HomeMy WebLinkAboutContract 35138-A2 AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. (M&C not required) COUNTY OF TARRANT 6 WHEREAS, the City of Fort Worth (City) and EJES, Inc. (Engineer) made and entered into City Secretary Contract No. 35138, (the Contract) which was authorized by the City Council by M&C C-22015 on the 20th day of March 2007 and subsequently revised by one amendment; and WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract, 2005 WSM-L. WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 25„ 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $9, 905.00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $191, 115 . 00. OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX 08-02-11 P02:39 IN 3 . A11 other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the me r� day of uss , 2011, in Fort Worth, Tarrant County, Texas. ATTEST: a� *, , p° as Marty Hendrix City Secretary o° o °0Q4 atl°p C]' APPROVAL RECOMMENDED: APPROVER: Frank S. Crumb, P.E. , Dir Fernando Costa Frank Department Assistant City Manager EJES INC. Engines By: Name: Edwin B. Jones P.E. President _9_4_01 LBJ Freeway, Suite 300 Dallas, Texas 75243 APPRO TO FORM AND LEGALITY: Assis ity Attorney OFFICIAL RECORD -2- CITY SECRETARY FT. WORTH,TX CORPORATE OFFICE ' Architectural 9401 L6J Freeway, Suite 300 • Engineering Dallas, Texas 75243 " Planning Phone: 214 343-1210 'Construction Management r—:=p I I'lI N C R P D R A F E o Fax: 214 343-3885 ' 1'1'S r vices nl Services ■ 1'4'Services Service With Excellence July 25, 2011 David Cooper, P.E. City of Fort Worth Water Department Engineering & Fiscal Services Division 1000 Throckmorton Street Fort Worth, TX 76102-6311 817-392-8252 RE: Amendment No. 2 Water& Sanitary Sewer Replacement Contract 2005, WSM-L City Project No. 00388 Park Hill Dr. - Simondale Dr. to Shirley Ave. Dear Mr. Cooper: Per your request we are pleased to submit this Amendment No. 2 for additional design services required to complete the above referenced project. On 4-28-11 we were informed by your office that the City now wishes to advertise and construct the above referenced project as a single construction bid. The plans have been recently removed from the M-210 project currently being designed by RJN Group, ino. to distribute the construction costs, In order to complete the construction documents for the Park Hill Drive project there are a few additional modifications that will need to be implemented. These additional modifications will be outside of our scope of services as set forth in City Secretary Contract No. 35138 and as amended by City Secretary Contract No. 35138-A1, therefore this Amendment No. 2 is being developed to further identify these services and summarize the associated costs. The additional services required to prepare final construction documents will include the following: •Modify design to remove proposed 8"&24"waterline replacement from current starting point at Simondale DrivelMockingbird Cane intersection up to Park Hill LanelColonial Parkway split. This portion of our design will be included with the City's in-house design of the connecting water replacement design to the south, •Modify remaining plan sheets to conform to new sheet numbering, project limits and construction notes Revise contract documents&specifications •Revise summary of quantities and cost estimate The City of Fort Worth Water Department is to provide EJES, inc. with new beginning station numbers to be used for the 8" & 24" water line replacements in Park Hill Drive from the Colonial Parkway area to Shirley Ave. We are requesting your assistance in the execution of this Amendment No, 2 in order for us to expeditiously perform these services. Shreveport 133titan Rottac Alexandria 6007 Financial Plaza, Suite 511 11726 Bricksome Avenue 201 Johnston Street, Suite 303 Shreveport, LA 71129 Baton Rouge, LA 70816 Alexandria, LA 71301 (318)670-7275 (866)635-7395 Page 2 The attached EXHIBIT I, outlines the additional tasks, personnel and man-hours we anticipate to be required to make the requested revisions to the construction documents. The total fee for these additional services will be an amount not to exceed $9,905,00. 1n order to avoid any further delay in the project schedule, EJES, Inc. will proceed to make the requested revisions outlined above at this time. These Amendment No. 2 services will be performed with the good faith understanding that an executed agreement for additional compensation is forthcoming and will be received prior to submittal of the final documents. The total contract amount to date, including amendments, is as follows: Original Contract Amount $160,650.00 Amendment No. 1 = $20,580.00 Amendment No. 2 = $9,905,00 New Contract Amount = $191,115.00 If you have any questions or require additional information, please contact me at 214-343-12'10, Ext. 101. Sincerely, Edwin B. Jones, P.E., President EJES, Inc. 9401 i_,BJ Freeway, Suite 300 Dallas, TX 75243 Tel: 214-343-1210 ejones@ejesinc.com Attachment �§ ) R � ) ~ ® ■ \ k � � ; & 2 § m w 2 } w ] § ) § ) ƒ i9 )k d § w2 uj { LLI � \ ) § / ) � §§ | ] f U ,