HomeMy WebLinkAboutContract 47844-A3 AMENDMENT No. 3 CITY SECRETARY f -fi� CONTRACT N0. TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Stream Water Group, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 47844, (the CONTRACT) which was authorized by M&C C-27718 on the 17th day of May, 2016 in the amount of $329,450 .00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $135,502 .00 which was authorized by (M&C C-27836) on August 2 , 2016 and Amendment No. 2 in the amount of $146,784 . 00 authorized August 29, 2017, (M&C C-28351) ; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement, Contract 2016, WSM- A; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated May 9, 2018, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $70,397 .00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $682,133 .00 . LOFFICIALCORDTARYPage -1- TX 3 . A11 other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER �^ Stream Water Group, Inc. Jesus J. Chapa Shamsul Arefin, P.E. Assistant City Manager President _l 12 DATE: � � ` DATE: 16 APPROVAL RECOMMENDED: Christopher Harder, P.E. Acting Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Emplo ee Title: Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A 9E"'4' Date: N/A Douglas W. Black Senior Assistant City Attorn F00-v- :ATTEST: j � :0 * OFFICIAL RECORD ary J. ser CITY SECRETARY City Secretary WORTH,TX Page -2- - - (a @ o -o May 9,2018 Tony Sholola,P.E. Engineering Manager Water Department Engineering and Capital Improvements City of Fort Worth,200 Texas St,Fort Worth,TX 76102 RE: Contract Amendment No.3,Water and Sanitary Sewer Replacement Contract 2016 WSM-A,City Project No.02693 Dear Mr.Sholola: The following is a summary of additional work requested for Amendment No.3 to the above referenced project,per recent design meetings with City of Fort Worth Water Department officials. Additional work requested forAmendment No.3.Contract • Additional Sewer Improvement design,prepared bid quantity,location maps,EOPCC,bid proposal and necessary update for the following location along Tex Blvd 1. L-4391(503 LF of 8"SS, 2 Plan/Profile Sheet),Line E,Sheets 43-44 2. L-4392(573 LF of 8"SS,2 Plan/Profile Sheet),Line F,Sheets 45-46 3. L-3661(1,365 LF of 8"SS,4 Plan/Profile Sheet),Line G,Sheets 47-50 4. L-5531R(353 LF of 8"SS, 1 Plan Sheet),Line M,Sheet 55 5. Update Location Maps(Sheet 5) 6. Prepared Bid Quantity and EOPCC • Additional Pavement Design,prepared bid quantity,location maps,location maps, EOPCC and updates all necessary water plan sheets for the following location- 1. Tex Blvd(From Greenway Rd to W.Elizabeth Lane)-1 Plan/Profile sheet,Sheet 59 2. Ridglea Ave(Malvey Ave to Darwood Ave and Locke Ave to Kenwick Ave)-2 Plan/Profile Sheets, Sheets 70-71 3. Curzon Ave(Lackland Rd to Sappington PI, Olive PI to Mary's Ln,and Bigham Blvd to Edghill Rd)-3 Plan/Profile Sheets and 1 Plan view Sheet,Sheets 72-75 4. Garland Ave(Sappington PI to Bigham Blvd)-3 Plan/Profile Sheets