HomeMy WebLinkAboutContract 35237-A3' 4'�'�'� `��'�' �,.s� �� �,.�,�� `<�.�� ���`���� �,� ����� �� ��� 35237- � �MENDMENT No . 3 TO CITY SECRETARY CONTRACT No. 35237 WHEREAS, the City of Fort Worth (CITY) and HALFF ASSOCIATES, Inc., (ENGINEER) made and entered into City Secretary Contract No. 35237, (the CONTRACT) which was authorized by M&C #C-21993 on the 6th day of March, 2007 in the amount of $ 63,650; and WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount of $213,605 which was authorized by M&C #C-24593 on November 16, 2010, and Amendment Number 2 in the amount of $114,944 which was authorized by M&C #C-26536 on October 29, 2013; and WHEREAS, the CONTRACT involves engineering services for the following project: Glen Garden Drainage Improvements, Project No. 00476; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 24, 2015, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $49,320. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $441,519. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 2 SCAHN ED �=__ _- - = -= — - - ---- � jl �FFfCIAI. iZE�O�D CITY SECRE'�A6tY � FT. �11AIt�'�1, 'TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth �--------" ._._ � - ``—'� ! � ` �-- F_��u ��'�._xo--�a ,��.1s '� C�+.��:�. Assistant City Manager DATE : � ''l � " �, ENGINEER lff Associates Inc. � � Te y. Barr, PE, CFM Authorized Agent DATE: 07 � 2y I 2.015 AP�R OVAL RECOMMENDED: 5� � �. � l Douglasf, . Wiersig. P.E. Director, Department of Transportation and Public Works APPROVED AS TO FORM AND LEGALITY: + �d" �" _�/` ,�, �__� Douglas W. Black Assistant City Attorney ATTEST: M�ry J. `��ser City Secretary City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 2 M&C: N/A Date: �;�� � ��Ci ,.c„�0ec ���� J���� �o � �� �� �� o`� �,{� � ,�.,� ty�, �-R O o���L� �bgD°y��000 C,+ , A.�y-��-�`� A�..� Ir�-�,.�---_-�� i� �FFICIAL RECOitD ; �ITY SECRETARY �% WORTH, TX � -_- FUNDING BREAKDOWN SHEET City Secretary No. 35237 Amendment No. 3 Department Fund-Account-Center Amount Transportation and Public P227 531200 2082800476 30 $49,320.00 Works Total: $49,320.00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 ATTACHMENT "A" — AMENDMENT NO. 3 Scope for Enqineerinq Desiqn Related Services for Storm Water Improvements Prolects The scope set forth herein defines the work to be perFormed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to cleariy define the work to be performed and address the needs of the Project. Under this scope, "ENGINEER" is expanded to include any sub-consultant, including surveyor, employed or contracted by the ENGINEER. OBJECTIVE The Glen Garden storm sewer system services a drainage area of approximately 332 acres in the vicinity of the Glen Garden Country Club, which was established in 1912, and contributes to Sycamore Creek Tributary SC-3. The system consists of approximately 6000 linear feet of closed conduit storm sewer and 2000 linear feet of defined open channel. In addition, there are more than 1000 linear feet of shallow swales that flow through the golf course. Numerous instances of flooding in the streets, houses, and within the Glen Garden Golf Course have been reported. Halff Associates, Inc. was authorized by the City of Fort Worth in April 2007 to conduct a detailed study of the drainage patterns in the vicinity of the Glen Garden Country Club. The final report, entitled Glen Garden Drainage Study, included a thorough examination of the existing system conditions and drainage patterns as well as analysis and recommendation of storm sewer and/or channel improvements aimed at removing or reducing flooding in the area. Based on the results presented in the study, The City of Fort Worth requested that Halff Associates Inc provide a proposal for design services, which was provided as part of Amendment No. 1. Amendment No. 1 was authorized by City Council on November 16, 2010. Amendment 2 included potential detention options within the watershed and plan submittals at 60, 90, and 100-percent completion and submittal of technical specifications and cost estimates. Additional items, including bid phase services, construction phase services, and City of Fort Worth permitting, were also included. Amendment No. 2 was authorized by City Council on November 25, 2013. Amendment No. 3 of the Glen Garden Storm Sewer Improvements project includes additional water and sanitary sewer design services, structural design services, drainage design and modeling, conceptual layout, and easement survey. Additional bid and construction phase tasks for Amendment No. 3 include change orders and requests for information beyond the assumptions specified in Amendment No. 2. