HomeMy WebLinkAboutContract 50339 City Secretary CITY SECRETARY — 0/ CONTRACT NO. a Construction C I FORTWORTH Project Manager[3 PROJECT MANUAL FOR THE CONSTRUCTION OF BRIDGE REHABILITATION FOR W. LANCASTER AVENUE BRIDGE (2017-2) City Project No. 100633 Betsy Price David Cooke Mayor City Manager Douglas W. Wersig, P.E. Director,Transportation and Public Works Department Prepared for The City of Fort Worth TRANSPORTATION AND PUBLIC WORKS 2017 a OF loci e jY �6 o f �•�e�o►e•ess s•so•o0o ise RAD I.IdUS�'�LI.�f i �•e•aeo••ee•rseeosps•s� e �i��►0 88823 e•�•O e A ee�01101 e • �. <F GQ OFFICIAL RECORD CITY SECRETARY t'7. VV01IRTH,Tit FORTWORTH PROJECT MANUAL FOR THE CONSTRUCTION OF BRIDGE REHABILITATION FOR W. LANCASTER AVENUE BRIDGE (2017-2) City Project No.100633 Betsy Price David Cooke Mayor City Manager Douglas W.Wiersig,P.E. Director,Transportation and Public Works Department Prepared for The City of Fort Worth TRANSPORTATION AND PUBLIC WORKS 2017 OF `' +!! a �r*.e.............e.i.� ,..RIAD 1;NU5RALLAH..� !!! 68823 ` : 7tl F F 000000-1 TABLE OF CONTENTS Page 1 of 2 1 SECTION 00 00 00 2 TABLE OF CONTENTS 3 Division 00- General Conditions 4 00 05 10 Mayor and Council Communication 5 00 05 15 Addenda 6 00 11 13 Invitation to Bidders 7 0021 13 Instructions to Bidders 8 00 35 13 Conflict of Interest Affidavit 9 00 41 00 Bid Form 10 00 42 43 Proposal Form Unit Price 11 00 43 13 Bid Bond 12 00 43 37 Vendor Compliance to State Law Nonresident Bidder 13 00 45 26 Contractor Compliance with Workers'Compensation Law 14 00 45 40 Minority Business Enterprise Goal 15 00 52 43 Agreement 16 0061 13 Performance Bond 17 00 61 14 Payment Bond 18 0061 19 Maintenance Bond 19 00 61 25 Certificate of Insurance 20 00 72 00 General Conditions 21 00 73 00 Supplementary Conditions 22 23 Division 01 - General Requirements 24 01 1100 Summary of Work 25 01 25 00 Substitution Procedures 26 01 31 19 Preconstruction Meeting 27 01 31 20 Project Meetings 28 01 32 16 Construction Progress Schedule 29 01 32 33 Preconstruction Video 30 01 33 00 Submittals 31 01 35 13 Special Project Procedures 32 014523 Testing and Inspection Services 33 01 50 00 Temporary Facilities and Controls 34 01 55 26 Street Use Permit and Modifications to Traffic Control 35 01 57 13 Storm Water Pollution Prevention Plan 36 01 58 13 Temporary Project Signage 37 01 60 00 Product Requirement 38 01 70 00 Mobilization and Remobilization 39 01 74 23 Cleaning 40 01 77 19 Closeout Requirements 41 01 78 39 Project Record Documents 42 43 Division 34-Transportation 44 3471 13 Traffic Control 45 46 Special (TxDOT)* 47 TxDOT Plan and Text Concrete Pavement(0-1/2")—Spec 354-6013 48 TxDOT Concrete Structural Repair(Clean &Coat with Epoxy)—Spec 429-6001 49 TxDOT Concrete Structural Repair(Partial Depth Rapid Deck Repair)—Spec 429-6004 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 9,2011 000000-2 TABLE OF CONTENTS Page 2 of 2 1 TxDOT Concrete Structure Repair(Vertical or Overhead)—Spec 429-6007 2 TxDOT Multiple Layer Polymer Overlay—Spec 439-6013 3 TxDOT Clean &Paint Existing Structure(System III-A) (Bottom Chord)—Spec 446-6013 4 TxDOT Clean&Paint Existing Structure(System III-A)(Gusset Plate)—Spec 446-6013 5 TxDOT Clean&Paint Existing Structure(System III-A)(Floor Beam)—Spec 446-6013 6 TxDOT Clean&Paint Existing Structure(System III-A)(Vertical)—Spec 446-6013 7 TxDOT Clean &Paint Existing Structure(System III-A) (Angle)—Spec 446-6013 8 TxDOT Clean&Paint Existing Structure(System III-A) (Bearing)—Spec 446-6013 9 TxDOT Install Rail(Pedestrian)(Special)—Spec 450-6082 10 TxDOT Remove Structure(Rail)—Spec 496-6099 11 TxDOT Replace Steel Bridge Member(Rivet/Bolt)—Spec 784-6038 12 TxDOT Repair Steel Bridge Member(Truss Vertical)—Spec 784-6004 13 TxDOT Repair Steel Bridge Member(Bottom Chord)—Spec 784-6011 14 TxDOT Repair Steel Bridge Member(Floor Beam)—Spec 784-6022 15 TxDOT Repair Steel Bridge Member(Lateral Bracing)—Spec 784-6044 16 TxDOT Repair Steel Bridge Member(Gusset Plates)—Spec 784-6050 17 TxDOT Power Wash Steel Members(Bottom Chord)—Spec 999-9999 18 19 *TxDOT Standard Specifications for Construction and Maintenance of Highways, Streets and 20 Bridges 2014 adopted by the Texas Department of Transportation are included for this Project by 21 reference and can viewed/downloaded from Project Folder at City's Buzzsaw site at: 22 23 http://www.fortworthgov.org/purchasing/ 24 25 Appendix 26 GC-6.06.D Minority and Women Owned Business Enterprise Compliance 27 GC-6.07 Wage Rates 28 AP-1 Bridge Locations,Quantity Summaries,Plans and Details 29 30 END OF SECTION CITY OF FORT WORTH BRIDGE REHABELITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 9,2011 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 2/6/2018 DATE: Tuesday, February 6, 2018 REFERENCE NO.: **C-28567 LOG NAME: 20BRIDGE REHABILITATION 2017-2 WEST LANCASTER BRIDGE SUBJECT: Authorize Execution of a Contract with Gibson &Associates, Inc., in the Amount of$695,694.00 for Bridge Rehabilitation 2017-2 for West Lancaster Avenue Bridge (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council authorize the execution of a contract with Gibson &Associates, Inc., in the amount of$695,694.00 for Bridge Rehabilitation 2017-2 for West Lancaster Avenue bridge. DISCUSSION: This contract provides for the repair and rehabilitation of West Lancaster Avenue bridge over Forest Park/Trinity River (100633). The major bridge repairs and rehabilitations include deck repair and overlay, substructure concrete crack repair, repair of steel members, clean and paint steel members, and pedestrian rail repair. Construction for this project is expected to start approximately March 2018 and to be completed by approximately July 2018. Upon completion of the project there will be no anticipated impact on the general fund operating budget. This project was advertised for bid on October 26, 2017 and November 2, 2017 in the Fort Worth Star- Telegram. On November 30, 2017, the following bids were received: Bidders Amoun Gibson &Associates, Inc. $695,694.00; ,Structural Assurance LLC $795,540.00; M/WBE OFFICE: Gibson &Associates, Inc., is in compliance with the City's BDE Ordinance by committing to five percent MBE participation and documenting good faith effort. Gibson &Associates, Inc., identified several subcontracting and supplier opportunities. However, the MBE's contacted in the areas identified did not submit the lowest bids. The City's MBE goal on this project isl0 percent. The City reserves the right to increase or decrease quantities of individual pay items within the contract provided that the total contract amount remains within plus or minus 25 percent of the contract award. This project is located in COUNCIL DISTRICT 9. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the General Capital Projects fund as previously appropriated. Logname: 20BRIDGE REHABILITATION 2017-2 WEST LANCASTER BRIDGE Page I of 2 FUND IDENTIFIERS (FIDS): TO Fund Department ccoun Project Program ctivity Budget (Reference } mount ID ID Year Chartfield 2 FROM Fund Department ccoun Project JProgram ctivity Budget Reference # moun ID ID Year Chartfield 2 CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (7801) Additional Information Contact: Tariqul Islam (2486) ATTACHMENTS 1. Compliance Memo.pdf (CFW Internal) 2. FID Lancaster Bridge.pd (CFW Internal) 3. Form 1295.pdf (Public) 4. Map Bridge 2017-2.pdf (Public) 5. SAM Search (2).pdf (CFW Internal) Logname: 20BRIDGE REHABILITATION 2017-2 WEST LANCASTER BRIDGE Page 2 of 2 CERTIFICATE OF INTERESTED PARTIES FORM 1295 a of 1. Coes iplete Nos.1.4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 12017-297165 Gibson&Associates, Inc. Balch Springs,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 12/28/2017 being filed. City of Fort Worth Date Acknowl/dged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 2017-2 W.Lancaster Bridge Rehabilitation Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling I intermediary Gibson,William J. Balch Springs,TX United States X Gibson.William E. Balch Springs,TX United States X. Meador,Alan C. Balch Springs,TX United States X Welch,John N. Balch Springs,TX United States X Blackburn,Patricia L Balch Springs,TX United States X 5 Check only it there is NO Interested Party. 5 UNSWORN DECLARATION l My name is 'l 0r`,i �Y�/ e la, and my date of birth is \-,� My address is V[ til It 1 �11 4r� F�1 14L? 5ik- (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. t � Executed in t County. State of on the 2 day of fht ,201 (month) (year) /A 'u, av Si nature of authorized agent,of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1,0.3337 I ADDENDUM NO. 1 BRIDGE REHABILITATION FOR W.LANCASTER AVENUE BRIDGE(2017-2) CITY PROJECT NO.: 100633 Addendum No. 1 Issued: October 31,2017 Prospective Bidders are hereby notified of the following revisions: SECTION 00 1113-INVITATION TO BIDDERS: The address of City of Fort Worth Purchasing Office should read: City of Fort Worth Purchasing Division 200 Texas Street Fort Worth,Texas 76102 SECTION 00 4100—BID FORM: The address of City Manager's office should read: The City Manager c/o: The Purchasing Department 200 Texas Street City of Fort Worth,Texas 76102 Please acknowledge receipt of this addendum by signing and inserting into your proposal at the time of bidding. Failure to return a signed copy of this addendum may be grounds for rendering the bid as nonresponsive. Receipt Acknowledges: By: li By: A t�. ,�64LH tjtcE eLdrea�Nt TARIQ11 ISLAM,PROJECT MANAGER i ADDENDUM NO.2 BRIDGE REHABILITATION FOR W.LANCASTER AVENUE BRIDGE(2017-2) CITY PROJECT NO.: 100633 Addendum No.2 Issued:November 1.6,2017 Prospective Bidders are hereby notified of the following revisions: BRIDGE PLAN SHEET: Plan Sheet no. 10,11, 12, 13, 16, 17 and 20 shall replace with attached revised plan sheets. Please acknowledge receipt of this addendum by signing and inserting into your proposal at the time of bidding. Failure to return a signed copy of this addendum may be grounds for rendering the bid as nonresponsive. Receipt Acknowledges: By: By: (V Va y. 'Wen , en TARIQ ( ISLAM,PROJECT MANAGER l '�l 7)) ', (�(JI F ILEI...NAMCker\Ci fy.FN.Layo f.Ot.OOn SCALD1,20 PLOT DRIVERt VR;-SAKER.kIN.8A.PDF.R1*ofp DATE1 1111CF201?T114:3142t43 PN USER.jbb 1.O-dt-r PENTABLE.Fo 10arth.Pen.tb 1 90% SUBMITTAL � � I ❑% I fA wz� OO> Z �❑'. 1N.1t1i N� �—_fir— \ /• �\ I 41 N At , /n\ / /* – VI— c I /\ a a C C y��j ' I .v / I�•v O I a © e r c c ®c \ O \'4// N _ —-—- T�'\a© CC I II NVQ©N N N — u _'I_._� /. c c . _– - --_–_-–I__= _-?�–__ _ _ 105,ITEM CITY OF FORT MONTH, TEXAS 05"1/" BRIDGE MAINTENANCE CONTRACT A STRUCTURAL wl+. D7 LANCASTER AVE. BRIDGE ��t« olo PBRIDGE REPAIR LAYOUT(TRUSS UNIT 1 ) . ............................... ....._.. ... .. ... .............. ............. sr( 1 n.PIn s (u Rt1r 31 A%• � a1ror-w f �.W y IDTµ1611T 1-1..PI.' • 19I�:Js SE VFx T—Ii.TOS 5E PEp wLi1 ,I , ryl - ti d= LT!'�Ax z•ia'-1Y- L 5P�Al 9�µJ-Te'-r/,� Ii •••__; 5PAx 4 BE1LT PZ (BExI P3 s LQi T 12 SEI 1P�(reEU11xG q c aEunxc I I ¢si> �6�EA e. L 1z u1 1z e o u1 r7! T f 11 +z vlssy- I �/Iz�se t sE � y i l 1 I I I � I 1 1 I I I I I• f I I � I '� �`,�,I;`c ,l6 I •�I•� "� 16 + .�I '� I I '� .�I\ I "�I I .� '� T O\ I---\ / i F �.I woo ti Ss7�Yx"'€'j.i ;` '�j •�—i ur i t3I �E�, �I ?aer /�I ���I 6 � q ,2!i6_,I - � ;r='. - __—�_._�� 0 'i�E 1 UT z'=�EY �II ` m ®h Yr0 U1 UP U! W U5 U6 Lb .10 U11 Ul. UIS U18 ti 9 u U9 UIP U1J PO UPt. 3P UPS Uo• PLAN Z LEGEND S ¢O a s O 511100E—AI6�W. ti W Q F sxEEl Edi pEIAILSNI' U xur W Zw Sr P' t Q SEI au> R W UI US u. UT W FfflULNull YI6 ut9UPO ul PP SII'QuLJ© 1 0.v W m d TRU55 1 u LI Lz lJ 5 Le 1 LB Lt0 i 41] L14 L15 LIT Lt L19 L20 Ltt LPl m 6 6L1 ^�•a L9 (P SE1 1F Sil E1 is.,L. 13e5E> 13 SEr Lie 13 Sir1P y;6 r®63 Sfr L31 F S u0 vt U9 Uv0 U1P Uta U14 U15 U18 U16 U19 O N' UP]B - TRUSS 2 'P - LJ L1 LS LII L12 LI] 11. L 6 LI9 LPO LPI LP Y 6 L6 LT 19 L10 6 L15 LIT 1 ) 1 Ln LF! t £ LO L' 9r y2 1 t3 Sir la 1$6 1 1P r 116 (t SE10a©IS SE1 1 110 Sir P u> 1 'P 61 1F SE r SSI •- aw UP U] © V5 U8 Ur RAR 116 UtU YIP iU1] UII UIS ulb U10 UPI U23 UP1 E TRUSS 3 LI LJ 1 LS L6 LT L9 LIO LI Y L126 LIS L1. L15 Ltr Lt. L19 UP Sit L21 Ltl LO T L 6 fi le tI ) 12 L G - 12 SEI 11.1 12 91 t5 SEI n 1 ©815 S<> 6 vz SilIF g r16TE.1.DEFECTS d TIIU55 LE 5 i1gM1 MY. fi Ir ELEVATION t IERT:. (IEMT 21 .L S sTA aj•oT.ro STA Till-., I xt J �� TOTLL—T LE— 234'-4/i• 3 L sPL AT 9'- 16'-II L YA AT. T6•.IY• a 1!_r- } „ 9JSF } YAN t YAM 2• Y1n] (PEa]1R4 t(E'i zs 19 Sf1Y 4 afA61RLJ @ '� ® EA 1 T 1. 2 iPo199 1 I L x YID i L...1 L ---- -_.T--- �_,. II .�1'� I .�I'� I .�I'� 1 .�I\ I .�I\ I •�I"'` .�I\ I .�I I .�I !1\ I .�I'� I .�6 §>•s I 4aw ./I>LL< E 4AI �E ` Ilya � I .�I'ti I .�1•� I .�I '� I .�I '� I !I'� I .�I'� I .�I'� I .��-� I .�1'� I .�I '� I .�I' I .�l '� cn 1 ,�1-� I /I-� I 31-� I �I '� I r�l � 1 ,�I-� I .�I -�, I .�I •� I /I -„ i .�I '� I ,�1 '��sf't?�, I� a � _ I -„-I -�•I�— I— �-Y- -I-- �I�(Twas-Y----�-�.I'._ � _\I---�—�I I___� _-r �I l �.I_-_I - �.I — I _CJI ¢ w Yp UI U2 UJ U+ U5 U6 UT LII W .1. Ull UI1' UI] U14 .1 U1. .11 .1. .11 uz0 uzl .2 uza V1Y W U Z PLAN Z �Q C)} LEGEND W S z :¢ as b z w o SEE REVNIP RT >• Q SNEEi fOR OELAIL5TALS1 u Q Q z W Z W p I1 EAI 0 Ul] W. Ut1 Ula 2 ) J W m 0 O TRUSS 1 L] Ltl LtE L13 .LII L19 LM tP1 LR ¢ a y L 15 LT 10 Lt+ Ll LIS tzl _ m S L tt]fL Sfl LZLYI L9 6tlz Sfl 066 L6 L �©IS afl LN T L pl.EAI L [-q,. ©t5 YI IS®1 4 ry ' N UP I U2 Ul U5 U6 u6 w W. Ut] U1. U1s VII Ulf U19 Ux0 ux1 uzx U11 IR+ q O TRUSS 2 11 LJ L. 11 L6 L9 LIR ttl t I L1+ L15 LIT LIL L19 L20 Lz111R L?? Lz] S LO LI 6 6 1 LT LL 12 9fiJ �16 3 li Sfl l2 aF 12 YI li Sfl II E.L>p ri 61 Y)� p15512t K) Tlx Sf> f2fi) - l+Yl 1 Lx Y) T 2 Sit� W U1 U2 Ul W US UI ll1 W U10 Ulx Ut] Ut. VIT YII U19 Ux0 TIR1 112x V1J Y)U2+ X - TRUSS 3 _ L1 L5 LII L11 LII L19 L30 L21 .� LA L1 L1 T LI La LIO Lt] L1+ LIS LIfi LIT T L L2. ] - . 'n Ix65f> 121St] 126Sf1 LzfiSfl [x Sfl 1z YI �• 4 v TOTE,1.OEfEET6 Ox iM55 1E1OER5 SI1U(9 i-T. Y 1 - ELEVATION ` sti K.IJ I JT f it TOTAL IT IMTH ­A&" &t.A Y PER T—.i05 Y PU-111 41 WA AT 9-ii. 74'-1 AT 1�. A,'A 1.1-1, AT A' 7 ST j ,r I EA I t I l�fAll ------[4K --I— z ¢ Lo re --_—_'(--_—I —a 7 vi 0 z eo s .1i q—, u,e U30 U2, IRI UIS U1i1 IIS U7 U10 .11 Ul' .1 UTA U15 U16 UtT UITI Z PLAN z LEGEND cc z w SEE "A cr �:' .1 U. FlIEra A ." TRUSS Nzj. S4 L. .. LB L'. .1 M UID III U12 LI. 113 UTI U15 U16 UI] Ma U19 WO I#1 M W3 U?4 4— TRUSS La LLS LII L,a LI3 LIB Lao L31 T L6 IT L9 12 STI II YI U" W. U21 Via LQJ Uta NZ— I'\ L12 L13 —/- TRUSS VD12 L 2 L13 i: �� �i I — L11 Ll 6 L: LI L ® 3r1 LBI LIS 12.1-TV— IV_ Tl: I.­­ T­ AiKFI1 —1. ELEVATTO (BEM fJ Se eExT J STA}�06,pe 0 1,*..t TOT•L Wl LEKrx-YH_I/T)als W PER—S,]OS 9F PEe IMiT) je SP••T 9'- ,e'-I� a SP1 tr 9'- le'-YY- s SPA IIT S"- }e'-1� ,91••.,—�" - SPw I SPw 2 SPw] (eERr JI (BEER 35 �! 5P` .�(eE.RtNG I I (eEAf1lNb�l �iI I \ I .�I'\ I I \ I .�I '\ I .�I '\ .�4'\ I .�I'\ I •�I'\ I -�I-\ I -f I•\ I .�I \ I .�I'\ I .�I o xs j. 'k, I .�I'\ 1 .�I�\ I �` \ I !I'\, I .�I '\ I .�I "\ I ,�I '\ d �I '\ ( .�I'\ I /I '\ I !I '\ I .�I -\ I• •trl ](:00 .� '\ / 1s7z R•9E.� i •\ ,i x i ,\ ! ,\i aa� �--F-`--�---r-�--�'--,-_`-k---'-F--k-- -r_�-�C--. •�. >I�----F---'�k-'-T �,+F---- --"k----,---�-q a I I 1 ' 1 1 1 I � j I ' I I I I I I I 1 I• ,�I '\ I /I '\ I �I \ I ,�I \ I .�I \ I .�I -\ I /I -\ I a Z i i ieuis J i i i - i I j I \I _I \ i \�•_ -_ _-\ -_I \J- \ '_ I r�F' I_ \ _\I _I__-`-I I \I I __\II ujtk � ` I I I IG I I� I I I 1 1 I I I I• 0 o� I� 1: d,1 b f: IsFII1: d�u): ) Ii hl c� cr m¢ UT W W U10 UI1 y12 U13 UTA Uls Wfi UI] ute U19 u20 Wt uYY IRJ V21 h u z ;w� PLAN z ?a LEGEND S F N¢a n R BNIOOE EP11R M. '3 z W J 7 ISEF xEV•IR SOBUNY � SgELr Fog OETAILSI � a to� L) - U W Z yaj gO It KI � J� tY SFII2 SF> wa W ' UD ut U. Ut2 Uta V19 IRO IR3 UY Vl. � � m h TRUSS Lt LY u L L u L19LII L J L1� Lli L19 Leo L21 m ue Ln Lo g,125 Sfl ® L] L! L9 eQiS l2 SF) Lvs L16 LY3 12, E ¢s u) T fzs sc) fz I a s)12 F) - 2 UY UO US Ug W u9 U. UlY U13 ul. UIS V16 UI] We um TRUSS 2 l3 1. LS L11 L1Y LO Lt LY l6 LT LBlS L10 ltJ Llb 115 Lli Lte Lt9 tY0 L21 L22 L2] -- 118 LY• 12 YI 12 SF)fY SFI 12 Y) I2 YI IY SFI f2�) T r ] b 6 i ilY SFI i I ] -yy ut ui UJ W W Ug U1 W W u10 UIt U12 U11 Ut• UIS y18 UIT Ule u19 U2p lltl UY2 112'] IRx �y TRUSS 3 L'I 9 M r Lt L2 LJ LS Lg L, L9 L10 LI' L Y Lt♦ Lt5 Llr L ©LIS SFI L21 L2Y LYJ _ LO L' LB 12 I [Y]ZFI Llfi LN x E.1.NFECTS M TRUSS L WRS SxOPN OILY- d ELEVATION " 'a — *�TOTAL y; WIt LEWTN 23r'-.h•/\/���)\® �59�1235 4 PEN TI955.)OS SE PE 1 <. e Y9 AT9'- -Te'-tl- e Ye 91 9'- - le'-I ' e Y1 LT 9'- )e'-P • •`•_- N - YIIN 1 Y9N 2 Yur J c Burt 31 BEMiNa t T-1,11 l) e I\ 4 ,. I ♦ I ; 1 ♦_ 1 ,- I ♦ I ,. I ., I ,- I ♦ I ,- I ♦ f ,- I ♦ 1 ,. 1'♦ I ; I ♦ I ,. I V ! ,• 1 ♦ I ,- II ,d k, I I ♦ I !\ I ♦ I 1 ♦ I I '♦ I - ♦ I 1 ♦ I I ♦ ♦ p. I ♦ t ! ♦ 1 ♦ II •r •♦ .� '♦ p. .l '♦ f '♦ / F ,Lvd.♦ ,v ,D Yi• .♦ / ,♦ l ,\ _' $a_le1! I I'♦ I '♦ I 1 ♦ I i ♦ I I ♦ I I '♦ 1 I ♦ I ♦ . I ♦ I I'♦ I ♦ I II ♦. A ♦.I I ♦,I ' I ♦.I ' ♦I I \I I ♦I' 1 \I ' I ♦ 1 ♦I I ♦I ' I ♦I f /I`♦ I !IV I /I •♦ I .�I�♦ .''IV I .�I '♦ I SIV i .SIV I /I '♦ I !I •♦ 1 /IV I /1V tl a z 3. , i - i ,♦ E[ w u mcr LID u1 uz u] u. us Ia ut ue u9 o Lnl lz s u l le a u20 .1 n us.l ak U Z .W sm PLAN Z cQ LEGENDw 6 N w t— N a a eel00E REPe1P ltl. � l.J o S—El�fOP'DEi.$1'IL 51N) g QQ w z w In Q� i 110 LI )Lt0 Y1 In -J W U1 u2 u] Ur U5 U6 U) W 119 UIO utl UI2 'UI] Utr 111 ut1 u1e u19 Ux0 u21 UYt •-y Uid vxJ. U2r cr � �7 d F T • L1 LT LJ Lr L5 Lf Lt L9 L10 111 LIS LI) Ltr Lis Ll, LIe L19 LTO LP1 LAY LTJ m �g 9 W U2 Ul W U5 Ud u1 W LH 112 U13 Ulr W5 119 ux0 U2T IIT] utr J TRUSS Z L3 Lr LS La I L11 L12 LiJ L19 LTO Ll' G LO LI L2 IT Le LD L 0 L1. LIS I LT. Lnt LI! Lxx L23 LN 5 C 110 YI t0 Yl ©1f0 Y1 O 91 IID Y1 10 yi 110 Y1 _ t 110 KI O SFI ) 'l , 11 x UI U2 UJ 1q )U6 D 'U) Ue Il! U12 -,. U15 Uld U11 Ute LFI U22 uY] UTr g' 6 e TRla55 3 - y' L1 L2 LS Li LS L6 Lt L9 L10 llt ll2 L13 lti Lt5 LIT Lle LIe LTD L21 LT2 LTl ' LO Le L16 L24 - $n 3 c x01E,t.OEEECI2 LN 1-1[N&N3 SlIOeN PIY. 1)- ELEVATION GENERAL NOTES 1 !iRUSs 1 1 !rfRlSs] I T.COVTRACTOR [EIN RE.—I !�' F— LAXGSTER AVE i YFYBER PECIFLEO OII�STE I LIRSSTMIIT r ' Ix=uD11TIG EG i CxOR05 GUSSET PL•lE5 EVECCApwxO n _ ___________________.__________ OIACOMLS.AMO BRACIMtS. E AA. F _i_______________ ____ __ ___t REPA TNI TnE Sa A. T E .AgvEO, T9 Fp� STCEVF_ BERS ITH SYSTEM 111 PER I- - PplxTl xG IS C—I 6. 2.O'R11RACi OR SHILL PROVIDE FDLL pR m I I I CW TAT xuExi ST.iEx 0 PREVEII F•INT j LILT OUSTX ID OTHER MISAIIS FROM p P L I i I WORTAAPTl IP"'AF,LS;STYE.°D TZtLCOAHEIilcTipllT , j j I COSI Of CONTISI-.T 1111Ex IS SUOSIDIIXY H Y2 i j ' I 1.FU515 EPi1PR REA1l SINS I TAITTEMiNCAa t DI STONTEO IIEIIBERS IVE1 fe'_ 1 I I RlPL EEK IIIS 111.LWEIR ITEM 10A. tss i� i f .IREo AniA a A T syg6 R `ten wes o LnNOTo ITEM I I TRUSS DOTTOI cHOAOs WNLIREHERESSWEO N 1 1 I �'ERECxEifxaos uRi IL DT ,J. I TAAISCBOiRRLLlri OR OR LFECES.EILL THREES 1 I li 1NIvx0iE[}6,•MBTR.OS LCONTRACTOAEO (} F n I SHLLL IME OE IS AMT RAT. Q x a I 1 i I I FPOR F BCIOI.IFTESSMRWAA.0R 0 FT � W� I CiG1ROO5E�N L(IIgDS SHALL MOT O " E H (, y I 1 1 I I Ex ISTIRG PAINT IN ARV FOIA.COST TO Z Q x L NG DOIT.CxpiDS IS PAID UNDER O CC IiEUN 199 "-+ L_______________________________________________________________�__ U Q g I 1 \_II CL41.AND REPAINT F W m a 5%Ei iRUISIIDM 15 1] CI z �Q� �W H � 1------------------------------- — ----------J Q n ..,.._.-...-,AAAA... Q FELL - AARKpr V 1.STEEL TRU55 IT 5 SHORN.REFER TOI�TYPICLL SEICITION SHEETS FORxOTHER L ars. SYSfE1CY BV OOxTRACIOP W Z 2.SEE BflIIXiE REPAIR L SN F AEMBERS A. FIR Ai S T EARED AND REPAINTED. <SEE UKRAL MOTE 21 (7 Q O J~ J TYPICAL TRUSS REPAIR SECTION m W HIS ° — W Exl¢MOLES RTTMO 1' o ANO SEµ€D R aMYYY,fD En Y2E0 HO.E—_— _ __ 6 AxCifR _ a 8 T REPAIR AIDTEs s o TAIUP55 lIPTICAA 1.RIVETS INTERFERE WITH TA RORR OR ARE fV <'S ER PETETERIOMiEO, L BE _ O ,n E0.SEE RIYETTREPLACEAfxiLUETIII. GUSSET It 2.TOCTxE OEPTx M BEPARpA-D BY FVWEP TOOL CLEA— - EXISTING PROPOSED - 3. �M15LTW15RIHIGE5EANi ISNPNOE STEED.E—ITS w E 5 THO55 BOi TOH CHORDS C p TSE P L 5 P•1 3 HRE: P ESSL HOTS 4 o RIVET REPLACEMENT DETAIL IRE:GENER4 iE IED B1 APPLYING WTILI" NfiRTElMilt _ 1. UREACE IEIPERATU .[.-1 250.1.1.AC1— NEAT ITR OF APPLYING RYI4ICIAL XEA1 SNLLL BE•PPROYED BV OISTORTE GIRf.L THE Ex LEER. IF TORCHES ARE USED,THE COfTRACTOR Nis c Po51 TIO10fl� SHALL DEMONSTRATE 0 NE ENG I HEIERR THAT HE AW EA Itli1e. "IED 11TxOITR C•MAGIxG TX t(5 E_IM. STE L,OP 1, P ARACEO RIVETSTWIIIT A325 GALVAHI2fD 001.15.IMTCH EXISTING DI•IIET€R.REFER o COAi1RE1O To ITRCEIT E15 TOP OCATIOAS. NEAT 5TRAICHIEN L b RSS MCA9E5M•BA PEttAiEOIxY L D AGED RIVETS F01X1D NFD,SNONH CHORD..E. PAC1eCp�i BE�RSET �O TN(IR dR1�INAL Cf1�10URAi1pI. 2 On SHILL IFI If ERGIKER PRIOR 10 THETREPLBAACEREA—UR A IE 0 ! -TALI.P HTS SPECIFIED 11�ITEW T1.LLN01 TRACT _ tlMl lST AM TafRA I. ESS,I€ fRATWE TPYPt��LWR Q �1..1.RI151 WE4Ex TRU51 ONORp W—AI ARO GUSSET PLATE lED 1. REPLACE RIVETS THAT INTERFERE xITO TK WOR R OF 1RU55 NEIBFR REPAIR.CONTRACTOR � SHONE SIMILAR AY OIxER L-11005. 6. I OIAIELT Af TER ixE SUKACE wS DEEM WIED, $MLLE NRI IFF HE CNGIREEP PRIOR EPLACFAExi FOR•PFMvu. 2. IYETS NOT S1M1M TOR..Ill. EPoRY PERETRA.IMG SLALE.. RFANO A'1. CdTPA[TOR LMIt REPLACE ONLY ONE RIVET Al A TIIE. ML BE Ic AICCECORUANCEWIIT� S. • {+ . TYPICAL TRUSS MEMBER REPAIR AFT Ors 5, STEEL IF4LBER5RIVETS AROROLWE THEE OPEIIMG OLIFI MILLIK.SHALL wT o MCE 1« ca«Ecnxc ), NF.SFIL EP HAS dtl Eb INITALI NEW NIG. LL o ply STRENGTH BOL IS.SEE RIVET M1EFLACEN[xT DETAIL. 6. CIEO...OP.1.HOLES FREE10 IAHrALLING Of—AHD DEBRIS ANO APPLY EPoXY PEHETRATINO 5EALEP PRI......... ........... .......... ..AAAA.__ _.._..-._.. ............ ......I.. AAAA. ........................ .. .......... ... ........ _...._ .......... ........ AAAA 001113-1 INVITATION TO BIDDERS Page 1 of 2 1 SECTION 00 11 13 2 INVITATION TO BIDDERS 3 RECEIPT OF BIDS 4 Sealed bids for the construction of BRIDGE REHABILITATION FOR W.LANCASTER 5 AVENUE BRIDGE(2017-2),City Project No. 100633 will be received by the City of Fort Worth 6 Purchasing Office: 7 8 City of Fort Worth 9 Purchasing Division 10 1000 Throckmorton Street 11 Fort Worth,Texas 76102 12 until 1:30 P.M.CST,Thursday,November 30,2017,and bids will be opened publicly and read 13 aloud at 2:00 PM CST in the Council Chambers. 14 15 GENERAL DESCRIPTION OF WORK 16 The major work will consist of the(approximate)following: 17 18 Project consists of bridge repair and rehabilitation construction. 19 20 346 S.F. Concrete Structural Repair(Vertical or Overhead) 21 43 S.F. Partial Depth Deck Repair 22 458 S.F. Clean and Paint Existing Structure(System III A) 23 30 L.F. Pedestrian Rail 24 365 S.F. Repair Steel Bridge Members 25 422 S.Y. Multiple Layer Epoxy Concrete Overlay 26 4,230 S.F. Power Wash Steel Members 27 28 DOCUMENT EXAMINATION AND PROCUREMENTS 29 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City 30 of Fort Worth's Purchasing Division website at hqp://www.fortworth og v_or&urchasinand 31 clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site.The 32 Contract Documents may be downloaded,viewed,and printed by interested contractors and/or 33 suppliers.The contractor is required to fill out and notarize the Certificate of Interested 34 Parties Form 1295 and the form must be submitted to the Project Manager before the 35 contract will be presented to the City Council.The form can be obtained at 36 https://www.ethics.state.tx.us/tec/1295-Info.htm 37 38 Copies of the Bidding and Contract Documents may be purchased from Nikki McLeroy,817- 39 392-8363.City of Fort Worth,TPW, 1000 Throckmorton St.,Fort Worth,TX 76102. 40 41 The cost of Bidding and Contract Documents is: $30.00 42 43 PREBID CONFERENCE 44 A prebid conference may be held as described in Section 00 21 13-INSTRUCTIONS TO 45 BIDDERS at the following location,date,and time: 46 DATE: Wednesday,November 8,2017 47 TIME: 10.00 A.M. 48 PLACE: Transportation and Public Works,Street Services,5001 James Avenue, Suite#: 49 201,Fort Worth,Texas 76115 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised July 1,2011 001113-2 INVITATION TO BIDDERS Page 2 of 2 1 2 CITY'S RIGHT TO ACCEPT OR REJECT BIDS 3 City reserves the right to waive irregularities and to accept or reject bids. 4 5 INQUIRIES 6 All inquiries relative to this procurement should be addressed to the following: 7 Attn: Tariqul Islam,City of Fort Worth 8 Email: tariqul.islam@fortworthTexas.gov 9 Phone: 817-392-2486 10 AND/OR 11 Attn: Hyunsik Moon,Michael Baker International 12 Email: Hyunsik.Moon@mbakerintl.com 13 Phone: 469-801-8532 14 15 ADVERTISEMENT DATES 16 October 26, 2017 17 November 2, 2017 18 19 END OF SECTION CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised July 1,2011 0021 13-1 INSTRUCTIONS TO BIDDERS Page 1 of 9 1 SECTION 00 2113 2 INSTRUCTIONS TO BIDDERS 3 1. Defined Terms 4 5 1.1.Terms used in these INSTRUCTIONS TO BIDDERS,which are defined in Section 00 72 6 00-GENERAL CONDITIONS. 7 8 1.2.Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 9 meanings indicated below which are applicable to both the singular and plural thereof. 10 11 1.2.1. Bidder: Any person,firm,partnership,company,association,or corporation acting 12 directly through a duly authorized representative,submitting a bid for performing 13 the work contemplated under the Contract Documents. 14 15 1.2.2. Nonresident Bidder: Any person,firm,partnership,company,association,or 16 corporation acting directly through a duly authorized representative,submitting a 17 bid for performing the work contemplated under the Contract Documents whose 18 principal place of business is not in the State of Texas. 19 20 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 21 (on the basis of City's evaluation as hereinafter provided)makes an award. 22 23 2. Copies of Bidding Documents 24 25 2.1.Neither City nor Engineer shall assume any responsibility for errors or misinterpretations 26 resulting from the Bidders use of incomplete sets of Bidding Documents. 27 28 2.2.City and Engineer in making copies of Bidding Documents available do so only for the 29 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 30 for any other use. 31 32 33 34 35 . . . -I e"alifieatieft At ah-e-s-iffl-e- of bidding.Bids meeived fiefa eealfaeteFs 4A.4-;-A- —Ar.A- 36 37 Wlewr,. 38 39 , 40 , 41 4 5 11,BEDDERS PREQUALEPICATIONS. 42 43 3.2.1. 44 . 45 46 CITY OF FORT WORTH BRIDGE REHABII.ITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 27,2012 0021 13-2 INSTRUCTIONS TO BIDDERS Page 2 of 9 1 2 , 3 , 4 , 5 to assist the City in e*aluating md assessing the ability of the app—Ar-e-ifit lew b-id-def(s)to 6 7City's 8 ififeffiNA80, 9 ,may be gf:eonds 10 11 . 12 13 3.4. , 14 . 15 16 4. Examination of Bidding and Contract Documents,Other Related Data,and Site 17 18 4.1.Before submitting a Bid,each Bidder shall: 19 20 4.1.1. Examine and carefully study the Contract Documents and other related data 21 identified in the Bidding Documents(including "technical data" referred to in 22 Paragraph 4.2.below).No information given by City or any representative of the 23 City other than that contained in the Contract Documents and officially 24 promulgated addenda thereto, shall be binding upon the City. 25 26 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general,local and 27 site conditions that may affect cost,progress,performance or furnishing of the 28 Work. 29 30 4.1.3. Consider federal, state and local Laws and Regulations that may affect cost, 31 progress,performance or furnishing of the Work. 32 33 4.1.4. 34 4.1.5. Study all: (i)reports of explorations and tests of subsurface conditions at or 35 contiguous to the Site and all drawings of physical conditions relating to existing 36 surface or subsurface structures at the Site(except Underground Facilities)that 37 have been identified in the Contract Documents as containing reliable "technical 38 data" and(ii)reports and drawings of Hazardous Environmental Conditions,if any, 39 at the Site that have been identified in the Contract Documents as containing 40 reliable"technical data." 41 42 4.1.6. Be advised that the Contract Documents on file with the City shall constitute all of 43 the information which the City will furnish.All additional information and data 44 which the City will supply after promulgation of the formal Contract Documents 45 shall be issued in the form of written addenda and shall become part of the Contract 46 Documents just as though such addenda were actually written into the original 47 Contract Documents. No information given by the City other than that contained in 48 the Contract Documents and officially promulgated addenda thereto, shall be 49 binding upon the City. 50 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 27,2012 0021 13-3 INSTRUCTIONS TO BIDDERS Page 3 of 9 1 4.1.7. Perform independent research,investigations,tests,borings,and such other means 2 as may be necessary to gain a complete knowledge of the conditions which will be 3 encountered during the construction of the project. On request,City may provide 4 each Bidder access to the site to conduct such examinations,investigations, 5 explorations,tests and studies as each Bidder deems necessary for submission of a 6 Bid. Bidder must fill all holes and clean up and restore the site to its former 7 conditions upon completion of such explorations,investigations,tests and studies. 8 9 4.1.8. Determine the difficulties of the Work and all attending circumstances affecting the 10 cost of doing the Work,time required for its completion,and obtain all information 11 required to make a proposal.Bidders shall rely exclusively and solely upon their 12 own estimates,investigation,research,tests,explorations,and other data which are 13 necessary for full and complete information upon which the proposal is to be based. 14 It is understood that the submission of a proposal is prima-facie evidence that the 15 Bidder has made the investigation,examinations and tests herein required.Claims 16 for additional compensation due to variations between conditions actually 17 encountered in construction and as indicated in the Contract Documents will not be 18 allowed. 19 20 4.1.9. Promptly notify City of all conflicts,errors,ambiguities or discrepancies in or 21 between the Contract Documents and such other related documents.The Contractor 22 shall not take advantage of any gross error or omission in the Contract Documents, 23 and the City shall be permitted to make such corrections or interpretations as may 24 be deemed necessary for fulfillment of the intent of the Contract Documents. 25 26 4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification of: 27 28 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 29 the site which have been utilized by City in preparation of the Contract Documents. 30 The logs of Soil Borings,if any,on the plans are for general information only. 31 Neither the City nor the Engineer guarantee that the data shown is representative of 32 conditions which actually exist. 33 34 4.2.2. those drawings of physical conditions in or relating to existing surface and 35 subsurface structures(except Underground Facilities)which are at or contiguous to 36 the site that have been utilized by City in preparation of the Contract Documents. 37 38 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 39 on request. Those reports and drawings may not be part of the Contract 40 Documents,but the "technical data"contained therein upon which Bidder is entitled 41 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 42 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 43 responsible for any interpretation or conclusion drawn from any"technical data" or 44 any other data,interpretations,opinions or information. 45 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIHCATION DOCUMENTS 100633 Revised November 27,2012 0021 13-4 INSTRUCTIONS TO BIDDERS Page 4 of 9 1 4.3.The submission of a Bid will constitute an incontrovertible representation by Bidder(i) 2 that Bidder has complied with every requirement of this Paragraph 4,(ii)that without 3 exception the Bid is premised upon performing and furnishing the Work required by the 4 Contract Documents and applying the specific means,methods,techniques, sequences or 5 procedures of construction(if any)that may be shown or indicated or expressly required 6 by the Contract Documents,(iii)that Bidder has given City written notice of all 7 conflicts,errors,ambiguities and discrepancies in the Contract Documents and the 8 written resolutions thereof by City are acceptable to Bidder,and when said conflicts, 9 etc.,have not been resolved through the interpretations by City as described in 10 Paragraph 6.,and(iv)that the Contract Documents are generally sufficient to indicate 11 and convey understanding of all terms and conditions for performing and furnishing the 12 Work. 13 14 4.4.The provisions of this Paragraph 4,inclusive,do not apply to Asbestos,Polychlorinated 15 biphenyls(PCBs),Petroleum,Hazardous Waste or Radioactive Material covered by 16 Paragraph 4.06. of the General Conditions,unless specifically identified in the Contract 17 Documents. 18 19 5. Availability of Lands for Work,Etc. 20 21 5.1.The lands upon which the Work is to be performed,rights-of-way and easements for 22 access thereto and other lands designated for use by Contractor in performing the Work 23 are identified in the Contract Documents. All additional lands and access thereto 24 required for temporary construction facilities,construction equipment or storage of 25 materials and equipment to be incorporated in the Work are to be obtained and paid for 26 by Contractor. Easements for permanent structures or permanent changes in existing 27 facilities are to be obtained and paid for by City unless otherwise provided in the 28 Contract Documents. 29 30 5.2.Outstanding right-of-way,easements,and/or permits to be acquired by the City are listed 31 in Paragraph SC 4.01 of the Supplementary Conditions.In the event the necessary right- 32 of-way,easements,and/or permits are not obtained,the City reserves the right to cancel 33 the award of contract at any time before the Bidder begins any construction work on the 34 project. 35 36 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 37 way,easements,and/or permits,and shall submit a schedule to the City of how 38 construction will proceed in the other areas of the project that do not require permits 39 and/or easements. 40 41 6. Interpretations and Addenda 42 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 27,2012 0021 13-5 INSTRUCTIONS TO BIDDERS Page 5 of 9 1 6.1.All questions about the meaning or intent of the Bidding Documents are to be directed to 2 City in writing on or before 2 p.m.,the Monday prior to the Bid opening. Questions 3 received after this day may not be responded to.Interpretations or clarifications 4 considered necessary by City in response to such questions will be issued by Addenda 5 delivered to all parties recorded by City as having received the Bidding Documents. 6 Only questions answered by formal written Addenda will be binding. Oral and other 7 interpretations or clarifications will be without legal effect. 8 9 Address questions to: 10 11 City of Fort Worth 12 1000 Throckmorton Street 13 Fort Worth,TX 76102 14 Attn: Tariqul Islam,Transportation and Public Works 15 Fax: 817-392-7969 16 Email: tariqul.islam@fortworthtexas.gov,,Phone: 817-392-2486 17 18 19 6.2.Addenda may also be issued to modify the Bidding Documents as deemed advisable by 20 City. 21 22 6.3.Addenda or clarifications may be posted via Buzzsaw at <Insert Link to Documents>. 23 24 6.4.A prebid conference may be held at the time and place indicated in the Advertisement or 25 INVITATION TO BIDDERS. Representatives of City will be present to discuss the 26 Project. Bidders are encouraged to attend and participate in the conference. City will 27 transmit to all prospective Bidders of record such Addenda as City considers necessary 28 in response to questions arising at the conference. Oral statements may not be relied 29 upon and will not be binding or legally effective. 30 31 7. Bid Security 32 33 7.1.Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 34 (5)percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 35 the requirements of Paragraphs 5.01 of the General Conditions. 36 37 7.2.The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 38 have been satisfied. If the Successful Bidder fails to execute and deliver the complete 39 Agreement within 10 days after the Notice of Award,City may consider Bidder to be in 40 default,rescind the Notice of Award,and the Bid Bond of that Bidder will be forfeited. 41 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 42 other Bidders whom City believes to have a reasonable chance of receiving the award 43 will be retained by City until final contract execution. 44 45 8. Contract Times 46 The number of days within which,or the dates by which,Milestones are to be achieved in 47 accordance with the General Requirements and the Work is to be completed and ready for 48 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 49 attached Bid Form. 50 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 27,2012 0021 13-6 INSTRUCTIONS TO BIDDERS Page 6 of 9 1 9. Liquidated Damages 2 Provisions for liquidated damages are set forth in the Agreement. 3 4 10. Substitute and "Or-Equal" Items 5 The Contract,if awarded,will be on the basis of materials and equipment described in the 6 Bidding Documents without consideration of possible substitute or"or-equal" items. 7 Whenever it is indicated or specified in the Bidding Documents that a"substitute" or"or- b equal" item of material or equipment may be furnished or used by Contractor if acceptable to 9 City,application for such acceptance will not be considered by City until after the Effective 10 Date of the Agreement. The procedure for submission of any such application by Contractor 11 and consideration by City is set forth in Paragraphs 6.05A.,6.05B. and 6.05C. of the General 12 Conditions and is supplemented in Section 0125 00 of the General Requirements. 13 14 11. Subcontractors,Suppliers and Others 15 16 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 17 12-2011 (as amended),the City has goals for the participation of minority business 18 and/or small business enterprises in City contracts.A copy of the Ordinance can be 19 obtained from the Office of the City Secretary. The Bidder shall submit the MBE and 20 SBE Utilization Form,Subcontractor/Supplier Utilization Form,Prime Contractor 21 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint 22 Venture Form as appropriate.The Forms including documentation must be received 23 by the City no later than 5:00 P.M.CST,five(5)City business days after the bid 24 opening date.The Bidder shall obtain a receipt from the City as evidence the 25 documentation was received.Failure to comply shall render the bid as non- 26 responsive. 27 28 11.2. No Contractor shall be required to employ any Subcontractor,Supplier,other person 29 or organization against whom Contractor has reasonable objection. 30 31 12. Bid Form 32 33 12.1. The Bid Form is included with the Bidding Documents;additional copies may be 34 obtained from the City. 35 36 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 37 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 38 the Bid Form. A Bid price shall be indicated for each Bid item,alternative,and unit 39 price item listed therein. In the case of optional alternatives,the words "No Bid," 40 "No Change," or"Not Applicable" may be entered.Bidder shall state the prices, 41 written in ink in both words and numerals,for which the Bidder proposes to do the 42 work contemplated or furnish materials required.All prices shall be written legibly. 43 In case of discrepancy between price in written words and the price in written 44 numerals,the price in written words shall govern. 45 46 12.3. Bids by corporations shall be executed in the corporate name by the president or a 47 vice-president or other corporate officer accompanied by evidence of authority to 48 sign. The corporate seal shall be affixed. The corporate address and state of 49 incorporation shall be shown below the signature. 50 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 27,2012 002113-7 INSTRUCTIONS TO BIDDERS Page 7 of 9 1 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 2 partner,whose title must appear under the signature accompanied by evidence of 3 authority to sign. The official address of the partnership shall be shown below the 4 signature. 5 6 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 7 member and accompanied by evidence of authority to sign. The state of formation of 8 the firm and the official address of the firm shall be shown. 9 10 12.6. Bids by individuals shall show the Bidder's name and official address. 11 12 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 13 indicated on the Bid Form. The official address of the joint venture shall be shown. 14 15 12.8. All names shall be typed or printed in ink below the signature. 