and 1 Plan view Sheet,Sheets 76-79 5. W.Elizabeth Lane(From Olive PI to Tex Blvd)-2 Plan/Profile Sheets,Sheets 80-81 Additional Engineer's Opinion of Probable Construction Cost for the above work(Amendment 3)is as follows(see Exhibit B-4):- Contract 1—EOPCC 100%,50150,and Concrete Pavement Replacement for Water tine Improvements $1,623,824 Contract 1 —EOPCC Sanitary Sewer Improvements $ 890,695 Contract 1 —EOPCC 50/50 of Asphalt Paving Rehab(Amend 3, Unit 4) $ 697,902 Amendment 3 Contract 1 Additional Water,Sewer&Paving Improvements EOPCC $3,212,421 Amendment No.3 Amount(see Exhibit B-3C): Additional Sewer Improvements $39,500.00 Additional Water Improvements $30,897.00 Total Amendment No.3 $70,397.00 The current status of the contract(Contract 1 and Contract 2)between Stream Water Group,Inc and City of Fort Worth for the above referenced project is as follows: Original Contract Amount= $329,450.00 Amendment No.1 Amount= $135,502.00 Amendment No.2 Amount= $146,784.00 Amendment No.3 Amount= $ 70,397.00 Total Contract Amount including Amendments= $682,133.00 6737 Brentwood Stair Rd • Suite 230 o Fort Worth, PX 7611? • Phone: 817.446.4171 e Fax: 817.446.4335 www. streamwatergroup.com o a Tony Sholola,P.E. RE: Contract Amendment No.3,Water and Sanitary Sewer Replacement Contract 2016 WSM-A,City Project No.02693 May 9,2018 Page 2 Contract 1 —EOPCC Water Line Improvements(Original contract) $2,811,807 Contract 1—EOPCC 100%,50/50,and Concrete Pavement Replacement for Water Line Improvements(Amend 3) $ 1,623,824 Contract 1 —EOPCC Sanitary Sewer Improvements(original contract) $ 594,483 Contract 1 —EOPCC Sanitary Sewer Improvements(Amend 3) $ 890,695 Contract 1 —EOPCC Paving Improvements(Amendment 1) $3,271,411 Contract 1 —EOPCC Paving Rehab(Amend 3, Unit 4) $ 697,902 Contract 1 Total Water,Sewer&Paving Improvements EOPCC $9,890,122 Contract 1 Total Water,Sewer&Paving Improvements EOPCC(Including Amendments) $9,890,122 Contract 2 Total Water,Sewer&Paving Improvements EOPCC(Including Amendments) $4,838,881 Total Contract(1&2)EOPCC Water,Sewer,&Paving Improvements $14,729,003 Please process Amendment No.3,to the Engineering Design Services:Water and Sanitary Sewer Replacement Contract 2016 WSM-A,City Project No.02693 in the amount of$70,397.00. If you require any additional information or have any questions regarding this matter,please give me a call at(817)4464171 ext. 106.We appreciate the opportunity to provide engineering design services for the City of Fort Worth. Sincerely, Stream Water Group,Inc. Shamsul Arefin,P.E.,CFM President Copy:File 6737 Brentwood Stair Rd • Suite 230 • Fort worth, TX 76112 o Phonc: 817.446.4171 o Fax: 817.446.4335 wv,'w. streamwater.aroup.com EXHIBIT B-3C(Amendment No.3) (SUPPLEMENT TO ATTACHMENT B)-Level of Effort Supplement TASKIHOUR BREAKDOWN Design Services for Engineering Design Services:Water and Sanitary Sewer Replacement Contract 2016,WSM-A City of Fort Worth Project No.02693(Amendment No.3) Basis