Loading...
HomeMy WebLinkAboutContract 34801-A4� STATE OF TEXAS b COUNTY OF TARRANT S AMENDMENT NUi�ER 4 CITY SECRETARY CONTRACT NO. � —�� WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc., (ENGINEER) made and entered into City Secretary Contract No. 34801, (the CONTRACT) which was authorized by the City Council by M&C C-21918 on the 9th day of January, 2007; and subsequently revised by Amendment #1 which was authorized by the City on the 19th day of June, 2007; and subsequently revised by Amendment #2 which was authorized by the City Council on the 18th day of March, 2008 (M&C C-22712); and subsequently revised by Amendment #3 which was authorized by the City Council on the 3rd day of February, 2009 (M&C C-23325); WHEREAS, the Contract involves engineering services for the following project: Keller-Hicks Road from 750 feet west of Ridgeview Street to Park Vista Boulevard and North Beach Street from Golden Triangle Boulevard to Keller-Hicks Road; WHEREAS, it has become necessary to execute Amendment #4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: l. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated November 18, 2010, copies of which are attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $50,000.00. Article II of th the maximum fee t performed under the the City for all $1,016,438.00. � Contract is amended to provide for an increase in be paid to Engineer for all work and services Contract, as amended, so that the total fee paid by work and services shall not exceed the sum of Page -1- -- ---�---_ -- --- = _ - � � ^ ;��FFICf�� ���:� �[tD a �' �ITY S�CRETAR�' �1!'o i�l4fd'��� �J'�S ,� ; K� All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the �k� day of � , 2010 in Fort Worth, Tarrant County, Texas. ATTEST: C� � Marty Hendri '��,'C�4�,';� �` City Secretary ��� ,��� �.s, �A p UQpU/A�QqQ� �. i�A /\ �n APPROVAL RECOMT�NDED: � William A.'Verke � P.E. �`Q��� � Director, Transportation/Public TEAGUE NALL and PERKINS, INC. ENGINEER / Mark Berry, P.E. Principal APPROVED AS TO FORM AND LEGALITY: .� ug Black Assistant City Attorney � � APPROVED: ���� Fernando Costa Assistant City Manager l�(� ��c� �€���!IJ�1t���..�, ____�z�,��_ � ks Department Page -2- OFFICIAL RECORD � — ' �I'Q'Y SECRETARY `' �T. iNORTH, VX � � �"i,,� TEAGUE NALL AND PERK/NS Civil Engineering Surveying Landscape Architecture Planning November 18, 2010 Mr. Michael R. Weiss P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Fort Worth, Texas 76102 Re: UNIT 1: Keller Hicks Road (750' westof Ridgeview thru Alta Vista Intersection) UNIT 2: Keller Hicks Road (Alta V'sta to Park Vista Boulevard), North Beach Street (Golden Triangle Boulevard to Keller Hicks Road) ree Nroposa� for Gonfiract Amendment No. 4 Dear Mr. Weiss: Teague Nall and Perkins, Inc. is submitting this fee Amendment to the abovereferenced contract based on additional services requested. The following is a brief description and cost for the additional services provided on this project: Additional Services to provide right of way staking for UNIT 2: Keller Hicks Road (Alta Vista to Park Vista Boule�vard); Engineering Services related to Big Bear Creek Crossing options, FEMA map modification for UNIT 2:North Beach Street (Golden Triangle Boulevard to Keller Hicks Road) As requested, the right of way along Keller Hicks (Phase 2) was staked for the franchise utility relocation phase of construction. The additional engineering services include the evaluation of changes to the flood plain and hydraulic model based on the FEMA Map Modification effective September 2009. In addition to the Map Modification issues, multiple crossing options were evaluated and modeled to identify a solution that was in the City's best interest. As requested, the engineer prepared multiple options to accommodate the Big Bear Creek crossing and provided onwn�on cf pr��M►�!e ��^str.:�t��� � cast ��� eacn option. ■ Additional Surveying Services o Right of Way staking along Keller Hicks (UNIT 2) $ 5,000 • Additional Engineering Services o Coordination and evaluation of FEMA Map Modifications from Halff $ 10,000 o Preparation and coordination of Big Bear Creek crossing options 35 000 s— _=–= - _ �-_ Total Contract Amendment No.4: $50,0��--'--- � �FF�����. �'��;�RD � �1�'� ��W:t��f�����f f��'� ���',T�y `�'� 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 phone 817.336.2813 fax www. tnp-online. com Mr. Michael R. Weiss, PE, November 18, 2010, Page 2 of 2 Summary of Contract Fee: Oriqinal Contract Amount: $ 668,038 Amendment No. 1: $ 19,000 Amendment No. 2: $ 89,000 Amendment No. 3: $ 190,400 Amendment No. 4: $ 50,000 Revised Contract Amount $1,016,438 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. �i�.� r. Scott A. Gibson, P.E. Copy: Mr. Tom Rutledge — TNP o:\projects\ftw06319\fee proposal\_contract amend 04.doc OFFICiia� �t���i'��► CITY SEC�E7'ARY t�u !���t'�'MI, �'� Page 1 of 1 Tidwell, Allison From: Black, Doug Sent: Friday, December 17, 2010 10:29 AM To: Tidwell, Allison Subject: RE: Question About Amendment Allison. Thanks for checking. By the city's code (Ch. 2, Art. I, Sec. 2.9(c)), contracts of $50,000.00 or less may be executed by the city manager without council approval. Had this contract been for $50,000.01, it would have required an M&C. Please let me know if there are other questions. Thanks, Doug Douglas �r1�r. F3Iack Assi,tant CitS� �ttorney C;itv of Fort i�i'orth i000 ThY°ockillor•ta�i F'ort L-1'ortll; "[:K 76�02 f3r;� a9•�.;b1�, tel. 8� f.3y2.�3,;g fax �n11�.�1�iC_�i(tt:: f01`ti1'Q1'��1�nT',fJI'f�T From: Tidwell, Allison Sent: Friday, December 17, 2010 9:50 AM To: Black, Doug Subject: Question About Amendment Importance: High Doug, I received an amendment with Teague Nall & Perkins for the design of Keller-Hicks Road and North Beach Street. The amendment is for $50,000.00, and it was my understanding that anything $50,000.00 and over requires Mayor and Council approval. Before I processed this contract, I wanted to touch base with you to make sure that we are following the proper procedure. Please advise. Thanks! - r li! Y !f: , .. i � � i.-... . �� ii �i Administrative/Records Technician City Secretary's Office Phone: {g17) 392-6090 Pax: (817) 392-6196 www. forfwo rthgov. org/cs ec 12/17/2010 � ��'FICIAL 6iECORD � �ITY SECRETAR'Y � ��, �����"H' ��