HomeMy WebLinkAboutContract 48462-FP1 FORT WORTH. V, .vORETARY '�N' `NO. 4ncl- TRANSPORTATION AND PUBLIC WORKS NOTICE OF PROJECT COMPLETION (Developer Projects) rA S, dao n e City Project Ns: 100321 Regarding contract for TRAFFIC SIGNAL&PAVING TO SERVE GOLDEN TRIANGLE BLVD as required by the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Price: $182,115.45 Amount of Approved Change Orders: Ne 1 Revised Contract Amount: $182,115.45 Total Cost Work Completed: $182,115.45 Recomor Acceptance Date Asst i r, TPW - In � �� rai ort v`fi (�. ---`f r�Ir Accepted 6 Date 4W Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT Asst. City Manager Dirtl-w-, C`10,PWIIL t tYU Date Department of TP &W Const. Services CPN# Date Project anager U— (4- " OFFICIAL RECORDComments: Risk Management Canady CITY SECRETARY D.O.E. Brotherton ~l'1 GFA Morales/Scanned 1P-7 f-l'1 FT.WORTH,TX Gutzler/Scanned (,2-74- -) RECEIVED 1QN 2 2gle The Proceeding people have been Contacted �-+ concerning the request for final payment&have released this project for such payment. Rev.9/22/18,,-y-M .✓�,,. enrzdi FORT Wog RT H CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name GOLDEN TRIANGLE BLVD Contract Limits Project Type ST LIGHT City Project Numbers 100321 DOE Number 0321 Estimate Number I Payment Number 1 For Period Ending 6/28/2017 CD City Secretary Contract Number Contract Time 120;D Contract Date Days Charged to Date 246 Contract is 100.00 Complete Project Manager NA Contractor WILLIAMS DEVELOPMENT&CONSTRUCTION, 8990 HEMPSTEAD ROAD,SUITE 200 HOUSTON, TX 77008 Inspectors RUFFIN / RUFFIN I I i Tuesday,October 24,2017 Page I of 6 I City Project Numbers 100321 DOE Number 0321 Contract Name GOLDEN TRIANGLE BLVD Estimate Number 1 Contract Limits Payment Number I Project Type ST LIGHT For Period Ending 6/28/2017 Project Funding ST LIGFTT ItemDescriptimi of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 REMOVE SIDEWALK 405 SF $5.20 $2,106.00 405 $2,106.00 2 REMOVE CONC CURB&GUTTER 69 LF $19.00 $1,311.00 69 $1,311.00 3 FURNISH/INSTALL ELEC SERV PEDESTAL 1 EA $3,500.00 $3,500.00 1 $3,500.00 4 2"CONDT PVC SCH 80 30 LF $8.00 $240.00 30 $240.00 5 3"CONDT PVC SCH 80 1150 LF $12.00 $13,800.00 1150 $13,800.00 6 3"CONDT PVC ECH 80 385 LF $15.00 $5,775.00 385 $5,775.00 7 4"CONC SIDEWALK 205 SF $9.50 $1,947.50 205 $1,947.50 8 BARRIER FREE RAMP R-1 1 EA $1,800.00 $1,800.00 1 $1,800.00 9 BARRIER FREE RAMP M-2 1 EA $1,530.00 $1,530.00 1 $1,530.00 10 BARRIER FREE RAMP P-1 1 EA $1,679.00 $1,679.00 1 $1,679.00 11 BARRIER FREE RAMP C-2 1 EA $1,500.00 $1,500.00 1 $1,500.00 12 6"CONC CURB&GUTTER 20 LF $33.50 $670.00 20 $670.00 13 4"SLD PVMT MARKING HAS 12 LF $1.40 $16.80 12 $16.80 14 4"SLD PVMT MARKING HAS 24 LF $1.40 $33.60 24 $33.60 15 24"SLD PVMT MARKING HAE 321 LF $7.20 $2,311.20 321 $2,311.20 16 LANE LEGEND ARROW 2 EA $115.00 $230.00 2 $230.00 17 REMOVE 4"PVMT MARKING 56 LF $0.60 $33.60 56 $33.60 18 REMOVE 8"PVMT MARKING 15 LF $0.95 $14.25 15 $14.25 19 REMOVE 24"PVMT MARKING 25 LF $2.40 $60.00 25 $60.00 20 REMOVE LANE LEGEND ARROW 4 EA $36.00 $144.00 4 $144.00 21 REMOVE LANE LEGEND ONLY 4 EA $60.00 $240.00 4 $240.00 22 3-SECT SIGNAL HEAD ASSEMBLY 6 EA $850.00 $5,100.00 6 $5,100.00 23 4-SECT SIGNAL HEAD ASSEMBLY 2 EA $950.00 $1,900.00 2 $1,900.00 24 PED SIGNAL HEAD ASSEMBLY 4 EA $650.00 $2,600.00 4 $2,600.00 25 FURNISH/INSTALL BBU