16 17 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of 18 which shall be filled in on the Bid Form. 19 20 12.10. Postal and e-mail addresses and telephone number for communications regarding the 21 Bid shall be shown. 22 23 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 24 Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance 25 to State Law Non Resident Bidder. 26 27 13. Submission of Bids 28 Bids shall be submitted on the prescribed Bid Form,provided with the Bidding Documents, 29 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 30 addressed to City Manager of the City,and shall be enclosed in an opaque sealed envelope, 31 marked with the City Project Number,Project title,the name and address of Bidder,and 32 accompanied by the Bid security and other required documents. If the Bid is sent through the 33 mail or other delivery system,the sealed envelope shall be enclosed in a separate envelope 34 with the notation "BID ENCLOSED" on the face of it. 35 36 14. Modification and Withdrawal of Bids 37 38 14.1. Bids addressed to the City Manager and filed with the Purchasing Office cannot be 39 withdrawn prior to the time set for bid opening. A request for withdrawal must be 40 made in writing by an appropriate document duly executed in the manner that a Bid 41 must be executed and delivered to the place where Bids are to be submitted at any 42 time prior to the opening of Bids.After all Bids not requested for withdrawal are 43 opened and publicly read aloud,the Bids for which a withdrawal request has been 44 properly filed may,at the option of the City,be returned unopened. 45 46 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 47 time set for the closing of Bid receipt. 48 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 27,2012 002113-8 INSTRUCTIONS TO BIDDERS Page 8 of 9 1 15. Opening of Bids 2 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 3 abstract of the amounts of the base Bids and major alternates(if any)will be made available 4 to Bidders after the opening of Bids. 5 6 16. Bids to Remain Subject to Acceptance 7 All Bids will remain subject to acceptance for the time period specified for Notice of Award 8 and execution and delivery of a complete Agreement by Successful Bidder. City may,at 9 City's sole discretion,release any Bid and nullify the Bid security prior to that date. 10 11 17. Evaluation of Bids and Award of Contract 12 13 17.1. City reserves the right to reject any or all Bids,including without limitation the rights 14 to reject any or all nonconforming,nonresponsive,unbalanced or conditional Bids 15 and to reject the Bid of any Bidder if City believes that it would not be in the best 16 interest of the Project to make an award to that Bidder,whether because the Bid is 17 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 18 meet any other pertinent standard or criteria established by City. City also reserves 19 the right to waive informalities not involving price,contract time or changes in the 20 Work with the Successful Bidder. Discrepancies between the multiplication of units 21 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 22 between the indicated sum of any column of figures and the correct sum thereof will 23 be resolved in favor of the correct sum. Discrepancies between words and figures 24 will be resolved in favor of the words. 25 26 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 27 among the Bidders,Bidder is an interested party to any litigation against City, 28 City or Bidder may have a claim against the other or be engaged in litigation, 29 Bidder is in arrears on any existing contract or has defaulted on a previous 30 contract,Bidder has performed a prior contract in an unsatisfactory manner,or 31 Bidder has uncompleted work which in the judgment of the City will prevent or 32 hinder the prompt completion of additional work if awarded. 33 34 17.2. City may consider the qualifications and experience of Subcontractors,Suppliers,and 35 other persons and organizations proposed for those portions of the Work as to which 36 the identity of Subcontractors, Suppliers,and other persons and organizations must 37 be submitted as provided in the Contract Documents or upon the request of the City. 38 City also may consider the operating costs,maintenance requirements,performance 39 data and guarantees of major items of materials and equipment proposed for 40 incorporation in the Work when such data is required to be submitted prior to the 41 Notice of Award. 42 43 17.3. City may conduct such investigations as City deems necessary to assist in the 44 evaluation of any Bid and to establish the responsibility,qualifications,and financial 45 ability of Bidders,proposed Subcontractors,Suppliers and other persons and 46 organizations to perform and furnish the Work in accordance with the Contract 47 Documents to City's satisfaction within the prescribed time. 48 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 27,2012 002113-9 INSTRUCTIONS TO BIDDERS Page 9 of 9 1 17.4. Contractor shall perform with his own organization,work of a value not less than 2 35%of the value embraced on the Contract,unless otherwise approved by the City. 3 4 17.5. If the Contract is to be awarded,it will be awarded to lowest responsible and 5 responsive Bidder whose evaluation by City indicates that the award will be in the 6 best interests of the City. 7 8 17.6. Pursuant to Texas Government Code Chapter 2252.001,the City will not award 9 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 10 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 11 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 12 comparable contract in the state in which the nonresident's principal place of 13 business is located. 14 15 17.7. A contract is not awarded until formal City Council authorization.If the Contract is 16 to be awarded,City will award the Contract within 90 days after the day of the Bid 17 opening unless extended in writing. No other act of City or others will constitute 18 acceptance of a Bid.Upon the contractor award a Notice of Award will be issued by 19 the City. 20 21 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 22 23 18. Signing of Agreement 24 When City issues a Notice of Award to the Successful Bidder,it will be accompanied by the 25 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 26 Contractor shall sign and deliver the required number of counterparts of the Agreement to 27 City with the required Bonds,Certificates of Insurance,and all other required documentation. 28 City shall thereafter deliver one fully signed counterpart to Contractor. 29 30 31 32 END OF SECTION CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 27,2012 0035 13-1 CONFLICT OF INTEREST AFFIDAVIT Page 1 of 1 1 SECTION 00 35 13 2 CONFLICT OF INTEREST AFFIDAVIT 3 4 Each bidder,offeror,or respondent(hereinafter also referred to as"you")to a City of Fort Worth. 5 (also referred to as"City")procurement are required to complete Conflict of Interest 6 Questionnaire(the attached CIQ Form)and Local Government Officer Conflicts Disclosure 7 Statement(the attached CIS Form)below pursuant to state law. This affidavit will certify that the 8 Bidder has on file with the City Secretary the required documentation and is eligible to bid on 9 City Work. The referenced forms may be downloaded from the website links provided below. 10 11 hqp://www.ethics.state.tx.us/forms/CIQ.pdf 12 13 http://www.ethics.state.tx.us/forms/CIS.pdf 14 15 © CIQ Form is on file with City Secretary 16 17 Q CIQ Form is being provided to the City Secretary 18 19 Q CIS Form is on File with City Secretary 20 21 Q CIS Form is being provided to the City Secretary 22 23 24 25 BIDDER: 26 27 Gibson&Associates Inc. By: John N. Welch 28 Company (Please Print) 29 � f 30 11210 Ryliecrest Signature: 1(/ 31 Address 32 33 Balch Springs,TX 75180 Title: Vice President 34 City/State/Zip (Please Print) 35 36 37 END OF SECTION CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100633 Revised March 27,2012 00 41 00 BID FORM Page 1 of 3 SECTION 00 4100 BID FORM TO: The City Manager c/o:The Purchasing Department 1000 Throckmorton Street City of Fort Worth,Texas 76102 FOR: BRIDGE REHABILITATION OF W.LANCASTER AVENUE BRIDGE(2017-2) City Project No.: 100633 Units/Sections: BRIDGE REHABILITATION 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid,Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS,including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance,will do so pending contract award,and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group,association,organization,or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt,fraudulent,collusive,or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice"means the offering,giving,receiving,or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive levels,or(c)to deprive City of the benefits of free and open competition. c. 'collusive practice"means a scheme or arrangement between two or more Bidders,with or without the knowledge of City,a purpose of which is to establish Bid prices at artificial,non-competitive levels. d. 'coercive practice"means harming or threatening to harm,directly or indirectly,persons or their property to influence their participation in the bidding process or affect the execution of the Contract. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Fom Revised 20110627 0041_0 _00_42_43_00_43_13_00_43_37 Revised2_Bid_Form-Proposal-Bond_Vendor_Compliance(1).xls 00 41 00 BID FORM Page 2 of 3 3. Prequalifiestion The Bidder aeknowledges that the following work types must be pe6eEmed only by pFequalified eentfaetef:s and subeentfaetefs: a. b. C. d. 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 130 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work(and/or achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form b. Required Bid Bond,Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form Section d. Vendor Compliance to State Law Non Resident Bidder,Section 00 43 37 e. MWBE Forms(optional at time of bid) f. Prequalifieation Statement,Seetion 00 45 12 g. Conflict of Interest Affidavit,Section 00 35 13 h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below,please enter the total bid amount for this project.Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts-. Total Bid $695,694.00 7. Bid Submittal This Bid is submitted on 30-Nov-17 by the entity named below. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUME Form Revised 20110627 00 411 _00_42_43_00_43_13_00_43_37_Revised2_Bid_Form-Proposal-Bond_Vendor_Compiiance(1).xls 00 41 00 BID FORM Page 3 of 3 Receipt is acknowledged of the Initial following Addenda: By: Addendum No. 1: r+✓ (Signature) Addendum No.2: Addendum No.3: John N.Welch I Addendum No.4: (Printed Name) Title: Vice President Company: Gibson&Associates,Inc. Corporate Seal: Address: P.O.Box 800579 l 1210 Ryliecrest Balch Springs,TX 75180-0579 State of Incorporation: Texas Email: iohnw(ftibsonassoc.net Phone: 972 557-1199 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Form Revised 20110627 00 41_0 _00_42 43_00 43_13_00_43_37_Revised2_Bid_Form-Proposal-Bond_Vendor_Compliance(1).xls SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Specification TxDOT Unit of Bid Item Description Unit Price Bid Value No, Section No. Item No. Measure Quantity 1 PLAN&TEXT CONC PAV(0"TO 1/2") 354-6013 SY 422.0 $35.00 $14,770.00 2 MULTIPLE-LAYER EPDXY CONCRETE OVERLAY 439-6013 SY 422.0 $7900 $33,338.00 3 CONC STR REPAIR(CLEAN&COAT WITH EPDXY) 429-6001 SY 15.0 $150.00 $2,250.00 4 CONC STR REPAIR(RAPID DECK REP)(PRT DPT) 429-6004 SF 43.0 $75.00 $3,225.00 5 CONC STR REPAIR(VERTICAL&OVERHEAD) 429-6007 SF 346.0 $125.00 $43,250.00 6 CLEAN&PAINT EXIST STR(SYSTEM III-A)(BOTTOM CHORD) 446-6013 SF 129.0 $487001 $62,823.00 7 CLEAN&PAINT EXIST STR(SYSTEM III-A)(GUSSET PLATE) 446.6013 SF 319.0 $487.00 $155,353.00 8 CLEAN&PAINT EXIST STR(SYSTEM III-A)(FLOOR BEAM) 446-6013 SF 2.0 $487.00 $974.00 9 CLEAN&PAINT EXIST STR(SYSTEM III-A)(VERTICAL) 446-6013 SF 4.0 $487.00 $1,948.00 10 CLEAN&PAINT EXIST STR(SYSTEM III-A)(ANGLE) 446-6013 SF 2.0 $487.00 $974.00 11 CLEAN&PAINT EXIST STR(SYSTEM III-A)(BEARING) 446-6013 SF 2.0 $487.00 $974.00 12 INSTALL RAIL(PEDESTRIAN)(SPL) 450-6082 LF 30.00 $575.00 $17,250.00 13 REMOVE STR(RAIL) 496-6099 LF 30.00 $50.00 $1,500.00 14 REPLACE STL BRIDGE MEMBER(RIVETBOLT) 784-6038 EA 32 $500.00 $16,000.00 15 REPAIR STL BRIDGE MEMBER(TRUSS VERTICAL) 7846004 SF 90 $700.00 $63,000.00 16 REPAIR STL BRIDGE MEMBER(BOTTOM CHORD) 784-6011 SF 155 $700.00 $108,500.00 17 REPAIR STL BRIDGE MEMBER(FLOORBEAM) 784-6022 SF 15 $700.00 $10,500.00 18 REPAIR STL BRIDGE MEMBER(LATERAL BRACING) 784-6044 SF 45 $700.00 $31,500.00 L9 REPAIR STL BRIDGE MEMBER(GUSSET PLATES) 784-6050 SF 60 $700.00 $42,000.00 20 POWER WASH STEEL MEMBERS(BOTTOM CHORD) 9999999 SF 4230 $15.50 $65,565.00 21 BRIDGE CONSTRUCTION ALLOWANCE EA 1.0 $20,000,00 $20,000.00 TOTAL BID: $695,694,00 7"� t 004313 DID BOND Page I of I SECTION 00 13 13 BID BOND KNOW ALL BY THESE PRESENTS: That we,(Bidder Name) Gibson &Associates, Inc. hereinafter called the Principal,and(Surety Name) Federal Insurance Company a corporation or firm duly authorized to transact surety business in the State of Texas.hereinafter called the Surety,are held and firmly bound unto the City, hereinafter called the Obligee, in the sum of Five Percent of the Greatest Amount Bid----------------------_--___ and No/100 Dollars (b 5% GAB ), ilia payment of which sum will be well and truly made and the said Principal and ilia said Surety,bind ourselves,our heirs,executors,administrators,successors and assigns,jointly and severally,firm by these presents. WHEREAS, the Principal has submitted a proposal to perform work for ilia following project of the Obligee, identified as BRIDGE REHABILITATION OF W.LANCASTER AVENUE BRIDGE(2017-2) NOW, THEREFORE, if the Obligce shall award the Contract for the foregoing project to the Principal. and the Principal shall satisfy all requirements and conditions required for the execution of the Con(ract and sholl enter into the Contract in writing with the Obligee in accordance with the terms of such proposal.then this bond shall be null and void.If the Principal fails to execute such Contract in accordance with the terms of such proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal,this bond shall become the property of the Obligce,without recourse of the Principal and/or Surely,not to exceed the penalty hereof, and shall be used to compensate Obligee for the difference between Principal's Total Bid Amount and the next selected Bidder's Total Bid Amount. SIGNED this 9th day of November ,2017. By Gibson Associa e , Inc. By (Signature and Title of Principal) 'By: Federal Insurance Company / ( � .2'YI Al L.&. Robbs orales (Signature ofAttomey-of-Fact) "Attach Power of Attorney(Surety)for Attorney-in-Fact Impressed Surety Seal Only END Or SECTION CITY OF FORT wOR711 STANDARD CONSrRI)MONSPECIFICATION DOCUMENTS Form Revised 20110627 B00k1.XIS% n Power of Attorney Federal Insurance Company I Vigilant Insurance Company I Pacific Indemnity Company Know All by These Presents,That FEDERAL INSURANCE COMPANY,an Indiana corporation,VIGILANT INSURANCE COMPANY,a New York corporation,and PACIFIC INDEMNITY COMPANY, a Wisconsin corporation,a hereby constitute and appoint--Doff E.-Cornell, Sophinie Hunter, V. DeLene Marshall, Tina McEwan, Robbi Morales,Ricardo J.Reyna and Kelly A.Westbrook of Dallas,Texas;Steven Dwain Brockinton of Little Rock,Arkansas=--- -—each as their true and lawful Attorney-in-Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise,bonds and undertakings and other writings obligatory in the nature thereof(other than bail bonds)given or executed in the course of business,and any instruments amending or altering the same,and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness Whereof,said FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY have each executed and attested these presents and .�aff�ix�ed their �corporate �t `seals on this 81 day of March,2017. l.X` � Q_ A.JlJt7 A-r r`y o t• jol A``— Dawn M.-Chkxots.As-l.swnt Secretary Stephen NL Haney,Vice Ptt--ident STATE OF NEW JERSEY County of Hunterdon On this 8'6 day of March,2017 before me,a Notary Public of New Jersey,personally came Dawn M.Chloros,to me known to be Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY,the companies which executed the foregoing Power of Attorney,and the said Dawn M. Chloros,being by me duly sworn,did depose and say that she is Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY and knows the corporate seals thereof,that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies;and that she signed said Power of Attorney as Assistant Secretary of said Companies by like authority;and that she is acquainted with Stephen M. Haney,and knows him to be Vice President of said Companies;and that the signature of Stephen M.Haney,subscribed to said Power of Attorney is in the genuine handwriting of Stephen M.Haney,and was thereto subscribed by authority ofsaid Companies and in deponent's presence. Notarial Seal KATHERINE J.ADEtAAR TRJt NOTARY PUBLIC OF I"JERMY ..... No,2316845 i p08LIC Common E%p"s July 16,2019 Wxar-v Public JER� CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY on August 30,2016: "RESOLVED,that the following authorizations relate to the execution,for and on behalf of the Company,of bonds,undertakings,remgnizances,contracts and other written commitments of the Company entered into in the ordinary course of business(each a"Written Commitment*); (U Each of the Chairman,the President and the Vice Presidents of the Company Is hereby authorized to execute any written Commitment for and on behalfof the Company,under the seal of the Company or otherwise. (2) Each duly appointed attomey-in-fact of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company,under the seal of the Company or otherwise.to the extent that such action is authorized by the grant of powers provided for in such persons written appointment as such attorney-in-fact. (3) Each of the Chairman,the President and the vice Presidents of the Company is hereby authorized,for and on behalfof the Company,to appoint In writing any person the attorney- in-fact of the Company with full power and authority to execute,for and on behalf of the Company,under the seal of the Company or otherwise,such Written Commitments of the Company as may be specified in such written appointment,which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (4) Each of the Chairman,the President and the Vice Presidents of the Company Is hereby authorized,for and on behalf of the Company,to delegate in writing to any other officer of the Company the authority to execute,for and on behalf of the Company,under the Company's seal or otherwise,such Written Commitments of the Company as are specified in such written delegation,which specification may be by general type or class of Written Commitments or by specification ofoneormore particular Written Commitments. (5) The signature of any officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution,and the seal of the Company,may be affixed by facsimile on such Written Commitment or written appointment or delegation. FURTHER RESOLVED, that the foregoing Resolution shall not be deemed to bean exclusive statement of the powers and authority of officers,employees and other persons to act for and on behalf of the Company,and such Resolution shall not limit or otherwise affect the exercise of any such power or authority otherwise validly granted or vested.- 1,Dawn M.Chloros,Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY(the"Companies")do hereby certify that (i) the foregoing Resolutions adopted by the Board of Directors of the Companies are true,correct and In full force and effect, (ii) the Companies are duly licensed and authorized to transact surety business in all 50 of the United States of America and the District of Columbia and are authorized by the U.S.Treasury Departmem further,Federal and Vigilant are licensed in the U.S.Virgin Islands,and Federal is licensed in Guam,Puerto Rico, and each of the Provinces of Canada except Prince Edward Island;and (iii) the foregoing Power of Attomey is true,correct and in full force and effect Given under my hand and seals ofsaid Companies at Whitehouse Station,M.this November 9, 2017 mac - . fflkt&es Dawn M.Chloros,As istant Secretarf IN THE EVENT YOU WISH TO NOTIFY US OF A CLAIM,VERIFY'TITE AUTHENTICITY OF THIS BOND OR NOTIFY US OF ANY OTHER MATTER PLEASE CONTACT US AT: 'Tele hone(908)903-3493 Fax(908)903-3656 a-mail-surety@chlibbcom Form 15-10-0225B-U GEN CONSENT(rev.12-16) Policyholder Information Notice IMPORTANT NOTICE AV/SO IMPORTANTE To obtain information or make a complaint: Para obtener informacion o para someter una queja: You may call Chubb's toll-free telephone number Usted puede llamar al numero de telefono gratis for information or to make a complaint at de Chubb's para informacion o para someter una queja al 1-800-36-CHUBB 1-800-36-CHUBB You may contact the Texas Department of Puede comunicarse con el Departamento de Insurance to obtain information on companies, Seguros de Texas para obtener informacion acerca coverages, rights or complaints at de companfas, coberturas, derechos o quejas al 1-800-252-3439 1-800-252-3439 You may write the Texas Department of Insurance Puede escribir al Departamento de Seguros de Texas P.O. Box 149104 P.O. Box 149104 Austin, TX 78714-9104 Austin, TX 78714-9104 FAX # (512) 475-1771 FAX # (512) 475-1771 Web: http://www.tdi.state.tx.us Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us E-mail: ConsumerProtection @ tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS O RECLAMOS: Should you have a dispute concerning your premium Si tiene una disputa concerniente a su prima o a un or about a claim you should contact the agent first. reclamo, debe comunicarse con el agente primero. If the dispute is not resolved, you may contact the Si no se resueve la disputa, puede entonces Texas Department of Insurance. comunicarse con el departamento (TDI). ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AVISO A SU POL/ZA: This notice is for information only and does not Este aviso es solo para proposito de informacion y become a part or condition of the attached no se convierte en parte o condicion del documento document. adjunto. Form 99-10-0299(Rev. I-08) 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page I of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications.The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of ,our principal place of business, are required to be %Here percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of Saft Here or Blank , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. F11 BIDDER: Company Gibson&Associates,Inc. By: John lN. Wel Address: P.O.Box 800579 h/ 11210 Ryliecrest (Signature) Balch Springs,TX 75180-0579 Title: Vice President Date: t/— END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20110627 00 41_00_00 42_43_00_43_13_00_43_37_Revised2_Bid_Form-Proposal-Bond_Vendor_Compliance(1) 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a),as amended, Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. 100633. Contractor further certifies that,pursuant to Texas Labor Code, Section 6 406.096(b),as amended, it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. 8 9 CONTRACTOR: 10 I 1 Gibson&Associates,Inc. By: /C a _ I/�. (,rJ•a/C 12 Company (Please Print) 13 14 11210 Ryliecrest Signature: J� 15 Address 16 17 Balch Springs,Texas 75180 Title: Vee-,e 18 City/State/Zip (Please Print) 19 20 21 THE STATE OF TEXAS § 22 23 COUNTY OF TARRANT § 24 25 BEFORE ME,the undersigned authority,on this day personally appeared 26J e�,.� &,f. ,known to me to be the person whose name is 27 subscribed to the foregoing instrument,and acknowledged to me that he/she executed the same as 28 the act and deed of V� for the purposes and 29 consideration therein expressed and in the capacity therein stated. 30 31 GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 32 r{ 6.-",fy ,20Le. 33 34 35 �p.... /'l. AAW,y4:- 36 Notary Public in and for the State of Texas 37 38 END OF SECTION °++, PAM N DAVIS .Poo 39 ' '�Notsry Public,State of Texas ' .��J' Comm.Expires 03-30-2021 Nnr:i ID 283117-2 CITY OF FORT WORTH BRIDGE REHABILITATION (2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100633 Revised July 1,2011 004540-1 Minority Business Enterprise Specifications Page 1 of 2 1 SECTION 00 45 40 2 Minority Business Enterprise Specifications 3 APPLICATION OF POLICY 4 If the total dollar value of the contract is greater than $50,000, then a MBE subcontracting goal is 5 applicable. 6 7 POLICY STATEMENT 8 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority 9 Business Enterprises (MBE) in the procurement of all goods and services. All requirements and 10 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. 11 12 MBE PROJECT GOALS 13 The City's MBE goal on this project is 10% of the total bid value of the contract (Base bid applies to 14 Parks and Community Services). 15 16 Note: If both MBE and SBE subcontracting goals are established for this project, then an Offeror 17 must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. 18 19 COMPLIANCE TO BID SPECIFICATIONS 20 On City contracts $50,000 or more where a MBE subcontracting goal is applied, Offerors are required to 21 comply with the intent of the City's Business Diversity Enterprise Ordinance by one of the following: 22 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation,or 23 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation,or 24 3. Good Faith Effort documentation,or; 25 4. Prime Waiver documentation. 26 27 SUBMITTAL OF REOUIRED DOCUMENTATION 28 The applicable documents must be received by the Purchasing Division, within the followin times 29 allocated, in order for the entire bid to be considered responsive to the specification's. 30 deliver the MBE documentation in person to the appropriate employee of the purchasing 1vi.sion an 31 obtain a date/time receipt. Such receipt shall be evidence that the City received the documentation in tho 32 § �oc:ated. A,, d and/or emailed copy „� � accepted, 33 1. Subcontractor Utilization Form,if received no later than 2:00 p.m., on the second City business goal is met or exceeded: day after the bid opening date, exclusive of the bid opening date. 2. Good Faith Effort and received no later than 2:00 p.m., on the second City business Subcontractor Utilization Form,if day after the bid opening date, exclusive of the bid opening participation is less than statedgoal: date. 3. Good Faith Effort and received no later than 2:00 p.m., on the second City business Subcontractor Utilization Form,if no day after the bid opening date, exclusive of the bid opening MBE participation: date. 4. Prime Contractor Waiver Form, received no later than 2:00 p.m., on the second City business if you will perform all day after the bid opening date, exclusive of the bid opening contracting/supplier work: date. 34 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised June 9,2015 004540-2 Minority Business Enterprise Specifications Page 2 of 2 1 5. Joint Venture Form,if goal is met received no later than 2:00 p.m., on the second City business or exceeded. day after the bid opening date, exclusive of the bid opening date. 2 FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE 3 WILL RESULT IN THE BID BEING CONSIDERED NON-RESONSIVE TO SPECIFICATIONS. 4 FAILURE TO SUBMIT THE REQUIRED MBE DOCUMENTATION WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE.A SECOND FAILURE WILL RESULT IN THE OFFEROR 5 BEING DISQUALIFIED FOR A PERIOD OF ONE YEAR.THREE FAILURES IN A FIVE YEAR 6 PERIOD WILL RESULT IN A DISQUALIFICAITON PERIOD OF THREE YEARS. 7 Any Questions,Please Contact The M/WBE Office at(817)212-2674. 8 END OF SECTION 9 10 11 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised June 9,2015 005243-1 Agreement Page 1 of 5 1 SECTION 00 52 43 2 AGREEMENT 3 4 THIS AGREEMENT, authorized on 02/06/2018 is made by and between the City of Forth 5 Worth, a Texas home rule municipality,acting by and through its duly authorized City Manager, 6 ("City"), and GIBSON & ASSOCIATES, INC., authorized to do business in Texas, acting by 7 and through its duly authorized representative, ("Contractor"). 8 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1.WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2.PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 CONCRETE RESTORATION(2017-2) 17 City Project No. 100633 18 Article 3. CONTRACT PRICE 19 City agrees to pay Contractor for performance of the Work in accordance with the Contract 20 Documents an amount,in current funds,of SIX HUNDRED NINETY-FIVE THOUSAND, 21 SIX HUNDRED AND NINETY-FOUR AND 00/100 DOLLARS ($695,694.00). 22 Article 4. CONTRACT TIME 23 4.1 Final Acceptance. 24 The Work will be complete for Final Acceptance within 130 days after the date when the 25 Contract Time commences to run,as provided in Paragraph 2.03 of the General Conditions, 26 plus any extension thereof allowed in accordance with Article 12 of the General 27 Conditions. 28 4.2 Liquidated Damages 29 Contractor recognizes that time is of the essence for completion of Milestones, if any, and 30 to achieve Final Acceptance of the Work and City will suffer financial loss if the Work is 31 not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also 32 recognizes the delays, expense and difficulties involved in proving in a legal proceeding, 33 the actual loss suffered by the City if the Work is not completed on time. Accordingly, 34 instead of requiring any such proof, Contractor agrees that as liquidated damages for 35 delay (but not as a penalty), Contractor shall pay City Six HundredFifty Dollars 36 ($650.00) for each day that expires after the time specified in Paragraph 4.1 for Final 37 Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised 11.15.17 005243-2 Agreement Page 2 of 5 38 Article 5. CONTRACT DOCUMENTS 39 5.1 CONTENTS: 40 A. The Contract Documents which comprise the entire agreement between City and 41 Contractor concerning the Work consist of the following: 42 1. This Agreement. 43 2. Attachments to this Agreement: 44 a. Bid Form 45 1) Proposal Form 46 2) Vendor Compliance to State Law Non-Resident Bidder 47 3) Prequalification Statement 48 4) State and Federal documents(project specific) 49 b. Current Prevailing Wage Rate Table 50 c. Insurance ACORD Form(s) 51 d. Payment Bond 52 e. Performance Bond 53 f. Maintenance Bond 54 g. Power of Attorney for the Bonds 55 h. Worker's Compensation Affidavit 56 i. MBE and/or SBE Utilization Form 57 3. General Conditions. 58 4. Supplementary Conditions. 59 5. Specifications specifically made a part of the Contract Documents by attachment 60 or, if not attached, as incorporated by reference and described in the Table of 61 Contents of the Project's Contract Documents. 62 6. Drawings. 63 7. Addenda. 64 8. Documentation submitted by Contractor prior to Notice of Award. 65 9. The following which may be delivered or issued after the Effective Date of the 66 Agreement and, if issued,become an incorporated part of the Contract Documents: 67 a. Notice to Proceed. 68 b. Field Orders. 69 c. Change Orders. 70 d. Letter of Final Acceptance. 71 72 Article 6.INDEMNIFICATION 73 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 74 expense, the city, its officers, servants and employees, from and against any and all 75 claims arising out of, or alleged to arise out of,the work and services to be performed 76 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 77 under this contract. This indemnification provision is specifically intended to operate 78 and be effective even if it is alleged or proven that all or some of the damages being 79 sought were caused,in whole or in part, by any act, omission or negligence of the city. 80 This indemnity provision is intended to include, without limitation, indemnity for 81 costs,expenses and legal fees incurred by the city in defending against such claims and 82 causes of actions. 83 CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100633 Revised 11.15.17 005243-3 Agreement Page 3 of 5 84 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 85 the city,its officers,servants and employees,from and against any and all loss,damage 86 or destruction of property of the city,arising out of,or alleged to arise out of,the work 87 and services to be performed by the contractor, its officers, agents, employees, 88 subcontractors, licensees or invitees under this contract. This indemnification 89 provision is specifically intended to operate and be effective even if it is alleged or 90 proven that all or some of the damages being sought were caused, in whole or in part, 91 by any act,omission or negligence of the city. 92 93 Article 7.MISCELLANEOUS 94 7.1 Terms. 95 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 96 have the meanings indicated in the General Conditions. 97 7.2 Assignment of Contract. 98 This Agreement, including all of the Contract Documents may not be assigned by the 99 Contractor without the advanced express written consent of the City. 100 7.3 Successors and Assigns. 101 City and Contractor each binds itself, its partners, successors, assigns and legal 102 representatives to the other party hereto, in respect to all covenants, agreements and 103 obligations contained in the Contract Documents. 104 7.4 Severability. 105 Any provision or part of the Contract Documents held to be unconstitutional, void or 106 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 107 remaining provisions shall continue to be valid and binding upon CITY and 108 CONTRACTOR. 109 7.5 Governing Law and Venue. 110 This Agreement, including all of the Contract Documents is performable in the State of 111 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 112 Northern District of Texas,Fort Worth Division. 113 7.6 Authority to Sign. 114 Contractor shall attach evidence of authority to sign Agreement if signed by someone other 115 than the duly authorized signatory of the Contractor. 116 117 7.7 Prohibition On Contracts With Companies Boycotting Israel. 118 Contractor acknowledges that in accordance with Chapter 2270 of the Texas Government 119 Code, the City is prohibited from entering into a contract with a company for goods or 120 services unless the contract contains a written verification from the company that it: (1) 121 does not boycott Israel; and(2)will not boycott Israel during the term of the contract. CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised 11.15.17 005243-4 Agreement Page 4 of 5 122 The terms "boycott Israel"and"company" shall have the meanings ascribed to those terms 123 in Section 808.001 of the Texas Government Code. By signing this contract, Contractor 124 certifies that Contractor's signature provides written verification to the City that 125 Contractor. (1) does not boycott Israel, and(2) will not boycott Israel during the term of 126 the contract. 127 128 7.8 Immigration Nationality Act. 129 Contractor shall verify the identity and employment eligibility of its employees who 130 perform work under this Agreement, including completing the Employment Eligibility 131 Verification Form(I-9). Upon request by City,Contractor shall provide City with copies of 132 all I-9 forms and supporting eligibility documentation for each employee who performs 133 work under this Agreement. Contractor shall adhere to all Federal and State laws as well as 134 establish appropriate procedures and controls so that no services will be performed by any 135 Contractor employee who is not legally eligible to perform such services. 136 CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS 137 FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF 138 THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, 139 SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to 140 Contractor, shall have the right to immediately terminate this Agreement for violations of 141 this provision by Contractor. 142 143 7.9 No Third-Party Beneficiaries. 144 This Agreement gives no rights or benefits to anyone other than the City and the Contractor 145 and there are no third-party beneficiaries. 146 147 7.10 No Cause of Action Against Engineer. 148 Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their 149 sureties, shall maintain no direct action against the Engineer, its officers, employees, and 150 subcontractors, for any claim arising out of, in connection with, or resulting from the 151 engineering services performed. Only the City will be the beneficiary of any undertaking by 152 the Engineer. The presence or duties of the Engineer's personnel at a construction site, 153 whether as on-site representatives or otherwise, do not make the Engineer or its personnel 154 in any way responsible for those duties that belong to the City and/or the City's construction 155 contractors or other entities, and do not relieve the construction contractors or any other 156 entity of their obligations, duties, and responsibilities, including, but not limited to, all 157 construction methods, means, techniques, sequences, and procedures necessary for 158 coordinating and completing all portions of the construction work in accordance with the 159 Contract Documents and any health or safety precautions required by such construction 160 work. The Engineer and its personnel have no authority to exercise any control over any 161 construction contractor or other entity or their employees in connection with their work or 162 any health or safety precautions. 163 164 SIGNATURE PAGE TO FOLLOW 165 CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised 11.15.17 005243-5 Agreement Page 5 of 5 166 167 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be 168 effective as of the date subscribed by the City's designated Assistant City Manager ("Effective 169 Date"). 170 Contractor: Gibson&Associates,Inc. City of Fort Worth By: Jesus Chapa By: Assistant City Manager (Sign re) Date �S� OF.r kt w.tel�- Attest: lL (Printed Name) City S re f' k Title: Vice President (Seal) > `..�.• Address: ............. 11210 Ryliecrest M&C C-0113510,7 Date: a? G 116 Form 1295 No. 201'7-a97 t IPS City/State/Zip: Contract Compliance Manager: Balch Springs,Texas 75180-0579 By signing,I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting Date requirements. Tariqul Islam Project Manager Approved as to Form and Legality: 4KUPL-, Douglas W. Black Assistant City Attorney 171 172 OFFICIAL fWX; 0 AP OVAL RECOMMENDED: 173 174 CITY w 175 FY. . ''fps ' - Dou as . Wiersig, P.E. 176 DIRECT-OR, 177 Transportation and Public Works 178 CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100633 Revised 11.15.17 0061 13-1 PERFORMANCE BOND Page I oft I SECTION 00 6113 Bond No. 8246-05-06 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we,Gibson&Associates,Inc, known as"Principal"herein and 9 Federal Insurance Company ,a corporate surety(sureties, if more than 10 one)duly authorized to do business in the State of Texas,known as"Surety"herein(whether one I I or more),are held and firmly bound unto the City of Fort Worth,a municipal corporation zreated 12 pursuant to the laws of Texas,known as"City"herein,in the penal sum of, SIX HUNDRED 13 NINETY-FIVE THOUSAND SIX HUNDRED AND NINETY-FOUR AND 00/100 Dollars 14 ($695.694.00), lawful money of the United States,to be paid in Fort Worth,Tarrant County, 15 Texas for the payment of which sum well and truly to be made,we bind ourselves, our heirs, 16 executors,administrators,successors and assigns,jointly and severally,firmly by these presents. 17 WHEREAS,the Principal has entered into a certain written contract with the City 18 awarded the 2 day of February,20I g,which Contract is hereby referred to and made a part hereof 19 for all purposes as if fully set forth herein,to furnish all materials,equipment labor and other 20 accessories defined by law,in the prosecution of the Work, including any Change Orders,as 21 provided for in said Contract designated as Concrete Restoration(2017-2), City Project No. 22 I00633. 23 NOW,THEREFORE,the condition of this obligation is such that if the said Principal 24 shall faithfully perform it obligations under the Contract and shall in all respects duly and 25 faithfully perform the Work,including Change Orders,under the Contract,according to the plans, 26 specifications,and contract documents therein referred to,and as well during any period of 27 extension of the Contract that may be granted on the part of the City,then this obligation shall be 28 and become null and void,otherwise to remain in full force and effect. 