HomeMy WebLinkAboutContract 34058 a E y AMENDMENT NO. 2 TO CITY SECRETARY CONTRACT NO.30743 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth ("City") and AMEC Earth and Environmental, Inc. ("Engineer") made and entered into City Secretary Contract No. 30743 (the "Contract") which was authorized by the City Council by M& C C-20292 on September 21, 2004; WHEREAS,the Contract involves engineering services for the following project: Comprehensive Storm Water Management Study WHEREAS, the City Council authorized additional funding for said Contract in the amount of$ 740,000.00for Phase II Services, by M & C C-20666, which increased the maximum funding for all work and services to $1,037,348.00; WHEREAS, Amendment No. 1 to said Contract was executed in the amount of $695,024.00 for Phase 11 Services as shown in Updated Exhibit A-1; WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement that amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated August 17, 2006, a copy of which is attached hereto and incorporated herein. The cost to the City for the additional design services to be performed by Engineer total $40,600.00. 2. rr Article II of the Contract is amended to provide for an increase in the maxiniuin fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$1,037,348.00. 1')9 :29-06'C' , 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the Qy�— day of , 2006, in Fort Worth, Tarrant County, Texas. OEST: CITY OMRTH By: Marty Hendrix _ A. Ott City Secretary Assistant City Manager NO M&C REQUIRED APPROVAL RECOMMENDED:p- Approved Form and Legality: Robert Goode, P.E. Assistant ty ttomey Director,Department of Transportation and Public Works ATTEST: AMEC EARTH&ENVIRONMENTAL, INC. By: /& IF rinted Name r Name: 9- 1.f Title: (/ (le, vI�b� � � .e SEP-01-2006 FRI 01 :32 PH ANA LLC 2 FAX NO, 8173359956 P. 02 1701 River Run Suite 610 CONSULTANTS, �c ort Worth,Texas 76.107 -9900 (817) 335 Fax (817) 335-9955 August 17,2006 Ms.lean M..Haggerty,Associate AMSC Earth&Environmental, Tric. 101 West Friendly Ave., Suite 603 Greensboro,North Carolina 27401 Re: City of Fort Worth,Comprehensive Storm Water Management Study 'Dear Ms. Haggerty: Thank you for allowing AN.A.Consultants,L.L.C,to assist you in providing Professional Engineering/Survey Services to the City of Fort Worth, Following is out understanding of the required scope of services,schedule and the design fee for this project. A.N.A. Consultants will assist the City of Fort Worth with the implementation of the City's new Storm Water Utility. This assistance will be provided on an as needed basis and will consist of: 1. Analyzing,evaluating,and providing recommendations for fee exemptions related to runoff which flows to waterbodies not controlled or maintained by the city. In some cases this will require an analysis of complex drainage systems where drainage areas on-site must be allocated between exempt and non- exempt waterbodies,where a portion of the runoff flows to a waterbody not controlled or maintained by the City, in accordance with the City's exemption policy, 2. Providing independent and detailed analysis of impervious cover calculations as needed. Typically,these situations will involve appeals by customers involving identification or measurement of qualified impervious cover, Schedule: A.N.A.Consultants,L.L.C.will work"on-call"on an as needed basis with a targeted completion date of October 31,2006. Fee' Invoicing will be on a monthly basis based on time and materials in accordance our standard billing rates, (included) up to the established total fee of$35,000.00. Sincerely, Accepted: A.N.A.Consultants,L.L.C. AMSC Earth &Environmental,Inc. It Dat i it tD. Williams,P.E. R.Keith Readlind,PE Title: Vice President Title: Vice President, Zi CLIENT$AT/SFACrION 1i OUR-BUSINFS9,, ameO September 1, 2006 Mr. Don McChesney, P.E. Senior Professional Engineer Transportation and Public Works Department Drainage Program City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Dear Don: Re: Comprehensive Storm Water Management Study, City of Fort Worth, Texas As we have recently discussed, AMEC Earth & Environmental, Inc. requests that our contract for the Comprehensive Storm Water Management Study be modified to include additional storm water utility implementation services. These services will include using our subcontractor, A.N.A. Consultants, LLC, to provide drainage area calculations and survey support, as detailed on the attached letter agreement, as well as additional support from AMEC staff to manage this subcontractor work and assist with any final implementation issues. The requested contract amendment is in the amount of$40,600.00. Please let me know if you need additional information related to this contract modification. We look forward to continuing to work with you on the implementation of your storm water utility. Best regards, AMEC EARTH & ENVIRONMENTAL, INC. n'1 Jean M. Haggerty Project Manager Enclosure: Letter Agreement with A.N.A. Consultants ,(may + (� AMEC Earth&Environmental,inc. l'J� �CA L RON 101 West Friendly Avenue,Suite 603 9 .y '1,-': (���I� q Greensboro,North Carolina 27401 �9�L/ �5� lSU!ii!PI�J Tel 336-691-5398 .;.ap Qn� Fax 336-691-7369 www.amec.comU,