SYSTEM EXT I EA $6,800.00 $6,800.00 1 $6,800.00 MOUNTED 26 FURNISHANSTALL HYBIRD DETECTION 3 AP $9,550.00 $28,650.00 3 $28,650.00 SYSTEM 27 FURNISH/INSTALL HYBIRD DETECTION 465 LF $2.25 $1,046.25 465 $1,046.25 CABLE 28 4/C 14 AWG MULTI CONDUCTOR 40 LF $1.00 $40.00 40 $40.00 29 5/C 14 AWG MULTI CONDUCTOR 345 LF $1.00 $345.00 345 $345.00 Tuesday,October 24,2017 Page 2 of 6 City Project Numbers 100321 DOE Number 0321 Contract Name GOLDEN TRIANGLE BLVD Estimate Number 1 Contract Limits Payment Number I Project Type ST LIGHT For Period Ending 6/28/2017 Project Funding 30 7/C 14 AWG MULTI CONDUCTOR 115 LF $1.25 $143.75 115 $143.75 31 10/C 14 AWG MULTI CONDUCTOR 490 LF $2.00 $980.00 490 $980.00 32 20/C 14 AWG MULTI CONDUCTOR 295 LF $4.00 $1,180.00 295 $1,180.00 33 3/C 14 AWG MULTI CONDUCTOR 510 LF $1.00 $510.00 510 $510.00 34 NO 6 INSULATED ELEC CONDR 20 LF $1.25 $25.00 20 $25.00 35 NO 8 INSULATED ELEC CONDR 220 LF $1.00 $220.00 220 $220.00 36 NO 6 BARE ELEC CONDR SLD 10 LF $1.25 $12.50 10 $12.50 37 NO 8 BARE ELEC CONDR 1535 LF $1.00 $1,535.00 1535 $1,535.00 38 GROUND BOX TYPE D W/APRON 5 EA $750.00 $3,750.00 5 $3,750.00 39 GROUND BOX TYPE AS 6 EA $3,145.00 $18,870.00 6 $18,870.00 40 FURNISH/INSTALL 10'-14'PED POLE 4 EA $850.00 $3,400.00 4 $3,400.00 ASSEMBLY 41 FURNISH/INSTALL TYPE 42 SIGNAL POLE 1 EA $2,986.00 $2,986.00 1 $2,986.00 42 FURNISH/INSTALL TYPE 43 SIGNAL POLE I EA $3,664.00 $3,664.00 1 $3,664.00 43 FURNISH/INSTALL TYPE 46 SIGNAL POLE 1 EA $5,329.00 $5,329.00 1 $5,329.00 44 FURNISIVINSTALL MAST ARM 16'-36' 1 EA $1,467.00 $1,467.00 1 $1,467.00 45 FURNISH/INSTALL MAST ARM 40'-48' 1 EA $1,828.00 $1,828.00 1 $1,828.00 46 FURNISH/INSTALL MAST ARM 52'-60' 1 EA $3,180.00 $3,180.00 1 $3,180.00 47 TY I SIGNAL FOUNDATION 4 EA $950.00 $3,800.00 4 $3,800.00 48 TY 3 SIGNAL FOUNDATION I EA $1,800.00 $1,800.00 1 $1,800.00 49 TY 4 SIGNAL FOUNDATION 1 EA $2,340.00 $2,340.00 1 $2,340.00 50 TY 5 SIGNAL FOUNDATION 1 EA $2,990.00 $2,990.00 1 $2,990.00 51 SIGNAL CABINET FOUNDATION 1 EA $1,800.00 $1,800.00 1 $1,800.00 52 FURNISH/INSTALL ATC SIGNAL CONTROLLER 1 EA $5,049.00 $5,049.00 1 $5,049.00 53 FURNISH/INSTALL ALUM SIGN MAST ARM 3 EA $650.00 $1,950.00 3 $1,950.00 MOUNT 54 REMOVE SIGN PANEL AND POST 2 EA $50.00 $100.00 2 $100.00 55 TRAFFIC CONTROL 3 MO $2,350.00 $7,050.00 3 $7,050.00 56 FURNISHANSTALL352ICONTROLLER 1 EA $14,783.00 $14,783.00 1 $14,783.00 CABINET 57 REMOVE AND DISPOSE OF TIMBER POLE 1 EA $700.00 $700.00 1 $700.00 58 REMOVE LUMINAIRE ARM AND FIXTURE 1 EA $300.00 $300.00 1 $300.00 59 REMOVE LUMINAIRE FIXTURE AND REPLACE 3 EA $1,000.00 $3,000.00 3 $3,000.00 WITH 138W LED 60 STREET NAME SIGNS 3 EA $650.00 $1,950.00 3 $1,950.00 Tuesday,October 24,2017 Page 3 of 6 City Project Numbers 100321 DOE Number 0321 Contract Name GOLDEN TRIANGLE BLVD Estimate Number I Contract Limits Payment Number i Project Type ST LIGHT For Period Ending 6/28/2017 Project Funding Sub-Total of Previous Unit $182,115.45 $182,115.45 Tuesday,October 24,2017 Page 4 of 6 i City Project Numbers 100321 DOE Number 0321 Contract Name GOLDEN TRIANGLE BLVD Estimate Number I Contract Limits Payment Number I Project Type sT LIGHT For Period Ending 6/28/2017 Project Funding Contract Information Snmmary I Original Contract Amount $182,115,45 Chanile Orders I Total Contract Price $182,115.45 i Date LO&I7 Total Cost of Worlc Completed 5182,115.45 � Contra a"r Less %Retained $0.00 � �, j—JZ l` Net Earned 5182,115.45 Y / Date Earned'misPeriod $182,115.45 Iuspeo a Supervl j�� Rctninage'I'bisPcriod $0.00 Date Less Liquidnted Damages jc t anager `� ! Days a /Day $0.00 \ D to J L LessPnvement Deficiency $0.00 A s. Infrastructure Dcsign and Construction Less Penalty $0.00 Less Previous Payment $0.00 Direct r Cootracling Dcpnrtmenl Plus Material on Hand Less 15% 50.00 Balance Due This Payment $182,115.45 it Page 5 of G Tuesday,Oclober 24,2017 City Project Numbers 100321 DOT Number 0321 Contract Name GOLDEN TRIANGLE BLVD Estimate Number I Contract Limits Payment Number I Project Type ST LIGIFF For Period Endh►g 6/28/2017 Project Funding Project Manager NA City Secretary Contract Number Inspectors RUFFIN / RUFFIN Contract Date Co►tractar WILLIAMS DEVELOPMENT&CONSTRUCTION, Contract Time 120 CD 8990 HEMPSTEAD ROAD,SUITE 200 Days Charged to Date 246 CD ! HOUSTON, TX 77008 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded f Total Cost of Work Completed $182,115.45 Less %Retained $0.00 Net Earned $182,115.45 Earned This Period $182,115.45 Retainage This Period $0.00 Less Liquidated Damages 0 Days cQ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $182,115.45 Tuesday,October 24,2017 Page 6 of 6 FORTWORTH rev 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME . FINAL STATEMENT NO.:1st and Final NAME OF PROJECT: Traffic Signal and Paving to serve Golden Triangle Blvd. PROJECT NO.: 100321 CONTRACTOR: Williams Development DOE NO.: N/A PERIOD FROM:06/01/17 TO: 06/30/17 FINAL INSPECTION DATE: 5-Jul-]7 WORK ORDER EFFECTIVE:11/7/2016 CONTRACT TIME: 120 0 w *- CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS MONTH CHARGED REASON FOR DAYS CREDITED MONTH CHARGED DURING DURING CREDITED 1. ']'hu 1 16. Fri 1 2. Fri t 17. Sat 1 3. Sat I 18. Sun 1 4. Sun 1 19. Mon 1 5. Mon I 20. Tue ! 6. Tue 1 21. Wed I 7. Wed 1 22. Thu 1 8. Thu 1 23. Fri 1 9. Fri 1 24, Sat I 10. Sat 1 25. Sun 1 11, Sun 1 26. Mor 1 12. Mon t 27. Tue 1 13. Tue 1 28. Wed 1 14. Wed l 29. Thu 1 15. Thu t 30. Fri I Stop Time. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL THIS &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS PERIOD 30 30 PREVIOUS PERIOD 216 216 TOTALS TO DATE 24G 246 *REMARKS: CONTRACTOR DATE INSPEC R V11 DATE ENGINEERING DEPARTMENT +.�� The Cit}'of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 0a (817)392-7941 •Fax:(817)392-7845 FORT WORTH RFV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I CONTRACTOR&PROJECTDATA None of Conn-nc7or Project Hallie Williams Development Traffic Signal&Paving to serve Golden Triangle Blvd Inspector C10,Project Number Darryl Ruffin 100321 Cawl"la9lan Components Project Alanager ❑ Water❑ Waste Water❑ Storm Drainage❑✓ Pavement Gopal Sahu Initial Contract Amount Projecl Djfcully $182,115,45 O Simple Routine O Complex 1•Durl Contract Amount Date ,$182,115.45 6/30/2017 11)PERFORMANCE EVALUATION 0-Inadequate I-Delicient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Pltms on Site 5 Y 3 20 15 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 4 60 60 7 Job Site Safely 15 Y 4 60 60 S Traffic Control Maintenance 15 Y 3 60 45 9 Daily Cleon Up 5 Y 3 20 IS 10 Citizen's Complaint Resolution 5 Y 4 20 20 } 5 Y 3 20 15 III Property Restoration 12 After Hours Response 5 Y 4 20 20 13 Proiccl Completion 5 Y 4 1 20 