29 PROVIDED FURTHER,that if any legal action be fled on this Bond,venue shall lie in 30 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 31 Worth Division. CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 0061 13-2 PERFORMANCE BOND Page 2 of2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code,as amended,and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN WITNESS WHEREOF,the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 15th day of 6 February ,20 18 7 PRINCIPAL: 8 Gibson&Associate e. 9 10 11 BY: 1� 12 Signature 13 ATTES : 14 15 k6Ld. /,IQ/c./,UW', AericQ�¢rr�f 16 (Principal)Secret46 ame and Title 17 18 Address: 11210 Ryliecrest 19 4 �' Balch Springs,Texas 75180 20 21 A)aE 22 i ess as to Principal 23 SURETY: 24 Federal Insurance Company 25 26 227 8 BY,�2aSig �n...,�./...,� 29 30 Robbi Morales,Attorney-in-fact 31 Name and Title 32 33 Address: 2711 N. Haskell Ave.. Suite 800 34 Dallas, TX 75204 35 36 37 Witness as to Surety Telephone Number: 214/989-0000 38 39 40 41 *Note: If signed by an officer of the Surety Company,there must be on file a certified extract 42 from the by-laws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address,both must be provided. 44 The date of the bond shall not be prior to the date the Contract is awarded. 45 CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 0061 14-1 PAYMENTBOND Page 1 oft 1 SECTION 00 6114 Bond No. 8246-05-06 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRA.NT § 7 That we, Gibson & Associates, Inc., known as "Principal" herein, and 8 Federal Insurance Company I a corporate surety 9 (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein 10 (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal I I corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the 12 penal sum of SIX HUNDRED NINETY-FIVE THOUSAND SIX HUNDRED AND 13 FOUR FOUR AND 00/100 Dollars($695.694.00), lawful money of the United States,to be paid in Fort 14 Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we bind 15 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 16 firmly by these presents: 17 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 18 2 day of February. 2018. which Contract is hereby referred to and made a part hereof for all 19 purposes as if fully set forth herein, to furnish all materials, equipment, labor and other 20 accessories as defined by law, in the prosecution of the Work as provided for in said Contract and 21 designated as Concrete Restoration(2017-2),City Project No. 100633. 22 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 23 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 24 Chapter 2253 of the Texas Government Code,as amended) in the prosecution of the Work under 25 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 26 force and effect. 27 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 28 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 29 accordance with the provisions of said statute. 30 CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 0061 14-2 PAYMENTBOND Page 2 oft 1 IN WITNESS WHEREOF,the Principal and Surety have each SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the 15th day of 3 February 12018 4 PRINCIPAL: Gibson&Associates i c. ATTEST: BY: Si ature (Principal)Secretary' Name and Title Address: 11210 R liecrest A ! Balch Sprino,Texas 75180 Witn ss as to Principal SURETY: Federal Insurance Company ATTEST: Signature I/1, A4 tn4A Robbi Morales, Attorney-in-fact (Sur ty) Secretary Name and Title Address: 2711 N. Haskell Ave., Suite 800 Dallas, TX 75204 Witness as to(Surety Telephone Number: 214/989-0000 5 6 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 7 bylaws showing that this person has authority to sign such obligation. If Surety's physical 8 address is different from its mailing address, both must be provided. 9 10 The date of the bond shall not be prior to the date the Contract is awarded. 11 END OF SECTION 12 CITY OF FORT\VORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Pmjcct No.100633 Rcviscd July 1,2011 0061 19-1 MAINTENANCE BOND Page I of 3 1 SECTION 00 6119 Bond No. 8246-05-06 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Gibson&Associates,Inc.,known as"Principal"herein and 9 Federal Insurance Company ,a corporate surety(sureties, if more than 10 one)duly authorized to do business in the State of Texas,known as"Surety"herein(whether one 11 or more),are held and firmly bound unto the City of Fort Worth,a municipal corporation created 12 pursuant to the laws of the State of Texas,known as"City"herein,in the sum of SIX HUNDRED 13 NINETY-FIVE THOUSAND, SIX HUNDRED AND NINETY-FOUR AND 00/100 Dollars 14 ($695.694.001, lawful money of the United States,to be paid in Fort Worth,Tarrant County, 15 Texas,for payment of which sum well and truly be made unto the City and its successors,we 16 bind ourselves,our heirs,executors,administrators,successors and assigns,jointly and severally, 17 firmly by these presents. 18 19 WHEREAS,the Principal has entered into a certain written contract with the City awarded 20 the 2 day of February.2018,which Contract is hereby referred to and a made part hereof for all 21 purposes as if fully set forth herein,to furnish all materials,equipment labor and other accessories 22 as defined by law, in the prosecution of the Work,including any Work resulting from a duly 23 authorized Change Order(collectively herein,the"Work")as provided for in said contract and 24 designated as Concrete Restoration 12017-2Z;CLty Project No. 100633;and 25 26 WHEREAS,Principal binds itself to use such materials and to so construct the Work in 27 accordance with the plans,specifications and Contract Documents that the Work is and will 28 remain free from defects in materials or workmanship for and during the period of two(2)years 29 after the date of Final Acceptance of the Work by the City("Maintenance Period");and 30 31 WHEREAS,Principal binds itself to repair or reconstruct the Work in whole or in part 32 upon receiving notice from the City of the need therefor at any time within the Maintenance 33 Period, 34 CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 0061 19-2 MAINTENANCE BOND Page 2 o1`3 I NOW THEREFORE,the condition of this obligation is such that if Principal shall 2 remedy any defective Work,for which timely notice was provided by City,to a completion 3 satisfactory to the City,then this obligation shall become null and void;otherwise to remain in 4 full force and effect. 5 6 PROVIDED,HOWEVER, if Principal shall fail so to repair or reconstruct any timely 7 noticed defective Work, it is agreed that the City may cause any and all such defective Work to 8 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 9 the Surety under this Maintenance bond; and 10 11 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 12 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 13 Worth Division;and 14 is PROVIDED FURTHER,that this obligation shall be continuous in nature and 16 successive recoveries may be had hereon for successive breaches. 17 18 19 CITY Or FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Reviscd July 1,2011 0061 19-3 MAINTENANCE BOND Page 3 ora 1 IN WITNESS WHEREOF,the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 15th day of 3 February ,2018 . 4 5 PRINCIPAL: 6 Gibson&Associate Inc. 7 8 9 BY: �• 10 Signature 11 ATTEST12 / 13 Jb - � G1 Lt.12�cL, —�f��f�tct Pa LZ 14 (Principal)Secrelaryu Name and Title 15 16 Address: 11210 Ryliecrest 17 18 Balch Springs,Texas 75180 19 a 0" 20 Witn ss as to Principal 21 ,T SURETY: 22 Federal Insurance Company 23 24 26 Signature 27 28 Robbi Morales,Attorney-in-fact 29 A. EST Name and Title 30 31 Address: 2711 N. Haskell Ave., Suite 800 32 (Sure )Secretary 33 Dallas, TX 75204 34 1,•`dl�/y 35 Witness as to Surety Telephone Number. 214/989-0000 36 37 *Note: If signed by an officer of the Surety Company,there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address, both must be provided. 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July I,2011 CHUBB, Power of Attorney Federal Insurance Company I Vigilant Insurance Company I Pacific Indemnity Company Know All by These Presents,That FEDERAL INSURANCE COMPANY,an Indiana corporation,VIGILANT INSURANCE COMPANY,a New York corporation,and PACIFIC INDEMNITY COMPANY, a Wisconsin corporation, do each hereby constitute and appoint Don E. Cornell, Sophinie Hunter, V. DeLene Marshall, Tina McEwan, Robbi Morales,Ricardo J.Reyna and Kelly A.Westbrook of Dallas,Texas;Steven Dwain Brockinton of Little Rock,Arkansas each as their true and lawful Attorney-in-Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise,bonds and undertakings and other writings obligatory in the nature thereof(other than bail bonds)given or executed in the course of business,and any instruments amending or altering the same,and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness WbereoE said FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY have each executed and attested these presents and affixed their corporate seals on this 86 day of March.2017. U\-ju� "'I 9-t� Itrwn -p :icphcn 41.Haney.1 k-c Prctidcnt A01k fZ aw � a.+► STATE OF NEW JERSEY County of Hunterdon Ss. On this 81 day of March,2017 before me,a Notary Public of New Jersey,personally came Dawn M.Chloros,to me known to be Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY,the companies which executed the foregoing Power of Attorney,and the said Dawn M. Chloros,being by me duly sworn,did depose and say that she is Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY and knows the corporate seals thereof,that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies;and that she signed said Power of Attorney as Assistant Secretary of said Companies by like authority;and that she is acquainted with Stephen M. Haney,and knows him to be vice President of said Companies;and that the signature of Stephen M.Haney,subscribed to said Power of Attorney is in the genuine handwriting of Stephen M.Haney,and was thereto subscribed by authority of said Companies and in deponent's presence. Notarial Seal KATHERNE L ADO AAR ex, T'tRY NOTARY PUKJC FI JEMY ., ✓atJ9LtC 00 COM,ft an E**ft JWy 10,2019 wury,h�lie JERg� CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY on August 30,2016: "RESOLVED,that the following authorizations relate to the execution,for and on behalf of the Company,of bonds,undertakings,recegnizattoes,contracts and other written commitments of the Company entered into in the ordinary course of business(each a"Written Commitment"): (1) Each of the Chairman,the President and the Vice Presidents of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company,under the seal of the Company or otherwise. (2) Each duly appointed atmmey-in-fact of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company,under the seal of the Company or otherwise,to the extent that such action is authorized by the grant of powers provided for in such person's written appointment as such attorney-in-fact (3) Each of the Chairman,the President and the Vice Presidents of the Company is hereby authorized,for and on behalf of the Company,to appoint in writing any person the attorney- in-fact of the Company with full power and authority to execute,for and on behalf of the Company,under the seal of the Company or otherwise,such Written Commitments of the Company as may be specified in such written appointment which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (4) Each of the Chairman,the President and the Vice Presidents of the Company is hereby authorized,for and on behalf of the Company,to delegate in writing to any other officer of the Company the authority to execute,for and on behalf of the Company,under the Company's seal or otherwise,such Written Commitments of the Company as are specified in such written delegation,which specification may be by general type or class of Written Commitments or by specification crone or more particular Written Commitments (5) The signature of any officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution,and the seal of the Company,may be affixed by facsimile on such Written Commitment or written appointment or delegation. FURTHER RESOLVED,that the foregoing Resolution shall not be deemed to be an exclusive statement of the powers and authority of officers,employees and other persons to act for and on behalf of the Company,and such Resolution shall not limit or otherwise affect the exercise of any such power or authority otherwise validly granted or vested." I,Dawn M.Chloros,Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY(the"Companies)do hereby certify that O) the foregoing Resolutions adopted by the Board of Directors of the Companies are we,correct and in full force and effect, (ii) the Companies are duly licensed and authorized to transact surety business in all 50 of the United States of America and the District of Columbia and are authorized by the US.Treasury Department;further,Federal and Vigilant are licensed in the U.S.Virgin Islands,and Federal is licensed in Guam,Puerto Rico, and each of the Provinces of Canada except Prince Edward Island;and (iii) the foregoing Power of Attorney is true,correct and in full force and effect. Given under my hand and seals of said Companies at Whitehouse Station,Pp,this February 15, 2018 Drawn M.Chit=)&Assistant Seco-Liar} IN THE EVENT YOU WISH TO NOTIFY US OF A CLAIM,VERIFY THE AUTHENTICITY OF THIS BOND OR NOTIFY US OF ANY OTHER MAT ML PLEASE CONTACT US AM Telephone(908)9013493 Fax(908)903-3656 a-mail ubb.com Form 15-10-02258-U GEN CONSENT(rev.12-16) Policyholder Information Notice IMPORTANT NOTICE AV/SO IMPORTANTE To obtain information or make a complaint: Para obtener informacion o para someter una queja: You may call Chubb's toll-free telephone number Usted puede hamar al numero de telefono gratis for information or to make a complaint at de Chubb's para informacion o para someter una queja al 1-800-36-CHUBB 1-800-36-CHUBB You may contact the Texas Department of Puede comunicarse con el Departamento de Insurance to obtain information on companies, Seguros de Texas para obtener informacion acerca coverages, rights or complaints at de companfas, coberturas, derechos o quejas al 1-800-252-3439 1-800-252-3439 You may write the Texas Department of Insurance Puede escribir al Departamento de Seguros de Texas P.O. Box 149104 P.O. Box 149104 Austin, TX 78714-9104 Austin, TX 78714-9104 FAX # (512) 475-1771 FAX # (512) 475-1771 Web: http://www.tdi.state.tx.us Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: D/SPUTAS SOBRE PRIMAS O RECLAMOS: Should you have a dispute concerning your premium Si tiene una disputa concerniente a su prima o a un or about a claim you should contact the agent first. reclamo, debe comunicarse con el agente primero. If the dispute is not resolved, you may contact the Si no se resueve la disputa, puede entonces Texas Department of Insurance. comunicarse con el departamento (TDI). ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AV/SO A SU POLIZA: This notice is for information only and does not Este aviso es solo para proposito de informacion y become a part or condition of the attached no se convierte en parte o condicion del documento document. adjunto. Form 99-10-0299(Rev. 1-08) CERTIFICATE OF LIABILITY INSURANCE QM ' THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed.If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this w certificate does not confer rights to the certificate holder in lieu of such endorsement(s). c PRODUCER CONTACT NAME: Aon Risk services southwest, Inc. PHONE FAX Dallas TX Office (AIC.No.Ext): (214) 989-0000 AK (214) 989-2530 v CityPlace Center East E-MAIL Ap-RIESS: 0 2711 North Haskell Avenue suite 800 Dallas TX 75204 USA INSURER(S)AFFORDING COVERAGE NAICN INSURED INSURERA: Hartford Ins co of the Midwest 37478 Gibson 6 Associates Inc. INSURERS: Hartford Underwriters Insurance Company 30104 P. 0. Box 800579 Balch springs TX 751800579 USA INSURER C: Hartford Casualty Insurance co 29424 B INSURER D: Great American Insurance Co. 16691 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: 570070244809 REVISION NUMBER: THIS IS TO CE=RTIFY THRT THE POLICIES OF INSURAOJCE LISTED BE•_OVV HAVE BEEN ISSUED TO TNF INSURED NAMED ABOVE POR THE POLICY I- RIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRA:;1 On „TI�4FI? .X(`*�UMEN'f VVI")"rl RESPEC J1 4C T'HS, CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICES DESCRIBED HEREIN IS SUBJECT ITC,ATHE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCEC BY PAID CLAWS, Limits shown are as requested LTR TYPE OF INSURANCE INSC7 WVC POLICY NUMBER MMIODiYYYY MMiDO1YYYV LIMITS X COMMERCULL GENERAL LIABILITY A 7l1 EAQT 1 7 1 :;,MCH OCCURRENCE CLAIMS-MADE 0OCCUR PREMISES Eaomurrence • ^ $300,000 X Includes XCU MED_XP(Any one person) X Includes Contractual Liability PERSONAL a ADV INJURY S1,000,000 p GENT AGGREGATE LIMITAPPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY ❑x JETPO- ❑X LOC >RODUCTS-CAMP/OP AGG S2,000,000 O OTHER: o r` A AUTOMOBILE LIABILITY Y Y 46 LEA QT1552 06/30/2017 06/30/2018 COMBINED SINGLE LIMIT Ea accident Sl,000,000 X ANY AUTO IODILY INJURY(Per person) O Z OWNED SCHEDULED IODILY INJURY(Per acddent) m AUTOS ONLY AUTOS HIRED AUTOS NON-OWNED FROPERTY OAMAGE td ONLY AUTOS ONLY 'Per accident w `iwCol Deductible l,oao - D UMBRELLA LIAB X OCCUR Y Y ITUE42gS71602 6/30/2017 06/30/2018 EACH.ICCURRENCE 5�,Q00,000 (.1 X EXCESS LIAR CLAIMS-MADE A(,GREGATE S5,000,000 C WORKERS COMPL NSATION AND Y 46WEAA(>6829 0-6/3-0/70-11-7 06/30/2018 X I PER OTH- EMPLO, YIN STATUTE I 11R pNw PRf,^br P74' r_­ R/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 aTFicLr.,: _ ED9 N NIA. (Mandatory.n hHl E.L.DISEASE-EA EMPLOYEE 51,000,000 i�yes. DESCRIPTION OF DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT DESCRIPTION OF OPERATIONS J LOCATIONS r VEHICLES( 101,Additbnal Remarks Schedule,may be atlaalted N more space Is required) RP V ect: Bridge RehV) Lancaster Avenue Bridge (2017-2). Cir'y of Fort worth, thei r•es5:r:, ive officers, directors, agents and employees are included as Additional Insured in accordance with the policy provisions of the General Liability, Automobile Liability and Excess Liability policies. General Liability evidenced herein is Primary and Non-contributory to other insurance available to an Additional Insured, but only in accordance with the policy's provisions. A waiver of subrogation is granted in favor of City of Fort worth in accordance with the policy provisions of the General Liability, Automobile Liability and workers' Compensation policies. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE MTN THE POLICY PROVISIONS. City of Fort Worth AUTHORIZED REPRESENTATIVE Attn: Ref N Contract 2018-1 200 texas St. Fort Worth TX 76102 USA ©1988-2015 ACORD CORPORATION.All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION TO CERTIFICATE HOLDER(S) Policy Number: 46 WEA A06829 Endorsement Number: Effective Date: 06/30/17 Effective hour is the same as stated on the Information Page of the policy. Named Insured and Address: GIBSON & ASSOCIATES, INC. PO BOX 800579 BALCH SPRINGS, TX 75180 This policy is subject to the following additional If notice is mailed, proof of mailing to the last known Conditions: mailing address of the certificate holder(s) on file A. If this policy is cancelled by the Company, other with the agent of record or the Company will be than for non-payment of premium, notice of such sufficient proof of notice. cancellation will be provided at least thirty (30) Any notification rights provided by this endorsement days in advance of the cancellation effective apply only to active certificate holder(s) who were date to the certificate holder(s) with mailing issued a certificate of insurance applicable to this addresses on file with the agent of record or the policy's term. Company. Failure to provide such notice to the certificate B. If this policy is cancelled by the Company for holder(s) will not amend or extend the date the non-payment of premium, or by the insured, cancellation becomes effective, nor will it negate notice of such cancellation will be provided cancellation of the policy. Failure to send notice within ten (10) days of the cancellation effective shall impose no liability of any kind upon the date to the certificate holder(s) with mailing Company or its agents or representatives. addresses on file with the agent of record or the Company. Form WC 99 03 94 Printed in U.S.A. Process Date: 06/20/17 Policy Expiration Date: 06/30/18 ©2011,The Hartford STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT C1TY OF FORT WORTH STANDARD CONSTRUCIYON SPECIFICATION DOCUMENTS Revision:F bray Z 2016 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 —Definitions and Terminology..........................................................................................................1 1.01 Defined Terms...............................................................................................................................l 1.02 Terminology..................................................................................................................................6 Article2—Preliminary Matters.........................................................................................................................7 2.01 Copies of Documents....................................................................................................................7 2.02 Commencement of Contract Time;Notice to Proceed................................................................7 2.03 Starting the Work..........................................................................................................................8 2.04 Before Starting Construction........................................................................................................8 2.05 Preconstruction Conference..........................................................................................................8 2.06 Public Meeting..............................................................................................................................8 2.07 Initial Acceptance of Schedules....................................................................................................8 Article 3—Contract Documents: Intent,Amending,Reuse............................................................................8 3.01 Intent..............................................................................................................................................8 3.02 Reference Standards......................................................................................................................9 3.03 Reporting and Resolving Discrepancies.......................................................................................9 3.04 Amending and Supplementing Contract Documents.................................................................10 3.05 Reuse of Documents...................................................................................................................10 3.06 Electronic Data............................................................................................................................l 1 Article 4—Availability of Lands; Subsurface and Physical Conditions;Hazardous Environmental Conditions;Reference Points.......................................................................... 11 ................................. 4.01 Availability of Lands..................................................................................................................11 4.02 Subsurface and Physical Conditions ..........................................................................................12 4.03 Differing Subsurface or Physical Conditions...................................... 4.04 Underground Facilities ...............................................................................................................13 4.05 Reference Points .........................................................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article5—Bonds and Insurance.....................................................................................................................16 5.01 Licensed Sureties and Insurers...................................................................................................16 5.02 Performance,Payment, and Maintenance Bonds.......................................................................16 5.03 Certificates of Insurance.............................................................................................................16 5.04 Contractor's Insurance................................................................................................................18 5.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................19 Article 6—Contractor's Responsibilities........................................................................................................19 6.01 Supervision and Superintendence...............................................................................................19 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebnmyZ 2016 6.02 Labor;Working Hours................................................................................................................20 6.03 Services,Materials, and Equipment...........................................................................................20 6.04 Project Schedule..........................................................................................................................21 6.05 Substitutes and"Or-Equals".......................................................................................................21 6.06 Concerning Subcontractors, Suppliers, and Others....................................................................24 6.07 Wage Rates..................................................................................................................................25 6.08 Patent Fees and Royalties...........................................................................................................26 6.09 Permits and Utilities....................................................................................................................27 6.10 Laws and Regulations.................................................................................................................27 6.11 Taxes...........................................................................................................................................28 6.12 Use of Site and Other Areas.......................................................................................................28 6.13 Record Documents......................................................................................................................29 6.14 Safety and Protection..................................................................................................................29 6.15 Safety Representative..................................................................................................................30 6.16 Hazard Communication Programs .............................................................................................30 6.17 Emergencies and/or Rectification...............................................................................................30 6.18 Submittals....................................................................................................................................31 6.19 Continuing the Work...................................................................................................................32 6.20 Contractor's General Warranty and Guarantee..........................................................................32 6.21 Indemnification.........................................................................................................................33 6.22 Delegation of Professional Design Services..............................................................................34 6.23 Right to Audit..............................................................................................................................34 6.24 Nondiscrimination.......................................................................................................................35 Article7-Other Work at the Site...................................................................................................................35 7.01 Related Work at Site...................................................................................................................35 7.02 Coordination................................................................................................................................36 Article 8-City's Responsibilities...................................................................................................................36 8.01 Communications to Contractor...................................................................................................36 8.02 Furnish Data................................................................................................................................36 8.03 Pay When Due ............................................................................................................................36 8.04 Lands and Easements;Reports and Tests...................................................................................36 8.05 Change Orders.......................................................................................... .............36 ...................... 8.06 Inspections,Tests, and Approvals..............................................................................................36 8.07 Limitations on City's Responsibilities.......................................................................................37 8.08 Undisclosed Hazardous Environmental Condition....................................................................37 8.09 Compliance with Safety Program...............................................................................................37 Article 9-City's Observation Status During Construction...........................................................................37 9.01 City's Project Manager............................................................................................................37 9.02 Visits to Site................................................................................................................................37 9.03 Authorized Variations in Work..................................................................................................38 9.04 Rejecting Defective Work..........................................................................................................38 9.05 Determinations for Work Performed..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work.....................38 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F bawyZ2016 Article 10-Changes in the Work;Claims;Extra Work................................................................................38 10.01 Authorized Changes in the Work...............................................................................................38 10.02 Unauthorized Changes in the Work...........................................................................................39 10.03 Execution of Change Orders.......................................................................................................39 10.04 Extra Work..................................................................................................................................39 10.05 Notification to Surety..................................................................................................................39 10.06 Contract Claims Process.............................................................................................................40 Article 11 -Cost of the Work;Allowances;Unit Price Work; Plans Quantity Measurement......................41 11.01 Cost of the Work.........................................................................................................................41 11.02 Allowances..................................................................................................................................43 11.03 Unit Price Work..........................................................................................................................44 11.04 Plans Quantity Measurement......................................................................................................45 Article 12-Change of Contract Price;Change of Contract Time.................................................................46 12.01 Change of Contract Price............................................................................................................46 12.02 Change of Contract Time............................................................................................................47 12.03 Delays..........................................................................................................................................47 Article 13-Tests and Inspections;Correction,Removal or Acceptance of Defective Work......................48 13.01 Notice of Defects ........................................................................................................................48 13.02 Access to Work...........................................................................................................................48 13.03 Tests and Inspections..................................................................................................................48 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work.............................................................................................................49 13.06 Correction or Removal of Defective Work................................................................................50 13.07 Correction Period........................................................................................................................50 13.08 Acceptance of Defective Work...................................................................................................51 13.09 City May Correct Defective Work.............................................................................................51 Article 14-Payments to Contractor and Completion....................................................................................52 14.01 Schedule of Values......................................................................................................................52 14.02 Progress Payments......................................................................................................................52 14.03 Contractor's Warranty of Title...................................................................................................54 14.04 Partial Utilization........................................................................................................................55 14.05 Final Inspection...........................................................................................................................55 14.06 Final Acceptance.........................................................................................................................55 14.07 Final Payment..............................................................................................................................56 14.08 Final Completion Delayed and Partial Retainage Release........................................................56 14.09 Waiver of Claims........................................................................................................................57 Article 15-Suspension of Work and Termination........................................................................................57 15.01 City May Suspend Work.............................................................................................................57 15.02 City May Terminate for Cause...................................................................................................58 15.03 City May Terminate For Convenience.......................................................................................60 Article 16-Dispute Resolution............................................................... ...................61 .................................... 16.01 Methods and Procedures.............................................................................................................61 Cn'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FtbnmyZ 2016 Article17—Miscellaneous..............................................................................................................................62 17.01 Giving Notice..............................................................................................................................62 17.02 Computation of Times................................................................................................................62 17.03 Cumulative Remedies.................................................................................................................62 17.04 Survival of Obligations...............................................................................................................63 17.05 Headings......................................................................................................................................63 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F bnay Z 2016 00 7200-1 GENERAL CONDITIONS Page 1 of 63 ARTICLE 1–DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify, correct,or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement—The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment—The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. S. Award–Authorization by the City Council for the City to enter into an Agreement. 6. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder—The individual or entity who submits a Bid directly to City. 8. Bidding Documents—The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements—The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form,if any, and the Bid Form with any supplements. 10. Business Day – A business day is defined as a day that the City conducts normal business, generally Monday through Friday,except for federal or state holidays observed by the City. 11. Buzzsaw–City's on-line,electronic document management and collaboration system. 12. Calendar Day–A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FdmwyZ 2016 00 7200-1 GENERAL CONDITIONS Page 2 of 63 13. Change Order—A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 14. City— The City of Fort Worth, Texas, a home-rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 15. City Attorney– The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 16. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 17. City Manager– The officially appointed and authorized City Manager of the City of Fort Worth,Texas,or his duly authorized representative. 18. Contract Claim—A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract.A demand for money or services by a third party is not a Contract Claim. 19. Contract—The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations,representations, or agreements, whether written or oral. 20. Contract Documents Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 22. Contract Time—The number of days or the dates stated in the Agreement to: (i) achieve Milestones,if any and(ii)complete the Work so that it is ready for Final Acceptance. 23. Contractor—The individual or entity with whom City has entered into the Agreement. 24. Cost of the Work—See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdmimy2.2016 007200-1 GENERAL CONDITIONS Page 3 of 63 25. Damage Claims – A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 26. Day or day–A day,unless otherwise defined, shall mean a Calendar Day. 27. Director of Aviation – The officially appointed Director of the Aviation Department of the City of Fort Worth,Texas,or his duly appointed representative, assistant, or agents. 28. Director of Parks and Community Services – The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant,or agents. 29. Director of Planning and Development– The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30.Director of Transportation Public Works – The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant,or agents. 31. Director of Water Department– The officially appointed Director of the Water Department of the City of Fort Worth,Texas,or his duly appointed representative,assistant,or agents. 32. Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 33. Effective Date of the Agreement—The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 34. Engineer—The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 35. Extra Work – Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents.Extra work shall be part of the Work. 36.Field Order—A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 37. Final Acceptance – The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FPbnmy2.2016 007200-1 GENERAL CONDITIONS Page 4 of 63 38. Final Inspection – Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 39. General Requirements—Sections of Division 1 of the Contract Documents. 40. Hazardous Environmental Condition The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 41. Hazardous Waste—Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 43. Liens--Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 44. Major Item–An Item of work included in the Contract Documents that has a total cost equal to or greater than 5%of the original Contract Price or$25,000 whichever is less. 45. Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 46. Notice of Award—The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 47. Notice to Proceed—A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 48. PCBs—Polychlorinated biphenyls. 49. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Waste and crude oils. 50. Plans–See definition of Drawings. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febmary Z 2016 007200-1 GENERAL CONDITIONS Page 5 of 63 51. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 52.Project—The Work to be performed under the Contract Documents. 53. Project Manager—The authorized representative of the City who will be assigned to the Site. 54. Public Meeting – An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55. Radioactive Material—Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954(42 USC Section 2011 et seq.) as amended from time to time. 56. Regular Working Hours – Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday(excluding legal holidays). 57. Samples—Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 59. Schedule of Values—A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 60. Site—Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights-of-way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 61. Specifications=That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 62. Subcontractor—An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdxmy Z 2016 0072 00 1 GENERAL CONDITIONS Page 6 of 63 63. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 64. Successful Bidder—The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent—The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions—That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water,wastewater,storm water,other liquids or chemicals,or traffic or other control systems. 69. Unit Price Work—See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours—Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day—A working day is defined as a day, not including Saturdays,Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.023 through E are not defined but, when used in the Bidding Requirements or Contract Documents,have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:ftbm uy Z 2016 00 7200-1 GENERAL CONDITIONS Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory,faulty, or deficient in that it: a. does not conform to the Contract Documents;or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2—PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time;Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 14 days after the Effective Date of the Agreement. Cn'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdm=y2.2016 007200-1 GENERAL CONDITIONS Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3—CONTRACT DOCUMENTS: INTENT,AMENDING,REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmazyZ2016 007200-1 GENERAL CONDITIONS Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications,Codes,Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work. If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation , (b) any standard, specification, manual, or code, or(c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febnwy2.2016 007200-1 GENERAL CONDITIONS Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier(whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized,by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal(subject to the provisions of Paragraph 6.18.C);or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FUxumyZ2016 00 7200-1 GENERAL CONDITIONS Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's Buzzsaw site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies,the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4—AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmayZ 2016 00 7200-1 GENERAL CONDITIONS Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site(except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors,members,partners, employees, agents,consultants,or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto;or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data,interpretations,opinions,or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any"technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate;or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FPbnmy2.2016 007200 1 GENERAL CONDITIONS Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A),notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract;or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site;or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated. The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated: 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any Cn'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdxu&yZ2016 007200-1 GENERAL CONDITIONS Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors,members,partners,employees, agents,consultants,or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FelmayZ2016 00 7200-1 GENERAL CONDITIONS Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings;or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data,interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers,or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action,if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdxuary 2,2016 007200-1 GENERAL CONDITIONS Page 16 of 63 ARTICLE 5—BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by City or any other additional insured)which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as"Additional Insured"on all liability policies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F bnoy2,2016 007200-1 GENERAL CONDITIONS Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M.Best Property&Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required,written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febmary 2.2016 007200-1 GENERAL CONDITIONS Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups,must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first-dollar basis,must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:ftbmary 2.2016 00 7200-1 GENERAL CONDITIONS Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured.There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6—CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods,techniques, sequences, and procedures of construction. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fbbnay Z 2016 007200-1 GENERAL CONDITIONS Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor, Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication)to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up,and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source,kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebnuaryZ 2016 007200-1 GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier,except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid,unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 0132 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or-Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or-equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or-Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or-equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febniazy Z 2016 00 7200-1 GENERAL CONDITIONS Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole;and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time;and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or-equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F I mmyZ 2016 007200-1 GENERAL CONDITIONS Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or-equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an"or-equal."City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or-equal"at Contractor's expense. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FdmimyZ 2016 007200-1 GENERAL CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract,unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Minority Business Enterprise Compliance: It is City policy to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE goal, Contractor is required to comply with the intent of the City's MBE Ordinance(as amended)by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE. Material misrepresentation of any nature will be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F bnimy Z 2016 007200-1 GENERAL CONDITIONS Page 25 of 63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity;nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs,pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:lidmay 2,2016 00 7200-1 GENERAL CONDITIONS Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258,Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless Cily,from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdmary 2,2016 00 7200-1 GENERAL CONDITIONS Page 27 of 63 the incorporation in the Work of any invention, design,process,product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F xwy Z 2016 00 7200-1 GENERAL CONDITIONS Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sales Tax Division Capitol Station Austin,TX 78711; or 2. http://www.window.state.tx.us/taxinfo/taxforms/93-forms.html 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F xuatyZ2016 007200-1 GENERAL CONDITIONS Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Per of the Work. During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febma y Z 2016 00 7200-1 GENERAL CONDITIONS Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage,injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal,relocation,or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal,relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs,if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febnmy2,2016 007200-1 GENERAL CONDITIONS Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmayZ 2016 00 7200-1 GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible;or CITY OF FORT WORTH STANDARD CONSTRUCf10N SPECIFICATION DOCUMENTS Revision:Ftbway Z 2016 00 7200-1 GENERAL CONDITIONS Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection,test,or approval by others;or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.13.The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME. OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febmay2.2016 007200- 1 GENERAL CONDITIONS Page 34 of 63 SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT I ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebnM Z 2016 00 7200-1 GENERAL CONDITIONS Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended. Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7—OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebnjayZ 2016 00 7200-1 GENERAL CONDITIONS Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized;and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8—CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements;Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FPbmary2,2016 00 7200-1 GENERAL CONDITIONS Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9—CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Manager City will provide one or more Project Manager(s) during the construction period. The duties and responsibilities and the limitations of authority of City's Project Manager during construction are set forth in the Contract Documents. The City's Project Manager for this Contract is <insert name here >, or his/her successor pursuant to written notification from the Director of < insert managing department here>. 9.02 Visits to Site A. City's Project Manager will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Manager will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Manager will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Manager's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Manager's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febniazy Z 2016 00 7200-1 GENERAL CONDITIONS Page 38 of 63 9.03 Authorized Variations in Work City's Project Manager may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor,who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Manager believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Per Contractor will determine the actual quantities and classifications of Work performed. City's Project Manager will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10—CHANGES IN THE WORK; CLAIMS;EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FdxuaryZ 2016 00 7200-1 GENERAL CONDITIONS Page 39 of 63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or(iii)agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febma y Z 2016 00 7200-1 GENERAL CONDITIONS Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor,if any,take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmayZ 2016 00 7200-1 GENERAL CONDITIONS Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11—COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included. The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.01.B, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.013, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55%markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Felmimy2,2016 007200-1 GENERAL CONDITIONS Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities,fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdmimy Z 2016 00 7200-1 GENERAL CONDITIONS Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded.The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.0I.A.1 or specifically covered by Paragraph 11.0I.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work,Contractor's fee shall be determined as set forth in Paragraph 12.0I.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.01.13, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre-bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febnary Z 2016 007200-1 GENERAL CONDITIONS Page 44 of 63 a. the pre-bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre-bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. 1. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. Cn'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmaryZ 2016 007200-1 GENERAL CONDITIONS Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities,unless revised by the governing Section or this Article. B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebroayZ 2016 00 7200-1 GENERAL CONDITIONS Page 46 of 63 E. For callout work or non-site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12—CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03);or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.0l.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.0l.B.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit(determined as provided in Paragraph 12.01.C). C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee;or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.0l.A.1, 11.0l.A.2. and 11.0l.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.0l.A.4 and 11.0l.A.5,the Contractor's fee shall be five percent(5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.01.C.2.a and 12.0l.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febn a y Z 2016 00 7200-1 GENERAL CONDITIONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.0l.A.1 and 11.0l.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor,however in no case shall the cumulative total of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.01.A.6, and 11.01.B; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any,which is to be furnished by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdmmry 2,2016 00 7200-1 GENERAL CONDITIONS Page 48 of 63 ARTICLE 13—TESTS AND INSPECTIONS; CORRECTION,REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected,or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections,which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City's acceptance.of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible,with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdmay Z 2016 007200-1 GENERAL CONDITIONS Page 49 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor,material, and equipment. 1. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing,observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering,exposure,observation, inspection,testing,replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FPbnjmy Z 2016 007200-1 GENERAL CONDITIONS Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee,if any,on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective,and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others)will be paid by Contractor. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FEbnay Z 2016 00 7200-1 GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim,pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of,the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven(7)days written notice to Contractor,correct,or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebnayZ 2016 00 7200-1 GENERAL CONDITIONS Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14—PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: 1. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as stipulated in the Contract Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:MxuayZ 2016 007200-1 GENERAL CONDITIONS Page 53 of 63 B. Review of Applications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules,that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor,or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors,requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F hmaryZ2016 OD7200-1 GENERAL CONDITIONS Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the City. E. Payment. Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment. 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmaryZ 2016 007200-1 GENERAL CONDITIONS Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 1. within 10 days,City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification of the City and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection,City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:F xumy Z 2016 00 7200-1 GENERAL CONDITIONS Page 56 of 63 14.07 Final Payment A. Application for Payment. 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied(except as previously delivered)by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety,if any,to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Fdniay Z 2016 00 7200-1 GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment,except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15—SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time,directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:ftnimy 2,2016 007200-1 GENERAL CONDITIONS Page 58 of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-2011 established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature,the correction of which has been directed in writing by the City;or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmayZ2016 007200-1 GENERAL CONDITIONS Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.B, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FebmsyZ 2016 00 7200-1 GENERAL CONDITIONS Page 60 of 63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Febn Z 2016 00 7200-1 GENERAL CONDITIONS Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for(without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination,including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16—DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.1) shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Ftbnwy Z 2016 007200-1 GENERAL CONDITIONS Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17—MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended;or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:Felin ay Z 2016 007200-1 GENERAL CONDITIONS Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision:FdxtaryZ 2016 007300-1 SUPPLEMENTARY CONDITIONS Page 1 of 5 1 SECTION 00 73 00 2 SUPPLEMENTARY CONDITIONS 3 TO 4 GENERAL CONDITIONS 5 Supplementary Conditions 6 7 These Supplementary Conditions modify and supplement Section 00 72 00-General Conditions,and other 8 provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are 9 modified or supplemented remain in full force and effect as so modified or supplemented. All provisions 10 of the General Conditions which are not so modified or supplemented remain in full force and effect. 11 12 Defined Terms 13 14 The terms used in these Supplementary Conditions which are defined in the General Conditions have the 15 meaning assigned to them in the General Conditions,unless specifically noted herein. 16 17 Modifications and Supplements 18 19 The following are instructions that modify or supplement specific paragraphs in the General Conditions and 20 other Contract Documents. 21 22 SC-3.03B.2,"Resolving Discrepancies" 23 24 Plans govern over Specifications. 25 26 SC-4.01A 27 28 Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. 29 Upon receiving the final easements descriptions,Contractor shall compare them to the lines shown on the 30 Contract Drawings. 31 32 SC-4.01A.1.,"Availability of Lands" 33 34 The following is a list of known outstanding right-of-way,and/or easements to be acquired,if any as of 35 February 9,2016: 36 37 Outstanding Right-Of-Way,and/or Easements to Be Acquired PARCEL OWNER TARGET DATE NUMBER OF POSSESSION NONE 38 The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, 39 and do not bind the City. 40 41 If Contractor considers the final easements provided to differ materially from the representations on the 42 Contract Drawings, Contractor shall within five (5)Business Days and before proceeding with the Work, 43 notify City in writing associated with the differing easement line locations. 44 45 SC-4.01A.2,"Availability of Lands" 46 47 Utilities or obstructions to be removed,adjusted,and/or relocated CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 007300-2 SUPPLEMENTARY CONDITIONS Page 2 of 5 1 2 The following is list of utilities and/or obstructions that have not been removed,adjusted,and/or relocated 3 as of February 9,2016 4 EXPECTED UTILITY AND LOCATION TARGET DATE OF OWNER ADJUSTMENT NONE 5 The Contractor understands and agrees that the dates listed above are estimates only,are not guaranteed, 6 and do not bind the City. 7 8 SC-4.02A.,"Subsurface and Physical Conditions" 9 10 The following are reports of explorations and tests of subsurface conditions at the site of the Work: 11 12 A"None"Report No. ,dated ,prepared by"None",a sub-consultant of"None"a 13 consultant of the City,providing additional information on"None" 14 15 The following are drawings of physical conditions in or relating to existing surface and subsurface 16 structures(except Underground Facilities)which are at or contiguous to the site of the Work: 17 "None" 18 19 SC-4.06A.,"Hazardous Environmental Conditions at Site" 20 21 The following are reports and drawings of existing hazardous environmental conditions known to the City: 22 "None" 23 24 SC-5.03A.,"Certificates of Insurance" 25 26 The entities listed below are"additional insureds as their interest may appear"including their respective 27 officers,directors,agents and employees. 28 29 (1) City 30 (2) Consultant"None" 31 (3) Other: "None" 32 33 SC-5.04A.,"Contractor's Insurance" 34 35 The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following 36 coverages for not less than the following amounts or greater where required by laws and regulations: 37 38 5.04A.Workers'Compensation,under Paragraph GC-5.04A. 39 40 Statutory limits 41 Employer's liability 42 $100,000 each accident/occurrence 43 $100,000 Disease-each employee 44 $500,000 Disease-policy limit 45 46 SC-5.04B.,"Contractor's Insurance" 47 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 007300-3 SUPPLEMENTARY CONDITIONS Page 3 of 5 1 5.04B.Commercial General Liability,under Paragraph GC-5.04B.Contractor's Liability Insurance 2 under Paragraph GC-5.04B.,which shall be on a per project basis covering the Contractor with 3 minimum limits of- 4 5 $1,000,000 each occurrence 6 $2,000,000 aggregate limit 7 8 The policy must have an endorsement(Amendment—Aggregate Limits of Insurance)making the 9 General Aggregate Limits apply separately to each job site. 10 11 The Commercial General Liability Insurance policies shall provide"X","C",and'i1'coverage's. 12 Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. 13 14 SC 5.04C.,"Contractor's Insurance" 15 5.04C. Automobile Liability,under Paragraph GC-5.04C.Contractor's Liability Insurance under 16 Paragraph GC-5.04C.,which shall be in an amount not less than the following amounts: 17 18 (1) Automobile Liability-a commercial business policy shall provide coverage on"Any Auto", 19 defined as autos owned,hired and non-owned. 20 21 $1,000,000 each accident on a combined single limit basis.Split limits are acceptable if limits are at 22 least: 23 24 $250,000 Bodily Injury per person/ 25 $500,000 Bodily Injury per accident/ 26 $100,000 Property Damage 27 28 SC-5.04D.,"Contractor's Insurance" 29 30 The Contractor's construction activities will require its employees,agents,subcontractors,equipment,and 31 material deliveries to cross railroad properties and tracks "None" 32 33 The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, 34 hinder,or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains 35 or other property. Such operations on railroad properties may require that Contractor to execute a"Right of 36 Entry Agreement"with the particular railroad company or companies involved,and to this end the 37 Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute 38 the right-of-entry(if any)required by a railroad company.The requirements specified herein likewise relate 39 to the Contractor's use of private and/or construction access roads crossing said railroad company's 40 properties. 41 42 The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide 43 coverage for not less than the following amounts,issued by companies satisfactory to the City and to the 44 Railroad Company for a term that continues for so long as the Contractor's operations and work cross, 45 occupy,or touch railroad property: 46 47 (1) General Aggregate: N/A 48 49 (2) Each Occurrence: N/A 50 51 _Required for this Contract X Not required for this Contract 52 53 With respect to the above outlined insurance requirements,the following shall govern: 54 55 With respect to the above outlined insurance requirements,the following shall govern: CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 007300-4 SUPPLEMENTARY CONDITIONS Page 4 of 5 1 2 1. Where a single railroad company is involved,the Contractor shall provide one insurance policy in 3 the name of the railroad company. However, if more than one grade separation or at-grade 4 crossing is affected by the Project at entirely separate locations on the line or lines of the same 5 railroad company,separate coverage may be required,each in the amount stated above. 6 7 2. Where more than one railroad company is operating on the same right-of-way or where several 8 railroad companies are involved and operated on their own separate rights-of-way, the Contractor 9 may be required to provide separate insurance policies in the name of each railroad company. 10 11 3. If,in addition to a grade separation or an at-grade crossing,other work or activity is proposed on a 12 railroad company's right-of-way at a location entirely separate from the grade separation or at- 13 grade crossing,insurance coverage for this work must be included in the policy covering the grade 14 separation. 15 16 4. If no grade separation is involved but other work is proposed on a railroad company's right-of- 17 way,all such other work may be covered in a single policy for that railroad,even though the work 18 may be at two or more separate locations. 19 20 No work or activities on a railroad company's property to be performed by the Contractor shall be 21 commenced until the Contractor has furnished the City with an original policy or policies of the insurance 22 for each railroad company named,as required above. All such insurance must be approved by the City and 23 each affected Railroad Company prior to the Contractor's beginning work. 24 25 The insurance specified above must be carried until all Work to be performed on the railroad right-of-way 26 has been completed and the grade crossing,if any,is no longer used by the Contractor. In addition, 27 insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. 28 Such insurance must name the railroad company as the insured,together with any tenant or lessee of the 29 railroad company operating over tracks involved in the Project. 30 31 SC-6.04.,"Project Schedule" 32 33 Project schedule shall be tier 1 for the project. 34 35 SC-6.07.,"Wage Rates" 36 37 The following is the prevailing wage rate table(s)applicable to this project and is provided in the 38 Appendixes:GC 6.07 39 40 SC-6.09.,"Permits and Utilities" 41 42 SC-6.09A.,"Contractor obtained permits and licenses" 43 The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: 44 "None" 45 SC-6.09B."City obtained permits and licenses" 46 The following are known permits and/or licenses required by the Contract to be acquired by the City: 47 "None" 48 49 SC-6.09C."Outstanding permits and licenses" 50 51 The following is a list of known outstanding permits and/or licenses to be acquired,if any as of February 9, 52 2016: 53 54 Outstanding Permits and/or Licenses to Be Acquired CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 007300-5 SUPPLEMENTARY CONDITIONS Page 5 of 5 OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION "None" 1 2 3 SC-7.02.,"Coordination" 4 5 The individuals or entities listed below have contracts with the City for the performance of other work at 6 the Site: 7 "None" Vendor t Sco a of Work Coordination Authority None None None 8 9 10 SC-8.01,"Communications to Contractor" 11 12 None 13 14 SC-9.01.,"City's Project Manager" 15 16 The City's Project Manager for this Contract is Tariqul Islam or his successor pursuant to written 17 notification from the Director of Transportation and Public Works 18 19 SC-13.03C.,"Tests and Inspections" 20 21 "None" 22 23 SC-16.01C.1,"Methods and Procedures" 24 25 "None" 26 27 28 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1/22/2016 F.Griffin SC-9.01., "City's Project Representative"wording changed to City's Project Manager. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 011100-1 SUMMARY OF WORK Page 1 of 3 1 SECTION 011100 2 SUMMARY OF WORK 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. VIOB]9, WION.ANI)z,DEMOBILIZATWN,SHALL,IPL SUBSIDIARY TO 9 TH1S IROjCT PAS [`I ,tNf SEP PAY PAYMENT WILI.BE 10 MADE FOR NIOBIIIZATaN AN ,DD ,. OBILIZATION FROM ONE 11 LOCATION TO ANOTHER IN NORMALPROGRESS,C}F PERFORMING THE 12 WORK.REMOBILIZATI N PAY ITEM SHALL BE PAID FOR SUSPENSION 13 OF WORK SPECIFICALLY REQUIR_I .IN, DOCUMENTS 14R AS REQUIRED BY TIfiE GTY, 15 C. Related Specification Sections include,but are not necessarily limited to: 16 1. Division 0-Bidding Requirements,Contract Forms,and Conditions of the Contract 17 2. Division 1 -General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Work Covered by Contract Documents 25 1. Work is to include furnishing all labor,materials,and equipment,and performing 26 all Work necessary for this construction project as detailed in the Drawings and 27 Specifications. 28 B. Subsidiary Work 29 1. Any and all Work specifically governed by documentary requirements for the 30 project, such as conditions imposed by the Drawings or Contract Documents in 31 which no specific item for bid has been provided for in the Proposal and the item is 32 not a typical unit bid item included on the standard bid item list,then the item shall 33 be considered as a subsidiary item of Work,the cost of which shall be included in 34 the price bid in the Proposal for various bid items. 35 2. MOBILIZATION AND DEMOBILIZATION SHALL NOT BE PAID DIRECTLY 36 BUT SHALL BE CONSIDERED SUBSIDIARY TO THE MAJOR ITEMS OF 37 WORK.NO PAYMENT WILL BE MADE FOR MOBILIZATION AND 38 DEMIBELIZATION FROM ONE LOCATION TO ANOTHER IN NORMAL 39 PROGRESS OF PERFORMING THE WORK. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 01 11 00 2 SUMMARY OF WORK Page 2 of 3 1 C. Use of Premises 2 1. Coordinate uses of premises under direction of the City. 3 2. Assume full responsibility for protection and safekeeping of materials and 4 equipment stored on the Site. 5 3. Use and occupy only portions of the public streets and alleys,or other public places 6 or other rights-of-way as provided for in the ordinances of the City,as shown in the 7 Contract Documents,or as may be specifically authorized in writing by the City. 8 a. A reasonable amount of tools,materials,and equipment for construction 9 purposes may be stored in such space,but no more than is necessary to avoid 10 delay in the construction operations. 11 b. Excavated and waste materials shall be stored in such a way as not to interfere 12 with the use of spaces that may be designated to be left free and unobstructed 13 and so as not to inconvenience occupants of adjacent property. 14 c. If the street is occupied by railroad tracks,the Work shall be carried on in such 15 manner as not to interfere with the operation of the railroad. 16 1) All Work shall be in accordance with railroad requirements set forth in 17 Division 0 as well as the railroad permit. 18 D. Work within Easements 19 1. Do not enter upon private property for any purpose without having previously 20 obtained permission from the owner of such property. 21 2. Do not store equipment or material on private property unless and until the 22 specified approval of the property owner has been secured in writing by the 23 Contractor and a copy furnished to the City. 24 3. Unless specifically provided otherwise,clear all rights-of-way or easements of 25 obstructions which must be removed to make possible proper prosecution of the 26 Work as a part of the project construction operations. 27 4. Preserve and use every precaution to prevent damage to,all trees, shrubbery,plants, 28 lawns,fences,culverts,curbing,and all other types of structures or improvements, 29 to all water,sewer,and gas lines,to all conduits,overhead pole lines, or 30 appurtenances thereof,including the construction of temporary fences and to all 31 other public or private property adjacent to the Work. 32 5. Notify the proper representatives of the owners or occupants of the public or private 33 lands of interest in lands which might be affected by the Work. 34 a. Such notice shall be made at least 48 hours in advance of the beginning of the 35 Work. 36 b. Notices shall be applicable to both public and private utility companies and any 37 corporation,company,individual,or other,either as owners or occupants, 38 whose land or interest in land might be affected by the Work. 39 c. Be responsible for all damage or injury to property of any character resulting 40 from any act,omission,neglect,or misconduct in the manner or method or 41 execution of the Work,or at any time due to defective work,material,or 42 equipment. 43 6. Fence 44 a. Restore all fences encountered and removed during construction of the Project 45 to the original or a better than original condition. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 011100-3 SUMMARY OF WORK Page 3 of 3 1 b. Erect temporary fencing in place of the fencing removed whenever the Work is 2 not in progress and when the site is vacated overnight,and/or at all times to 3 provide site security. 4 c. The cost for all fence work within easements,including removal,temporary 5 closures and replacement, shall be subsidiary to the various items bid in the 6 project proposal,unless a bid item is specifically provided in the proposal. 7 1.5 SUBMITTALS [NOT USED] 8 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 9 1.7 CLOSEOUT SUBMITTALS [NOT USED] 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE[NOT USED] 12 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 13 1.11 FIELD [SITE] CONDITIONS [NOT USED] 14 1.12 WARRANTY [NOT USED] 15 PART 2- PRODUCTS [NOT USED] 16 PART 3- EXECUTION [NOT USED] 17 END OF SECTION 18 Revision Log DATE NAME SUMMARY OF CHANGE 19 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 012500-1 SUBSTITUTION PROCEDURES Page 1 of 4 1 SECTION 0125 00 2 SUBSTITUTION PROCEDURES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specked by descriptive or performance criteria or 8 defined by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 11 c. Trade name 12 d. Catalog number 13 2. Substitutions are not"or-equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include,but are not necessarily limited to: 17 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 18 2. Division 1 —General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. 22 No separate payment will be allowed for this Item. 23 1.3 REFERENCES[NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. Request for Substitution-General 26 1. Within 30 days after award of Contract(unless noted otherwise),the City will 27 consider formal requests from Contractor for substitution of products in place of 28 those specified. 29 2. Certain types of equipment and kinds of material are described in Specifications by 30 means of references to names of manufacturers and vendors,trade names,or 31 catalog numbers. 32 a. When this method of specifying is used,it is not intended to exclude from 33 consideration other products bearing other manufacturer's or vendor's names, 34 trade names,or catalog numbers,provided said products are"or-equals," as 35 determined by City. 36 3. Other types of equipment and kinds of material may be acceptable substitutions 37 under the following conditions: 38 a. Or-equals are unavailable due to strike,discontinued production of products 39 meeting specified requirements,or other factors beyond control of Contractor; 40 or, CITY OF FORT WORTH BRIDGE REHABB_ITAITON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 012500-2 SUBSTITUTION PROCEDURES Page 2 of 4 1 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form(attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution,including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with 11 Contract Documents 12 2) Data relating to changes in construction schedule,when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product,including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including,but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Location of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved,the resulting cost and/or time reduction 46 will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH BRIDGE REHABILITAITON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 012500-3 SUBSTITUTION PROCEDURES Page 3 of 4 1 4. No additional contract time will be given for substitution. 2 5. Substitution will be rejected if- 3 a. Submittal is not through the Contractor with his stamp of approval 4 b. Request is not made in accordance with this Specification Section 5 c. In the City's opinion,acceptance will require substantial revision of the original 6 design 7 d. In the City's opinion,substitution will not perform adequately the function 8 consistent with the design intent 9 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE 13 A. In making request for substitution or in using an approved product,the Contractor 14 represents that the Contractor: 15 1. Has investigated proposed product,and has determined that it is adequate or 16 superior in all respects to that specified,and that it will perform function for which 17 it is intended 18 2. Will provide same guarantee for substitute item as for product specified 19 3. Will coordinate installation of accepted substitution into Work,to include building 20 modifications if necessary,making such changes as may be required for Work to be 21 complete in all respects 22 4. Waives all claims for additional costs related to substitution which subsequently 23 arise 24 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 25 1.11 FIELD [SITE] CONDITIONS [NOT USED] 26 1.12 WARRANTY [NOT USED] 27 PART 2- PRODUCTS [NOT USED] 28 PART 3- EXECUTION[NOT USED] 29 END OF SECTION 30 Revision Log DATE NAME SUMMARY OF CHANGE 31 CITY OF FORT WORTH BRIDGE REHABILTTAITON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 012500-4 SUBSTITUTION PROCEDURES Page 4 of 4 1 EXHIBIT A 2 REQUEST FOR SUBSTITUTION FORM: 3 4 TO: 5 PROJECT: DATE: 6 We hereby submit for your consideration the following product instead of the specified item for 7 the above project: 8 SECTION PARAGRAPH SPECIFIED ITEM 9 10 11 Proposed Substitution: 12 Reason for Substitution: 13 Include complete information on changes to Drawings and/or Specifications which proposed 14 substitution will require for its proper installation. 