Loading...
HomeMy WebLinkAboutContract 43534-A4 AMENDMENT No.4 CITY SECRETARY t� J? ` q y CONTRACT NO._ `7 a TO CITY SECRETARY CONTRACT < 9S b £ WHEREAS, the City of Fort Worth (CITY) and Criado & Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 43534, (the CONTRACT) which was authorized by M&C C-25758 on the 24th day of August, 2012 in the amount of $184,347 . 00; and WHER +LAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $47 , 460 .00 which was administratively authorized on October 2 , 2013, Amendment Number 2 in the amount of $5, 000.00 which was Administratively authorized on April 7, 2014 and Amendment No. 3 in the amount of $49,500 . 00 which was administratively authorized on September 28, 2015; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2011, WSM-A; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated October 3, 2017 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $47,188. 00 (water: $28, 188 . 00; sewer: $19,000 .00) . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services s1 a bean amount of $333,495.00. OFFICIAL RECORD CITY SECRETARY Page -1- FT.NORTH,TX 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of ort Worth Criado & Associates, Inc. Jesus J. Chapa Cristina Criado, P.E. Assistant CityManagerPresident CEO DATE: Id�6y�G � DATE: f(2 -- 11- /7 APPROVAL/RECOMMENDED: Chris Harder, P.E. Assistant Director, Water Department APPROVED AS TO FORM AND LEGALITY: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee M&C: N/A Title: Project Manager Date: N/A Douglas W. Black Senior Assistant City Attorney OF Fps,. ATTEST: ?' Mary J. ser ;:�y OFFICIAL RECORD City Secre ary ' CITY SECRETARY FT. WORTH, TX Page -2- CRIADO CIVIL ENGINEERING I LAND SURVEYING I SUBSURFACE UTILITY ENGINEERING CE&I October 3,2017 Mr. Robert Sauceda, P.E. Project Manager City of Fort Worth Water Department l000 Throckmorton Street Fort Worth,Texas 76102-6311 Re: Water and Sanitary Sewer Replacement Contract 2011,WSM-A-Amendment No.4 Dear Mr. Sauceda, Criado & Associates, Inc. (CRIADO) is pleased to s u b m i t Amendment No.4 t o C i t y S e c r e t a r y Contract No.43534for additional Engineering Services for the project "Water and Sanitary Sewer Replacement Contract 2011,WSM-A'. This amendment includes the following task: PROJECT MANAGEMENT CRIADO's contract schedule will be extended to December 30,2018. FINAL DESIGN CRIADO will provide three separate construction packages, instead of one, and incorporate up to three sets of designs "by others" into the first construction package. CRIADO will provide final design plans and estimates of probable construction cost, using standard CITY bid items for each part. CRiADO will provide construction documents and project manuals for each part. BID PHASE AND CONSTRUCTION PHASE SERVICES CRIADO will attend pre-bid meetings, public meetings, and pre-construction meetings. CRIADO will upload documents related to this amendment to Buzzsaw and maintain the plan holders list. CRIADO will prepare three mylar cover sheets and will attend the bid opening and assist the CITY with tabulating the bids. CRIADO will make an award recommendation to the CITY based on the documents submitted by the bidders. Our proposal to perform the additional engineering services is $47,188.0o and with approval of this amendment,the total fee for all work and services will be$335,485.00. The following additional contract documents are enclosed with this proposal:Amendment No.4(signed copy);and the Exhibit"B-2""Level of Effort"spreadsheet. 