1 20 TOTAL ELEMENT SCORE(A) 403 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 403 111)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating(ITS/MSJ h 100%) 403 / 448 — 90% I' Performance Category Excellent <20%=Inadeguale 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspeclo•'s Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature ✓ Conhactor Signature Inspector's Supervisor Signature 1 � CON'rRAC'rOR'S COMMENTS 'i'It11NSP01iTAT`ION AND PUBLIC WORKS The City of Font Vlorth•8851 Camp Bowie West Blvd.•Fort Worth,'1176116•(817)392-8306 FORTWORTHREV:02'22107 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY 1 PROJECT INFORMATION Date: 6/30/2017 Name ofCont•aclor Project Name Williams Development Traffic Sign Is&Paving to serve Golden Triangle Blvd. DOE Inspector Projecl Manager Darryl Ruffin Go al Sahu DOE Ahauber Projecl Dffficullp Tjpe of Contract N/A 0 Simple QQ Routine Q Complex ❑ water[] wastewater[] Storm DralnageD Pavement lnillal Contact Aruoanl final Contract/1111011111 $182,115.45 $182,115.45 11)PERFORMANCE EVALUATION 0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Ins ector I Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications 4 Display Of Professionalism 4 ccuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting tip Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Pa meats 4 Resolution ofUtility Conflicts 3 Bid O enin to Pre-Con Meeting Timefi-ame 111)COMMENTS&SIGNATURES COMMENTS I Signature Contractor Signature DOE Inspector Vu Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS � f The City of Fort Worth•1000 Throclunorton Street•Fort Wortlr,TX 76012-6311 i (817)392-7941 •Fix:(817)392-7845 I I AFFIDAVIT STATE OF Texas i COUNTY OF Harris Before me,the undersigned authority, a notary public in the state and county aforesaid,on this day personally appeared Tim Sneed, Director of Operations Of Williams Development& Construction, Inc, known to me to be a credible person,who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Golden Triangle Blvd- Traffic Signal aving BY Tim Sneed,Director of Operations Subscribed and sworn before me on this date 13 of October,2017. 4 otary Public Arris, •00094, p ••• 0takls� •. �t1�•�y,PUBE�C!� i • • � r r Y�- • •0. • 081 i i C CONSENT OF OWNER SURETY COMPANY ARCHITECT CONTRACTOR TO FINAL PAYMENT SURETY AIA DOCUMENT G707 Bond No. 61BCSEM8315 OTHER PROJECT: Traffic Signal& Paving Improvements to Serve Golden Triangle Blvd. TO (Owner) ARCHITECT'S PROJECT NO: Sam's Real Estate Business Trust CONTRACT FOR: Construction 702 SW 8'1' Street Bentonville, AR 72716 CONTRACT DATE: April 11,2016 In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here insert name and address of Surety Company). Hartford Fire Insurance Company , SURETY, One Hartford Plaza Hartford,Connecticut 06115 on bond of(here insert name and address of Contractor) Williams Development& Construction,Inc. ,CONTRACTOR, 8990 Hempstead,Suite 200 Houston,Texas 77008 hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to(here insert name and address of Owner) Sam's Real Estate Business Trust , OWNER, 702 SW 8`1' Street Bentonville, AR 72716 as set forth in the said Surety Company's bond, IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this 3rd day of January 2018 Hartford Fire Insurance Company Sur Company Witness: ' (- & (Seal): �` A;,Zk