 19 10� T I 1 1 5 — -9 f 1 _ _ OPEN SPACE i'- .. ]UM O •D•IVE .. .� 7 T j 6 I: 1 2 3 4 5 6 7 8 9 10 11 12 j e t !�6 1 8 j 0 10 7 r -- ----f west O 5 L- m 8 ---------Pr 2253025 --4 �1 I 24 23 22 21 20 19 18 17 16 15 14 13 9 A 6\n0(lo' 3 . .. .. .. .._ ._. _. .. .. 1 10 5 ' 2 4 ` 10 23 22 21 2019�18 17 16 15 14 13 12OT iX PRNA I I; 11 3 CH H SSI H H H Hr H SSI H H SSI H S� d 1 1 1 1 , r LEGEND • PROPOSED STREET NAME SIGNS EXIST STREET NAME SIGNS EXHIBIT C1 - STREET NAME SIGNS V HAWTHORNE OWNER/ DEVELOPER: Ii!II PELOTON 0 NORTH 200' I I LAND SOLUTIONS MEADOWS D.R. HORTON 9800 HILLWOOD PARKWAY SUITE 2506751 NORTH FREEWAY } PHASE 3 FORT WORTH,TX 6131 FORT WORTH,6XL GRAPHIC SCALE PHONE:817-562-33350350 SriCET 6 OF fa I)A-E.,:k1NE PELOTON LAND SOLUTIONS,LLC 5751 KROGER DR,SUITE 185,KELLER,TX 76244(817)562-3350 HAWTHORNE MEADOWS PHASE 3 7/20/2017 WATERIMPROVEMENTS r # DESCRIPTION UNIT QTY UNIT PRICE TOTAL 261 8"PVC Water Pipe LF 2,878 34.00 97,852.00 003 1"Water Service EA 84 850.00 71,400.00 103 1 1/2"Water Service EA 4 1,800.00 7,200.00 003 8"Gate Valve EA 5 1,150.00 5,750.00 001 Fire Hydrant EA 2 4,500.00 9,000.00 001 Ductile Iron Water Fittings w/Restraint TON 31 4,000.001 10,000.00 3312.0117 Connection to E>asting 4"-12"Water Main EA 4 1,000.00 4,000.00 3305.0109 Trench Safety LF 2,8781 0.251 719.50 TOTAL WATER $205,921.50 SANITARY SEWER IMPROVEMENTS ITEM# IDESCRIPTION UNIT QTY UNIT PRICE TOTAL 3331.4115 8"Sewer Pipe LF 2,572 38.00 97,736.00 3339.1001 4'Manhole EA 8 3,600.00 28,800.00 9999.0001 CSS Encasement for Utility Pipes CY 29 20.00 580.00 3339.1003 4'Extra Depth Manhole VF 10 175.00 1,750.00 3301.0101 Manhole Vacuum Testing EA 8 50.00 400.00 3331.3101 4"Sewer Service EA 86 650.00 55,900.00 9999.0013 Conned to Ex 10"SS to✓I`SS EA 3 1,000.00 3,000.00 3305.0109 ITrench Safety I LF 2,572 1.00 2,572.00 3301.0002 Post-CCN Inspection LF 2,572 2.00 5,144.00 TOTAL SANITARY SEWER $195,882.00 STORM DRAINS IMPROVEMENTS ITEM# IDESCRIPTION UNIT QTY UNIT PRICE TOTAL 3341.0205 24"RCP,Class III LF 27 48.00 1,296.00 3349.5001 10'Curb Inlet EA 3 2,500.00 7,500.00 9999.0018 Remove Headwall EA 2 3,000.00 6,000.00 9999.0005 24"Sloping Headwall EA 1 2,500.00 2,500.00 3305.0109 Trench Safety LF 27 1.00 27.00 TOTAL STORM DRAIN $17,323.00 PAVING IMPROVEMENTS ITEM# DESCRIPTION UNIT QTY UNIT PRICE TOTAL 3213.0101 6"Conc Pvmt SY 9,544 34.00 324,496.00 3213.0301 4"Conc Sidewalk SF 1,241 3.00 3,723.00 3211.0501 6"Lime Treatment SY 10,021 2.75 27,557.75 3211.0400 Hydrated Lime TN 160 175.00 28,000.00 3213.0501 Banier Free Ramp,Type R-1 EA 3 1,200.00 3,600.00 3213.0504 Barrier Free Ramp,Type M-2 EA 3 1,000.00 3,000.00 3213.0506 Barrier Free Ramp,Type P-1 EA 