4100 Spring Valley Road,Suite 1001,Dallas,Texas 75244 1 (972)392-9092 1 (972)392-9192(0 1 www.criadoassociates.com CRIADO CIVIL ENGINEERING I LAND SURVEYING I SUBSURFACE UTILITY ENGINEERING I CE&I October 3, 2017 Robert Sauceda,P.E. Page 2 We trust this proposal is satisfactory and we appreciate the opportunity to be of service to the City of Fort Worth. If this proposal meets with your approval,please sign and date in the provided below and return one copy as your order to proceed and approval of the budget. Please call me if you have any questions. Sincerely, Original Contract $184347.00 Amendment No. 1 $47,46o.00 Amendment No. 2 $5,000.00 Amendment No. 3 $49500.00 Amendment No.4 $47.188.00 Revised Contract Total $333495.00 Cristina Criado,P.E. President/CEO Enclosures APPROVED: City of Fort Worth Robert Sauceda,P.E. Project Manager By: Date: 4100 Spring Valley Road,Suite 1001,Dallas,Texas 75244 J (972)392-9092 1 (972)392-9192(f)J www.criadoassociates.com EXHIBIT B-2 Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Amendment No.4:Water and Sanitary Sewer Replacement Contract 2011 WSM-A City Project No.01928,DOE No.6867 Labor hours Ex ones Task No. Task Description Primipsl project Project EIT CADD I Administrative Total Labor Subconsultant Total Expense Task Sub Total Manatier Engineer Cost Travel Reproduction Coat ate $220 $150 $120 $100 $80 $60 MWBE Non-MWBE 1.0 Project Management 0 40 0 0 0 0 $6,000 s0 $0 $0 $0 $0 $6,000 1.1 Managing the Team 10 1.1. QA/QC 15 $2,250 $0 $2,250 1.2 Communications and Reporting 1.2. Pre-Design Coordination Meeting s0 $0 $0 1,2. Desi n Submittal Review Mee' $0 $0 $0 1.2. Pre are Baseline Schedule $0 $0 $0 Prepare Monthly Progress Reports with 1.2. Schedule 12 $1,800 $0 $1,800 1.2. Prepare M-thty MBE/SBE R rts 3 $450 1 $0 $450 2.0 Conco ual Desi n 30-Perron 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 so 2.1 Data Collection s0 $0 $0 22 Conceptual Design Parka a s0 SO 2.2. Cover Sheet $0 $0 f0 2.2. Exhibits and Su nm $0 $0 so 2.2. Phasing $0 $0 $0 2.2. Construction Estimate $0 $0 $0 3.0 PreliminaryDesign 60 Percent 0 0 0 0 0 0 $0 $0 s0 so s0 s0 s0 3.1 Preliminary Design Package $0 $0 3.1.1 Cover $0 SO $0 3.1.2 NMIL out $0 s0 $0 3.1.3 Plan and Pla refile Sheets $0 $0 $0 3.1.4 1 S lions s0 $0 $0 3.1.5 Construction Estimate $0 $0 $0 3.2 Comstrudalbk Review s0 s0 so 3.3 Lit"Ity Clearance $0 $0 $0 4.0 Final Design 1 6 35 126 48 0 $22,060 $0 $0 $0 $108 $108 $22 168 Final Dra11(90%)Construction Plans and 4.1 S icetlona 3 6 48 $4,800 sib $18 54,818 4.2 Sinai 100X ens and tions 1 4 24 72 $10900 $90 $90 $10,880 4.3 Construction Estimates(90%and 100%) 4 8 48 $8360 s0 $0,360 5.0Bid Phase 0 28 26 30 0 3 $10,500 $0 $0 $0 s0 $0 410.51)(1 5.1 Bd Su 54, U d Documents to Buaeaw 10 6 3 $2,520 $0 $2,520 SeA Contract Documents and Maintain 5.1. Plan Holders List 4 16 3 $2.580 $0 $2,580 5.1 Issue Addenda 4 18 $2760 $0 $2,760 5.1. AHend Bid O i 9 $1,350 $0 $1,350 5.1. Tabulate Bids and Recommend Award 2 9 $1,290 $0 $1,290 5.2 ar D s $0 $0 $0 City of Fort worth,Texas Attachment B-Level of Effort Supplement TypWA Water and Sewer ReplaC mMMt FW WTR Official Rebase Date:8.09.2012 10r3l2017 EXHIBIT B-2 Level of Effort Spreadsheet TASKMOUR BREAKDOWN Design Services for Amendment No.4:Water and Sanitary Sewer Replacement Contract 2011 WSM-A City Project No.01928,DOE No.6867 Labor hoursEx arae Task No. Task Description Principal Project Project EIT CADD AtlminlstnOve Tout Labor Subconsultant Total Expense Task Sub Total Marta er En ineer Coat Travel Reprotlucdon Cost Rate $220 $150 $120 $10D $80 $801 MWBE Non-MWBE 6.0 Constructlon Phase Services 0 20 30 0 24 0 $8,520 $01 $0 $0 $5 $0 $0,52 6.1 Construction Support 6.1. Attend Preconstruction Conference 11 12 $3,090 $0 $3,090 6.1. Attend Public Meetinga 12 $2,640 $0 $2,840 8.2 Record D sfAs BuAt 1 6 24 $21790 $D $2,790 7.0 ROW/Easement Services 0 0 a 0 0 0 $0 $0 $0 $0 $0 $0 f0 7.1 R'hl-of-Ent Documents $0 $0 $0 8.0 Starve 0 p 0 a o 0 $0 $0 $0 $0 $0 $0 $a 8.1 esrgn uney 0 $0 $0 Totals 1 90 91 1561 72 3 $47,080 SD $o $0 447,1015.00 Water Litre Footage 1,882 00% Project Summa Sewer Lia F s 1,200 40% Total Hours 419 3 082 100% Tota(Labor 547,0811 Total Expense $108 (A) Total Fee $47,188 MBE/SBE Subconsuhant $( (B) Survey Fee $0 N--MBE/SBE Subconsultant 50 (C) Toal Fes- Fee $47,188 10% Sub Marku $0 WaterFee(W%of C) MBE/SBE Par clation 0.% 19,O % $28,158.00 Total Project Cost $17,188.00 City of Fort Worth,Tam Attachment B-Level of Ell"Supplement Typical Water and Sewer Replaxmara FW WTR Official Release tate,.5 09.2012 10/3(2017