Q I aix l gnature of Authorized Representative -- Myi 1Teffer n Richard Covington, Attorney-in-Fact NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,Current Edition AIA DOCUMENT 6707 - CONSENT OF SURETY COMPANY TO FINAL PAYMENT - APRIL 1970 EDITION - AIAO CC) 1970 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE.,NW,WASHINGTON,D.C,2000 Direct Inquiries/Claims to: THE HARTFORD BOND,T-12 POWER OF ATTORNEY Hartfod,Conne tcut06165 Bond.CiaimsAthehartford.com ca//:888-266-3488 or tax:860-757-5835 Agency Name: MCGRIFF SEIBELS WILLIAMS OF TX INC KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 61-611452 _ Hartford Fire Insurance Company,a corporation duly organized under the laws of the State of Connecticut Hartford Casualty insurance Company,a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company,a corporation duly organized under the laws of the State of Connecticut O Hartford underwriters Insurance Company,a corporation duly organized tinder the laws of the State of Connecticut Twin City Fire Insurance Company,a corporation duly organized under the laws of the State of Indiana O Hartford Insurance Company of Illinois,a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest,a corporation duly organized under the laws of the State of Indiana Hartford insurance Company of the Southeast,a corporation duly organized under the laws of the State of Florida having their home office in Hartford,Connecticut, (hereinafter collectively referred to as the"Companies")do hereby make, constitute and appoint, up to the amount of unlimited : Joseph R. Aulbert, MARC W. BOOTS, Richard Covington, Ashley Koletar, Vickie Lacy, Maria D. Zuniga of HOUSTON, Texas their true and lawful Attorneys)-in-Fact,each in their separate capacity if more than one is named above, to sign its name as surety(ies)only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof,on behalf oft he Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of.contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. ` In Witness Whereof,and as authorized by a Resolution oft he Board of Directors of the Companies on May6,2 015 the Companieshave caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further,pursuant to Resolution of the Board of Directors of the Companies,the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. .yw. t`• fl �I 1447 ;,•', A ♦ 3i � F ♦ 6�+�M�.�, ae •ti• +.�! '`4�frltrtt` � 4U�F t�.;tt`,tfl79`i � la7D� 0:11-It John Gray,Assistant Secretary M.R oss Fisher,S enior Vice President STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD ))) On this 11 th day of January,2016,before me personally came M. Ross Fisher,to me known,who being by me duly sworn,did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies,the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority, 0 1 Nora M.Stranko Notary Public CERTIFICATE My Commission Expires March 31,2018 I,the undersigned,Assistant Vice President of the Companies,DO HEREBY CERTIFY thatt he above and foregoing,is a true and correct copy oft he Power of Attorney executed by said Companies,which is still in full force effective as of 3rd day of January, 2018, Signed and sealed at the City of-I artford. 'G hM►+� �� .� 9 '+ tssv .� � . 9{ � is . ! � .. * - `ryi. !r14\i •4ATla- bra'�!�+ • N rt, ir�� 4NN+ ..�.• a. : Kevin Heckman,As sistant Vice President nrn 2016