3 1,000.00 3,000.00 3217.0503 24"SLD Pvmt Marking Paint(W) LF 42 20.00 840.00 9999.0017 IRemove End of Road Barricade EA 4 300.00 1,200.00 9999.0012 IStreet Sign EA 1 7 650.00 4,550.00 9999.0020 1 Street Name Blade EA 1 121 250.00 3,000.00 TOTAL PAVING $402,966.75 EBTIMATE S(MO ARY Water Improvements $205,921.50 Sanitary Sewer Improvements $195,882.00 Storm Thain Improvements $17,323.00 Paving Improvements $402,966.75 Total Estimate $822,193.25 7/1W101] CFA PROJECT QUANTITY MATRIX-HAWTHORNE MEADOWS PHASE 3 BFOiBT NO. MMTOTAL UNESPRICE TALCO ITBM rvO. BID ITBM UNIT 4 1 6 T 8 9 37 10 11 17 28 I9 8"PVC WakrF 28]8 I,8'18 f34W s".n. rn Smiu _ U.. 5]1400.00 3 I IIP W Scn'ia CA 4 IF— S:10U.cxI 9'Gak Vnl.oEA I I — $S)SOW in HEA 2 2 54 SW.W S90W.W Fhntile Iron Wnta Elv' ewl Rcatreinl TON 5400000 SIVOOV.10 ] Comeceanto Erinin 4'12"Wekr Mnin U 4 51 rXp.W f10W00 8 LF 2,8]d 50.25 S)1950 e'Seuv Pi LP' n IV RA 5] S3kW S9],J]6.f�0 8 1B53K w f2ddWW 4'MmMle mtl'ar Utili P CY 7 29 $2aW SSAO_W 12 1'F— !Me VT 10 $17600 S1]1— 13 McMok Vecumn Tod EA S50W 540G.M 14 1"6e—ice I86 56SO.tV 5<5900.W 15 Comctl Rx l ISINS'SH EA If1000_W 33000.00 16 T-11Iola LF 25]2 25]2 SI.. 13 PwLCC1V Im LF S]i 3210 $5,144.00 18 2J"RCP CIeu IIIOm LF 27 E] f4d.W wb Ink 3 52 5— S7.- 20 Romwe Hudwill EA 2 1 53 .W 36,o00.W 21 24"81u' Heedwell 1 52500.00 32.S00.W 22 irtoeh Se(eN LP 2J 21 51.00 Y3'1.00 21 6"Coot Rmt SY 9544 9541534.W f31449fi(Ni Sidewalk IF 1 41 1341 13 W 53]2F. 25 6"LweTrceuneot SV' 10,021 52.]5 52],55].]5 26 Hipntcd Limc 101E0 3I JSW $2S(UO.W 27 Bemee Fr 3512W.Cb 5]bW.Oo 28 }Ismer Fra u... TG 3 S'I(W.[p 5]0(800 29 Same Fm Pmi Tv P-11 F! 3 3 $I.-. IF- 3o 24"SLU Pvmt LF 42 31000 344000 31 Remove Eld nfRoed Beta ede FA lJp).O0 512 32 Sven S'n G I I ] S650.[xI 3451— 50fq trar Nemc Hlede 12 5250.00 3JOW.W IT TOTAL 38229033.13 Developer and Project Information Cover Sheet: Developer Company Name: D.R.Horton Texas,LTD Address, State,Zip Code: 6751 North Freeway,Fort Worth,TX 76131 Phone&Email: 817-230-800,mpallen@drhorton.com 1 Authorized Signatory,Title: Mark P.Allen,Assistant Vice President f I Project Name: Hawthorne Meadows Phase 3 Brief Description: Water, Sewer,Paving, Storm Drain Project Location: between Blue Mound Rd. ,HWY 287,and East Bonds Ranch Rd. Plat Case Number: FP-17-005 Flat Name: Hawthorne Meadows Mapsco: I 20U Council District: No. 7 CFA Number: 2017-096 City Project Number: 100958 To be completed staff. A2Received by:_ Date: 10/1, ^ RECEIVED co f ' ' 2017 0 cza �'RY CF FORT WORT[( - CITYSECRETARY Z 1 Wd I i I City of Fort Worth,Texas j Standard Community Facilities Agreement-Hawthorne Meadows Phase 3 CFA Official Release Date:02.20.2017 Page 1 of 11