for Labor(hours) Exponse Total Task No. Task Description Hour Unit Project Project Project EIT CADD Administrative Total Labor Subconsultant Expense Task Sub Total Estimate Director Mana er En ine Cost Prlme Travel Reproduction Cost !ef 1 t MWBE T—o Project Management 8 1 1 0 0 0 $1,475 $0 $o $e $0 $0 - $1,475 1.1 Managing the Team 1.1.1 internal Team Meetings 0 Ea 0 0 D 0 0 0 $0 $0 $0 1.1.2 ONGG - 1 Ea 8 0 $1,200 $0 $1,200 1.2 Communications and Reporting 1.2.1 Pre-Design Coordination Meeting 1 Ea 1 1 $275 $0 $0 $275 1.2.2 Quarterly Project Update Meetings 3 Ea D $0 $0 $0 $D 1.2.3 Prepare Baseline Schedule 0 Ea $0 $0 $0 $D 1.2.4 repare on yProgress epc s one D 0 0 0 1.2.5 p ae on y Scuiacuie _ one 0 11 1.2.6 Prepare Monthly MWBE Reports 12 Monthly 0 0 $0 $0 $0 $0 1.2.T nvacing on y 0 D D D 0 0 2.0 Conceptual Design 30-Percent 20 47 T1 63 8 $2413T0 $0 $0 50 $0 $0 $24,370 2.1 Data Collection 1 Ea 0 1 0 0 $125 $0 $0 $125 Communication and coordinate with other 2.2 agencies and City Departments 1 Ea 1 0 0. 0 $150 $0 $150 2..3 Qty e—w Meeting 0 Ea 0 0 $0 $0 $0 $0 2.4 Conceptual Design Package _ 2.4.1 Cover Sheet Ea 0 0 0 0 $0 $0 $0 Develop Ian Sheets With onceptual 2.4.2 Layout 21 Sheet 21 42 63 53 $22,675 $0 $0 $22,575 Develop Conceptual Estimate o Probable 2A.3 Construction Cost 1 Ea 4 4 B 6 $2,420 $0 $2,420 Submit Conceptual Design to Cny For 2.4.4 Review 1 Ea 0 $0 $0 $0 $0 $D Conduct Review eeling w City Develop 2.4.5 Minutes end action Items 1 Ea 0. 0 $0 $0 $0 $0 Receive Permission to Proceed with 2.4.6 Preliminary Design 0 Ea 0 $0 $0 $0 3.0 Prel minary Design(60 Percent) 1 24 70 73 129 13 $35,390 $0 $0 $0 $0 $0 $35,390 Devaiopmenl of reliminary esign 3.1 Drawings and Specifications $0 $0 3.1.1 Revise Cover Sheet D Ea 0 0 $0 $0 $0 3.1.2 Develop Index 1 Ea 0 1 $105 $D $105 —1.1-3 D-00P General Notes 0 Ea 0 0 $0 $0 $0 Develop Project Control and Monument 3.1.4 Sheet on City Datum 0 Ea 01 0 01 0 $0 _ $0 $0 Develop Project Easement and .O. .. 3.1.5 Sheet(none) 0 Sheet 0 0 D 0 0 $0 $0 $0 3.1.6 Develop Overall Water Sheet 0 Sheet 0 0 0 0 $0 $0 $0 3.1.7 IDevelop Plan and Profile Sheets 21 Street 1 20 46 69 120 2 $29,870 $0 $0 $29,870 Prepaare Standard and Special Detail 3.1.8 Sheets 0 Sheet 0 0 0 0 $0 $0 $0 3.1,9 Develop Preliminary Specifications 1 a 0 C 0 $0 $0 $0 evelop Prllminary Estimates of Probable 3.1.10. Construclion Cost 1Ea 4 12 $2,100 $0 $2,100 3.2 onstrucliNty Review with City Ea 2 2 $550 $0 $550 3.3Meet on-site with City 1 Ea 2 $550 $0 $D PINY, 3.4 Submit Utlity tans for Utlity Glearenc9 1 Ea 1 1 $170 $0 $0 $0 Consult with Other City Department an 3.5 other Agencies on Utlity Locations 1 Ea 2 2 4 $730 $0 $730 City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMD Official Release Date:5.19.2010 1 of 3 (SUPPLEMENT TO ATTACHMENT B)-Level of Effort Supplement TASK/HOUR BREAKDOWN Design Services for Engineering Design Services:Water and Sanitary Sewer Replacement Contract 2016,WSM•A City of Fort Worth Project