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2�12 Page 1 of 22 Task 1. Task 2. Task 4. Task 5. Task 6. Task 7. Task 11 Task 3. Task 8. Task 9. Task 10 WORK PERFORMED Design Management Conceptual Design Final Design Bid Phase Services Construction Phase Services ROW/Easement Services Additional Services ADDITIONAL SERVICES NOT INCLUDED IN AMENDMENT Preliminary Design Survey Services Permitting Plan Submittal Checklists TASK 1. DESIGN MANAGEMENT (MODIFIES TASK 1.1, 1.2) ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. 1.2 Managing the Team • Lead, manage and direct design team activities • PerForm quality assurance & quality control (QA/QC) for design changes requested Communications and Reporting • Conduct additional project meetings with the CITY to discuss plan revisions, cost estimates and issues that were encountered during construction TASK 2. CONCEPTUAL DESIGN (30 PERCENT) 2.2. Drainage Computations (MODIFIES TASK 2.2) � ENGINEER will make the necessary adjustments to the terrain and the model of the Glen Garden storm sewer system using InfoWorks SD/2D based on design changes. • ENGINEER will evaluate potential diversions from the channel downstream of the Glen Garden Country Club golf course into the storm sewer along Glen Garden Avenue. In addition, detention scenarios on the vacant property near the golf course will be evaluated to see if there is any potential benefit downstream. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 2 of 2 ASSUMPTIONS • Previous drainage analysis of the Glen Garden Drainage System was done using Innovyze O InfoWorks SD (formerly Wallingford InfoWorks SD) as part of the Glen Garden Drainage Study, completed by Halff Associates, Inc in April 2008. Pipe and inlet capacity, as well as capacity of open channels and roadways will be based off the analysis findings. The ENGINEER shall adjust the InfoWorks SD model to reflect changes encountered during the design process. • Conceptual Design Package submittal was completed as part of Amendment 1 and will not be provided as part of this amendment. DELIVERABLES A. Updated InfoWorks SD/2D models TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT) (MODIFIES TASK 4.2, 4.4) 4.2 Final Design (100%) • ENGINEER will revise construction documents to address the following changes at the request of the CITY: o Adjustment of the plan and profile drawings to facilitate moving construction away from City parks property. Line "C" along Glen Garden Avenue shall be ended at Heather Trail. Line "A" shall be moved into the Eastline ROW. o Design of an 8" waterline alternate alignment per the Water Department request. The alignment shall be within the Eastline ROW behind the west curbline. o Design of a 12" waterline at the intersection of Eastline Dr. and Timberline Ave. per the Water Department request. o Design of an 8" sanitary sewer at Glen Garden Avenue due to a shift in the storm sewer alignment into the street. o Address Water Department comments related to the waterline and sanitary sewer designs. o Adjust typical pavement sections per CITY comments o Design connection of proposed 36" storm sewer line from Tadlock Park (SD-625) into the proposed 6'x5' RCB in Eastline Dr. 4.4 Construction Estimate (100%) • ENGINEER will revise construction cost estimates for design changes including storm sewer, sanitary sewer, waterline, and pavement improvements based on changes made by the CITY City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 3 of 3 DELIVERABLES A. Revised 100% construction plans and technical specifications per updated City of Fort Worth Standards. B. Revised estimate of probable construction cost, including summary of bid items and quantities using the CITY's standard items. TASK 5. BID PHASE SERVICES (MODIFIES TASK 5.1) ENGINEER will support the bid phase of the project as follows: 5.1. Bid Support • Incorporate all addenda into the contract documents and issue conformed sets. An additional two (2) addenda were issued based on changes to the design or comment provided after the final documents were submitted. �ASSUMPTiONS • A maximum of one (1) addendum will be completed by the ENGINEER per Amendment No. 2 Agreement DELIVERABLES A. Addenda TASK 6. CONSTRUCTION PHASE SERVICES (MODIFIES TASK 6.1) ENGINEER will support the construction phase of the project as follows. 