15 16 Fill in Blanks Below: 17 A. Will the undersigned contractor pay for changes to the building design,including engineering 18 and detailing costs caused by the requested substitution? 19 20 21 B. What effect does substitution have on other trades? 22 23 24 C. Differences between proposed substitution and specified item? 25 26 27 D. Differences in product cost or product delivery time? 28 29 30 E. Manufacturer's guarantees of the proposed and specified items are: 31 32 Equal Better(explain on attachment) 33 The undersigned states that the function, appearance and quality are equivalent or superior to the 34 specified item. 35 Submitted By: For Use by City 36 37 Signature _Recommended _Recommended 38 as noted 39 40 Firm _Not recommended _Received late 41 Address By 42 Date 43 Date Remarks 44 Telephone 45 46 For Use by City: 47 48 Approved Rejected 49 City Date CITY OF FORT WORTH BRIDGE REHABILITAITON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 013119-1 PRECONSTRUCTION MEETING Page 1 of 3 1 SECTION 013119 2 PRECONSTRUCTION MEETING 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. ,Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 12 2. Division 1—General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Coordination 20 1. Attend preconstruction meeting. 21 2. Representatives of Contractor,subcontractors and suppliers attending meetings 22 shall be qualified and authorized to act on behalf of the entity each represents. 23 3. Meeting administered by City may be tape recorded. 24 a. If recorded,tapes will be used to prepare minutes and retained by City for 25 future reference. 26 B. Preconstruction Meeting 27 1. A preconstruction meeting will be held within 14 days after the execution of the 28 Agreement and before Work is started. 29 a. The meeting will be scheduled and administered by the City. 30 2. The Project Representative will preside at the meeting,prepare the notes of the 31 meeting and distribute copies of same to all participants who so request by fully 32 completing the attendance form to be circulated at the beginning of the meeting. 33 3. Attendance shall include: 34 a. Project Representative 35 b. Contractor's project manager 36 c. Contractor's superintendent 37 d. Any subcontractor or supplier representatives whom the Contractor may desire 38 to invite or the City may request CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised August 17,2012 013119-2 PRECONSTRUCTION MEETING Page 2 of 3 1 e. Other City representatives 2 f. Others as appropriate 3 4. Construction Schedule 4 a. Prepare baseline construction schedule in accordance with Section 0132 16 and 5 provide at Preconstruction Meeting. 6 b. City will notify Contractor of any schedule changes upon Notice of 7 Preconstruction Meeting. 8 5. Preliminary Agenda may include: 9 a. Introduction of Project Personnel 10 b. General Description of Project 11 c. Status of right-of-way,utility clearances,easements or other pertinent permits 12 d. Contractor's work plan and schedule 13 e. Contract Time 14 f. Notice to Proceed 15 g. Construction Staking 16 h. Progress Payments 17 i. Extra Work and Change Order Procedures 18 j. Field Orders 19 k. Disposal Site Letter for Waste Material 20 1. Insurance Renewals 21 in. Payroll Certification 22 n. Material Certifications and Quality Control Testing 23 o. Public Safety and Convenience 24 p. Documentation of Pre-Construction Conditions 25 q. Weekend Work Notification 26 r. Legal Holidays 27 s. Trench Safety Plans 28 t. Confined Space Entry Standards 29 u. Coordination with the City's representative for operations of existing water 30 systems 31 v. Storm Water Pollution Prevention Plan 32 w. Coordination with other Contractors 33 x. Early Warning System 34 y. Contractor Evaluation 35 z. Special Conditions applicable to the project 36 aa. Damages Claims 37 bb. Submittal Procedures 38 cc. Substitution Procedures 39 dd. Correspondence Routing 40 ee. Record Drawings 41 ff. Temporary construction facilities 42 gg. M/WBE or MBE/SBE procedures 43 hh. Final Acceptance 44 ii. Final Payment 45 J. Questions or Comments CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised August 17,2012 013119-3 PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS[NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 13 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised August 17,2012 013120-1 PROJECT MEETINGS Page 1 of 3 1 SECTION 013120 2 PROJECT MEETINGS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for project meetings throughout the construction period to enable orderly 7 review of the progress of the Work and to provide for systematic discussion of 8 potential problems 9 B. Deviations this City of Fort Worth Standard Specification 10 1. None. 11 C. Related Specification Sections include,but are not necessarily limited to: 12 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 13 2. Division 1—General Requirements 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES[NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Coordination 21 1. Schedule,attend and administer as specified,periodic progress meetings,and 22 specially called meetings throughout progress of the Work. 23 2. Representatives of Contractor, subcontractors and suppliers attending meetings 24 shall be qualified and authorized to act on behalf of the entity each represents. 25 3. Meetings administered by City may be tape recorded. 26 a. If recorded,tapes will be used to prepare minutes and retained by City for 27 future reference. 28 4. Meetings,in addition to those specked in this Section,may be held when requested 29 by the City,Engineer or Contractor. 30 B. Pre-Construction Neighborhood Meeting 31 1. After the execution of the Agreement,but before construction is allowed to begin, 32 attend 1 Public Meeting with affected residents to: 33 a. Present projected schedule,including construction start date 34 b. Answer any construction related questions 35 2. Meeting Location 36 a. Location of meeting to be determined by the City. 37 3. Attendees 38 a. Contractor CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 013120-2 PROJECT MEETINGS Page 2 of 3 1 b. Project Representative 2 c. Other City representatives 3 4. Meeting Schedule 4 a. In general,the neighborhood meeting will occur within the 2 weeks following 5 the pre-construction conference. 6 b. In no case will construction be allowed to begin until this meeting is held. 7 C. Progress Meetings 8 1. Formal project coordination meetings will be held periodically. Meetings will be 9 scheduled and administered by Project Representative. 10 2. Additional progress meetings to discuss specific topics will be conducted on an as- 11 needed basis. Such additional meetings shall include,but not be limited to: 12 a. Coordinating shutdowns 13 b. Installation of piping and equipment 14 c. Coordination between other construction projects 15 d. Resolution of construction issues 16 e. Equipment approval 17 3. The Project Representative will preside at progress meetings,prepare the notes of 18 the meeting and distribute copies of the same to all participants who so request by 19 fully completing the attendance form to be circulated at the beginning of each 20 meeting. 21 4. Attendance shall include: 22 a. Contractor's project manager 23 b. Contractor's superintendent 24 c. Any subcontractor or supplier representatives whom the Contractor may desire 25 to invite or the City may request 26 d. Engineer's representatives 27 e. City's representatives 28 f. Others,as requested by the Project Representative 29 5. Preliminary Agenda may include: 30 a. Review of Work progress since previous meeting 31 b. Field observations,problems,conflicts 32 c. Items which impede construction schedule 33 d. Review of off-site fabrication,delivery schedules 34 e. Review of construction interfacing and sequencing requirements with other 35 construction contracts 36 f. Corrective measures and procedures to regain projected schedule 37 g. Revisions to construction schedule 38 h. Progress,schedule,during succeeding Work period 39 i. Coordination of schedules 40 j. Review submittal schedules 41 k. Maintenance of quality standards 42 1. Pending changes and substitutions 43 m. Review proposed changes for: 44 1) Effect on construction schedule and on completion date 45 2) Effect on other contracts of the Project 46 n. Review Record Documents 47 o. Review monthly pay request 48 p. Review status of Requests for Information CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 013120-3 PROJECT MEETINGS Page 3 of 3 1 6. Meeting Schedule 2 a. Progress meetings will be held periodically as determined by the Project 3 Representative. 4 1) Additional meetings may be held at the request of the: 5 a) City 6 b) Engineer 7 c) Contractor 8 7. Meeting Location 9 a. The City will establish a meeting location. 10 1) To the extent practicable,meetings will be held at the Site. 11 1.5 SUBMITTALS [NOT USED] 12 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 13 1.7 CLOSEOUT SUBMITTALS [NOT USED] 14 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 15 1.9 QUALITY ASSURANCE[NOT USED] 16 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 17 1.11 FIELD[SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY [NOT USED] 19 PART 2- PRODUCTS [NOT USED] 20 PART 3- EXECUTION[NOT USED] 21 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 23 CITY OF FORT WORTH CONCRETE RESTORATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 013216-1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 5 1 SECTION 013216 2 CONSTRUCTION PROGRESS SCHEDULE 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation,submittal,updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include,but are not necessarily limited to: 13 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 14 2. Division 1—General Requirements 15 1.2 PRICE AND PAYMENT PROCEDURES 16 A. Measurement and Payment 17 1. Work associated with this Item is considered subsidiary to the various items bid. 18 No separate payment will be allowed for this Item. 19 1.3 REFERENCES 20 A. Definitions 21 1. Schedule Tiers 22 a. Tier 1-No schedule submittal required by contract. Small,brief duration 23 projects 24 b. Tier 2-No schedule submittal required by contract,but will require some 25 milestone dates. Small,brief duration projects 26 c. Tier 3-Schedule submittal required by contract as described in the 27 Specification and herein.Majority of City projects,including all bond program 28 projects 29 d. Tier 4-Schedule submittal required by contract as described in the 30 Specification and herein.Large and/or complex projects with long durations 31 1) Examples: large water pump station project and associated pipeline with 32 interconnection to another governmental entity 33 e. Tier 5-Schedule submittal required by contract as described in the 34 Specification and herein.Large and/or very complex projects with long 35 durations,high public visibility 36 1) Examples might include a water or wastewater treatment plant 37 2. Baseline Schedule-Initial schedule submitted before work begins that will serve 38 as the baseline for measuring progress and departures from the schedule. 39 3. Progress Schedule-Monthly submittal of a progress schedule documenting 40 progress on the project and any changes anticipated. CITY OF FORT WORTH BRIDGE REHABILTTATTON(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 100633 Revised July 1,2011 013216-2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 5 1 4. Schedule Narrative-Concise narrative of the schedule including schedule 2 changes,expected delays,key schedule issues,critical path items,etc 3 B. Reference Standards 4 1. City of Fort Worth Schedule Guidance Document 5 1.4 ADMINISTRATIVE REQUIREMENTS 6 A. Baseline Schedule 7 1. General 8 a. Prepare a cost-loaded baseline Schedule using approved software and the 9 Critical Path Method(CPM)as required in the City of Fort Worth Schedule 10 Guidance Document. 11 b. Review the draft cost-loaded baseline Schedule with the City to demonstrate 12 understanding of the work to be performed and known issues and constraints 13 related to the schedule. 14 c. Designate an authorized representative(Project Scheduler)responsible for 15 developing and updating the schedule and preparing reports. 16 B. Progress Schedule 17 1. Update the progress Schedule monthly as required in the City of Fort Worth 18 Schedule Guidance Document. 19 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 20 3. Change Orders 21 a. Incorporate approved change orders,resulting in a change of contract time,in 22 the baseline Schedule in accordance with City of Fort Worth Schedule 23 Guidance Document. 24 C. Responsibility for Schedule Compliance 25 1. Whenever it becomes apparent from the current progress Schedule and CPM Status 26 Report that delays to the critical path have resulted and the Contract completion 27 date will not be met,or when so directed by the City,make some or all of the 28 following actions at no additional cost to the City 29 a. Submit a Recovery Plan to the City for approval revised baseline Schedule 30 outlining: 31 1) A written statement of the steps intended to take to remove or arrest the 32 delay to the critical path in the approved schedule 33 2) Increase construction manpower in such quantities and crafts as will 34 substantially eliminate the backlog of work and return current Schedule to 35 meet projected baseline completion dates 36 3) Increase the number of working hours per shift,shifts per day,working 37 days per week,the amount of construction equipment,or any combination 38 of the foregoing, sufficiently to substantially eliminate the backlog of work 39 4) Reschedule activities to achieve maximum practical concurrency of 40 accomplishment of activities,and comply with the revised schedule 41 2. If no written statement of the steps intended to take is submitted when so requested 42 by the City,the City may direct the Contractor to increase the level of effort in 43 manpower(trades),equipment and work schedule(overtime,weekend and holiday 44 work,etc.)to be employed by the Contractor in order to remove or arrest the delay 45 to the critical path in the approved schedule. 46 a. No additional cost for such work will be considered. CITY OF FORT WORTH BRIDGE REHABILITAITON(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 100633 Revised July 1,2011 013216-3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 5 1 D. The Contract completion time will be adjusted only for causes specified in this 2 Contract. 3 a. Requests for an extension of any Contract completion date must be 4 supplemented with the following: 5 1) Furnish justification and supporting evidence as the City may deem 6 necessary to determine whether the requested extension of time is entitled 7 under the provisions of this Contract. 8 a) The City will,after receipt of such justification and supporting 9 evidence,make findings of fact and will advise the Contractor,in 10 writing thereof. 11 2) If the City finds that the requested extension of time is entitled,the City's 12 determination as to the total number of days allowed for the extensions 13 shall be based upon the approved total baseline schedule and on all data 14 relevant to the extension. 15 a) Such data shall be included in the next updating of the Progress 16 schedule. 17 b) Actual delays in activities which,according to the Baseline schedule, 18 do not affect any Contract completion date shown by the critical path in 19 the network will not be the basis for a change therein. 20 2. Submit each request for change in Contract completion date to the City within 30 21 days after the beginning of the delay for which a time extension is requested but 22 before the date of final payment under this Contract. 23 a. No time extension will be granted for requests which are not submitted within 24 the foregoing time limit. 25 b. From time to time,it may be necessary for the Contract schedule or completion 26 time to be adjusted by the City to reflect the effects of job conditions,weather, 27 technical difficulties,strikes,unavoidable delays on the part of the City or its 28 representatives,and other unforeseeable conditions which may indicate 29 schedule adjustments or completion time extensions. 30 1) Under such conditions,the City will direct the Contractor to reschedule the 31 work or Contract completion time to reflect the changed conditions and the 32 Contractor shall revise his schedule accordingly. 33 a) No additional compensation will be made to the Contractor for such 34 schedule changes except for unavoidable overall contract time 35 extensions beyond the actual completion of unaffected work,in which 36 case the Contractor shall take all possible action to minimize any time 37 extension and any additional cost to the City. 38 b) Available float time in the Baseline schedule may be used by the City 39 as well as by the Contractor. 40 3. Float or slack time is defined as the amount of time between the earliest start date 41 and the latest start date or between the earliest finish date and the latest finish date 42 of a chain of activities on the Baseline Schedule. 43 a. Float or slack time is not for the exclusive use or benefit of either the 44 Contractor or the City. 45 b. Proceed with work according to early start dates,and the City shall have the 46 right to reserve and apportion float time according to the needs of the project. CITY OF FORT WORTH BRIDGE REHABILITAITON(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 100633 Revised July 1,2011 013216-4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 5 1 c. Acknowledge and agree that actual delays,affecting paths of activities 2 containing float time,will not have any effect upon contract completion rimes, 3 providing that the actual delay does not exceed the float time associated with 4 those activities. 5 E. Coordinating Schedule with Other Contract Schedules 6 1. Where work is to be performed under this Contract concurrently with or contingent 7 upon work performed on the same facilities or area under other contracts,the 8 Baseline Schedule shall be coordinated with the schedules of the other contracts. 9 a. Obtain the schedules of the other appropriate contracts from the City for the 10 preparation and updating of Baseline schedule and make the required changes 11 in his schedule when indicated by changes in corresponding schedules. 12 2. In case of interference between the operations of different contractors,the City will 13 determine the work priority of each contractor and the sequence of work necessary 14 to expedite the completion of the entire Project. 15 a. In such cases,the decision of the City shall be accepted as final. 16 b. The temporary delay of any work due to such circumstances shall not be 17 considered as justification for claims for additional compensation. 18 1.5 SUBMITTALS 19 A. Baseline Schedule 20 1. Submit Schedule in native file format and pdf format as required in the City of Fort 21 Worth Schedule Guidance Document. 22 a. Native file format includes: 23 1) Primavera(P6 or Primavera Contractor) 24 2. Submit draft baseline Schedule to City prior to the pre-construction meeting and 25 bring in hard copy to the meeting for review and discussion. 26 B. Progress Schedule 27 1. Submit progress Schedule in native file format and pdf format as required in the 28 City of Fort Worth Schedule Guidance Document. 29 2. Submit progress Schedule monthly no later than the last day of the month. 30 C. Schedule Narrative 31 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth 32 Schedule Guidance Document. 33 2. Submit schedule narrative monthly no later than the last day of the month. 34 D. Submittal Process 35 1. The City administers and manages schedules through Buzzsaw. 36 2. Contractor shall submit documents as required in the City of Fort Worth Schedule 37 Guidance Document. 38 3. Once the project has been completed and Final Acceptance has been issued by the 39 City,no further progress schedules are required. CITY OF FORT WORTH BRIDGE REHABILITAITON(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 100633 Revised July 1,2011 013216-5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 5 1 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.9 QUALITY ASSURANCE 5 A. The person preparing and revising the construction Progress Schedule shall be 6 experienced in the preparation of schedules of similar complexity. 7 B. Schedule and supporting documents addressed in this Specification shall be prepared, 8 updated and revised to accurately reflect the performance of the construction. 9 C. Contractor is responsible for the quality of all submittals in this section meeting the 10 standard of care for the construction industry for similar projects. 11 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 12 1.11 FIELD [SITE] CONDITIONS [NOT USED] 13 1.12 WARRANTY [NOT USED] 14 PART 2- PRODUCTS [NOT USED] 15 PART 3- EXECUTION[NOT USED] 16 END OF SECTION 17 Revision Log DATE NAME SUMMARY OF CHANGE 18 CITY OF FORT WORTH BRIDGE REHABILITAITON(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 100633 Revised July 1,2011 013233-1 PRECONSTRUCTION VIDEO Page 1 of 2 1 SECTION 0132 33 2 PRECONSTRUCTION VIDEO 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstruction Videos 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 12 2. Division 1—General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES[NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment,including all areas in the 21 vicinity of and to be affected by construction. 22 a. Provide digital copy of video upon request by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS[NOT USED] 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS[NOT USED] 29 1.9 QUALITY ASSURANCE[NOT USED] 30 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY[NOT USED] 33 PART 2- PRODUCTS[NOT USED] CITY OF FORT WORTH BRIDGE REHABILITAITON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 013233-2 PRECONSTRUCTION VIDEO Page 2 of 2 1 PART 3- EXECUTION[NOT USED] 2 END OF SECTION 3 Revision Log DATE NAME SUMMARY OF CHANGE 4 CITY OF FORT WORTH BRIDGE REHABILITAITON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 013300-1 SUBMITTALS Page 1 of 8 1 SECTION 0133 00 2 SUBMITTALS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following 7 Work-related submittals: 8 a. Shop Drawings 9 b. Product Data(including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 16 2. Division 1 —General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES[NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Notify the City in writing,at the time of submittal,of any deviations in the 25 submittals from the requirements of the Contract Documents. 26 2. Coordination of Submittal Times 27 a. Prepare,prioritize and transmit each submittal sufficiently in advance of 28 performing the related Work or other applicable activities,or within the time 29 specified in the individual Work Sections,of the Specifications. 30 b. Contractor is responsible such that the installation will not be delayed by 31 processing times including,but not limited to: 32 a) Disapproval and resubmittal(if required) 33 b) Coordination with other submittals 34 c) Testing 35 d) Purchasing 36 e) Fabrication 37 f) Delivery 38 g) Similar sequenced activities 39 c. No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013300-2 SUBMITTALS Page 2 of 8 1 d. Make submittals promptly in accordance with approved schedule,and in such 2 sequence as to cause no delay in the Work or in the work of any other 3 contractor. 4 B. Submittal Numbering 5 1. When submitting shop drawings or samples,utilize a 9-character submittal cross- 6 reference identification numbering system in the following manner: 7 a. Use the first 6 digits of the applicable Specification Section Number. 8 b. For the next 2 digits number use numbers 01-99 to sequentially number each 9 initial separate item or drawing submitted under each specific Section number. 10 c. Last use a letter,A-Z,indicating the resubmission of the same drawing(i.e. 11 A=2nd submission,B=3rd submission,C=4th submission,etc.). A typical 12 submittal number would be as follows: 13 14 03 30 00-08-B 15 16 1) 03 30 00 is the Specification Section for Concrete 17 2) 08 is the eighth initial submittal under this Specification Section 18 3) B is the third submission(second resubmission)of that particular shop 19 drawing 20 C. Contractor Certification 21 1. Review shop drawings,product data and samples,including those by 22 subcontractors,prior to submission to determine and verify the following: 23 a. Field measurements 24 b. Field construction criteria 25 c. Catalog numbers and similar data 26 d. Conformance with the Contract Documents 27 2. Provide each shop drawing,sample and product data submitted by the Contractor 28 with a Certification Statement affixed including: 29 a. The Contractor's Company name 30 b. Signature of submittal reviewer 31 c. Certification Statement 32 1) `By this submittal,I hereby represent that I have determined and verified 33 field measurements,field construction criteria,materials,dimensions, 34 catalog numbers and similar data and I have checked and coordinated each 35 item with other applicable approved shop drawings." 36 D. Submittal Format 37 1. Fold shop drawings larger than 8 t/2 inches x 11 inches to 8 '/2 inches x l Iinches. 38 2. Bind shop drawings and product data sheets together. 39 3. Order 40 a. Cover Sheet 41 1) Description of Packet 42 2) Contractor Certification 43 b. List of items/Table of Contents 44 c. Product Data/Shop Drawings/Samples/Calculations 45 E. Submittal Content 46 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH BRIDGE REHABILITATION(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013300-3 SUBMITTALS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of- 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product,with the Specification Section number,page and 8 paragraph(s) 9 6. Field dimensions,clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards,such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 F. Shop Drawings 16 1. As specified in individual Work Sections includes,but is not necessarily limited to: 17 a. Custom-prepared data such as fabrication and erection/installation(working) 18 drawings 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 f. Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. Where correct fabrication of the Work depends upon field measurements 31 1) Provide such measurements and note on the drawings prior to submitting 32 for approval. 33 G. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List,clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List,submittal data may include,but is not necessarily limited to: 38 a. Standard prepared data for manufactured products(sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation 41 instructions 42 2) Availability of colors and patterns 43 3) Manufacturer's printed statements of compliances and applicability 44 4) Roughing-in diagrams and templates 45 5) Catalog cuts 46 6) Product photographs CITY OF FORT WORTH BRIDGE REHABILITATION(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013300-4 SUBMITTALS Page 4 of 8 1 7) Standard wiring diagrams 2 8) Printed performance curves and operational-range diagrams 3 9) Production or quality control inspection and test reports and certifications 4 10) Mill reports 5 11) Product operating and maintenance instructions and recommended 6 spare-parts listing and printed product warranties 7 12) As applicable to the Work 8 H. Samples 9 1. As specified in individual Sections,include,but are not necessarily limited to: 10 a. Physical examples of the Work such as: 11 1) Sections of manufactured or fabricated Work 12 2) Small cuts or containers of materials 13 3) Complete units of repetitively used products color/texture/pattern swatches 14 and range sets 15 4) Specimens for coordination of visual effect 16 5) Graphic symbols and units of Work to be used by the City for independent 17 inspection and testing,as applicable to the Work 18 I. Do not start Work requiring a shop drawing,sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 1. Fabrication performed,materials purchased or on-site construction accomplished 21 which does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 2. The City will not be liable for any expense or delay due to corrections or remedies 24 required to accomplish conformity. 25 3. Complete project Work,materials,fabrication,and installations in conformance 26 with approved shop drawings,applicable samples,and product data. 27 J. Submittal Distribution 28 1. Electronic Distribution 29 a. Confirm development of Project directory for electronic submittals to be 30 uploaded to City's Buzzsaw site,or another external FTP site approved by the 31 City. 32 b. Shop Drawings 33 1) Upload submittal to designated project directory and notify appropriate 34 City representatives via email of submittal posting. 35 2) Hard Copies 36 a) 3 copies for all submittals 37 b) If Contractor requires more than 1 hard copy of Shop Drawings 38 returned,Contractor shall submit more than the number of copies listed 39 above. 40 c. Product Data 41 1) Upload submittal to designated project directory and notify appropriate 42 City representatives via email of submittal posting. 43 2) Hard Copies 44 a) 3 copies for all submittals 45 d. Samples 46 1) Distributed to the Project Representative 47 2. Hard Copy Distribution(if required in lieu of electronic distribution) CITY OF FORT WORTH BRIDGE REHABILITATION(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013300-5 SUBMITTALS Page 5 of 8 1 a. Shop Drawings 2 1) Distributed to the City 3 2) Copies 4 a) 8 copies for mechanical submittals 5 b) 7 copies for all other submittals 6 c) If Contractor requires more than 3 copies of Shop Drawings returned, 7 Contractor shall submit more than the number of copies listed above. 8 b. Product Data 9 1) Distributed to the City 10 2) Copies 11 a) 4 copies 12 c. Samples 13 1) Distributed to the Project Representative 14 2) Copies 15 a) Submit the number stated in the respective Specification Sections. 16 3. Distribute reproductions of approved shop drawings and copies of approved 17 product data and samples,where required,to the job site file and elsewhere as 18 directed by the City. 19 a. Provide number of copies as directed by the City but not exceeding the number 20 previously specified. 21 K. Submittal Review 22 1. The review of shop drawings,data and samples will be for general conformance 23 with the design concept and Contract Documents. This is not to be construed as: 24 a. Permitting any departure from the Contract requirements 25 b. Relieving the Contractor of responsibility for any errors,including details, 26 dimensions,and materials 27 c. Approving departures from details furnished by the City,except as otherwise 28 provided herein 29 2. The review and approval of shop drawings, samples or product data by the City 30 does not relieve the Contractor from his/her responsibility with regard to the 31 fulfillment of the terms of the Contract. 32 a. All risks of error and omission are assumed by the Contractor,and the City will 33 have no responsibility therefore. 34 3. The Contractor remains responsible for details and accuracy,for coordinating the 35 Work with all other associated work and trades,for selecting fabrication processes, 36 for techniques of assembly and for performing Work in a safe manner. 37 4. If the shop drawings,data or samples as submitted describe variations and show a 38 departure from the Contract requirements which City finds to be in the interest of 39 the City and to be so minor as not to involve a change in Contract Price or time for 40 performance,the City may return the reviewed drawings without noting an 41 exception. 42 5. Submittals will be returned to the Contractor under 1 of the following codes: 43 a. Code 1 44 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or 45 comments on the submittal. 46 a) When returned under this code the Contractor may release the 47 equipment and/or material for manufacture. 48 b. Code 2 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013300-6 SUBMITTALS Page 6 of 8 1 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of 2 the notations and comments IS NOT required by the Contractor. 3 a) The Contractor may release the equipment or material for manufacture; 4 however,all notations and comments must be incorporated into the 5 final product. 6 c. Code 3 7 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is 8 assigned when notations and comments are extensive enough to require a 9 resubmittal of the package. 10 a) The Contractor may release the equipment or material for manufacture; 11 however,all notations and comments must be incorporated into the 12 final product. 13 b) This resubmittal is to address all comments,omissions and 14 non-conforming items that were noted. 15 c) Resubmittal is to be received by the City within 15 Calendar Days of 16 the date of the City's transmittal requiring the resubmittal. 17 d. Code 4 18 1) "NOT APPROVED" is assigned when the submittal does not meet the 19 intent of the Contract Documents. 20 a) The Contractor must resubmit the entire package revised to bring the 21 submittal into conformance. 22 b) It may be necessary to resubmit using a different manufacturer/vendor 23 to meet the Contract Documents. 24 6. Resubmittals 25 a. Handled in the same manner as first submittals 26 1) Corrections other than requested by the City 27 2) Marked with revision triangle or other similar method 28 a) At Contractor's risk if not marked 29 b. Submittals for each item will be reviewed no more than twice at the City's 30 expense. 31 1) All subsequent reviews will be performed at times convenient to the City 32 and at the Contractor's expense,based on the City's or City 33 Representative's then prevailing rates. 34 2) Provide Contractor reimbursement to the City within 30 Calendar Days for 35 all such fees invoiced by the City. 36 c. The need for more than 1 resubmission or any other delay in obtaining City's 37 review of submittals,will not entitle the Contractor to an extension of Contract 38 Time. 39 7. Partial Submittals 40 a. City reserves the right to not review submittals deemed partial,at the City's 41 discretion. 42 b. Submittals deemed by the City to be not complete will be returned to the 43 Contractor,and will be considered"Not Approved"until resubmitted. 44 c. The City may at its option provide a list or mark the submittal directing the 45 Contractor to the areas that are incomplete. 46 8. If the Contractor considers any correction indicated on the shop drawings to 47 constitute a change to the Contract Documents,then written notice must be 48 provided thereof to the City at least 7 Calendar Days prior to release for 49 manufacture. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013300-7 SUBMITTALS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City,the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal,appropriately coded,will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections,include,but are not necessarily 8 limited to,complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications 11 1. If specifically required in other Sections of these Specifications,submit a P.E. 12 Certification for each item required. 13 N. Request for Information(RFI) 14 1. Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. When the Contractor believes there is a conflict between Contract Documents 17 c. When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Use the Request for Information(RFI)form provided by the City. 21 3. Numbering of RFI 22 a. Prefix with"RFI"followed by series number, "-xxx",beginning with"01"and 23 increasing sequentially with each additional transmittal. 24 4. Sufficient information shall be attached to permit a written response without further 25 information. 26 5. The City will log each request and will review the request. 27 a. If review of the project information request indicates that a change to the 28 Contract Documents is required,the City will issue a Field Order or Change 29 Order,as appropriate. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE[NOT USED] 35 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 36 1.11 FIELD [SITE] CONDITIONS [NOT USED] 37 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH BRIDGE REHABILITATION(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013300-8 SUBMITTALS Page 8 of 8 i PART 2- PRODUCTS[NOT USED] 2 PART 3- EXECUTION [NOT USED] 3 END OF SECTION 4 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.4.K.8.Working Days modified to Calendar Days 5 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-12 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013513-1 SPECIAL PROJECT PROCEDURES Page 1 of 8 1 SECTION 0135 13 2 SPECIAL PROJECT PROCEDURES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes,but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives,Drop Weight,Etc. 12 f. Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include,but are not necessarily limited to: 21 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 22 2. Division 1 —General Requirements 23 3. Section 33 12 25—Connection to Existing Water Mains 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Coordination within Railroad permit areas 27 a. Measurement 28 1) Measurement for this Item will be by lump sum. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 will be paid for at the lump sum price bid for Railroad Coordination. 32 c. The price bid shall include: 33 1) Mobilization 34 2) Inspection 35 3) Safety training 36 4) Additional Insurance 37 5) Insurance Certificates 38 6) Other requirements associated with general coordination with Railroad, 39 including additional employees required to protect the right-of-way and 40 property of the Railroad from damage arising out of and/or from the 41 construction of the Project. 42 2. Railroad Flagmen CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013513-2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 a. Measurement 2 1) Measurement for this Item will be per working day. 3 b. Payment 4 1) The work performed and materials furnished in accordance with this Item 5 will be paid for each working day that Railroad Flagmen are present at the 6 Site. 7 c. The price bid shall include: 8 1) Coordination for scheduling flagmen 9 2) Flagmen 10 3) Other requirements associated with Railroad 11 3. All other items 12 a. Work associated with these Items is considered subsidiary to the various Items 13 bid. No separate payment will be allowed for this Item. 14 1.3 REFERENCES 15 A. Reference Standards 16 1. Reference standards cited in this Specification refer to the current reference 17 standard published at the time of the latest revision date logged at the end of this 18 Specification,unless a date is specifically cited. 19 2. Health and Safety Code,Title 9. Safety,Subtitle A.Public Safety,Chapter 752. 20 High Voltage Overhead Lines. 21 3. North Central Texas Council of Governments(NCTCOG)—Clean Construction 22 Specification 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Coordination with the Texas Department of Transportation 25 1. When work in the right-of-way which is under the jurisdiction of the Texas 26 Department of Transportation(TxDOT): 27 a. Notify the Texas Department of Transportation prior to commencing any work 28 therein in accordance with the provisions of the permit 29 b. All work performed in the TxDOT right-of-way shall be performed in 30 compliance with and subject to approval from the Texas Department of 31 Transportation 32 B. Work near High Voltage Lines 33 1. Regulatory Requirements 34 a. All Work near High Voltage Lines(more than 600 volts measured between 35 conductors or between a conductor and the ground) shall be in accordance with 36 Health and Safety Code,Title 9,Subtitle A,Chapter 752. 37 2. Warning sign 38 a. Provide sign of sufficient size meeting all OSHA requirements. 