No.02693(Amendment No.3) Basis for Labor(hours) - Expense Total Task No. Task Description Hour Unit Project Project Project EIT CADD Administrative Total Labor Subconsultant Expense Task Sub Total Estimate Director Mana ar En Inner Cost Prime Travel Reprotluction Cost 5 MWBE 3.6 City Statndard Traffic Control Details 2 sheet 1 2 4 D $820 $0 $820 3.7 Develop SWPPP Plan Sheet(No Docs) 2.shiest 1 4 4 4 $1.230 $0 $1,230 Develop Top of Curve info(Only Plan View, 3.8 no Profile) none Ea 0 D 0 0 sD $0 $0 3.9 Submit Preliminary Plans to City r Review 1 Ea 1 $125 $0 $0 $0 $125 Conduct Review Meeting w/CNy Develop 3.10 Minutes and action Items 1 Ea 1 2 2 $49D $0 $490 Receive Permission to Proceed with Final 3.11 Design 1 Ea D $0 $0 $0 4.0 Final Design 0 7 14 25 27 4 $8,815 $0 $0 $0 $0 $0 $8,815 4.1 Develop 90%Final Plans 20 Sheet 4 8 23 23 0 $6,775 $0 $6,775 Develop 90%Fina Estimates of Probable 4.2 Construction Cost 1 Ea 1 2 2 0 4 $820 $0 $820 Develop 90%Final Construction 4.3 Specifications 1 Ea 2 4 0 4 0 $1,22D $0 $1,220 4.4 Provide Cover Mylar for Signature 1 Ea 0 0 0 0 0 $0 s0 $0 $0 $0 5.0 Sid Phase 0ro, 0 0 2 1 $255 $0 $0 $0 $92 $92 $347 5.1 Bid Support 1 Ea Upload Plans&Specifications into B-sow 5.2 in PDF Format 1 Ea 0 0 0 0 $0 $0 $0 Sell Contract Documents and Maintain 5,3 Plan Holders List 1 Ea 0 0 0 0 $0 $0 $0 Receive,leg and respond to all bidders 5.4 questions and request 1 Ea 0 0 0 0 $0 $0 $o Develop adden as and upload addendas 5.5 in Buzsaw 1 Ea 0 D 0 0 $0 $0 $D F Attend Bid Opening 0 Ea 0 0 0 0 0 0 $0 $0 Tabulate and Review Bids Received, evaluate and make Racemmendabons 1 Ea 0 0 0 0 1 $45 $0 $45 Mylar Drawings 23 Sheet 0 0 0 2 0 $210 $0 $92 $92 $302 Submit Mylar Drawings 1 Ea 0 0 0 a $D $0 $0 $D $0 Construction Phase Services 0 `0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 Construction Support $0 $D $0 Attend Prsoonstruction Conference 1 Ea 0 0 0 0 0 $o $0 $0 $0 Develop Projec? x ibits D Sheet 0 0 0 0 0 $0 $0 $0 F6. Attend Public Meeting - __ 1 Ea 0 0 0 0 0 $o $0 $0 $0 $D Project Site Visits and Assistance during Construction 0 Ea 0 0 0 0 0 $0 $0 $0 $0 Submittal Review(None) 0 Ea 0 0 0 0 0 $0 $0 $0 Request for InformatioNChange Order Review(None) 0 Ea 0 0 0 0 0 $0 $0 $0 Final Walk Through an Punch List Ea 0 0 0 0 0 $D $0 $0 Record Drawings 0 0 0 0 0 0 $0 $0 $0 Construction Survey(none) 0 Ea D 0 0 0 0 $0 $0 $0 7.0 ROW/Easement Services(None) 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 7.1 Right-of-Way Research(None) 0 Ea 0 0 0 0 0 $0 $0 $0 7.2 Easement Preparation and Submittal(None) 0 Ea 0 0 0 0 0 $0 $0 $0 7.3 Temporary Right of Entry Submittal(None) 0 Ea 0 0 0 0 ol $0 $0 $0 9.0 Survey(None) 0 0 0 o a o $o $a $o $D $0 $o $o City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMO Official Release Data:5.19.2010 2 o13 (SUPPLEMENT TO ATTACHMENT B)-Level of Effort Supplement TASKIHOUR BREAKDOWN Design Services for Engineering Design Services:Water and Sanitary Sewer Replacement Contract 2016,WSM-A