6.1 Construction Support • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. Additional change orders outside the approved scope (3) include the following: o Provide updates to structural drawings for the equalizer box located at the downstream end of Line "C" to accommodate field location of existing 54" storm sewer line. o Provide evaluation of construction errors on the Modified Inlet Box (5'x11') and provide revised structural drawings for lower profile box. o Adjust Gypsy Gulch flume alignment at the request of the CITY to reduce maintenance burden on the home owner • Additional Requests for Information (RFI) outside the approved scope (2) include the following: o Investigation of the curbline efevations along Eastline Dr. o Investigation of the cross drainage along Eastline Dr. City of Fort Worth, Texas Attachment A PMO Release Date: 07l23/2012 Page 4 of 4 ASSUMPTIONS • Two (2) RFI's are assumed per Amendment No. 2 Agreement • One (1) Change Orders are assumed per Amendment No. 2 Agreement DELIVERABLES A. Response to Contractor's Request for Information B. Plan Revisions TASK 7. ROW/EASEMENT SERVICES (MODIFIES TASK 7.2) ENGINEER will support and perForm activities related to ROW and easements as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.2 Right-of-Way/Easement Preparation and Submittal • ENGINEER shall provide two (2) additional Permanent Drainage easements for Parcels 4& 5 along Glen Garden Avenue. TASK 11. ADDITIONAL SERVICES (MODIFIES TASK 11.1) ENGINEER shall provide Additional Services for this project that are summarized below. An established lump sum fee is included in the contract for the additional services. Additional Services will be approved by the CITY prior to work occurring. Additional Services included in the Scope of Services may include the following: 11.1 Property Owner/Stakeholder Meetings • ENGINEER may meet with property owners and other stakeholders to discuss and/or explain project scope and objectives, as requested by the CITY. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 5 of 5 Attachment B- Level of Effort Supplement TASK/HOUR BREAKDOWN Design Services for Glen Garden Storm Sewer Improvements City Project No. 00476 Labor (hours) Expense Task Description Project Project Project Total Labor Total Expense Task Sub Task No. EIT CADD Administrative Subconsultant Director Manager Engineer Cost Travel Reproduction Cost Total Rate , $220 ''$150 ' $130 ` '$100 $80 $60 MWBE Non-MWBE 1.0 Design Management 4 16 12 4 0 0 $5,240 $0 $0 :$0 $0 $0 $5,240 1.1 Managing the Team 1.1.1 Internal Team Meetings 4 4 4 $1,520 $0 $1;520 1.1.2 QA/QC 4 8 $2,080 $0 $2,080 1.2 Communications and Reporting 1.2.2 Coordination with City and Outside Entities 4 8 $1,640 $0 $1,640 _ __ __ __ __ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ __ 2A Conceptual Design (30-Percent) D 2 4 10 ` 0 0 $1;820 $0 $0 $0 $0 $0 $1,820 2.2 Drainage Computations and DrainageArea Map 2 4 10 $1,820 '$0 $1,820 4.0 Final Design 0 16 ' 100 76 40 0 $26,200 $0 $0 $0 $0 $0 $26,200 4.2 Final (100%) Plans and Specifications 12 84 64 32 $21,680 $0 $21,680 4.4 Construction Estimates (90% and 100%) 4 16 12 8 $4;520 $0 '$4,520 5.0 Bid Phase 0 4 12 12 , 0 0 $3,360 $0 $0 $0 '$0 $0 $3,360 5.1 Bid Support 5.1.2 Issue Addenda (2 Additional) 4 12 12 $3,360 $0 $3,360 _ _ . _. _. . �. , 6A Construction Phase Services 0' 10 '40 24 8 0 $9,740 $0 $0 $0 $0 $0 '$9,740 6.1 Construction Support 6.1.5 Request for Information/Change Order Review (2 RFI 3 CO) 10 40 24 8 $9,740 $0 '$9,740 7.0 ROW/Easement Services 0 2 2 0 0 : 0 $560 �1,200 $0 $0 ,$0 $1,200 $1,760 7.2 Right-of-Way/Easement Preparation and Submittal 2 2 $560 $1,200 °'$1,200 :$1,760 11.0 � Additional Services 0 2 6 0 0 0 $1,080 $0 $0 $0 $0 $0 '�1,08� 11.1 Property Owner/Stakeholder Meetings 2 6 $1,080 $0 ` ;$9;080 4 50 ' 170 126 48 0 $48,000 $1,200 $0 $0 $0 $1,200 ' $49,200