39 3. Equipment operating within 10 feet of high voltage lines will require the following 40 safety features 41 a. Insulating cage-type of guard about the boom or arm 42 b. Insulator links on the lift hook connections for back hoes or dippers 43 c. Equipment must meet the safety requirements as set forth by OSHA and the 44 safety requirements of the owner of the high voltage lines 45 4. Work within 6 feet of high voltage electric lines CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013513-3 SPECIAL PROJECT PROCEDURES Page 3 of 8 1 a. Notification shall be given to: 2 1) The power company(example: ONCOR) 3 a) Maintain an accurate log of all such calls to power company and record 4 action taken in each case. 5 b. Coordination with power company 6 1) After notification coordinate with the power company to: 7 a) Erect temporary mechanical barriers,de-energize the lines,or raise or 8 lower the lines 9 c. No personnel may work within 6 feet of a high voltage line before the above 10 requirements have been met. 11 C. Confined Space Entry Program 12 1. Provide and follow approved Confined Space Entry Program in accordance with 13 OSHA requirements. 14 2. Confined Spaces include: 15 a. Manholes 16 b. All other confined spaces in accordance with OSHA's Permit Required for 17 Confined Spaces 18 D. Air Pollution Watch Days 19 1. General 20 a. Observe the following guidelines relating to working on City construction sites 21 on days designated as"AIR POLLUTION WATCH DAYS". 22 b. Typical Ozone Season 23 1) May 1 through October 31. 24 c. Critical Emission Time 25 1) 6:00 a.m.to 10:00 a.m. 26 2. Watch Days 27 a. The Texas Commission on Environmental Quality(TCEQ),in coordination 28 with the National Weather Service,will issue the Air Pollution Watch by 3:00 29 p.m. on the afternoon prior to the WATCH day. 30 b. Requirements 31 1) Begin work after 10:00 a.m.whenever construction phasing requires the 32 use of motorized equipment for periods in excess of 1 hour. 33 2) However,the Contractor may begin work prior to 10:00 a.m.if: 34 a) Use of motorized equipment is less than 1 hour,or 35 b) If equipment is new and certified by EPA as "Low Emitting",or 36 equipment burns Ultra Low Sulfur Diesel(ULSD),diesel emulsions,or 37 alternative fuels such as CNG. 38 E. TCEQ Air Permit 39 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. 40 F. Use of Explosives,Drop Weight,Etc. 41 1. When Contract Documents permit on the project the following will apply: 42 a. Public Notification 43 1) Submit notice to City and proof of adequate insurance coverage,24 hours 44 prior to commencing. 45 2) Minimum 24 hour public notification in accordance with Section 0131 13 46 G. Water Department Coordination CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013513-4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1 1. During the construction of this project,it will be necessary to deactivate,for a 2 period of time,existing lines. The Contractor shall be required to coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line system with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed,obtain a hydrant water meter from the Water Department for use 9 during the life of named project. 10 c. In the event that a water valve on an existing live system be turned off and on 11 to accommodate the construction of the project is required,coordinate this 12 activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. 14 a) Failure to comply will render the Contractor in violation of Texas Penal 15 Code Title 7,Chapter 28.03(Criminal Mischief)and the Contractor 16 will be prosecuted to the full extent of the law. 17 b) In addition,the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 H. Public Notification Prior to Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis,prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction.The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a) Name of Project 29 b) City Project No(CPN) 30 c) Scope of Project(i.e.type of construction activity) 31 d) Actual construction duration within the block 32 e) Name of the contractor's foreman and phone number 33 f) Name of the City's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre-construction notification' flyer is attached as Exhibit 36 A. 37 3) Submit schedule showing the construction start and finish time for each 38 block of the project to the inspector. 39 4) Deliver flyer to the City Inspector for review prior to distribution. 40 b. No construction will be allowed to begin on any block until the flyer is 41 delivered to all residents of the block. 42 I. Public Notification of Temporary Water Service Interruption during Construction 43 1. In the event it becomes necessary to temporarily shut down water service to 44 residents or businesses during construction,prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2. Prepared notice as follows: 47 a. The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013513-5 SPECIAL PROJECT PROCEDURES Page 5 of 8 1 b. Prepare flyer on the contractor's letterhead and include the following 2 information: 3 1) Name of the project 4 2) City Project Number 5 3) Date of the interruption of service 6 4) Period the interruption will take place 7 5) Name of the contractor's foreman and phone number 8 6) Name of the City's inspector and phone number 9 c. A sample of the temporary water service interruption notification is attached as 10 Exhibit B. 11 d. Deliver a copy of the temporary interruption notification to the City inspector 12 for review prior to being distributed. 13 e. No interruption of water service can occur until the flyer has been delivered to 14 all affected residents and businesses. 15 f. Electronic versions of the sample flyers can be obtained from the Project 16 Construction Inspector. 17 J. Coordination with United States Army Corps of Engineers(USACE) 18 1. At locations in the Project where construction activities occur in areas where 19 USACE permits are required,meet all requirements set forth in each designated 20 permit. 21 K. Coordination within Railroad Permit Areas 22 1. At locations in the project where construction activities occur in areas where 23 railroad permits are required,meet all requirements set forth in each designated 24 railroad permit. This includes,but is not limited to,provisions for: 25 a. Flagmen 26 b. Inspectors 27 c. Safety training 28 d. Additional insurance 29 e. Insurance certificates 30 f. Other employees required to protect the right-of-way and property of the 31 Railroad Company from damage arising out of and/or from the construction of 32 the project. Proper utility clearance procedures shall be used in accordance 33 with the permit guidelines. 34 2. Obtain any supplemental information needed to comply with the railroad's 35 requirements. 36 3. Railroad Flagmen 37 a. Submit receipts to City for verification of working days that railroad flagmen 38 were present on Site. 39 L. Dust Control 40 1. Use acceptable measures to control dust at the Site. 41 a. If water is used to control dust,capture and properly dispose of waste water. 42 b. If wet saw cutting is performed,capture and properly dispose of slurry. 43 M. Employee Parking 44 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013513-6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE[NOT USED] 6 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS[NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 1.4.13—Added requirement of compliance with Health and Safety Code,Title 9. 8/31/2012 D.Johnson Safety,Subtitle A.Public Safety,Chapter 752.High Voltage Overhead Lines. 1.4.E—Added Contractor responsibility for obtaining a TCEQ Air Permit 13 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013513-7 SPECIAL PROJECT PROCEDURES Page 7 of 8 1 EXHIBIT A 2 (To be printed on Contractor's Letterhead) 3 4 5 6 Date: 7 8 CPN No.: 9 Project Name: 10 Mapsco Location: 11 Limits of Construction: 12 13 14 - 15 16 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23 24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> 29 30 OR 31 32 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 36 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 37 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 013513-8 SPECIAL PROJECT PROCEDURES Page 8 of 8 1 EXHIBIT B 2 FORT WORTH DaW Dos NO.xxxx NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT,PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, .CONTRACTOR 3 4 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 014523-1 TESTING AND INSPECTION SERVICES Page 1 of 2 1 SECTION 0145 23 2 TESTING AND INSPECTION SERVICES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 11 2. Division 1 —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing,coordinating,and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails,the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES[NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City,notify City, sufficiently 31 in advance,when testing is needed. 32 b. When testing is required to be completed by the Contractor,notify City, 33 sufficiently in advance,that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site,or another external FTP site approved by 38 the City. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 014523-2 TESTING AND INSPECTION SERVICES Page 2 of 2 1 2) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution(if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered load of 11 Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 24 1.11 FIELD[SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2- PRODUCTS[NOT USED] 27 PART 3- EXECUTION[NOT USED] 28 END OF SECTION 29 Revision Log DATE NAME SUMMARY OF CHANGE 30 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015000-1 TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 1 SECTION 0150 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including,but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include,but are not necessarily limited to: 16 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 17 2. Division 1—General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c. Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 1) Included are fuel, power,light,heat and other utility services necessary for 32 execution,completion,testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping,equipment,devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH BRIDGE REHABILITAITON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015000-2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 1 d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work,including 6 testing of Work. 7 1) Provide power for lighting,operation of equipment,or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off-site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated,watertight,weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner. 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting,and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH BRIDGE REHABILITAITON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015000-3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1 1. Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a. Contractor remains on-call at all times 4 b. Must respond in a timely manner 5 F. Temporary Protection of Construction 6 1. Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS[NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS[NOT USED] 12 1.9 QUALITY ASSURANCE[NOT USED] 13 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2- PRODUCTS [NOT USED] 17 PART 3- EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR]/[RESTORATION] 25 3.6 RE-INSTALLATION 26 3.7 FIELD [OR] SITE QUALITY CONTROL[NOT USED] 27 3.8 SYSTEM STARTUP[NOT USED] 28 3.9 ADJUSTING[NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH BRIDGE REHABILITAITON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015000-4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work,to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION[NOT USED] 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8 CITY OF FORT WORTH BRIDGE REHABILITAITON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015526-1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page I of 3 1 SECTION 0155 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include,but are not necessarily limited to: 13 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 14 2. Division 1 —General Requirements 15 3. Section 34 71 13—Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification,unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices(TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. When traffic control plans are included in the Drawings,provide Traffic 30 Control in accordance with Drawings and Section 34 71 13. 31 b. When traffic control plans are not included in the Drawings,prepare traffic 32 control plans in accordance with Section 34 71 13 and submit to City for 33 review. 34 1) Allow minimum 10 working days for review of proposed Traffic Control. 35 B. Street Use Permit 36 1. Prior to installation of Traffic Control,a City Street Use Permit is required. 37 a. To obtain Street Use Permit,submit Traffic Control Plans to City 38 Transportation and Public Works Department. CITY OF FORT WORTH BRIDGE REHABILrrATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015526-2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1 1) Allow a minimum of 5 working days for permit review. 2 2) Contractor's responsibility to coordinate review of Traffic Control plans for 3 Street Use Permit, such that construction is not delayed. 4 C. Modification to Approved Traffic Control 5 1. Prior to installation traffic control: 6 a. Submit revised traffic control plans to City Department Transportation and 7 Public Works Department. 8 1) Revise Traffic Control plans in accordance with Section 34 71 13. 9 2) Allow minimum 5 working days for review of revised Traffic Control. 10 3) It is the Contractor's responsibility to coordinate review of Traffic Control 11 plans for Street Use Permit,such that construction is not delayed. 12 D. Removal of Street Sign 13 1. If it is determined that a street sign must be removed for construction,then contact 14 City Transportation and Public Works Department,Signs and Markings Division to 15 remove the sign. 16 E. Temporary Signage 17 1. In the case of regulatory signs,replace permanent sign with temporary sign meeting 18 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 19 Devices (MUTCD). 20 2. Install temporary sign before the removal of permanent sign. 21 3. When construction is complete,to the extent that the permanent sign can be 22 reinstalled,contact the City Transportation and Public Works Department,Signs 23 and Markings Division,to reinstall the permanent sign. 24 F. Traffic Control Standards 25 1. Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] 34 PART 2- PRODUCTS [NOT USED] 35 PART 3- EXECUTION[NOT USED] 36 END OF SECTION CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015526-3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 1 Revision Log DATE NAME SUMMARY OF CHANGE 2 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015713-1 STORM WATER POLLUTION PREVENTION Page 1 of 3 1 SECTION 015713 2 STORM WATER POLLUTION PREVENTION 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0— Bidding Requirements,Contract Forms and Conditions of the 11 Contract 12 2. Division 1—General Requirements 13 3. Section 3125 00—Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than 1 acre of disturbance 17 a. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 a. Measurement and Payment shall be in accordance with Section 3125 00. 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent: NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification,unless a date is specifically cited. 32 2. Integrated Storm Management(iSWM)Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015713-2 STORM WATER POLLUTION PREVENTION Page 2 of 3 1 B. Construction Activities resulting in: 2 1. Less than 1 acre of disturbance 3 a. Provide erosion and sediment control in accordance with Section 3125 00 and 4 Drawings. 5 2. 1 to less than 5 acres of disturbance 6 a. Texas Pollutant Discharge Elimination System(TPDES)General Construction 7 Permit is required 8 b. Complete SWPPP in accordance with TCEQ requirements 9 1) TCEQ Small Construction Site Notice Required under general permit 10 TXR150000 11 a) Sign and post at job site 12 b) Prior to Preconstruction Meeting,send 1 copy to City Department of 13 Transportation and Public Works,Environmental Division,(817)392- 14 6088. 15 2) Provide erosion and sediment control in accordance with: 16 a) Section 3125 00 17 b) The Drawings 18 c) TXR150000 General Permit 19 d) SWPPP 20 e) TCEQ requirements 21 3. 5 acres or more of Disturbance 22 a. Texas Pollutant Discharge Elimination System(TPDES)General Construction 23 Permit is required 24 b. Complete SWPPP in accordance with TCEQ requirements 25 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee 26 a) Sign and post at job site 27 b) Send copy to City Department of Transportation and Public Works, 28 Environmental Division,(817) 392-6088. 29 2) TCEQ Notice of Change required if making changes or updates to NOI 30 3) Provide erosion and sediment control in accordance with: 31 a) Section 3125 00 32 b) The Drawings 33 c) TXR150000 General Permit 34 d) SWPPP 35 e) TCEQ requirements 36 4) Once the project has been completed and all the closeout requirements of 37 TCEQ have been met a TCEQ Notice of Termination can be submitted. 38 a) Send copy to City Department of Transportation and Public Works, 39 Environmental Division,(817) 392-6088. 40 1.5 SUBMITTALS 41 A. SWPPP 42 1. Submit in accordance with Section 0133 00,except as stated herein. 43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 1) 1 copy to the City Project Manager 46 a) City Project Manager will forward to the City Department of 47 Transportation and Public Works,Environmental Division for review CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015713-3 STORM WATER POLLUTION PREVENTION Page 3 of 3 1 B. Modified SWPPP 2 1. If the SWPPP is revised during construction,resubmit modified SWPPP to the City 3 in accordance with Section 0133 00. 4 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS[NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE[NOT USED] 8 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 9 1.11 FIELD[SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2- PRODUCTS [NOT USED] 12 PART 3- EXECUTION [NOT USED] 13 END OF SECTION 14 Revision Log DATE NAME SUMMARY OF CHANGE 15 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015813-1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 1 SECTION 015813 2 TEMPORARY PROJECT SIGNAGE 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Temporary Project Signage Requirements 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 11 2. Division 1—General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES[NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE[NOT USED] 23 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2- PRODUCTS 27 2.1 OWNER-FURNISHED[OR]OWNER-SUPPLIEDPRODUCTS[NOT USED] 28 2.2 EQUIPMENT,PRODUCT TYPES,AND MATERIALS 29 A. Design Criteria 30 1. Provide free standing Project Designation Sign in accordance with City's Standard 31 Details for project signs. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015813-2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 1 B. Materials 2 1. Sign 3 a. Constructed of 3/4-inch fir plywood,grade A-C(exterior)or better 4 2.3 ACCESSORIES [NOT USED] 5 2.4 SOURCE QUALITY CONTROL[NOT USED] 6 PART 3- EXECUTION 7 3.1 INSTALLERS [NOT USED] 8 3.2 EXAMINATION [NOT USED] 9 3.3 PREPARATION[NOT USED] 10 3.4 INSTALLATION 11 A. General 12 1. Provide vertical installation at extents of project. 13 2. Relocate sign as needed,upon request of the City. 14 B. Mounting options 15 a. Skids 16 b. Posts 17 c. Barricade 18 3.5 REPAIR/RESTORATION[NOT USED] 19 3.6 RE-INSTALLATION[NOT USED] 20 3.7 FIELD[OR]SITE QUALITY CONTROL[NOT USED] 21 3.8 SYSTEM STARTUP[NOT USED] 22 3.9 ADJUSTING[NOT USED] 23 3.10 CLEANING [NOT USED] 24 3.11 CLOSEOUT ACTIVITIES [NOT USED] 25 3.12 PROTECTION [NOT USED] 26 3.13 MAINTENANCE 27 A. General 28 1. Maintenance will include painting and repairs as needed or directed by the City. 29 3.14 ATTACHMENTS [NOT USED] 30 END OF SECTION 31 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 015813-3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 1 Revision Log DATE NAME SUMMARY OF CHANGE 2 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 016000-1 PRODUCT REQUIREMENTS Page 1 of 2 1 SECTION 0160 00 2 PRODUCT REQUIREMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. References for Product Requirements and City Standard Products List 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 11 2. Division 1 —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A. A list of City approved products for use is located on Buzzsaw as follows: 16 1. Resources\02-Construction Documents\Standard Products List 17 B. Only products specifically included on City's Standard Product List in these Contract 18 Documents shall be allowed for use on the Project. 19 1. Any subsequently approved products will only be allowed for use upon specific 20 approval by the City. 21 C. Any specific product requirements in the Contract Documents supersede similar 22 products included on the City's Standard Product List. 23 1. The City reserves the right to not allow products to be used for certain projects even 24 though the product is listed on the City's Standard Product List. 25 D. Although a specific product is included on City's Standard Product List,not all 26 products from that manufacturer are approved for use,including but not limited to,that 27 manufacturer's standard product. 28 E. See Section 0133 00 for submittal requirements of Product Data included on City's 29 Standard Product List. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE[NOT USED] CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 016000-2 PRODUCT REQUIREMENTS Page 2 of 2 1 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 2 1.11 FIELD[SITE] CONDITIONS[NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2- PRODUCTS[NOT USED] 5 PART 3- EXECUTION[NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D.Johnson Modified Location of City's Standard Product List 8 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 017000-1 MOBILIZATION AND REMOBILIZATION Page 1 of 4 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Mobilization and Demobilization 7 a. Mobilization 8 1) Transportation of Contractor's personnel,equipment,and operating supplies 9 to the Site 10 2) Establishment of necessary general facilities for the Contractor's operation 11 at the Site 12 3) Premiums paid for performance and payment bonds 13 4) Transportation of Contractor's personnel,equipment,and operating supplies 14 to another location within the designated Site 15 5) Relocation of necessary general facilities for the Contractor's operation 16 from 1 location to another location on the Site. 17 b. Demobilization 18 1) Transportation of Contractor's personnel,equipment,and operating supplies 19 away from the Site including disassembly 20 2) Site Clean-up 21 3) Removal of all buildings and/or other facilities assembled at the Site for this 22 Contract 23 c. Mobilization and Demobilization do not include activities for specific items of 24 work that are for which payment is provided elsewhere in the contract. 25 2. Remobilization 26 a. Remobilization for Suspension of Work specifically required in the Contract 27 Documents or as required by City includes: 28 1) Demobilization 29 a) Transportation of Contractor's personnel,equipment,and operating 30 supplies from the Site including disassembly or temporarily securing 31 equipment,supplies,and other facilities as designated by the Contract 32 Documents necessary to suspend the Work. 33 b) Site Clean-up as designated in the Contract Documents 34 2) Remobilization 35 a) Transportation of Contractor's personnel,equipment,and operating 36 supplies to the Site necessary to resume the Work. 37 b) Establishment of necessary general facilities for the Contractor's 38 operation at the Site necessary to resume the Work. 39 3) No Payments will be made for: 40 a) Mobilization and Demobilization from one location to another on the 41 Site in the normal progress of performing the Work. 42 b) Stand-by or idle time 43 c) Lost profits 44 3. Mobilizations and Demobilization for Miscellaneous Projects 45 a. Mobilization and Demobilization CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 017000-2 MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel,equipment,and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel,equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include,but are not necessarily limited to: 22 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 23 2. Division 1—General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Mobilization and Demobilization 27 a. Measure 28 1) This Item is considered subsidiary to the various Items bid. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 are subsidiary to the various Items bid and no other compensation will be 32 allowed. 33 2. Remobilization for suspension of Work as specifically required in the Contract 34 Documents 35 a. Measurement 36 1) Measurement for this Item shall be per each remobilization performed. 37 b. Payment 38 1) The work performed and materials furnished in accordance with this Item 39 and measured as provided under"Measurement"will be paid for at the unit 40 price per each"Specified Remobilization"in accordance with Contract 41 Documents. 42 c. The price shall include: 43 1) Demobilization as described in Section 1.1.A.2.a.1) 44 2) Remobilization as described in Section 1.1.A.2.a.2) 45 d. No payments will be made for standby,idle time,or lost profits associated this 46 Item. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 017000-3 MOBII.IZATION AND REMOBILIZATION Page 3 of 4 1 3. Remobilization for suspension of Work as required by City 2 a. Measurement and Payment 3 1) This shall be submitted as a Contract Claim in accordance with Article 10 4 of Section 00 72 00. 5 2) No payments will be made for standby,idle time,or lost profits associated 6 with this Item. 7 4. Mobilizations and Demobilizations for Miscellaneous Projects 8 a. Measurement 9 1) Measurement for this Item shall be for each Mobilization and 10 Demobilization required by the Contract Documents 11 b. Payment 12 1) The Work performed and materials furnished in accordance with this Item 13 and measured as provided under"Measurement"will be paid for at the unit 14 price per each"Work Order Mobilization'in accordance with Contract 15 Documents. Demobilization shall be considered subsidiary to mobilization 16 and shall not be paid for separately. 17 c. The price shall include: 18 1) Mobilization as described in Section 1.1.A.3.a.1) 19 2) Demobilization as described in Section 1.1.A.3.a.2) 20 d. No payments will be made for standby,idle time,or lost profits associated this 21 Item. 22 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 23 a. Measurement 24 1) Measurement for this Item shall be for each Mobilization and 25 Demobilization required by the Contract Documents 26 b. Payment 27 1) The Work performed and materials furnished in accordance with this Item 28 and measured as provided under"Measurement"will be paid for at the unit 29 price per each"Work Order Emergency Mobilization'in accordance with 30 Contract Documents. Demobilization shall be considered subsidiary to 31 mobilization and shall not be paid for separately. 32 c. The price shall include 33 1) Mobilization as described in Section I.1.A.4.a) 34 2) Demobilization as described in Section 1.1.A.3.a.2) 35 d. No payments will be made for standby,idle time,or lost profits associated this 36 Item. 37 1.3 REFERENCES [NOT USED] 38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 39 1.5 SUBMITTALS [NOT USED] 40 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 41 1.7 CLOSEOUT SUBMITTALS [NOT USED] 42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 43 1.9 QUALITY ASSURANCE[NOT USED] 44 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 017000 4 MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY[NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3- EXECUTION[NOT USED] 5 END OF SECTION 6 Revision Log DATE NAME SUMMARY OF CHANGE 7 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 017423 1 CLEANING Page 1 of 4 1 SECTION 0174 23 2 CLEANING 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Intermediate and final cleaning for Work not including special cleaning of closed 7 systems specified elsewhere 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 12 2. Division 1—General Requirements 13 3. Section 32 92 13—Hydro-Mulching,Seeding and Sodding 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various Items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Scheduling 21 1. Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will not fall on newly painted surfaces. 23 2. Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALSAMORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE[NOT USED] 30 1.10 STORAGE,AND HANDLING 31 A. Storage and Handling Requirements 32 1. Store cleaning products and cleaning wastes in containers specifically designed for 33 those materials. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 017423-2 CLEANING Page 2 of 4 1 1.11 FIELD[SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS 4 2.1 OWNER-FURNISHED[OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 A. Cleaning Agents 7 1. Compatible with surface being cleaned 8 2. New and uncontaminated 9 3. For manufactured surfaces 10 a. Material recommended by manufacturer 11 2.3 ACCESSORIES[NOT USED] 12 2.4 SOURCE QUALITY CONTROL[NOT USED] 13 PART 3- EXECUTION 14 3.1 INSTALLERS [NOT USED] 15 3.2 EXAMINATION[NOT USED] 16 3.3 PREPARATION [NOT USED] 17 3.4 APPLICATION[NOT USED] 18 3.5 REPAIR/RESTORATION[NOT USED] 19 3.6 RE-INSTALLATION [NOT USED] 20 3.7 FIELD[OR] SITE QUALITY CONTROL[NOT USED] 21 3.8 SYSTEM STARTUP[NOT USED] 22 3.9 ADJUSTING[NOT USED] 23 3.10 CLEANING 24 A. General 25 1. Prevent accumulation of wastes that create hazardous conditions. 26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of 27 governing authorities. 28 3. Do not dispose of volatile wastes such as mineral spirits,oil or paint thinner in 29 storm or sanitary drains or sewers. 30 4. Dispose of degradable debris at an approved solid waste disposal site. 31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an 32 alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 017423-3 CLEANING Page 3 of 4 1 6. Handle materials in a controlled manner with as few handlings as possible. 2 7. Thoroughly clean,sweep,wash and polish all Work and equipment associated with 3 this project. 4 8. Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9. If project is not cleaned to the satisfaction of the City,the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 10. Do not burn on-site. 9 B. Intermediate Cleaning during Construction 10 1. Keep Work areas clean so as not to hinder health,safety or convenience of 11 personnel in existing facility operations. 12 2. At maximum weekly intervals,dispose of waste materials,debris and rubbish. 13 3. Confine construction debris daily in strategically located container(s): 14 a. Cover to prevent blowing by wind 15 b. Store debris away from construction or operational activities 16 c. Haul from site at a minimum of once per week 17 4. Vacuum clean interior areas when ready to receive finish painting. 18 a. Continue vacuum cleaning on an as-needed basis,until Final Acceptance. 19 5. Prior to storm events,thoroughly clean site of all loose or unsecured items,which 20 may become airborne or transported by flowing water during the storm. 21 C. Interior Final Cleaning 22 1. Remove grease,mastic,adhesives, dust,dirt, stains,fingerprints,labels and other 23 foreign materials from sight-exposed surfaces. 24 2. Wipe all lighting fixture reflectors, lenses,lamps and trims clean. 25 3. Wash and shine glazing and mirrors. 26 4. Polish glossy surfaces to a clear shine. 27 5. Ventilating systems 28 a. Clean permanent filters and replace disposable filters if units were operated 29 during construction. 30 b. Clean ducts,blowers and coils if units were operated without filters during 31 construction. 32 6. Replace all burned out lamps. 33 7. Broom clean process area floors. 34 8. Mop office and control room floors. 35 D. Exterior(Site or Right of Way)Final Cleaning 36 1. Remove trash and debris containers from site. 37 a. Re-seed areas disturbed by location of trash and debris containers in accordance 38 with Section 32 92 13. 39 2. Sweep roadway to remove all rocks,pieces of asphalt,concrete or any other object 40 that may hinder or disrupt the flow of traffic along the roadway. 41 3. Clean any interior areas including,but not limited to,vaults,manholes, structures, 42 junction boxes and inlets. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 017423-4 CLEANING Page 4 of 4 1 4. If no longer required for maintenance of erosion facilities,and upon approval by 2 City,remove erosion control from site. 3 5. Clean signs,lights,signals,etc. 4 3.11 CLOSEOUT ACTIVITIES [NOT USED] 5 3.12 PROTECTION[NOT USED] 6 3.13 MAINTENANCE [NOT USED] 7 3.14 ATTACHMENTS [NOT USED] 8 END OF SECTION 9 Revision Log DATE NAME SUMMARY OF CHANGE 10 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 017719-1 CLOSEOUT REQUIREMENTS Page 1 of 3 1 SECTION 017719 2 CLOSEOUT REQUIREMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 11 2. Division 1—General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees,Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees,bonds, 20 certificates,licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 017719-2 CLOSEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PART 2- PRODUCTS[NOT USED] 4 PART 3- EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION[NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 A. Prior to requesting Final Inspection,submit: 10 1. Project Record Documents in accordance with Section 0178 39 11 2. Operation and Maintenance Data,if required,in accordance with Section 0178 23 12 B. Prior to requesting Final Inspection,perform final cleaning in accordance with Section 13 01 74 23. 14 C. Final Inspection 15 1. After final cleaning,provide notice to the City Project Representative that the Work 16 is completed. 17 a. The City will make an initial Final Inspection with the Contractor present. 18 b. Upon completion of this inspection,the City will notify the Contractor,in 19 writing within 10 business days,of any particulars in which this inspection 20 reveals that the Work is defective or incomplete. 21 2. Upon receiving written notice from the City,immediately undertake the Work 22 required to remedy deficiencies and complete the Work to the satisfaction of the 23 City. 24 3. Upon completion of Work associated with the items listed in the City's written 25 notice,inform the City,that the required Work has been completed. Upon receipt 26 of this notice,the City,in the presence of the Contractor,will make a subsequent 27 Final Inspection of the project. 28 4. Provide all special accessories required to place each item of equipment in full 29 operation. These special accessory items include,but are not limited to: 30 a. Specified spare parts 31 b. Adequate oil and grease as required for the first lubrication of the equipment 32 c. Initial fill up of all chemical tanks and fuel tanks 33 d. Light bulbs 34 e. Fuses 35 f. Vault keys 36 g. Handwheels 37 h. Other expendable items as required for initial start-up and operation of all 38 equipment 39 D. Notice of Project Completion CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 017719-3 CLOSEOUT REQUIREMENTS Page 3 of 3 1 1. Once the City Project Representative finds the Work subsequent to Final Inspection 2 to be satisfactory,the City will issue a Notice of Project Completion(Green Sheet). 3 E. Supporting Documentation 4 1. Coordinate with the City Project Representative to complete the following 5 additional forms: 6 a. Final Payment Request 7 b. Statement of Contract Time 8 c. Affidavit of Payment and Release of Liens 9 d. Consent of Surety to Final Payment 10 e. Pipe Report(if required) 11 f. Contractor's Evaluation of City 12 g. Performance Evaluation of Contractor 13 F. Letter of Final Acceptance 14 1. Upon review and acceptance of Notice of Project Completion and Supporting 15 Documentation,in accordance with General Conditions,City will issue Letter of 16 Final Acceptance and release the Final Payment Request for payment. 17 3.5 REPAIR/RESTORATION [NOT USED] 18 3.6 RE-INSTALLATION[NOT USED] 19 3.7 FIELD[OR]SITE QUALITY CONTROL[NOT USED] 20 3.8 SYSTEM STARTUP[NOT USED] 21 3.9 ADJUSTING[NOT USED] 22 3.10 CLEANING[NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 1 29 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 017823-1 OPERATION AND MAINTENANCE DATA Pagel of 5 1 SECTION 0178 23 2 OPERATION AND MAINTENANCE DATA 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Product data and related information appropriate for City's maintenance and 7 operation of products furnished under Contract 8 2. Such products may include,but are not limited to: 9 a. Traffic Controllers 10 b. Irrigation Controllers(to be operated by the City) 11 c. Butterfly Valves 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 16 2. Division 1—General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Schedule 24 1. Submit manuals in final form to the City within 30 calendar days of product 25 shipment to the project site. 26 1.5 SUBMITTALS 27 A. Submittals shall be in accordance with Section 0133 00. All submittals shall be 28 approved by the City prior to delivery. 29 1.6 INFORMATIONAL SUBMITTALS 30 A. Submittal Form 31 1. Prepare data in form of an instructional manual for use by City personnel. 32 2. Format 33 a. Size: 8 t/2 inches x 11 inches 34 b. Paper 35 1) 40 pound minimum,white,for typed pages 36 2) Holes reinforced with plastic,cloth or metal 37 c. Text: Manufacturer's printed data,or neatly typewritten CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 017823-2 OPERATION AND MAINTENANCE DATA Page 2 of 5 1 d. Drawings 2 1) Provide reinforced punched binder tab,bind in with text 3 2) Reduce larger drawings and fold to size of text pages. 4 e. Provide fly-leaf for each separate product,or each piece of operating 5 equipment. 6 1) Provide typed description of product,and major component parts of 7 equipment. 8 2) Provide indexed tabs. 9 f. Cover 10 1) Identify each volume with typed or printed title "OPERATING AND 11 MAINTENANCE INSTRUCTIONS". 12 2) List: 13 a) Title of Project 14 b) Identity of separate structure as applicable 15 c) Identity of general subject matter covered in the manual 16 3. Binders 17 a. Commercial quality 3-ring binders with durable and cleanable plastic covers 18 b. When multiple binders are used,correlate the data into related consistent 19 groupings. 20 4. If available,provide an electronic form of the O&M Manual. 21 B. Manual Content 22 1. Neatly typewritten table of contents for each volume,arranged in systematic order 23 a. Contractor,name of responsible principal,address and telephone number 24 b. A list of each product required to be included, indexed to content of the volume 25 c. List,with each product: 26 1) The name,address and telephone number of the subcontractor or installer 27 2) A list of each product required to be included,indexed to content of the 28 volume 29 3) Identify area of responsibility of each 30 4) Local source of supply for parts and replacement 31 d. Identify each product by product name and other identifying symbols as set 32 forth in Contract Documents. 33 2. Product Data 34 a. Include only those sheets which are pertinent to the specific product. 35 b. Annotate each sheet to: 36 1) Clearly identify specific product or part installed 37 2) Clearly identify data applicable to installation 38 3) Delete references to inapplicable information 39 3. Drawings 40 a. Supplement product data with drawings as necessary to clearly illustrate: 41 1) Relations of component parts of equipment and systems 42 2) Control and flow diagrams 43 b. Coordinate drawings with information in Project Record Documents to assure 44 convect illustration of completed installation. 45 c. Do not use Project Record Drawings as maintenance drawings. 46 4. Written text,as required to supplement product data for the particular installation: 47 a. Organize in consistent format under separate headings for different procedures. 