City of Fort Worth Project No.02693(Amendment No.3) Basis for Labor(hours) Expense Total Task Description Hour Unit Project Project Project Total Labor Task No. EIT CADD Administrative Subconsultant Exoense Task sub Total Estimate Director -manager Engineer Cosi crime Travei Reproaucaon $150 ma$150 $125$120 $105 $45 MWBE Cost Develop and submit Kightof Entry letter for 8.1 survey(None) 0 Ea 0 0 0 $0 $0 s0 8.2 Conduct Survey 0 LF 0 0 0 D 0 $0 $0 $0 8.3 Prepare Base Map - 0 LF 0 0 0 0 0 $0 $0 $0 8.4 Temporary Righto Lntry a ml one a 0 0 D 0 0 8.5 Construction Survey one 01 LF 0 0 0 0 0 $0 $0 $0 9.6 Permitting(None) — 0 0 D 0 D 0 $o $0 $0 $0 $0 $0 $0 9.1 TXDOT(None) 0 Ea 0 00 0 D $0 $0 $0 9.2 RuIroa (None) 0 Ea 0 0 0 0 $0 $0 $0 10.0 �._Additional Services one a $0 $0 otos 91 521 1321 1691 221 26 $70,305 $0 $0 $0 $92 $92 $70,397 Project Summary Total Hours 609 Total Labor $70,305 Total Expense $92 MWBE Sub(,, $0 Prime consultant(Survey) $0 10%M/WBE Markup $0.00 MWBE Participation 0.00% Total Project Cost $70,397 City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMO Official Release Date:5.19.2010 3 of3 �� � City ��x Fort Worth, Texas Mayor and Council Communication ommunmcation COUNCIL ACTION: Approved xxnG/2G/2018 - Ordinance Nos. 23285-06-2018 & 2328G-QG- 2018 DATE: Tuesday, June 28. 2O18 REFERENCE NO.: °°C'28751 LOG NAME: GU1GVVSN4AA3SVVGFUND|NG SUBJECT; Adopt Appropriation Ordinances in the Collective Amount of$80,397.00 for Water and Sanitary Sewer Replacement Contract 2016, VVSW1+A, Which Replaces Water and Sewer Lines in Various Streets (COUNCIL DISTRICT 3) RECOMMENDATION: It is recommended that the City Council adopt the attached appropriation ordinances increasing estimated receipts and appropriations inthe Water Capital Fund inthe amount of$35.807.UUfrom available funds and in the Sewer Capital Fund— Legacy in the amount of$44,500.00 from available funds for the purpose of funding Water and Sanitary Sewer Replacement Contract 2016, WSM-A (City Project No. 02693) DISCUSSION: On May 17, 2016, Mayor and Council Communication (M&C C-27718), the City Council authorized the execution of an Engineering Agreement with Stream Water Group, Inc., in the amount of$329,450.00 for the preparation of plans and specifications for the replacement of the water and/or sanitary sewer mains on various streets as identified in that M&C. The Agreement was subsequently revised by Amendment No. 1 inthe amount nf$135.5O2.UUauthorized August 2. 2U18 /M&CC-2783G> and Amendment No. 2inthe amount nf$148.784.UUauthorized August 20. 