Loading...
HomeMy WebLinkAboutContract 26895 CITY SECRETARY CONTRACT NO. AMENDMENT NO. 1 STATE OF TEXAS 3 CITY SECRETARY CONTRACT COUNTY OF TARRANT 3 WHEREAS, the City of Fort Worth (City) and Kimley-Horn and Associates, Inc. , (Engineer) made and entered into City Secretary Contract No. 25233, (the Contract) which was authorized by the City Council by M&C C-17633 on the 7 day of September, 1999; and WHEREAS, the Contract involves engineering services for the following project: Design and construction management of Repair and Repainting of 1 .0 MG Northwest Elevated Storage Tank, project No.P77-060770180200. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract : 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated April 25, 2001, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $6, 800. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum . of $132,300.00 USrn D' r� 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect . EXECUTED on this the 14 day of June 2001, in Fort Worth, Tarrant County, Texas . APPROVAL RECOMMENDED: APPROVED: LL Dale A. Fisseiel P.E. Mike Groomer Director, Water Department Assistant City Manager Kimley-Horn and Associates, Inc. ENGINEER ATTEST: Gloria Pearson, City Secretary B y. /Z— Name: Glenn A Garry, P.E. 801 Cherry Street Suite 1100 Fort Worth, Tx. 76102-6803 APPROVED AS TO FORM AND LEGALITY: C-17633 Contract Authorization 9-7-99 Date Gary Steinberger Assistant City Attorney F-S-CORD 2 CNN Cho Gr�,�,,�,���➢ ���o ®—® Kimley-Horn O and Associates, Inc. April 25, 2001 • sufte 1100 801 Cherry Street Fort Worth,Texas Mr. Seiavash Mir 76102.6803 Fort Worth Water Department City of Fort Worth 1000 Throckmorton St. Fort Worth, TX 76101 Re: Northwest Elevated Storage Tank Rehabilitation Additional Engineering Services Dear Mir: The original awarded scope for the Northwest Elevated Tank Rehabilitation is nearly complete. The Contractor is currently working on items associated with Change Order #1 issued by the City. Change Order #1 is the addition of $89,230 to the original contract that includes $63,230 of additional work that required design information, drawings and specifications to be provided to the Contractor by Kimley-Horn. Included in the change order were the following items: • Removal and Replacement of 20" Inlet/Outlet Cast Iron, Lead Joint Piping • Removal and Replacement of 12" Cast Iron, Lead Joint Overflow Piping • Removal and Replacement of Valve Vault on Inlet/Outlet.Line • Relocation of SCADA Antennae to new Pole with Vight Fixture We request the following fees associated with the additional service completed on this project: Drawings, Specifications & Contract Construction Administration for: • Inlet/Outlet Replacement $3,500 • Overflow Replacement $1,000 • Vault Replacement $1,500 • SCADA Antennae Pole and Light Fixture $800 �i IMF�l2�II VFF OT f � i Total for Additional Services $6,800 n „ ■ TEL 817 335 6511 MET 817 654 4266 FAX A17 335 6070 ®_❑ Kimley-Horn Mr.Seiavash Mir,April 25,2001,Page 2 and Associates, Inc. This increase amends the total not to exceed fee for Construction Phase Services from $60,000 to $66,800. We have enjoyed working with the City of Fort Worth on this project. I look forward to meeting with you on this subject. Please call if you have any questions. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Ztz'� ar Glenn A. Gary, P.E. GAG/TKB:hvh Copy to: Mr. David Townsend, P.E., FWWD P:\061018.010\ppp\AddS.".dx ,: Ellw�L� City of Fort Worth, Texas "Cagor And council communication DATE REFERENCE NUMBER LOG NAME TPAGE 9/7/99 **C-17633 60KIM 1 of 1 SUBJECT ENGINEERING AGREEMENT WITH KIMLEY-HORN AND ASSOCIATES, INC. FOR THE DESIGN AND CONSTRUCTION MANAGEMENT OF THE REPAIR AND REPAINTING OF THE NORTHWEST ELEVATED STORAGE TANK RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute an engineering contract with Kimley-Horn and Associates, Inc. for the design and construction management of the repair and repainting of the 1 MG Northwest Elevated Storage Tank for a fee not to exceed $125,500.00. DISCUSSION: The 1 MG Northwest Elevated Storage Tank was recently inspected and was found to be badly corroded and in need of repairs and repainting to extend the service life of the tank. In addition, modifications are required to meet Texas Natural Resources Conservation Commission and Occupational Safety and Health Administration requirements. The engineer will prepare construction plans and specifications for the repair and repainting of the Northwest Elevated Storage Tank and provide construction management during the construction phase of the project. The project is located in COUNCIL DISTRICT 2. Kimley-Horn and Associates, Inc. has complied with the City's M/WBE Ordinance by committing to 32% M/WBE participation. The City's goal on this project is 25%. FISCAL INFORMATION/CERTIFICATION: r The Finance Director-certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper-Water Fund. MGJ Submitted for City Manager's FUND I ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) Mike Groomer 6140 CITY C APPROVED 4 �` Originating Department Head: O� '� Lee Bradley,Jr. 8207 (from) S E P 7 1999 PW77 531200 060770180200 $125,500.00 Additional Information Contact: x C11729"34ary a'tl• Lee Bradley,Jr. 8207 City of Fort's orifi,T=:xav