48 b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 017823-3 OPERATION AND MAINTENANCE DATA Page 3 of 5 1 5. Copy of each warranty,bond and service contract issued 2 a. Provide information sheet for City personnel giving: 3 1) Proper procedures in event of failure 4 2) Instances which might affect validity of warranties or bonds 5 C. Manual for Materials and Finishes 6 1. Submit 5 copies of complete manual in final form. 7 2. Content,for architectural products,applied materials and finishes: 8 a. Manufacturer's data,giving full information on products 9 1) Catalog number, size,composition 10 2) Color and texture designations 11 3) Information required for reordering special manufactured products 12 b. Instructions for care and maintenance 13 1) Manufacturer's recommendation for types of cleaning agents and methods 14 2) Cautions against cleaning agents and methods which are detrimental to 15 product 16 3) Recommended schedule for cleaning and maintenance 17 3. Content,for moisture protection and weather exposure products: 18 a. Manufacturer's data,giving full information on products 19 1) Applicable standards 20 2) Chemical composition 21 3) Details of installation 22 b. Instructions for inspection,maintenance and repair 23 D. Manual for Equipment and Systems 24 1. Submit 5 copies of complete manual in final form. 25 2. Content,for each unit of equipment and system,as appropriate: 26 a. Description of unit and component parts 27 1) Function,normal operating characteristics and limiting conditions 28 2) Performance curves,engineering data and tests 29 3) Complete nomenclature and commercial number of replaceable parts 30 b. Operating procedures 31 1) Start-up,break-in,routine and normal operating instructions 32 2) Regulation,control,stopping,shut-down and emergency instructions 33 3) Summer and winter operating instructions 34 4) Special operating instructions 35 c. Maintenance procedures 36 1) Routine operations 37 2) Guide to "trouble shooting" 38 3) Disassembly,repair and reassembly 39 4) Alignment,adjusting and checking 40 d. Servicing and lubrication schedule 41 1) List of lubricants required 42 e. Manufacturer's printed operating and maintenance instructions 43 f. Description of sequence of operation by control manufacturer 44 1) Predicted life of parts subject to wear 45 2) Items recommended to be stocked as spare parts 46 g. As installed control diagrams by controls manufacturer 47 h. Each contractor's coordination drawings 48 1) As installed color coded piping diagrams CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 017823-4 OPERATION AND MAINTENANCE DATA Page 4 of 5 1 i. Charts of valve tag numbers,with location and function of each valve 2 j. List of original manufacturer's spare parts,manufacturer's current prices,and 3 recommended quantities to be maintained in storage 4 k. Other data as required under pertinent Sections of Specifications 5 3. Content,for each electric and electronic system,as appropriate: 6 a. Description of system and component parts 7 1) Function,normal operating characteristics,and limiting conditions 8 2) Performance curves,engineering data and tests 9 3) Complete nomenclature and commercial number of replaceable parts 10 b. Circuit directories of panelboards 11 1) Electrical service 12 2) Controls 13 3) Communications 14 c. As installed color coded wiring diagrams 15 d. Operating procedures 16 1) Routine and normal operating instructions 17 2) Sequences required 18 3) Special operating instructions 19 e. Maintenance procedures 20 1) Routine operations 21 2) Guide to "trouble shooting" 22 3) Disassembly,repair and reassembly 23 4) Adjustment and checking 24 f. Manufacturer's printed operating and maintenance instructions 25 g. List of original manufacturer's spare parts,manufacturer's current prices,and 26 recommended quantities to be maintained in storage 27 h. Other data as required under pertinent Sections of Specifications 28 4. Prepare and include additional data when the need for such data becomes apparent 29 during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 017823-5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2- PRODUCTS [NOT USED] 5 PART 3- EXECUTION[NOT USED] END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D.Johnson 1.5.A.1—title of section removed 8 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised December 20,2012 017839-1 PROJECT RECORD DOCUMENTS Page 1 of 4 1 SECTION 0178 39 2 PROJECT RECORD DOCUMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Work associated with the documenting the project and recording changes to project 7 documents,including: 8 a. Record Drawings 9 b. Water Meter Service Reports 10 c. Sanitary Sewer Service Reports 11 d. Large Water Meter Reports 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 16 2. Division 1—General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection,deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE 30 A. Accuracy of Records 31 1. Thoroughly coordinate changes within the Record Documents,making adequate 32 and proper entries on each page of Specifications and each sheet of Drawings and 33 other Documents where such entry is required to show the change properly. 34 2. Accuracy of records shall be such that future search for items shown in the Contract 35 Documents may rely reasonably on information obtained from the approved Project 36 Record Documents. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 017839-2 PROJECT RECORD DOCUMENTS Page 2 of 4 1 3. To facilitate accuracy of records,make entries within 24 hours after receipt of 2 information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work,both concealed and 4 visible,to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement,investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements 8 1. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data,use means necessary to again secure the data 12 to the City's approval. 13 a. In such case,provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2- PRODUCTS 18 2.1 OWNER-FURNISHED[OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed,secure from the City,at no 22 charge to the Contractor, 1 complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection,provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL[NOT USED] 28 PART 3- EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION [NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A. Maintenance of Job Set 34 1. Immediately upon receipt of the job set,identify each of the Documents with the 35 title, "RECORD DOCUMENTS-JOB SET". CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 017839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time,the probable number of occasions 3 upon which the job set must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed,devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City,until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum,in accordance with the intervals set forth in Section 01 71 23, 11 clearly mark any deviations from Contract Documents associated with 12 installation of the infrastructure. 13 4. Making entries on Drawings 14 a. Record any deviations from Contract Documents. 15 b. Use an erasable colored pencil(not ink or indelible pencil),clearly describe the 16 change by graphic line and note as required. 17 c. Date all entries. 18 d. Call attention to the entry by a"cloud" drawn around the area or areas affected. 19 e. In the event of overlapping changes,use different colors for the overlapping 20 changes. 21 5. Conversion of schematic layouts 22 a. In some cases on the Drawings,arrangements of conduits,circuits,piping, 23 ducts,and similar items,are shown schematically and are not intended to 24 portray precise physical layout. 25 1) Final physical arrangement is determined by the Contractor,subject to the 26 City's approval. 27 2) However,design of future modifications of the facility may require 28 accurate information as to the final physical layout of items which are 29 shown only schematically on the Drawings. 30 b. Show on the job set of Record Drawings,by dimension accurate to within 1 31 inch,the centerline of each run of items. 32 1) Final physical arrangement is determined by the Contractor,subject to the 33 City's approval. 34 2) Show,by symbol or note,the vertical location of the Item("under slab", "in 35 ceiling plenum", "exposed",and the like). 36 3) Make all identification sufficiently descriptive that it may be related 37 reliably to the Specifications. 38 c. The City may waive the requirements for conversion of schematic layouts 39 where,in the City's judgment,conversion serves no useful purpose. However, 40 do not rely upon waivers being issued except as specifically issued in writing 41 by the City. 42 B. Final Project Record Documents 43 1. Transfer of data to Drawings 44 a. Carefully transfer change data shown on the job set of Record Drawings to the 45 corresponding final documents,coordinating the changes as required. 46 b. Clearly indicate at each affected detail and other Drawing a full description of 47 changes made during construction,and the actual location of items. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 017839-4 PROJECT RECORD DOCUMENTS Page 4 of 4 1 c. Call attention to each entry by drawing a"cloud" around the area or areas 2 affected. 3 d. Make changes neatly,consistently and with the proper media to assure 4 longevity and clear reproduction. 5 2. Transfer of data to other Documents 6 a. If the Documents,other than Drawings,have been kept clean during progress of 7 the Work,and if entries thereon have been orderly to the approval of the City, 8 the job set of those Documents,other than Drawings,will be accepted as final 9 Record Documents. 10 b. If any such Document is not so approved by the City, secure a new copy of that 11 Document from the City at the City's usual charge for reproduction and 12 handling,and carefully transfer the change data to the new copy to the approval 13 of the City. 14 3.5 REPAIR/RESTORATION[NOT USED] 15 3.6 RE-INSTALLATION[NOT USED] 16 3.7 FIELD[oR]SITE QUALITY CONTROL[NOT USED] 17 3.8 SYSTEM STARTUP[NOT USED] 18 3.9 ADJUSTING[NOT USED] 19 3.10 CLEANING[NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION[NOT USED] 22 3.13 MAINTENANCE[NOT USED] 23 3.14 ATTACHMENTS [NOT USED] 24 END OF SECTION 25 Revision Log DATE NAME SUMMARY OF CHANGE 26 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100633 Revised July 1,2011 013119-2 PRECONSTRUCTION MEETING Page 2 of 3 1 e. Other City representatives 2 f. Others as appropriate 3 4. Construction Schedule 4 a. Prepare baseline construction schedule in accordance with Section 0132 16 and 5 provide at Preconstruction Meeting. 6 b. City will notify Contractor of any schedule changes upon Notice of 7 Preconstruction Meering. 8 5. Preliminary Agenda may include: 9 a. Introduction of Project Personnel 10 b. General Description of Project 11 c. Status of right-of-way,utility clearances,easements or other pertinent permits 12 d. Contractor's work plan and schedule 13 e. Contract Time 14 f. Notice to Proceed 15 g. Construction Staking 16 h. Progress Payments 17 i. Extra Work and Change Order Procedures 18 j. Field Orders 19 k. Disposal Site Letter for Waste Material 20 1. Insurance Renewals 21 in. Payroll Certification 22 n. Material Certifications and Quality Control Testing 23 o. Public Safety and Convenience 24 p. Documentation of Pre-Construction Conditions 25 q. Weekend Work Notification 26 r. Legal Holidays 27 s. Trench Safety Plans 28 t. Confined Space Entry Standards 29 u. Coordination with the City's representative for operations of existing water 30 systems 31 v. Storm Water Pollution Prevention Plan 32 w. Coordination with other Contractors 33 x. Early Warning System 34 y. Contractor Evaluation 35 z. Special Conditions applicable to the project 36 aa. Damages Claims 37 bb. Submittal Procedures 38 cc. Substitution Procedures 39 dd. Correspondence Routing 40 ee. Record Drawings 41 ff. Temporary construction facilities 42 gg. M/WBE or MBE/SBE procedures 43 hh. Final Acceptance 44 ii. Final Payment 45 J. Questions or Comments CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised August 17,2012 013119-3 PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS[NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 7 1.11 FIELD[SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION[NOT USED] 1 i END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised August 17,2012 015000-1 TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 1 SECTION 0150 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including,but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 1 I d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include,but are not necessarily limited to: 16 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 17 2. Division 1—General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c. Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 1) Included are fuel,power,light,heat and other utility services necessary for 32 execution,completion,testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping,equipment,devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH BRIDGE REHABILITATON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised July 1,2011 015000 2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 1 d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work,including 6 testing of Work. 7 1) Provide power for lighting,operation of equipment,or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off-site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated,watertight,weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner. 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting,and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH BRIDGE REHABILITATON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised July 1,2011 01 50 00 3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1 1. Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a. Contractor remains on-call at all times 4 b. Must respond in a timely manner 5 F. Temporary Protection of Construction 6 1. Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE[NOT USED] 13 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2- PRODUCTS [NOT USED] 17 PART 3- EXECUTION[NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR]/[RESTORATION] 25 3.6 RE-INSTALLATION 26 3.7 FIELD[OR] SITE QUALITY CONTROL[NOT USED] 27 3.8 SYSTEM STARTUP[NOT USED] 28 3.9 ADJUSTING[NOT USED] 29 3.10 CLEANING[NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH BRIDGE REHABILITATON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised July 1,2011 015000-4 TEMPORARY FACIIITIES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work,to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION[NOT USED] 4 3.13 MAINTENANCE[NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 8 CITY OF FORT WORTH BRIDGE REHABI ITATON(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised July 1,2011 3471 13-1 TRAFFIC CONTROL Page 1 of 6 1 SECTION 34 7113 2 TRAFFIC CONTROL 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Installation of Traffic Control Devices and preparation of Traffic Control Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. FOR THISPROJECT TRAI I TONTIn �� "f IOItI 34 71" SHALL 9 CONSIDERED SUBSIDIARY WORK, ARATE PAY. 10 2. rFRA � NTI OL RvIPLEMENTA 01 e�STA LATION, 11 MAIN DANCE, ADIUS".l"MEN'l RiCEMENTS AND REMOVAL OF 12 TRAFFIC CONTROL DEVICES SHALL BE CONSIDERED SUBSIDIARY 13 W OR K,NO SEPARATE PAY. 14 T77PPREPARATION OF TR IC CONTROL PLAN IN&AILS,ADHERENCE TO 15 CITY AND TEXAS� AL ON UNIFORM TRAFFIC CONTROL DEVICES 16 (TMUTCD),QB' IGNATURE AND SEAL OF A LICENSED,TEXAS 17 PROFESSIONA0, �1 SkIALL� E CONSIf BAR 18 wC)o' 19 C. Related Specification Sections include,but are not necessarily limited to: 20 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 21 2. Division 1 —General Requirements 22 1.2 PRICE AND PAYMENT PROCEDURES 23 A. Measurement and Payment 24 1. Installation of Traffic Control Devices: SUBSIDIARY NO SEPARATE PAY 25 a. Me a wn 26 27 deffAiefl. 28 . 29 b. Payment 30 31 "shall be paid for-at the 32 " 33 e. The pr-iee bid shall inealude- 34 35 2)Insw1atiefl 36 ee 37 4) Adjustments 38 5) Replaeefaents 39 6` al 40 41 2. Portable Message Signs CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 22,2013 347113-2 TRAFFIC CONTROL Page 2 of 6 1 a. Measurement 2 1) Measurement for this Item shall be per week for the duration of use. 3 b. Payment 4 1) The work performed and materials furnished in accordance to this Item and 5 measured as provided under"Measurement"shall be paid for at the unit 6 price bid per week for"Portable Message Sign'rental. 7 c. The price bid shall include: 8 1) Delivery of Portable Message Sign to Site 9 2) Message updating 10 3) Sign movement throughout construction 11 4) Return of the Portable Message Sign post-construction 12 3. Preparation of Traffic Control Plan Details: SUBSIDIARY NO SEPARATE PAY 13 a. Measur-emen 14 . 15 b. Payment 16 17 ` 18 pFepeFed. 19 . 20 21 IORgeF 22 23 (m 4UTGD) 24 3) Obtaining the signature and seal of a lieensed Texas Pfefessienal Enginee 25 4) hieer-peFation of City eewAnents 26 1.3 REFERENCES 27 A. Reference Standards 28 1. Reference standards cited in this Specification refer to the current reference 29 standard published at the time of the latest revision date logged at the end of this 30 Specification,unless a date is specifically cited. 31 2. Texas Manual on Uniform Traffic Control Devices(TMUTCD). 32 3. Item 502,Barricades,Signs,and Traffic Handling of the Texas Department of 33 Transportation,Standard Specifications for Construction and Maintenance of 34 Highways,Streets,and Bridges. 35 1.4 ADMINISTRATIVE REQUIREMENTS 36 A. Coordination 37 1. Contact Traffic Services Division(817-392-7738)a minimum of 48 hours prior to 38 implementing Traffic Control within 500 feet of a traffic signal. 39 B. Sequencing 40 1. Any deviations to the Traffic Control Plan included in the Drawings must be first 41 approved by the City and design Engineer before implementation. 42 1.5 SUBMITTALS 43 A. Provide the City with a current list of qualified flaggers before beginning flagging 44 activities.Use only flaggers on the qualified list. CITY OF FORT WORTH BRIDGE REHABILrrATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 22,2013 3471 13-3 TRAFFIC CONTROL Page 3 of 6 1 B. Obtain a Street Use Permit from the Street Management Section of the Traffic 2 Engineering Division,311 W. 100'Street. The Traffic Control Plan(TCP)for the 3 Project shall be as detailed on the Traffic Control Plan Detail sheets of the Drawing set. 4 A copy of this Traffic Control Plan shall be submitted with the Street Use Permit. 5 C. Traffic Control Plans shall be signed and sealed by a licensed Texas Professional 6 Engineer. 7 D. Contractor shall prepare Traffic Control Plans if required by the Drawings or 8 Specifications. The Contractor will be responsible for having a licensed Texas 9 Professional Engineer sign and seal the Traffic Control Plan sheets. 10 E. Lane closures 24 hours or longer shall require a site-specific traffic control plan. 11 F. Contractor responsible for having a licensed Texas Professional Engineer sign and seal 12 changes to the Traffic Control Plan(s)developed by the Design Engineer. 13 G. Design Engineer will furnish standard details for Traffic Control. 14 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 15 1.7 CLOSEOUT SUBMITTALS[NOT USED] 16 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 17 1.9 QUALITY ASSURANCE[NOT USED] 18 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USED] 19 1.11 FIELD [SITE] CONDITIONS[NOT USED] 20 1.12 WARRANTY [NOT USED] 21 PART 2- PRODUCTS 22 2.1 OWNER-FURNISHED[oR]OWNER-SUPPLIED PRODUCTS [NOT USED] 23 2.2 ASSEMBLIES AND MATERIALS 24 A. Description 25 1. Regulatory Requirements 26 a. Provide Traffic Control Devices that conform to details shown on the 27 Drawings,the TMUTCD, and TxDOT's Compliant Work Zone Traffic Control 28 Device List(CWZTCDL). 29 2. Materials 30 a. Traffic Control Devices must meet all reflectivity requirements included in the 31 TMUTCD and TxDOT Specifications—Item 502 at all times during 32 construction. 33 b. Electronic message boards shall be provided in accordance with the TMUTCD. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 22,2013 3471 13-4 TRAFFIC CONTROL Page 4 of 6 1 2.3 ACCESSORIES [NOT USED] 2 2.4 SOURCE QUALITY CONTROL[NOT USED] 3 PART 3- EXECUTION 4 3.1 EXAMINATION [NOT USED] 5 3.2 PREPARATION 6 A. Protection of In-Place Conditions 7 1. Protect existing traffic signal equipment. 8 3.3 INSTALLATION 9 A. Follow the Traffic Control Plan(TCP) and install Traffic Control Devices as shown on 10 the Drawings and as directed. 11 B. Install Traffic Control Devices straight and plumb. 12 C. Do not make changes to the location of any device or implement any other changes to 13 the Traffic Control Plan without the approval of the Engineer. 14 1. Minor adjustments to meet field constructability and visibility are allowed. 15 D. Maintain Traffic Control Devices by taking corrective action as soon as possible. 16 1. Corrective action includes but is not limited to cleaning,replacing, straightening, 17 covering,or removing Devices. 18 2. Maintain the Devices such that they are properly positioned, spaced,and legible, 19 and that retroreflective characteristics meet requirements during darkness and rain. 20 E. If the Inspector discovers that the Contractor has failed to comply with applicable federal 21 and state laws(by failing to furnish the necessary flagmen,warning devices,barricades, 22 lights,signs,or other precautionary measures for the protection of persons or property),the 23 Inspector may order such additional precautionary measures be taken to protect persons 24 and property. 25 F. Subject to the approval of the Inspector,portions of this Project,which are not affected by 26 or in conflict with the proposed method of handling traffic or utility adjustments,can be 27 constructed during any phase. 28 G. Barricades and signs shall be placed in such a manner as to not interfere with the sight 29 distance of drivers entering the highway from driveways or side streets. 30 H. To facilitate shifting,barricades and signs used in lane closures or traffic staging may 31 be erected and mounted on portable supports. 32 1. The support design is subject to the approval of the Engineer. 33 I. Lane closures shall be in accordance with the approved Traffic Control Plans. 34 J. If at any time the existing traffic signals become inoperable as a result of construction 35 operations,the Contractor shall provide portable stop signs with 2 orange flags,as 36 approved by the Engineer,to be used for Traffic Control. CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 22,2013 3471 13-5 TRAFFIC CONTROL Page 5 of 6 1 K. Contractor shall make arrangements for police assistance to direct traffic if traffic signal 2 turn-ons,street light pole installation,or other construction will be done during peak traffic 3 times(AM:7 am—9 am,PM:4 pm-6 pm). 4 L. Flaggers 5 1. Provide a Contractor representative who has been certified as a flagging instructor 6 through courses offered by the Texas Engineering Extension Service,the American 7 Traffic Safety Services Association,the National Safety Council,or other approved 8 organizations. 9 a. Provide the certificate indicating course completion when requested. 10 b. This representative is responsible for training and assuring that all flaggers are 11 qualified to perform flagging duties. 12 2. A qualified flagger must be independently certified by 1 of the organizations listed 13 above or trained by the Contractor's certified flagging instructor. 14 3. Flaggers must be courteous and able to effectively communicate with the public. 15 4. When directing traffic,flaggers must use standard attire,flags, signs,and signals 16 and follow the flagging procedures set forth in the TMUTCD. 17 5. Provide and maintain flaggers at such points and for such periods of time as may be 18 required to provide for the safety and convenience of public travel and Contractor's 19 personnel,and as shown on the Drawings or as directed by the Engineer. 20 a. These flaggers shall be located at each end of the lane closure. 21 M. Removal 22 1. Upon completion of Work,remove from the Site all barricades,signs,cones,lights 23 and other Traffic Control Devices used for work-zone traffic handling in a timely 24 manner,unless otherwise shown on the Drawings. 25 3.4 REPAIR/RESTORATION[NOT USED] 26 3.5 RE-INSTALLATION [NOT USED] 27 3.6 FIELD[OR]SITE QUALITY CONTROL[NOT USED] 28 3.7 SYSTEM STARTUP[NOT USED] 29 3.8 ADJUSTING[NOT USED] 30 3.9 CLEANING [NOT USED] 31 3.10 CLOSEOUT ACTIVITIES [NOT USED] 32 3.11 PROTECTION [NOT USED] 33 3.12 MAINTENANCE[NOT USED] 34 3.13 ATTACHMENTS [NOT USED] 35 END OF SECTION 36 Revision Log CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 22,2013 3471 13-6 TRAFFIC CONTROL Page 6 of 6 DATE NAME SUMMARY OF CHANGE 11/22/13 S.Arnold Added police assistance,requirement for when a site specific TCP is required 1 CITY OF FORT WORTH BRIDGE REHABILITATION(2017-2) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100633 Revised November 22,2013 ATTACHMENT 1A Page 1 of 4 FORT WORTH �.,,�.�•---- City of Fort Worth Minority Business Enterprise MBE Subcontractors/Suppliers Utilization Form OFFEROR COMPANY NAME: Check applicable block to describe Offeror PROJECT NAME: hl,W.'DBEEl NON-MNVPDBE BID DATE City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER % % Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Purchasing Division no later than 2:00 p.m. on the second City business day after bid opening, exclusive of bid opening date, Will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fart Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications. MBEs listed toward meeting the project goal must be located in the six (6) county marketplace at the time of bid or the business has a Significant Business Presence in the Marketplace. Marketplace is the geographic area of Tarrant, Dallas, Denton, Johnson. Parker, and Wise counties. Prime contractors must identify by tier level of all subcontractors/suppliers. Tier: means the level of subcontracting below the prime contractor/consultant i.e. a direct payment from the prime contractor to a subcontractor is considered 1 s'tier, a payment by a subcontractor to its supplier is considered 2`d tier. The prime contractor is responsible to provide proof of payment of all tiered subcontractors identified as a MBE and counting those dollars towards meeting the contract committed goal, ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located within the Marketplace, that have been determined to be a bondafide minority business enterprise by the North Central Texas Regional Certification Agency(NCTRCA)or other certifying agencies that the City may deem appropriate and accepted by the City of Fort Worth. If hauling services are utilized, the Offeror will be given credit as long as the MBE listed awns and operates at least one fully licensed and operational truck to be used on the contract. The MBE may lease trucks from another MBE firm, including MBE owner-operated, and receive full MBE credit. The MBE may lease trucks from non-MBEs, including owner-operated, but will only receive credit for the fees and commissions earned by the MBE as outlined in the lease agreement. Rev.2/10115 FORTWORTH ATTACHMENT 1A Page 2 of 4 Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. MBE firms are to be listed first,use additional sheets if necessary. Please note that only certified MBEs will be counted to meet an MBE goal. NCTRCA N SUBCONTRACTOR/SUPPLIER ° Company Name T n Detail Detail Address i Subcontracting Supplies M w Dollar Amount Telephone/Fax e B B B Work Purchased Email E E Contact Person E F] El u El Rev.2/10/15 FORTWORTHATTACHMENT 1A Page 3 of 4 Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minoru WW non-MBEs. MBE firms are to be listed first,use additional sheets if necessary. Please note that only certified MBEs will be counted to meet an MBE goal. NCTRCA N SUBCONTRACTORISUPPLIER ° Company Name T n Detail Detail Address I M W Subcontracting Supplies Telephone/Fax f B B � Work Purchased Dollar Amount Email E E Contact Person E El El 0 F F El ® F Rev.2/10/15 FORT WORTH ATTACHMENT 1A Page 4 of 4 Total Dollar Amount of MBE Subcontractors/Suppliers $ Total Dollar Amount of Non-MBE Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ The Offeror will not make additions, deletions, or substitutions to this certified list without the prior approval of the. Minority and Women Business Enterprise Office through the submittal of a Request for Approval o Change/Addition form. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The Offeror shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed MBE goal. if the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and any special arrangements with MBEs. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The Offeror agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work performed by the MBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of the contract and may result in a determination of an irresponsible Offeror and debarment from participating in City work for a period of time not less than one (1) year. Authorized Signature - - Printed Signature Title Contact Name/Title(if different) Company Name Telephone and/or Fax Adldr"s E-mail Address City/Statelzip Date Rev,X11Q/15 ATTACHMENT 1C Page 1 of 4 FORT WORTH ---�'�•,.1 ---- City of Fort Worth Minority Business Enterprise MBE Good Faith Effort Form OFFEROR COMPANY NAME: Check applicable block to describe Offeror PROJECT NAME: M;W/DBE NON-MIWWIDBE BID DATE City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER % % If the Offeror did not meet or exceed the MBE subcontracting goal for this project, the Offeror must complete this form. If the Offeror's method of compliance with the MBE goal is based upon demonstration of a "good faith effort", the Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 11 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Offeror. Failure to complete this form, in its entirety with supporting documentation, and received by the Purchasing Division no later than 2:00 p.m. on the second City business day after bid opening, exclusive of bid opening date,will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a MBE or non-MBE. (DO NOT LIST NAMES OF FIRMS) On all projects, the Offeror must list each subcontracting and or supplier opportunity regardless of tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Rev.2/10/15 ATTACHMENT 1C Page 2 of 4 2.) Obtain a current(not more than two(2) months old from the bid open date) list of MBE subcontractors and/or suppliers from the City's M/WBE Office. Yes Date of Listing / / No 3.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? Yes (If yes,attach MBE mail listing to include name of firm and address and a dated copy of letter mailed.) No 4.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? Yes (If yes,attach list to include name of MBE firm, ep rson contacted,phone number and date and time of contact.) No 5.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by facsimile(fax), exclusive of the day the bids are opened? Yes (If yes,attach list to include name of MBE firm,fax number and date and time of contact. In addition,if the fax is returned as undeliverable,then that"undeliverable confirmation"received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation and/or"undeliverable confirmation" documentation may render the GFE non-responsive.) No 6.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? Yes (If yes,attach email confirmation to include name of MBE firm,date and time.In addition,if an email is returned as undeliverable,then that"undeliverable message"receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation and/or"undeliverable message"documentation may render the GFE non-responsive.) No NOTE: The four methods identified above are acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Offeror must document that either at least two attempts were made using two of the four methods or that at least one successful contact was made using one of the four methods in order to be deemed responsive to the Good Faith Effort requirement. NOTE: The Offeror must contact the entire MBE list specific to each subcontracting and supplier opportunity to be in compliance with questions 3 through 6. 7.) Did you provide plans and specifications to potential MBEs? Yes No 8.) Did you provide the information regarding the location of plans and specifications in order to assist the MBEs? Yes No Rev.2/10115 ATTACHMENT IC Page 3 of 4 9.) Did you prepare a quotation for the MBEs to bid on goods/services specific to their skill set? Yes (If yes,attach all copies of quotations.) No 10.) Was the contact information on any of the listings not valid? Yes (If yes,attach the information that was not valid in order for the MMBE Office to address the corrections needed.) No 11.)Submit documentation if MBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the MBE was rejected and any supporting documentation the Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Offeror will provide for confidential in-camera access to an inspection of any relevant documentation by City personnel. Please use additional sheets,if necessary,and attach. Company Name Telephone Contact Person Scope of Work Reason for Rejection ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain MBE participation on this project. The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance shall create a material breach of contract and may result in a determination of an irresponsible Offeror and debarment from participating in City work for a period of time not less than one (1) year. Rev.2110/15 ATTACHMENT 1C Page 4 of 4 The undersigned certifies that the information provided and the MBEs) listed was/were contacted in good faith. It is understood that any MBE(s) listed in Attachment 1 C will be contacted and the reasons for not using them will be verified by the City's M/WBE Office. Authorized Signature Printed Signature Title Contact Name and Title(if different) Company Name Phone Number Fax Number Address Email Address City/State/Zip Date Rev.2/10/15 Joint Venture Page 1 of 3 FORT WORTH CITY OF FORT NORTH MBE Joint Venture Eligibility Form Aft questions must be answered;use"NIA"if not applicable. Name of City project: A joint venture form must be completed,on=4 project RFP/Bid/Purchasing Number: 1.Joint venture information: Joint Venture Name: Joint Venture Address: (If applicable) Telephone: Facsimile: E-mail address: Cellular: Identify the firms that comprise the joint venture: Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the hint venture MBE firm Non-MBE firm name: name: Business Address: Business Address: City,State,Zip: City,State,Zip: Telephone Facsimile E-mail Telephone Facsimile Cellular Cellular Certification Status: E-mail address Name of Certifying Agency: 2.Scope of work performed by the Joint Venture: Describe the scope of work of the MBE: Describe the scope of work of the non-MBE: Rev.2110115 Joint Venture Page 2 of 3 3.What is the percentage of MBE participation on this joint venture that you wish to be counted toward meeting the project goal? 4.Attach a copy of the joint venture agreement. 5.List components of ownership of joint venture: (Do not complete if this information is described in joint venture agreement) Profit and loss sharing: Capital contributions,including equipment: Other applicable ownership interests: 6.Identify by name,race,sex and firm those individuals(with titles)who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable: Management decisions: a. Estimating -------------- --- ---------- b. Marketing and Sales c. Hiring and Firing of management personnel ---------------------------------- --_____ d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Minority and Women Business Enterprise Office will review your joint venture submission and will have final approval of the MBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's M/WBE Office immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's BDE Ordinance. Rev.2/10/15 Joint Venture Pa e3of3 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore,the undersigned shall agree to provide to the joint venture the stated scope of work, decision-making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits,interviews with owners and examination of the books,records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful misrepresentation of facts. Name of MBE firm Name of non-MBE finn Printed Name of Owner Printed Name of Ow=ner Signature of Owner Signature of Owner Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Title Title Date Date Notarization State of County of On this day of ,20 ,before me appeared and to me personally known and who,being duly swom,did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public Signature Commission Expires (seal) Rev.2/10/15 ATTACHMENT 113 FORT WORTHPage 1 of 1 City of Fort Worth Minority Business Enterprise Specifications Prime Contractor Waiver Form OFFEROR COMPANY NAME: Check applicable block to describe prime PROJECT NAME: M!w/DBE NON-MNVIDBE BID DATE City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER If both answers to this form are YES, do not complete ATTACHMENT 1C (Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only applicable if both answers are yes. E re to complete this form in its entirety and be received by the Purchasing Division no later than 2:00 ,on the second City business day after bid opening, exclusive of the bid opening date,will result inid being considered non-responsive to bid specifications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this NO project,this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s)on this contract, the payment thereof and any proposed changes to the original MBE(s) arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract and may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one(1)year. Authorized signature Printed Signature Title Contact Name(if different) Company Dame Phone Number Fax Number Address - Email Address - City/State/Zip Date Rev.2110/15 ATTACHMENT 1A Page 1 of 4 FORT WORTH City of Fort Worth Minority Business Enterprise MBE Subcontractors/Suppliers Utilization Form OFFEROR COMPANY NAME: Check applicable block to describe Offeror Gibson&Associates, Inc. PROJECT NAME: rA B10[SATE Bridge Rehabilitation for W.Lancaster Ave(2017-2) 1'1-30-17 City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER 10 % 5% 100633 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Purchasing Division no later than 2:00 p.m. on the second City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specificatbns. The undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications. MBEs listed toward meeting the project goal must be located in the six (6) county marketplace at the time of bid or the business has a Significant Business Presence in the Marketplace. Marketplace is the geographic area of Tarrant, Dallas, Denton, Johnson, Parker, and Wise counties. ,Prime contractors must identify by tier level of all subcontractors/suppliers. Tier: means the level of ,subcontracting below the prime contractor/consultant i.e. a direct payment from the prime contractor to a ,subcontractor is considered tst tier, a payment by a subcontractor to its supplier is considered 2"d'tier. The prime contractor is responsible to provide proof of payment of all tiered subcontractors identified as a MBE and (counting those dollars towards meeting the contract committed goal ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located within the Marketplace, that have been determined to be a bondafide minority business enterprise by the North Central Texas Regional Certification Agency(NCTRCA)or other certifying agencies that the City may deem appropriate and accepted by the City of Fort Worth. If hauling services are utilized, the Offeror will be given credit as long as the MBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The MBE may lease trucks from another MBE firm, including MBE owner-operated, and receive full MBE credit. The MBE may lease trucks from non-MBEs, including owner-operated, but will only receive credit for the fees and commissions earned by the MBE as outlined in the lease agreement. Rev.2/10/15 FORTWORTH ATTACHMENT 1A 1 Page 2 of 4 Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. MBE firms are to be listed first,use additional sheets if necessary. Please note that only certified MBEs will be counted to meet an MBE goal. NCTRCA N SUBCONTRACTOR/SUPPLIER o Company Name T n Detail Detail Address i Subcontracting Supplies M W Dollar Amount Telephone/Fax ' B B e Work Purchased Email E E Contact Person E Macias Specialty Contracting,LLC 615 N.Main Street,#306 Euless,TX 76039 Concrete Patching $36,100.00 817-368-9456 1st E (Vertical&Overhead) aj@maciasspecialty.com Abe Jackson S&S Bridge Painting,Inc. P.O.Box 295094 Clean&Paint Existing Kerrville,TX 78029-2189 1st ❑ ❑ X Steel(System III); $265,360.00 830-896-5208/830-257-4789 Power Wash Steel sspaint@ktc.com Members Wesley Skains TexOp Construction,L.P. P.O.Box 427 Roanoke,TX 76262 Ptane and Text Concrete 940-648-1455/940-648-1457 1st ❑ ❑ X Pavement(0"-1/Y) G9,706.00 jdavis@texop.com James Davis Nelson Industrial Services,Inc. 6021 Melrose Lane Oklahoma City, 73127 ❑ 405-495-9797/40 40 595-4994 psi $5,000.00 pjackson@nelsonindustrial.com Lj Paul Jackson CrossRoads,L.P 5012 David Strickland Road Fort Worth,TX 76119 817-634-0044/817-634-0048 1st ❑ ❑ X Signs and Barricades $13,996 00 klong@crossroadslp.com Kevin Long Benningfield Steel Fabrication,LLC. 901 Marcella Road Houston,TX 77091 832-831-3691 1st D X Bridge Rail Fabrication $4,950.00 glen@benningfieldsteel.com Glen Benningfield Rev.2/10/15 FORTWORTH ATTACHMENT IA i Page 3 of 4 Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. MBE firms are to be listed first, use additional sheets if necessary. Please note that only certified MBEs will be counted to meet an MBE goal. NCTRCA N SUBCONTRACTOR/SUPPLIER o Company Name T n Detail Detail Address i Subcontracting Supplies M W Dollar Amount Telephone/Fax ' B B B Work Purchased Email E E Contact Person E El El El 1 El El Rev.2110115 FORT WORTH ATTACHMENT 1A Page 4 of 4 Total Dollar Amount of MBE Subcontractors/Suppliers $36,100.00 Total Dollar Amount of Non-MBE Subcontractors/Suppliers $299,012.00 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $335,112.00 The Offeror will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office through the submittal of a Request for Approval o Change/Addition form. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The Offeror shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed MBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and any special arrangements with MBEs. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The Offeror agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work performed by the MBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of the contract and may result in a determination of an irresponsible Offeror and debarment from participating in City work for a period of time not less than one (1)year. /t✓ John N.Welch Aut rued Signature Printed Signature Vice President Pam Davis Title Contact Name/Title(if different) Gibson&Associates, Inc. 972-557-1199/972-557-1552 Company Name Telephone and/or Fax P.O. Box 800579 pamd@gibsonassoc.net Address E-mail Address Balch Springs, TX 75180 12/04/2017 CftWState/Zip Date Rev.2/10/15 2013 PREVAILING WAGE RATES (Heavy and Highway Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate Asphalt Distributor Operator $ 15.32 Asphalt Paving Machine Operator $ 13.99 Asphalt Raker $ 12.69 Broom or Sweeper Operator $ 11.74 Concrete Finisher,Paving and Structures $ 14.12 Concrete Pavement Finishing Machine Operator $ 16.05 Concrete Saw Operator $ 14.48 Crane Operator,Hydraulic 80 tons or less $ 18.12 Crane Operator,Lattice Boom 80 Tons or Less $ 17.27 Crane Operator,Lattice Boom Over 80 Tons $ 20.52 Crawler Tractor Operator $ 14.07 Electrician $ 19.80 Excavator Operator,50,000 pounds or less $ 17.19 Excavator Operator,Over 50,000 pounds $ 16.99 Flagger $ 10.06 Form Builder/Setter,Structures $ 13.84 Form Setter,Paving&Curb $ 13.16 Foundation Drill Operator,Crawler Mounted $ 17.99 Foundation Drill Operator,Truck Mounted $ 21.07 Front End Loader Operator,3 CY or Less $ 13.69 Front End Loader Operator,Over 3 CY $ 14.72 Laborer,Common $ 10.72 Laborer,Utility $ 12.32 Loader/Backhoe Operator $ 15.18 Mechanic $ 17.68 Milling Machine Operator $ 14.32 Motor Grader Operator,Fine Grade $ 17.19 Motor Grader Operator,Rough $ 16.02 Off Road Hauler $ 12.25 Pavement Marking Machine Operator $ 13.63 Pipelayer $ 13.24 Reclaimer/Pulverizer Operator $ 11.01 Reinforcing Steel Worker $ 16.18 Roller Operator,Asphalt $ 13.08 Roller Operator,Other $ 11.51 Scraper Operator $ 12.96 Servicer $ 14.58 Small Slipform Machine Operator $ 15.96 Spreader Box Operator $ 14.73 Truck Driver Lowboy-Float $ 16.24 Truck Driver Transit-Mix $ 14.14 Truck Driver,Single Axle $ 12.31 Truck Driver,Single or Tandem Axle Dump Truck $ 12.62 Truck Driver,Tandem Axle Tractor with Semi Trailer $ 12.86 Welder $ 14.84 Work Zone Barricade Servicer $ 11.68 The Davis-Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by the United States Department of Labor and current as of September 2013. The titles and descriptions for the classifications listed are detailed in the AGC of Texas'Standard Job Classifications and Descriptions for Highway, Heavy,Utilities,and Industrial Construction in Texas. Page 1 of 1 2013 PREVAILING WAGE RATES (Commercial Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate AC Mechanic $ 25.24 AC Mechanic Helper $ 13.67 Acoustical Ceiling Installer $ 16.83 Acoustical Ceiling Installer Helper $ 12.70 Bricklayer/Stone Mason $ 19.45 Bricklayer/Stone Mason Trainee $ 13.31 Bricklayer/Stone Mason Helper $ 10.91 Carpenter $ 17.75 Carpenter Helper $ 14.32 Concrete Cutter/Sawer $ 17.00 Concrete Cutter/Sawer Helper $ 11.00 Concrete Finisher $ 15.77 Concrete Finisher Helper $ 11.00 Concrete Form Builder $ 15.27 Concrete Form Builder Helper $ 11.00 Drywall Mechanic $ 15.36 Drywall Helper $ 12.54 Drywall Taper $ 15.00 Drywall Taper Helper $ 11.50 Electrician(Journeyman) $ 19.63 Electrician Apprentice(Helper) $ 15.64 Electronic Technician $ 20.00 Floor Layer $ 18.00 Floor Layer Helper $ 10.00 Glazier $ 21.03 Glazier Helper $ 12.81 Insulator $ 16.59 Insulator Helper $ 11.21 Laborer Common $ 10.89 Laborer Skilled $ 14.15 Lather $ 12.99 Metal Building Assembler $ 16.00 Metal Building Assembler Helper $ 12.00 Metal Installer(Miscellaneous) $ 13.00 Metal Installer Helper(Miscellaneous) $ 11.00 Metal Stud Framer $ 16.12 Metal Stud Framer Helper $ 12.54 Painter $ 16.44 Painter Helper $ 9.98 Pipefitter $ 21.22 Pipefitter Helper $ 15.39 Plasterer $ 16.17 Plasterer Helper $ 12.85 Plumber $ 21.98 Plumber Helper $ 15.85 Reinforcing Steel Setter $ 12.87 Page 1 of 2 Reinforcing Steel Setter Helper $ 11.08 Roofer $ 16.90 Roofer Helper $ 11.15 Sheet Metal Worker $ 16.35 Sheet Metal Worker Helper $ 13.11 Sprinkler System Installer $ 19.17 Sprinkler System Installer Helper $ 14.15 Steel Worker Structural $ 17.00 Steel Worker Structural Helper $ 13.74 Waterproofer $ 15.00 Equipment Operators Concrete Pump $ 18.50 Crane,Clamsheel,Backhoe,Derrick, D'Line Shovel $ 19.31 Forklift $ 16.45 Foundation Drill Operator $ 22.50 Front End Loader $ 16.97 Truck Driver $ 16.77 Welder $ 19.96 Welder Helper $ 13.00 The prevailing wage rates shown for Commercial construction projects were based on a salary survey conducted and published by the North Texas Construction Industry(Fall 2012)Independently compiled by the Lane Gorman Trubitt,PLLC Construction Group. The descriptions for the classifications listed are provided on the TEXO's(The Construction Association)website. www.texoassociation.org/Chapter/wagerates.asp Page 2 of 2 AP-1 Bridge Location, Quantity Summaries, Plans and Details 4' 44 clw 3" 3"- Project Title----------- 4 Funding g2" 3" 12 Contractor: iw Contractor's Name-- _;w Jim 12 2 Questions on this Project Call: " 12w _ _ (817) 392 - XXXX _ 1" 12" After Hours Call: (817) 392 - XXXX 1w R,"TYP. 1"TYP. FONTS: NOTES: FORT WORTH LOGO IN CHELTINGHAM BOLD IF APPLICABLE TO THE PROJECT, ALL OTHER LETTERING IN ARIAL BOLD CONTRACTOR SHALL OBTAIN VINYL STICKER"CITY GAS LEASE REVENUE COLORS: IN ACTION"!LOGO AT CDR SIGN AND FORT WORTH-PMS 288-BLUE ENGRAVING,6311 EAST LANCASTER LONGHORN LOGO-PMS 725-BROWN AVE(817.451-4684),PEEL AND PLACE LETTERING-PMS 288-BLUE IN FUNDING SECTION. BACKGROUND-WHITE BORDER-BLUE PROJECT DESIGNATION SIGN CITY OF FORT WORTH - CONSTRUCTION STANDARD DRAWING NO. 1 - H DATE: THE CITY OF FORT WORTH, TEXAS FORT WORTH TRANSPORTATION & PUBLIC WORKS BRIDGE REPAIR AND REHABILITATION lFOR W. LANCASTER AVE. BRIDGE 377 Saginaw P � a 37 Richland Hills Lake Worth 2s7 10 Haltom City 183 149 121 4 1 White Settlement Fort WOCIh 1 180 FDI t STOP 61POLY GVERSIGHTASSNI WEST LANCATER AVE. �-� RIDGLEA HILLS I (OVER CLEAR FORK TRINITY) 183 l3enbrook Forest Hill: Edgeclift S Village Kennedale LOCATION MAP mzon NaRTR cENTRAL re - T.A. COUNCIL OT covEaNMENrsAS TRANSPORTATION & PUBLIC W®lE KS NTERNATI no"nAo FI—Y llFK\1 \1 %i523G J LY 2017 TBPE g iroian No. F-26„ INDEX OF SHEETS r _ to/le/s,17 m $HEFT NQ. DFSf RIPTIQN � " . GFNFRAI F f � i x6 001 TITLE SHEET 002 INDEX OF SHEETS 55 003 ESTIMATED QUANTITIES P$ 11. RR IDGF 004 REPAIR SUMMARY 005 TYPICAI SECTION ~ U _ 006 TYPICAI. —TION a 007 ORIOGF —AIR LAYOUT (GENERAL) R- W H U 008 ORI OGF REPAIR LAYOUT (GENERAL) Z 009 ORI OCE REPAIR LAYOUT (GENERAL) O U F 010 BRIDGE REPAIR LAYOUT(TRUSS UNIT 1) 0]W 011 BRIDGE REPAIR LAYOUT(TRUSS UNIT 2) W W W U .S 012 BRIDGE REPAIR LAYOUT(TRUSS UNIT 3) Z a W N 013 BR-113E REPAIR LAYOUT(TRUSS UNIT 4) Q Z Q W 014 OHIGGL H-P—LAYCUT(TRUSS UNIT 5A) $ W a' O o a a 015 BRIDGE PL—R LAYOU-ITRUSS JNIT 5B) ~ o Z W X 016 BRIDGE REPAIR LA"OU"(TRUSS UNIT 6) " F-W Q N 0 017 BRIDGE RLPAIH LAYOUTITRUES UNIT 7) u Q Z 018 GENERAL REPAIR DETAILS U 019 STANDARD SPALL REPAIR DETAILS W Z z 020 STEED TRJSS UNITS REPAIR DETAILS _ O J 021 BENT RE'SIR DE-AILS 022 PV(2)-12 m d N iT- 8 O O x� 1 BID ITEM NUMBER 354-6013 429-6001 429-6009 429-600T 439-6013 146-6013 446-6013 446-6013 446-6013 416-6013 416-6013 450-6082 996-6099 ]01 6004 I - io�iz�eo fi N PLAN M TEXT CONC SIR CONE STR CONC STRMULTIPLE- CLEAN 9 INT CLEAN B PAgNi CLEAN M PAINT CLEAN M PAINT CLEAN M PpINi CLEAN B PAINT IL REMOVE STR EP STL BRIDGE P GONE PA REPAIR(CLEAN REPAIR(RAPID REPAIR LAYER E%IST STR E%1 JT EXIST STR E%IST SITAR E%IST STR E%IST STR (pEDRAIL IAN) RAIL) MEMBER TRUSS BID ITEM DESCRIPTION i0" 0 &COAT WITH PECK REP) (VERTICAL 6 POLYMER (SYSTEM 111-A) (SYSTEM ILII-A)15FLOOM 111-A)(SYSTEM 111-A)(SYSTEM 111-A) (SYSTEM III-A) SPL( VERTICAL) 2") EPO%T) OPT) OVERHEAD) OVERLAY (BOTTOM CHORD) (GUSSET LATE) R BEAM) ERTICALI (ANGLE] (BEARING) ST SF SF EF SY EF SF EF SF SF LF LF SF _ 5 y LANCASTER AVE.BRIDGE 922 15 43 346 422 129 3192 4 2 2 30 30 e 5 fi`K6 TOTAL 422 15 43 346 422 129 319 2 4 2 2 30 30 - - ^d8. H U a w� BID ITEM NUMBER 104-6011 IBI-6022 ]01-6030 T84-fi044 ]04 6050 999 9999 H (' Z m W REP STL BRIDGE REP STL BRIDGE REP STL BRIDGE REP STL BRIDGE REP STL BRIDGE POWER WASH U rti MEMBER BOTTOM MEMBER MEMBER(REPL MEMBERTERAL MEMBER GUSSET STEEL MEMBERS a U m ti BID ITEM DESCRIPTION CH- (FLOORBEAM) RIVET/BOLT) BRACING) PLATES) (BOTTOM CHORD) W Z SF Si EA SF SF SFU ' z awa LANCASTER AVE.BRIDGE ISS 15 32 45 60 4230 Z u Q W u� TOTAL 155 15 32 45 60 a Na U w z~ c� a w O J co co _ 4 L lo O 4 REPAIR NO. ITEM BID ITEM DESCRIPTION UNIT- QUANTITY DETAILS/NOTES GENERAL NOTES. I.SEE BRIDGE REPAIR LAYOUT SHEETS FOR 1 �I 354-6013 PLAN&TEXT CONC PAV 10"TO I/2'1 ST 422 MILL DOWN EXISTING OVERLAY REPAIR LOCATIONS. 02 439-6013 MULTIPLE-LAYER POLYMER OVERLAY SY 422 INSTALL EPDXY OVERLAY Yx R (� 03 429-6004 C Nc sift REP[R RAPID OECN REP) (PRT OPT) SF 43 DECK PARTIAL U H (BASED ON 10%AREA( r Qq 429-6001 CONC Si I2 REPAIR (CLEAN&COAT WITH EPDXY) SF 15 MINOR CCC( 11 '.IR 05 429-6007 CONI SIR REPAIR (VERTICAL&CVERHEdDI SF 346 INT RMEIATC CONCRETE "'ALL AD AIR ° N © 446-6013 .[LEAN&PAINT EXIST STR (SYSTEM III A) (BOTTOM CHORD) SF 129 CLEAN AND REPAINT 5-EL T1155 ELEMENTS-BOTTOM CHORD - Io�12�Ee1} 6 ?at ❑T 446-6013 ICLEAN&PAINT EXIST STR (SYSTEM III-A) (GUSSET PLATE) SF 319 CLEAN AND REPAINT STEE I. -u s ELEMENTS-GUSSET PLATE H m © 446-6013 CLEAN&PAINT EXIST STR (SYSTEM 111-A) (FLOOR BEAM) SF 2 CLEAN AND REP1 'TCC HL FANTS-FLOOR B=AIA F9 446-6013 CLEAN 4 PAINT EXIST S-R (SYSTEM III-A) (VERTICAL) SF 4 CLEAN AND REPA NI 'STEEL U ILEMENTS VFRTICAI p I� 446-6113 CLEAN&PAIN'EXIST S"R (SYST EIA III-A> (ANGLE( SF 2 CLEAN AND REPAINT ST E_L IH'J SS'LEMEN z a 11 446-6013 CLEAN&PAINT EXIST STR (SYSTEM III-AI (BEARING) SF 2 CLEAN AND REPAINT 5_EL TRUSS ELEMENTS-BEARING 12 704-6030 REP Si-BRIDGE MEMBER (REPL RIVET/BOLT) EA 32 REPLdC-STEEL B't_JGE NIEM BLH- _ Cy-GS 13 704 6004 REP ALL 33_DGE—PER (TRUSS VERTICAL) $F 90 REPAIR STEEL BRIDGE NEMBER-TRUSS VEPTICAL €„�$ 14 704-fi011 —f-REP STL BRIDGE MEMBER (BOTTOM CHORDI SF 155 REPAIR STEEL BRIDGE LEMPER —f-C IOHD '- z yy I© 704-6022 REP STL BRIDGE MEMBER (FLOORBEAM) SF 15 REPAIR'TEE-BRIDGE MEMBER-FLOO P3=AM11 0 784 6044 R-P -T ?RIDC=MEMBER (LATERAL BRACING) SF 45 REPAIR STEEL BR!vC.E BEYBER-LATERAL BRACING " STL a L _ 704-6050 RAP ST_CRIU !E'D ER .S`,E-PLATES( SF 60 REPAIRSTE=L BRiDCE h.EMdER-GUSSET o FLAILS 1-5102 RAIL 1FEDES ;iS', r 10 45TRIdN _I LF 30 REPLACE DAMI.GED RAILING AT SPECIFIED'_OCATIONS U_ _ 1® 999-9999 PCIGER V,ASF STEE_MEMFHFRS SF 4230 POWERI'IASH TRUSS BOTTOM CHORDS AT TRUSS UNITS 1-4, 6. AND 7 Q LLI F— C7 Z � Om Ug Z a LJ S Z u a N W 'a O H BE: n a Z LJ Q F- o a Na g a� EL, z L� a � J of O] O N CO 4 0'-W" SI OEWALK ROAD Y SIDEWALK .. L—Q ROADWAY -- i - IDFI x�YNV' m WF IC BEAM AL SI DEWALI( F 4 35 IiTP OF 6) DIAPHRAGM Ei o MS 5 EO SPA AT 8'-0' 40'-0" DAP4I SEE NOTE(T P) &-_ ^yd'a NOTE c. I.WF BEAM SIZES VARY. SEE AS-BUILT PLANS FOR DETAILS. AS-BUILT PLANSEFORI Oi HER DETAELSN Ai THE ENDS.SEE STEEL I-BEAM TYPICAL SECTION (APPROACH SPANS) NTS Q W � 0 z o O z 5'-0" 40'-0' 5'-O' n U SIDEWALK BOADWY SIDEWALK In'+ W h U U CTGU55 I_ ' Q TRUSS 5 QQ ROADWAY& Z a W W rC TRUSS Z Z V Q N I ; W Q J S Ld a s a Z W U Q Ln d - ar SIDEWALK BFACU(ALK U H BRACKET XB ET W Z Q FLOOR BEAM TOP CHORD J CHANNELS(TYR) ��VERTICAL ANDIAGONAL GUSSETCITTPI DIAGONAL DBRACINGi U55 MEMBERS RITYPI � ERTICAL BRACIG�� I f I 18' BOTTOM CHORD WE B'-0" -0" IIF"' BEAM ITYP OF 3) yOTES.' I LATE 5 WN FOR CLARITY. [REI RDRI D.ECREPAIFMBAYOUT TRUSS UNIT SHEETS) _ STEEL TRUSS TYPICAL SECTION (UNIT 1-4, 6 & 7) NTS e. m 90'-0' D WE 5SIDEWALK OA RDWY SIELK £ C Q TRUSS I �Q ROADWAY B Q TRUSS _ 6 iQ TRUSS Z B� ; Yew TRYPHOGRBIA SIDEWALK X - IIS SIOEWALKJ i BRACKET U FLUOR BEAM TOP CHORD o W CHdNNELS ITTPI cD Z � a s O Z a Q U �O w 4'-11/, -Itl/z" " • •• uU U Z aW w Q >Nza DIAGONAL - Z w U BRACING GUSSET 21TTP)MERTIDAL AND /n aDIAGONAL QTRUSS MEMBERS U hITTPILd(JQ VERTICAL ED BRACING I BOTTOM C.-D CHANNELS ITTRI =; ;o I o m o I8-0" j IB'- _ NOTES, I.;ATERAL BRACgNC MEMBERS NOT SHOWN FOR CLARITY. RE:BRIDGE EPAIR LAYOUT TRUSS UNIT SHEETS) 65 STEEL TRUSS TYPICAL SECTION (UNIT 5) NTS .......... 43'-0"CONCRETE 121-40' I STEEL 1-BEAM SPANS 151-42'-0"STEEL I BEAM SPANS 3)CONCRETE[-BEAM SPANS .... ABUTMENT SPAN 96'YA' 210'0 -li0 0 ¢ASU C BFTNT 2 ¢BFTNT 3 ¢BFTNT 4 ¢BFTNT 5 ff BFTNT 6 ¢BENT i ¢BENT 6 ¢BENT 9 � 1aaZ<, STA 55.96.26 O m 5'-0"SIDEWALK O SQ 110 SFIt1-5 5 5 SGI 5(10 SF) 5 O F 5(5 5Fl 5 115 SF N " - s•oo se•oo s w IF l ' 6p•oG O o 6 d o — — 5 5 SF)�'S IF) .T 5 120 SF) ISI 5.E 5Q IS SFI�L 1 ❑1� r �(I6 IF ZJ 110 SFI , 15 IF) `LJ rW�6 5'-0'SIDEWALK W ©(4 5F) i o IID 51) I i p<5 6F) I 1191 ST) 02(191 STI H Q 0(19.1 SY) g a wZ NOTES, I.FRAMIMNG PLAN AND SUBSTRUCTURE BELOW NOT SHOWN FOR CLARITY. ~Z m w 2 O LEGEND "< O .. ED I_X BRIDGE REPAIR NO. (SEE REPAIR SUMMARY SHEET) PLAN W I_ • U Z aW� o a >>a z tam w p z „L a a z w g a w (3)CONCRETE U I-BEAM SPANS ITI-40'-IY,"STEEL 1-BEAM SPANS TOWER PIER 13)SPAN DECK TRUSS(UNIT 3) W Z •I70'-0" -317'-V/,' 28'-0" Q W O J(7 ¢?ENT 10 ¢BEAT II ¢BE`JT 12 ¢BENT 13 ¢BENT 14 ¢BENT 15 ¢BE`JT 16 ff BE`JT Ii ¢BELT 18A ff BELT IBB ¢BET 19 m O O m O O O I n N - 62.00 64.001 Lll r a F 115 SFI 1 (10 SF) I.SFJ — Q 130 SF) 20 SFI Z t 5Q IS IF) 5 110 SFI 5(40 IF) 5 110 SF) 5 f10 SF) O = pPt = w U U o5 a ~ s =h a NOTES( I. FRAMIMNG PLAN AND SUBSTRUCTURE BE SH CLARITY. 2. TEE'BRIDGE EPAIR LAYOUT- RUSSLUNIT OTSHEETs FOR REPAIR R OCATIONI FOR THE TRUSS UNITS. PLAN F (3)SPAN DECK TRUSS(UNIT 1) (3)SPAN DECK TRUSS(UNIT 2) (3)SPAN DECK TRUSS(UNIT 3) a 235'-P K' 235-M" =235.�.. R BENT 20 C BENT 21 C BENT 22 C BENT 23 C BENT 24 C BENT 25 O O O O I66-oo 69•0o 70.00 *o @ _._..r._______________—_r_____-F________--___________-______f_______________f_I_________________- ___�__._._. .fi t Vl .� J _ 2 2 J a U g g a W _ af W Z N ji . 1.FRAMIMNG PLAN AND SUBSTRUCTURE BELOW NOT SHOWN FOR CLARITY. ~ w Z 7 2.SEE'BRIDGE REPAIR LAYOUT-TRUSS UNIT"SHEETS FOR REPAIR LEGEND LOCATIONS FOR THE TRUSS UNITS. U ¢ m XQ BRIDGE REPAIR N0. (SEE REPAIR SUMMARY SHEET) PLAN U 0 0 S a ;>a S w a Z „u as o z w„ VI d g a w U AN DECK TRUSS(UNIT 3) (3)SPAN DECK TRUSS(UNIT 4) (3)SPAN DECK TRUSS(UNIT 5) W Z 2]5•-'A/z.. 235'-9[" - 326-OW2 J C BEIM 26 ZtT 21 C BEAT 28 C BENT 29 f BEAT 30 C BENT 31 of m O O m O O O / I� N V 72.00 74.00 7 O NGO N A A J (12 - F Q � ~ g g NOTES: I.FRAMIMNG PLAN AN CRE BELOW NOT SHOWN FOR CLARITY. 2.SEE"BRIDGE REPAIRSLAYOUT-TRUSS UNIT'SHEETS FOR REPAIR LOCATIONS FOR THE TRUSS UNITS. PLAN _ 4 Q BENT IBB3 ;* ..1.'..•lt 1 Q BENT 21 $ h -h Ti J STA 61+36.57 STP 61•72.17 r TOTAL UNIT LENGTH-231'4'/" ®(235 IF PER TRUSS 705 IF PER UNIT) 8 5 DA 9SPA AT 95 TB'-I%" 8 SPA AT 9'- i8'-1'/, ir] G BENT 19 PAN 2 BENT 20 SPAN J- f BEARING '' m 8 BEARING TRUSS I 112 - I�I -\—\/_:,II�-'\—._/�,II_'_\,_\_;III_1\_S_/FI,�II '\\/II 12�,S/FI�I •\—�/_-II_"'—\_/,I��—'\_—\/II_IZ__fi/_II _\—\_I Fl 12 SFI 6 ] \5S5 14 SF1 SF1 SFI12 _—_/—�I _—\:_II�r—'_—/_•�I �_ \I /�I 'SF )�bI''I w< g Aefr. y_$ \ •oo _ I _ _I_ �.I \ \ .If E")� ssl \ \ `\I ' •\I ' \I ' \I \I ' \ S) (10 SF 1; 6 F— r ��j ©lY�SFI ,1 •1 ,� •'\ZJ )a`SFI Q(S s / \ / •\ / •\ / •\ / \ / •\ / \ / •\ / (�sF, / \ I Uo SF)jd0,EA)I, a z �v \ � I_ _f21SF) _.12 6F1_ —_-1—_—_I _—_ ___ I_—_—� _— I \ \ c� �6� it}sF) I\ I\ z ocn II F)(j ©r15 5 1 12 SFI 6 6 ] O I 12 5 SFTr 11 SF T'r(2 SF)'l � < U c UO U1 U2 U3 UI US U6 Ui U. U9 TUIO U T UI2 T UI3 19 IS I6 1] U18 UIS U20 U21 22 23 U24I F W co H 12 SF) 112 SFI 12 SFI © (1 EA) U Z <W 7 PLAN z a O LEGEND LdN a Ile a s El BP fOGE PEPPIP ND. o W J SEE REPAIR SUMAARY a' SHEET FOR DETAILS) Q In aQ U WZ W (4 SFI (2 SF)(2 SFI 12 SFI 12 SF) 12 SFI (2 SF) )12 SFI (2 SFI J 6 0 W Uo UI U2 T U3 U4 i US U6 U) UB U9 UIO Uil Uig UI3 UI4 UIS UI6 Ut) UIB UI9 U20 U21 U22 U23 iU21 m � TRUSS 1 LI L2 LJ L4 L5 LB L) L IQQ L11 12 L13 L14 Lis LI) L18 119 L20 121 L22 L23 m LO L8 6L 7 ®15 SFI (5 IF LIB )12 SFI L2I -_ ©(5 SFI 12 SFI <2 SF) (2 SFI ®15 SFI ®(S SF) 6 ®(5 SFI _ O U U1 U2 UJ UI U5 U6 U) UB U9 U10 Uil U12 UI] U14 UIS UI6 U1i UIB U2 U21 U22 U21 U24 O TRUSS 2 L2 L3 L4 LS Lfi LI L11 I 03 LII L. L19 L20 L21 L22 LI L) L9 ©l5 SF) LIS LIT L23 .. _ LO I IS SFY-0SFI 12)SF) L8 12 SFI ®(5 SF)(2 IF)(2 SFI LIB © ()EAI 12 SF) ©8© 21 � (1 SF1120 EA)110 SF) © ] ©IS SF i ) 6 6 i 12 SF) W UO UI U2 U4 U5 U6 N UB U9 UI US UI2 UI3 UI4 LIS Utfi UI] UI8 U20 U21 U22 f U23 U2/ TRUSS 3 L3 L4 LS L11 L12 L13 L20 L21 _ L1 L2 L6 Li L9 LIO LII LIS LII LIB L19 L22 L23 L LB 6 12 SF) 6 12 SF) LI L24 fi SQ ® (1 EA) 12 SF114 SFI NOTE. I. DEFECTS ON TRUSS MEMBERS SHOWN ONLY. ELEVATION I BENT 21 C.BENT 24 STA 61.72.t] STA 61-07.G TOTAL _ FTOTAL UNIT LENGTH 234'-41," ®(235 EF PER TRUSS, 705 EF PER UNIT) 8 SPA AT 9'-9K _]8'-I%" 8 SPA AT 9-9% T8-I%" 8 SPOT 9'-9%- 78'-1% �.}/•' SPAN I SPAN T r SPAN 3 N` QBEARING 4 BENT 22 Q BENT 23 6 6 ]12 SFI l2 SF OBQ2 P E BEARING 12 BF) EA 6 12 SF) 12 S' 6©IS IF) 6 ISE 15 SFI 4'"s, RU I - - (�SFI S2 SFI — (2 FI (2—1 f2 SF) 2 SFII-— — —---I--- (2 SFII---- — 2 SFII SF) Iz 9 F / sB � I' /•/ -SFI /6 ER A4 65F) \ —4 —(� I2`SFI\ \ \ \ 60 00 J� �Rd�S T € I-\ I /I '\ I ,/I -\ I ,/I '\ I ,/I -\ I ,/I �\ I ,?�FT I ,/I '\ I ,/ •\ I ,/I •\ I ,/I -\ I ,/I �\ I ,/I' N \,I ' I �\,I ' I' � � // \• // \ fi / 6 // \• // \" // fi\ fi / \ Q SRUSS I3 \ // \ 12 SFI/ 12 SFI /'/ D II \ ,/�,lF ' !2 SP1\ '. \ \ /,-�,i��F' FF `\ - \,I /I�.p\ _ \,I _ \b w Imo------- [[—�` -- - 1-—- ---'-- l c�v) 7 RI 10 SF) \ �R� 6 7 77—SF0 _ E10 UI U2 1J SF U3 U4 US U6 IT U. U9 U10 Ull U12 U13 U14 UIS U16 UI] UIB U19 u20 U21 U22 U2} U2A F w m~ U p Z PLAN z Ia LEGEND W g I— �x Q n n BRIDGE EPAIII N0. W SEE REPAIR SLAM RY ~ SHEET FOR DETAILS) u Q ti c.)a w za (2 SF) 12 SFI 12 1P® (� Q 2 EF) 12 EF) 12 SF) 6 il2 SFJ ] T 12 SF)� EA J UO U1 U2 U3 U4 US Ufi U7 U8 TU9 U10 UII U12 UI3 U14 UIS UI6 ] UIB U19 U20 U21 U22 ]U23© w 07 u TRUSS I L3 L4 LS LII L12 L13 L19 L20 L21 m L2 L6 LID L14 LI L22 LI L] L9 LIS LI] 6 8] fi 12 SFI L21 LO 12 SF) <2 SFI ®15 SF)LB (265F) (26 SF) Llfi 12 SF)12 SF146$F©15 SF) L21 _ UO UI U2 U3 U4 US U6 IT UB U9 U10 UII U12 UI3 U14 U15 UI6 U17 U20 U21 U22 U23 U24 $ LtL No x� �24 TRUSS 2 L3 LI LS LI113 LI9 L211 L21LI L2L6 Li L9 LIO 6 L14 LI] LIB 6 19 SFI L22 L0 12 SF) 12 SFI 10 12 SFI 12 LI6 (2 EF)Q]6 Q(5 SFI Y� 110 SF) 7 12 SFI fi 2 SF) l2 fi (2 SF 7 ]12 SFI 3 UO V2 V3 ®U4 US U6 IT UB U9 U10 U11 U12 UIJ U14 U15 UI6 UIT UIB U20 U21 U22 U U24 �M TRUSS 3 L3 L4 LS �IF) 22 113 L14 1)8 L19 L21 L22 _ LI L6 Ll�L � LIS LI] ]ft 5F1 L23 LO ] 6 B 12 1SF) 1I6 L24 12 EF) 12 IF) <2 SF) I�IS IF) Q 15 SF) 2 SF) NOTE: 1. DEFECTS ON TRUSS MEMBERS SHOWN ONLY. 6 12 IF) ELEVATION " E BENT 24 E BENT 21 fi fill STA 61.07.00 STA 13.93 25. Fj^ i0iAL UNIT LENGTH 234'-4%" ®(235 IF PER TRUSS, 705 IF PER UNIT) j ' 8 SPA AT 9'- -78'-IVI,' 0 SPA AT 9' TB'IV 8 SPA AT 9'-9YN =T8'-I%' */0/1 SPANISPANlI r E BEARING E BE T 25 E BENT 26 ® E BEARING (S SFI EAI 11]FI l2 SF)' BUSS (1]) 12G2�1 12 SFI 2 IF) --- I---- I. ZI sF11 I \J ' 11� F/I,�j.'—\\j //.�j \ 6 /^1j /F•4^'U\'S52 ,/j^'\ /,/�j '\\ �' \ //•j'\ \ //",P</-Q°\ / j il. ljj //j \�j B jfi (5 SFI/ z,sF1�1\ I EA ( l2 SFI\ AfE. ]0.00\ a ]<2 SF) "\ ®(5 SFI \ / \ ,/ \ ,/ •\ ,/ \ ,/ \ ,/ \ ,/ \15 sFl t-tls'SF1 II a \I \ \I�EjRusr� \I \I _\I' W --- =� --- -- -- - -------= o In -'I' z N Ij�14 IF) �J(2 SF) 6 16 _—� `--�� Z[I _ —_— _ _ _ —_— _T_— I 11 SFf r )� NAP,1 ( 12 SF U (C a. MSFT—(,6 SIO Ut U2 U} W U5 U6 U] UB U9 Uf0 Ull UI2' FUI3 UII UIS UI6 FUt] U18 UIS U20 U21 U22 U23 U2/ F LJ-I m~ U Z <W PLAN z a}o LEGEND w a BECE REPAIR N SIM SEE REPAIR SUNIAAo Q N SHEET FOR GE TA ILS) as U W Z W c� a� r© FI 11 EAI ]l2 O -1 (I SF) i 12 SSF) W UI U2 U3 U9 U5 U6 Ui UB T U9 U10 U11 U12 Ull U19 UIS Ulfi UI] UIB U19 U20 U21 U22 U23 � � m � TRUSS t L3 L �LF LII L12 L13 L19 L20 L21 [() L LIOLl ](1 SFI L] L15LIL ]11 SF) 1L8 6 12 SFI LIG �®11 IF) ]F&©14 EAI ®(5 5F1 15 IF) F ry UO ( UI U2 U3 UI US U6 U] UB U9 U10 Ull UI2 U13 U14 U15 UIG UI] UIB U19 U20 U21 U22 U23 U24 TRUSS 2 L3 LI LS LI1 LI 13 L19 L20 L21 LI L2 \_M 6 L6 L] LB L9 LIG 12 fiSFl L14 L15 LI6 LIT LIB L® L23 L 4 G SW LO0 SF) I2 SF) 12 SF) 12 IF) (2 SFI 6 19 SFI ]12 SI) T 12 SFI 6 I SF) ®IS SFI T 12 SF) 8 ] 12?F) 11 EAI© (2 SF) (2 EF) UO UI U2 U3 U4 U5 UG UT U8 U9 U10 U12 U13 U14 U15 UI6 UI] U18 U19 U20 U21 U22 U23 UN N TRUSS 3 0 L° L5 L11 L12 Lll L19 L20 L21 L2 L L9 L10 L14 LIS LI] LIB }}}} LO LI LB LIG L\ L29 6 6 2 SF) (26 SFI 12 IF I (2 SF) (2 GSF) 2 IF) NOTE( 1. DEFECTS ON TRUSS MEMBERS SHOMN ONLY. ELEVATION 0.BENT 27 G BENT 308 II1 STA TI 93.93 STA 7},]9.20 r j - TOTAL UNIT LENGTH 234'-41/" ®(235 IF PER TRUSS, 70 UNIT) ga I ' 0 SPA AT 9'- -78'-1%" 8 SPA AT 9'-9}�"_]0'-II/" UN8 TSPA AT 9' -i8'-II " 1•�' SPAN I SPAN 2 PAN'3 0.BENT 28 Q BENT 29 11YvI=GI: Q BEARING Q BEARING--/! m 8® 6 6 Q TRUSS,) TI© ] A A ((I IF I SII EAI j- — ---- (2 SF{ (2 IFI)--- — - -- SFI;_12 IF - - E 1 --- —12 LA II i u Ed) aj®`6,�I :� /,/ '� // '� /,/ '� � \,�g cz sF 1;5 SFIY5 / J 4dr;44IRVE` °`00 1 F) b T — — — T —i — ,— �,- - E— E— — =k- - 'I '� I ,/I '� I ,/I '� I ,/I �� I ,/ •� I ,/I �� I ,/I '� I /I '� I / '� I ,/I '� I ./I '� I ,/I �� I ,/I' v asF�,IzSF) j. TRUSSIF)j I�alIz n 9&I 9 ] 6 & 1 SFI' 0 �-+ _ X)0 UI U2 U3 U��4I US U6 UT UB U9 BIG UI1 U12 U13 U14 UIS U16 Uli U18 U19 U20 U21 U22 U23 U24I F w m r IYSFI U Z s> PLAN z '.a LEGEND w a a s Z W J 0 BISEEREPAIR SU IAARY ~ SHEET FOR DETAILS) �a w zw (I SF) - 12 SF) (2 SF) J © 11 EAI 6 12 SF) –Ell IF) /--oUQ IFI 1©(1 EAI ] T Fy UI U2 U3 U4 US Ui UB U9 U10 U12 U13 U14 UIS UI6 Uli U18 U19 U20 U21 U. U23 U24 w EO D TRUSS 1 LL3 L4 L5 L11 L12 LIS L19 L20 L21 0] L1 2 L6 L] L9 L10 Ltd LIS LI] LIB L22 L23 T(I SF) LB LIR 1.24 _ ®(1 EAI _ M UO U1 U2 U3 U4 U5 uG UT U8 U9 U10Ul I U12 U13 U14 U15 UI6 U17 UIB U19 U20 u21 U22 U23 U24 8 O J TRUSS 2 LIO L11 LIB L19 L20 L21 L22 1T ��L L] L9LIS LI] L2LB LI6 11 iF) (I]SF) L24(2 SF)15 SF)IS SF) (2 SF) (2 SF) _ 9 0 I©l5 SF) T 0©(5 SFI ]12 SF) 6 12 SF) i 11 SFI ] ] UO Ul U2 U3 U4 US 12 L9 113 UIS U19 U21 U22 U23 R TRUSS 3 L L L4 LS Lfi LI L 12 L13 L14 LIB L19 L20 L21 L _ LI ® (I� Q1 Li L9 1�1 LIS LI] �� 6 L2} L ® l5 IF 5 SFI IS SF) LB (S F. 2 SF) Llfi 15 IFI UPS L29 IS SFI 1 6 6 II IS SF) 12 IF (PSF) AllNOTE, 1.DEFECTS ON TRUSS MEMBERS SHO-ONLY. ELEVATION " E BENT 30 E *I STA 71.79.20 fr *II 4 r TOTAL UNIT LENGTH 325-4" a 6 SPA AT II' -66-6" 2 SPA AT SPAN 14'91-29'6' 0 SPA AT I6-0' 133'-4" 4yN" SPAN I SPAN 2 _ (BEARING ( SENT 31 PANEL 8-16 145 SF TOTAL,5 IF EACH/PANEL) JV/ �I TRUSS I % - ` \ I /" I \ I /" I \ I / I'\ i I•� i�•\ "I•\ sF)\ / P'NEL 8�6 145$IF TOTeL�S SF jEACH%BA LI j •?r.oP"/" j •\, j ,z—Oust ! ,/" \ S •\, j! j,/ \. ^:ase --3� — — — /" •\ •\ it•3F)T- '\ / •\ / •\ n \ / j •\ j / j •\ / j `\/ j `� PA EL 0-6/195 If i01l�L,/5 IF€ACHJPAN5LI CI TWU�S 1®SFI 0 to a U a ILO UI U2 U] U4 US U6 UT UB U9 UIO UII U12 w W m W U PLAN ? z a W r J 9y Q 1 z GQ0 LEGEND = W v r N a 6R IOGE RIR N0. Q o Z W J ❑ SH'I DETAAILS ) Q In U UO LU U2 U3 U4 US UG U7 UB U9 DID U, U12 W Z d � Q� � J TRESS 1 W C7 NZI L2 L] L4 L5 (I IF LII L12 CO O LB LIO LT L9 PANEL 8-I6 m L8 145 IF TOTAL,5 IF EACH/PANEL) _ UO U2 U3 U4 US Ufi UT U0 U9 U10 UII U12q ,n TRUSS 2 O LI L2 L3 L4 LS Lll LI2 LO L6 11 SF) LIO L] L9 PANEL 0 ® 145 SF TOTAL, LB 5 Si EACH/PANEL) UO UI U2- U3 U4 US U6 UT U. U9 DID Ull TRUSS 5 SFI L1 L2 L3 L4 LS LII LI2 -� LO L6 LIO 9 PANEL 0-I6 LB 195 SF TOTAL,5 IF EACH/PANEL) NOTE: 1. DEFECTS ON TRUSS MEMBERS SHOWN ONLY. ELEVATION Q BENT 33 sTA 77,-06.08 '1... TOTAL UNIT LENGTH 325'-4" ' E. % B SPA AT I6'-0" 133'-4" 2 SPA AT 14'-9" 29'-6" I'- SPA AT II"-66'-6" SPAN 2 SPAN I SPAN 3 /1/1a-i PdNEL 8-i6 Q BEARING A.BENT 32 /V m 4 SF TOTAL,5 SF EdON/PANEL), TRUSS Ii �® 1 SFI © a X FI (I 5F� - (I - 5 —_—__IS 5i e 6 e •\/• PatSEL B6/145 sk TOTAF,/s SFacxieaN�u j \,/ \ •/ \ -/ \• •/ 's /, /, .\ ./T6•ao 4&tl44s§�1WE: \,i /� i \ i ,/� � \, i,/� j ao I - ^asm m PA EL.-16/14S SF iCT6FADH/A71-1 USS < w� L,] I z o N O n e U EC U12 Ui3 U14 UIS U16 U17 UI8 LIS U20 U21 -U22 U23 Utam W H PLAN z aw a o a >» � z �ao LEGEND a i o Z W J H BRIDGE EPAIR F Q SEE RFORIp SUMAARY u Q Q SHEET DETAILS) N 12 U?(/ uz SFI U CL U12 UI} U15 U16 UIi III. U U20U2] U24 Q W D J� sFl TRUSS 1 W 1\ 71 i (D L12 L13 L14 11 SFI Z---L18 1 SF LI9 L20 21 iL22 L23 1 SF m LIS LIT 15 IF) J LIS U12 U13 U14 U15 U16 UIi III. U19 U20U21 U22 U2] U24 v: TRUSS L12 L13 I.I. L20 L21 L22 L23 L. L10 L24 LIS LIi �- LI6 - U13 U14 U15 .16 U17 U18 UI9 U20 U21 U22 U23 U24 TRUSS 3 :LI13 L LIS L20 L21 L22 2] o r 1 L14 LIB L24 - FLlS T 00 LIB NOTE: 1.DEFECTS ON TRUSS MEMBERS SHOWN ONLY. ELEVATION Q BENT 33 g BENT J6 / \ STA 71-06.08 STA 79J-41.56 a TOTAL UNIT LENGTH 234'-4/" ®(235 IF PER TRUSS,705 IF PER UNIT) m 8 SPA AT 9'- TB'-I� 0 SPA AT 9'- •)0'-1%" 8 SPA Ai 9'-94" 7-11" 11 rjl(4• SPAN I SPAN 2 SPAN Q BENT 34 TL BENT 35 P '�E BEARING Q BEARINGJI' — (25 SF) — 12 SFIIf S-2 iFl I j )S3 SF) 2 SFI- -- ----�- _ _-_�_-__ _ �--------k-- --- - -� —�-- -- •- -- — -n •I o H ISI i i i i i i i i i i i i �s 0\IF)' ` 3F1 �,I 78'0Q I ( dell,AVE. I jl il ' / /"i I �� I ,i �� Ir ,i I �� I i l •� I /,i / /,i I �� � 25"' x, \ � `� �, � � � � IMD 52Is o_Ln I,� ) 126 6 -IIql 1 ) I2 11 F QSF F) F ) T _ UO UI F U2 U] U4 U5 U6 UT U8 U9 U10 U11. U12 U13 U19 UIS UI6 UI) U16 U19 U20 U21 U22,SF U23 U24 F W m - U S z W 70)` PLAN z a LEGEND BR[OGE EPAIR N0, o W J SEE REPAIR SUA9AARY SHEET FOR DETAILS) Q U)H QQ U W z LLI 6&Q) (1 SFI J aw 12 SF-IF) W UO U, U2 U3 U4 US U6 U) UB U9 Ul0 Ut1 U12 U13 UTA UIS UI6 UI) U18 U19 U20 U21 U22 U23 U24 m � TRUSS LJ 19 L LII L LI3 L19 L20 L21 m L2 L6 LIO L19 L16 L22 LI 6(25 SFI LT L9 6& ) LIS LIT L23 LO 125 IF T(25 SF) (2®F) LB l2 SF)12❑SFI 12 IFI L16 L24 i(2 SFI S U0 N ffi= UO U1 U2 U] U9 US U6 U] VB V9 VIO Uil U12 U13 UI4 UI5 UI6 Ut) UIB 019 U10 U21 U22 U23 V24 � TRUSS 2 6L 2 L3 L4 15 L6 LIO LII L12 L13 L14 L16 L19 L20 L21 L22 LI LT L9 LIS LI) L23 LO LB L16 L21 SW 12 SF) 12 SF) 12 SFI 12 S-2 SF) (2 SF) 12 IF) 1 SFI (2 IF ._ rffl U2 )U3 UO 6 US T U6 UT UB U9 U10 O11 U13 U14 U15 U16 �U1(T SF)UIB U19 U20 )U21 2)U22 U23 U24 TRUSS 3 L] L 15 LIO L11 L12 L13 L14 119 L20 L21 L22 Ll 12 L6 L) L9 ) 1 LIS LIT L�—®15 IF L23 LO ) LB 12 IF I (2 IF)) LIG L29 2 SF) NOTE, I.DEFECTS ON TRUSS MEMBERS SHOWN ONLY. 4 ELEVATION FT ¢BENT 36 STA 791.41.86 `g I" STA 111 SPAN BENT 37 3 77.47 r TOTAL UNIT LENGTH 2]9'-4/" ®1235 SF PER TRUSS, 705 SF PER UNIT) I SPA AT 9' ¢ SPA ¢BENT 38 d� - TB'-I'/" 0 SPA AT 9'- 78'-119" 8 SPA AT 9'-HR SPAN I N 2 TV/ m ¢BEARING ¢OEARINGA yy ¢TRUSS 1 i T .. g ao 15FI I I.iFI Sm- KID,/ \� / I \ / I tl54IEp AVC,I / i \e�,e no sFll ------- I •\ I /,/I '\ I /,/I '\ I /,/I \ I /,/ \ I /,/I \ I /,/I •\ I /,/I '\ I /,/ '\ I /,/I \ I •\ / \ ,/ \ ,/ •\ / •\ ,/ \ ,/ \ ,/ \ ,/ •\ ,/ •\ II a z TRUSS II z LA I'D IIo SF) IIo sF1 (10 SF) < ) � ' 0 ::) rYrt M F /iil tM m _ UO UI 112 U3 114 US 116 UT 118 119 U10 1111 U12 U13 U14 U15 U16 U17 U18 1119 U20 U21 U22 U23 UA U PLAN z a LEGEND u n BRIDGE REPAIR N0. o Z W J El )SEE REPAIR$UAMARY � SHEET FOR DETAILS) Q N rv-� � QQ U W Z W U Q 7 (10 SF 1 i 110 SF) � J UO UI U2 113 U4 US 116 U7 UB U9 1110 UII U12 U13 U14 UIS U17 U18 1119 U20 1121 U22 U23 1124 W m U TRUSS I 0 L] 14 LS LII L12 L13 L19 L20 L21 L2 LG LIO L14 L18 1-22 m LI L7 L9 LIS L17 L23 LO L8 LI6 L24 4 N= UO UI 112 U3 U4 U5 116 UT UB 119 1110 UII 1112 U13 1111 1115 LIG UIT UIB 1119 U20 U21 U22 U23 U24 O TRUSS Z L3 14 LS LII L12 L13 L19 L20 L21 L2 L6 LIO L14 LIB L22 LI L7 L9 LIS LI7 L23 EG LO LB LI6 ® ;24 10 SF) 110 SF) (lo SF1 (IO SFI (IO EF) (10 SF) 110 SF)(0 SFI _ 110 SF) 7 110 SF1 7 110 SFI 7 UO UI U2 U] 7U6 U7 UB U9 1110 UII 1112 TU13 TUI9 UI6 U17 Ul. U19 71120 7U21 U22 7U23 U24 il � TRUSS 3 LII L12 LI3 L19 L20 L21 _ LI L2 9 LL6 L7 L9 LIO L14 L15 Lli LIB L22 L3 LS L23 LO LB LI6 L24 - NOTE: I.DEFECTS ON TRUSS MEMBERS SHOWN ONLY. ? ELEVATION FR R '1 ONRE LANE[ E ALLOW E TO FIC TRAFFIC FROM M. 0 SUBMIT IL CONTROL L OL COSI A . *1/ IS SUBSIDIARY TO OVERLdY COST, 2. PRIOR NO DEC S OWNER.TEEM 354 ISR T DAMAGE THE TO TIE CONCHETE DEC M 1 G IS RESPONSIBLE CAN EP rrH HCCo2DdNCE lLL 0 43'-0' 52'0 REINFORCED REINFED CONCRETE 3 F PR VIDE PARTIAL 14�%I Cal} CONCRETE A.I.T.SPANAC,I. E 1 E E EP I L INHMTgR 3 ABUT.SPAN � 5 14 DEP ERLL 111111F LANE BUTTONS S 29 6009 G ABUT. 1 C BENT 2 (BENT 43 Q BENT 49 E ABUT.95 4 RER IOONSTHE NEW AR R TO STANDARB —2 12VEFORT INSAAILG.MATCH ESUBTIII LFI-R COST OF T AND CATION IS s .RY TO TH_OVERLAY COST. 5'-0'SIDEWALK 5. E F EXISTING R LUDING DIMENSIONS, `� € RALE REPLACEMENT M Ni L Inn i�r T I SHELL FPADE, AND CO'OR. SFF As C ANS F CONTRACTOR E R TTTAILS. IELD VERIFY F DE-n:LEO DIMENSIONS dRF rv0i AVd ILABLE. 5 C SHOP DRAWING SHALL BE SIIBMT-ED PRIOR TO FABRICATION FOR APPROVAL. OF REMOVAL ANO IN d,L IN;TIE RAILING WIFE BE PAID UNDER ITEMS C. 84.00 W ' 495 PND 450.RESPECT IVES Y. —_—_—_ _ _ 40'-0•ROADWAY Ba 5'-0'SIDEWALK U Q REPLACE OVERLAY ON BOTH ABUTMENT SPAN%WITH F- C7 H TIPLE-LAYER POLYMER OVERLAY IRE, DOT ITEM 4391 z p Q OQ W I p W OVERLAY REPLACEMENT PLAN z NIS S Q Ll '> z Ga Ld HK W as z w� o Q v)J u Q le U W Z W p J� CO pry (BENT 2T }1pN q.BENT 39A (BENT 39B DOWNSNiYE�TI—�—UPSH�ASTI DGWNSTATION(WEST)—1--UPSTATION(EAST) I =� (POST vT (POST v6 (POST a5 (POST v2 (POST (POST v23 (POST v22 (MST v21 (POST v20 (POST v3 (POST v2 (POST v1i _ Imo'—_ - Co N ' 'P4NEL e8 P1NEL v5\ PANEL vl PANEL v22 PANEL v21 I I j P1NEL v20J I I PANEL v2 I PANEL vl i A Of (\\ EL v2 �W / `REPLACE PANELS P5 AND P6 AND POST P6 RIPPLAIE PANELS— REPLACE PAN S 21,dND POST 21 a� NOTE, 1.ELEVATION VIEW OF THE OUTSIDE FACE OF TIE RAIL NOTE, 1.ELEVATION VIEW OF THE INSIDE FACE OF THE RAIL SOUTH RAIL REPAIR LOCATION NORTH RAIL REPAIR LOCATION wt 2 STEEL RAILING REPLACEMENT DETAILS ITS R EMBVE RUST FROM ANYg PARTIALLY EXPOSED REBAR 4o I" ""':""""""'�'i 90 DEGREE MINI fTYPI IF M R HALF REB REMOVE DAMAGED/LOOSE MATERIAL ' I CROSS-SECTION IS EXPOSED, NEN GOWN TO SOUND CONCRETE ° 1 ,' ~ ly m REMOVE CONCRETE FROM AROUND THE BAR PER THE TXDOT CONCRETER EPAIR MANUAL EXISTING CONCRETE Nr----------- 0 __-_______ 'a' Io/IEO2Ni OUTLINE OF SPALLED ANO/OH I DELAMINATED CONCRETE m IGENT IFIEO BY SOUNDING i LIMITS OF CLEANLY SAWCUT $5p a D REPAIRED AREA LIMITS OF VISIBLE // ££� 5 SPA LLED AND/OR I- / E%IST ING SPALLED ppTCH EO AND/OR < �� DELAMINATED AEA -- ---- EXISTING CONCRETE SURfd<E IMAY BE HORIZ, ON C ETE SURFACE DELAMINATED ARE4 WITH 6-MINIMUM'(TYP) ERTICAL OR OVERHEABI -Y Nlpii OF EPALLEO REPAIR MORTAR LIMITS OF CLEANLY E COATED z OAKUPT ANO REPAIRED CONSOEED IDENTIFIED B [NG VERTICAL OR OVERHEAD SURFACE - TYPICAL CONCRETE REPAIR PLAN 6"MIN(TYR) of CONCRETE(SURFACE TE%TORE N $HALL MATCH EXI ST ING( N.I.S ~ - CONCRETE REPAIR NOTES: CONCRETE REPAIR SECTION W a I. CONTRACTOR SHALL REPsII DAMAGED CONCRETE AT THE LOCATIONS NOTED ON N T 5 O W E LAN$. OCATIO R E A U , ARE BASED ON INFORMATION PROVIDED Z O CJ BY BRIDGE COND:—N4IS EP A A ELY O OESSMENT R NTRAC H LL -OI O NOTIFY ENGINEER IF NUNBER OF LOCA PEOU IR ING REIR OR THE m ti EXTENT OF DAMAGE SH xl ON THE PLANS DIFFER FROM ACTUAL CONDITIONS. 2.CONTRACTOR SHALL INCLUCC J T COSTS FOR ALL REPAIR METHODS WITH BID W Q N QUANTITIES CHANCE DURING CONSTRUCTION. O d 3.CONCRETE REPAIR S CY WITH T%DOT SPECIFICATION N ITEM 429Z CONCRETE STRUCTURE REPA.' Q 4.COTRAA—ATHALL FOUOWTHPROCEDURES OUTLINED IN THE T%DOQ RCRETE'CHAIR N _ -ER ALL CONCRETE .R WOHUNLESS dPFOVED 11EASE. W> WCJC O F- ICY J IN A001 TLCN - HEMP OV IN THE 7NDON REPAIR MANUAL", o ti W Q FOLLOW AIL AaAC.V JATI CNS (DED BY E.AIR PCUUC ~d MANUFACTURERECO Q /n In G.SIA LED EAS S:- .lI ZED BASED ON F'x ERCTT OF u Q DAMAGE PER THE - _ - O ' in CONCRETE REPAI RMA EMINORSAN = 9 5 PER W Z PROCEDURES OU T_I N-LININ 'I C,I IN_F AFTER}OF THE C7 Q Q MANUAL. NO MA.,CH SPALLS AIL ANTICIPATE DEC m J O l FOR MINOR SP N ACC0 CANCL WITH TNGGT 'i EPO%IES AND Z ADHESIVES" MATERIAL 5III _EPDXY Q HALL A TON V IAL m PRODUCER LIST I VIL)oFORVEPPDXIESRAND DHESIVES MAT E BE USED. n 8. FOR INTERNE D:n-E SPALLS: IN ACCORDANCE WITH T 4655 CONCRETE TEP TRIALS",RE AIR MATERIALS s L BESA CEMENT(T'OJSR MOflTAR FOR RAPID VERTICAL 0 MATERIAL ORA LICATI ONS iHI CE. - R REPAIREXCEEDING 2 _ MA-EPIALS-:STED ON TIE ATEBRIAL PRODUCER .ST ...PLI FJk�JN_RE IE RE AIR—MALS MA BE LSED. 9 __ PROREDURES SHALL B TO EN�7 "AICI LIGATION. IT Es _III p '^ AILI n T F R EACH aEPA R a ODUCi IS INTENDED T p. 11. TILLR F E?Oo'�COMPOUND AND ANY ADDED AGGREGATES SHALLO MATCHE _ DEMONSTRATE OVNONEE%ISiINGECONCRETE PAND i OBTAIN APPROVAL PRICR-0 BEC INN( CONCRETE ON REPAIRS. I, - NREPAIR OR REPLACE BEFECTIVE AREAS AN PATCH - - T LOSE AFTER CURING,Ai TxE<Oq TRACTOR'S EXPENSE IN SACH NC ITN %OOT PECIFICAiI ON ITEM 29"CONCRETE STRUETMflE REPIIE'.A GENERAL NOTES C TRUSS I E .USE] C TRpCROB SHALL BLAST CLEAN TO REN"E 1 I LANCASTER AVE& I BUST N AINT OFF OF STEEL TRU55 UNIT r TRUSS 2 MEMBERS SPECIFIED ON REPAIR LAYOUT 9gl CHORDS,IGUEREiMRLATES,AID VVERTICAL AND DIAGONALS,AND BRAGINGS.ONCE PAINT 1 ————————————————————————— ---1 AND RUST APE REMOVED,REPAINT THE I ——— ———— TEEL ITEMEIIfiWICLEANSTEM4 III PER REPAINTING IS PALO UNDER ITEM 116. lo/ly�pali 2.CONTRACTOR SHALL P TEMPORARY i SCAFFOLDING RRSTFMROR PROVIDE WORKING LATFOAM 0 P I I DUST, ND OixEHVpEB LL1 NG $$ COSTHOFGSCAFFFOL00IIG O qIT 5YSTEM W E ' = AINT LFA R INTO S THEWATER6 IS SUBSIDIARY R n T J.TRUSS MEMBER BEPA[q NGLUDINO 4% ° i RUST RTEUIMEMBEFS STB.I GHTETDISI NG OF t R W6 REPLACEMENT IS PAS NAUNDERMIiFM ET F CLEANING EALING �el`.•- TERAIRED Ed IS SUBSIDIARY TO S BOTTOM CHORDS SHALL BE 1 TRU WASHED UNTIL FREE OF DEBRIS, 1 PAARTICULARLY RODENT FECES.ALL THREE N I TUHHI151101 CHORDS IILLD NTRADT FED J SHALL PROTECT TIIE DEBRIS AN'WATER FRC'FALLING INTO THE WATER ANO f' GRCJND BELOW.PRESSURE WISH SHALL NOT U Q BLAST C`MM` N AND REPAINT DAMAGE THE EX'ST ING PAINT IN ANY FORM. Q H STEELTTq SSIUNITS 1-i ISPAIDUNDER ITEMAS99BOii0M CHORDS W W ISEE NOiiiiir A2) Z Q cl a a O LY; _ wt _ a U m Q I I w W m a U W AE. Z a W cr Q >> z a� wItp w� Ln a In � a NOTES T—ORARY SCAFFOLDING U N STEEL TRUSS UNIT 5 SHOWN.FEICR TO TYPICAL SECTION SHEETS FOR OTHER UNITS. TEM BY CONTRACTOR W Z 2. SEE BRIDGE RUN LAYOUT SHEETS FOR MEMBERS AND THEIR LOCATIONS TO BE CLEANED AND REPAINTED. (SEE GENERAL NOTE-2) "r D J J TYPICAL TRUSS REPAIR SECTION m w ITSknW OPENING HOLES E%[STING H AND SEALEDNED RIVETS A3250GAOVANI ZED DIAMETER i.MATCH K RuSi REPAIR NOTES - ---4 HOLE--— -- METER SII VERs[CAL IAC(VETS THAT INTERFERE WIiN THE WORK OR ARE - MEMBEfl P ETERIORATED,OEFORFED, FAILED SHALL BE - - N REMOVED'SEE RIVET REPLACEMENT DE TAIL. GUSSET R 2'TOCTIERUST DEPTH OF SEPARATION,By POWER TOOL CLEANING EXISTING PROPOSED BOTTOM CHORDS 3 PAEASRUETWISMRFESRNTWTSMPROHI BITE'.ELEMENTS WHERE TRUll BE PRESSURE WASHED E s EMovAL,THE REPAIR AgEA RIVET REPLACEMENT DETAIL E:GENERAL NOTE 11 1'SHALL BE'R'ED BY APPLYING ARTIFICIAL HEAT UNTIL D I STORI FA IMEMDERS OF EAPPLYING AACE RTIFICIALEHEATCSHALLSOEFAPPflOVEDTB00 B4LX i0 OR IG[NAL THE ENGINEER. IF TORCHES ARE USED,THE COI ACTOR ITS PoSI TION SHALL OEMONSTR4TE i0 THE ENGINTER T TH A doal N BE DRHAT WITHOUT DAMAGING E STEEL,OR I. RTOL.gID xIVYTS WH A32R ALVANIZED BOLTS.MATCH—STING DIAMETER.REFER COATING IS TO REMAIN. I REPAIR LA i SHEETS OR LOCATIONS. TRUSS LOWER CX RUST BETWEEN 6 iOATHEIRA0RIGI NALLCONF CORER., TRUSS ESHALLCX 2. RE v DA ED RIVETS FOUND N T SHOWN ON THE BRIDGE REPAIR T PLAC=AN ADDITIONAL MAG CHORD MEMBEq MEMBER AND GUSSET 2 MEET ALL REOUI REMENTS SPECIFIED IN ITEM TBI SUCH APFROVA CONTRACTOR SHALL NOT THE ENGINEER RRIOR i0 THE REPLACEMENT FOR -— AS HEAiIAC ATD COOLING PROCESS, TEMPERATURE L' d4IE5l LIMITS, ND OLERANCES. I. PAC' BEWEEN TRUSS CHORD MEMBER AND GUSSET PLATE 3. REPLACE RI i ERFERE WITH THE WORN OF TRUSS MEMBER REPAIR.CONTRACTOR _ SHOWNpUSIMI L AR AT OTHER LOCATIONS. 6. IMMEDIATELY AFTER THE SURFACE HAS BEEN CRIED, SHALL c'I Fv TxEMErvGIFEEq PgIOR TO THE REP CEMENT FOR APPROVAL. 2. RIVETS NOT SHOWN FOR CLARITY. APPLT AN EPOAv E SEALER CONY NaCi OH�nALL HcvLaCE ONLY ONE RIVET AT A TIME. PERLMANNFACTURER'SAREC RECOMMENDAIRA TIONS. AND APPLIED 1 TYPICAL T RUS S MEMBER REPAIR S. STEELIMEMBEPSTAROUNDLIHE OPENING DURINGODRIILLING.SNALL NOT DAMAGE THE CONNECTING I. AFTER THE SEALER AS DRIED [NSTALL H ITS STRENGTH BOLTS. SEE RIVET M1EPLACEMENiEDETA IL. 6. C ANP DEBRIS ANO APPLY EPDXY PENETRATING SEALER �.o PRIOR TOE INSTALL[NG NEWEBOL iS. GENERAL NOTES: f COLUMN I EPA IR AREA INC ND IiYP) DERLAMINATED CON 11 FORWARD C BENT CAP 2.F W R AND f'" � *li FORWAR BENT. REPAIR IIS RE NS i p LOOKING F --__ --L-_-I ---I __ I 1-__ __ 3.PSL PA SIAL RE a i E'i ILS r r-- —T - Rnn Flo Fp A SREET. - - - _ BACK IN QUANTITIES s1ALL NOT BE m CONCRETE BENT CAP 4 INNCCIA'ASEO WITHOUT ENGINEER'S CONCRETE COLUMN OVAL ^ BELOW Y OF 3) PLAN NTS n �S r5 Y�y BENT 9y<FW, 16 IF; BENT 4 (BX, 4 SE) PRBC BENT (BK, 10 SF) _ I H �SENT 11(FW, 10 SF) BENT 2'BX, 5 SF) U BENT 4 BK, SF) Q BENT 5 IBX 10 SW BENT IBA(4K,3F)0 SFI F- 0(n BENT 36(BK,5 SFI Z D J O < U Of Q _ m� zo BBENT iB1INE.5 SF' ~ U BENT 16 IFF, 10 SEI BENT JRA(BK, IB SFI Z a W BENT 5 IBK, 10 SF) BENT T W, 5 RF) Q ?> BENT 30 BK,5 SF) Z V Q ti BENEN122(SKK 10 SF) a W Q a u BT IFW,4 SFI ~ �cr 0- GENT ENT 3 IBK,5 SFI LLo W W BENT 6 IBK, 1C SFI BENT 4 IBK, I FI H ENT 5 IBK, 10 SFI BENT 10(BK, 10 SF)—/ BENT II IBK, IS SFI Q N BENT 6 IBK, 5 SFI BENT] IBK, 15 SF) u Q~ BENT 0(BK, I U Z W Z W 7 Q LO o J BENT]fBK, 5 SF) BENT 5(BK, 10 SF) G_ BENT 12 fBK 1 SF) m BENT BA IBk,0GSFFI BENT 33 IBK, I ESTIMATED SPALL QUANTITY MINOR SPALL INTERMEDIATE SPALL (NEAT EPDXY) )EPDXY MORTAR) ESTIMATED ACATRUAL ESTIMATED ACTUAL BENT SPALL AREA EA INSPECTOR BENT SPA 15 AREA AR AID INSPECTOR N0. E REPAIRED VERIFICATION NO. F REPAIRED VERIFICATION 33 S 2 0 3 5 0 44 5 40 6 15 29 8 15 10 0 ELEVATION 11 15 _ NTS 12 20 6 25 t] 40 IBA 50 36 38 5 E� 39A 16 .5: REFLECTIVE RAISED PAVEMENT MARKERS - m iF is SPECIFICATIONS rmg FOR VEHICLE POSITIONING GUIDANCE "L-pec----- —OMS4200 6#. FSIVES OMS 6 0. N I SIVE FOR PAVEMENT MANS_III P C SEE DETAIL A SEE RETAIL"D" C^f Synme er InaEllR�T2U� TYR,a-A-A �/ e er ne arcane „N�vr PE DNL.+ RrcIVGS.uu,°za° 0 o a o n o C°minNws.w war err rwn is f Tro 11 A A - DR ,r—qR' .1.—AO• 1I q0'-1 Rai nu CENTERLINE FOR ALL TWO LANE ROADWAYS aTYM G CENTERLINE AND LANE LINES FOR TWO-WAY LEFT TURN LANE A A Type II-A-A SEE AIL C n C� f Tr°e I-G er 11-C-R suffOCeor ze Type I (Top Viewl ISO.1-C ar 11-C-a =µ CENTERLINE & rLANE LINES 0*.1—Tm I-C,°i°r 5 FOR FOUR LANE TWO-WAY HIGHWAYS ee Rim:eereon°Oeo=roarra�r`ere. ° o o o e0 0 _i A A T-11 41 In �T'- I LANE LINES FOR ONE-WAY ROADWAY (NON-FREEWAY FACILITIES) Serf°Ce Ze A a Type LT-C-R Type Ir (Top View) A Y1T1T1- ;� ra£t'crarw a e I`— T, ow°ra wrong war f otilc. a" _ T+.- roware norma r 1 Tyoe 11-A-A -2 25^mm DETAIL "A" DETAIL "B" DETAIL "C" J 0 0 D D GENERAL NOTES Awasi ve CENTER OR EDGEL INE1. wrra°e SECTION A R o o D R o 0 0 0 0 0 0 o f�iePSa°ea.n i I..cairn am m[a.ar eeAween IGS 30 BROKEN LANE LINE z. De wrNer RAISED PAVEMENT MARKERS P�oce0 io ane side of MeV ongi ND�rpi` REFLECTORIZED PROFILE PATTERN DETAIL Texas Depart—,t of T—portotJon USING REFLECTIVE PROFILE PAVEIENT MARKINGS rrmno a onou omAro, Iz•cr �R•.�• POSITION GUIDANCE USING sA.,y. sr RAISED MARKERS f°500 mil DR 06 �y00 NP1 (t� � y RR A REFLECTORIZED PROFILE 101- eNai r a.N` a MARKINGS Ne?Ont o` °°arens. z ra PM(2)-1 2 A'EDGE LINE OR CENTERLINE OPTIONAL G'EDGE LINE OR CENTERLINE q LANE LINE OPTIONAL 6 LANE LINE ®r.00 n r Aa,i,s NOTE: 206