2U17 (yN&CC-28351). This project requires additional funding inthe amount of$1U`0OU.OUfor project managementandtncnver costs associated with Amendment No. 3 in the amount of$70,397.00 for additional water and sanitary sewer onthe project. The project iolocated inCOUNCIL DISTRICT 3. This M&C does not request approval nfacontract with abusiness entity. ���FISCAL INFORMATION / ����������������� CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current capital budget, as appropriated, of the Water Capital Fund and the Sewer Capital Fund — Legacy. The Fiscal Year 2018 Water Operating Fund Budget includes appropriations of$29,069,236-00 for the purpose of providing Pay-As-You-Go funding for Water Capital Projects. AfterthiotnonofarfnrFioca| Year2U18. thaba|ancavvi|| ba $8.G30.504.UO. The Fiscal Year 2018Water Operating Budget includes appropriations nf$20.U22.G80.0U for the purpose of providing Pay-As-You-Go funding for Sewer Capital Projects. After this transfer for Fiscal Year 2O18. the balance will ba $7.212.8G8.UU. Appropriations for the Water and Sanitary Sewer Replacements Contract 2016 WSM-A Project by Fund will consist nfthe following: |ttp://appa.cfwneLo|g/ecouncil/printmc.asp?id=25q36&print=truc&Doc? ype=Print 6/27/2018 FUND IlExisting Appropriations dditional Ap ropriations Project Total* 014 Bond Program Fund-34014 2,103 805.00 11$0.00 2 103 805.00 008 Bond Program Residuals Fund-39411 623,376.00 0.00623,376.00 Street Improvement Cos Residuals Fund-39412:]0816,282.00 11$0.00 816,282.00 Water Capital Fund-59601 2 622 674.00 %35,897.00 2,658,571.00 ewer Capital Fund-Legacy-59607 94,996.00 44,500.00 139,496.00 Project Total 6,261,133.00 1$80,397.00 6,341,530.00 * Numbers rounded for presentation purposes. FUND IDENTIFIERS (FIDS): TO Fund Department ccoun Project Program ctivity Budget Reference # Amoun ID ID Year (Chartfield 2) FROM Fund Department ccoun Project ,Program ctivity Budget Reference # moun ID ID I Year Chartfield 2 CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Chris Harder (5020) Additional Information Contact: Liam Conlon (6824) ATTACHMENTS 1. 6016WSMAA3-SWGFUNDING FID Table (Dan).docx (CFW Internal) 2. 6016WSMAA3SWGFUNDING Map.pdf (Public) 3. 6016WSMAA3SWGFUNDING 60 AO 18r.docx (Public) 4. 6016WSMAA3SWGFUNDING 70 AO 18r.docx (Public) http://apps.cfwnet.org/ecouncil/printme.asp?id=25936&print=true&DoeType=Print 6/27/2018 6016WSMAA3SWGFUNDING FID Table FIIBM ,K Journal Enfes) R#ee Fund � Dept#% Account PrI -ct "�� Activity �� Budget Year �F Program 1#mount Purpose Xfer - 961 0600430 4959607 CO2693 - 2018 -_ $35,897.00I-_ _ 59601 0600430 5110101 CO2693C017302018 $5,000.00 -_ 59601 0600430 5330500 CO2693 C01730 2018 $30,897.00 59607 0700430 4959607 CO2693 2018 $44,500.00 - 59607 0700430 I 1 I .• C01730 2018 $5,000.00 59607 0700430 5330500 CO2693 C01730 2018 $39,500.00 ournal Entries) - Rec Fund Dept# Account Project Activity Budget Year CF ',I Program Amournt Purpose '''Xfer'i Amortize 59601 10600430 4959607 CO2693 C017ZZ - 59601 0600430 5110101 CO2693C01730 •••• $5,000.00 --- 59601 0600430 5330500 CO2693 C01730 9999 $30,897.00 59607 0700430 4959607 CO2693 C017ZZ 9999 $44,500.00 _ 961 0700430 i • / ••3 C01730 •••• $5,000.00 59607 0700430 5330500 CO2693 C01730 9999 $39,500.00 FIDs(Expense Only-No KK or GL Entries Needed) Rec Fund Dept# Account Project Activity Budget Year CF Program Amount Purpose # ID 2