Loading...
HomeMy WebLinkAboutContract 48599-CO1 RC ,v�q CITY SECRETARY l 201g CONTRACT NO.,_q! - c�� FORT WORTH. City of Fort worth Change Order Request ProjectNamel Trinty Trails East Bank Extensim City Sec# 1 48599 Client Project#(s) 02156 Project Trinity trails and retaining walls under 1-30 and Vickery overpasses. Description Contraclorl 2L Construction LLC Change Order# 0 Dale 512212019 CityProjectMgr.J Clarence Bryant,Jr. City Inspector Eddie Walker III Dept. PARD Contract Time Totals Original Contract Amount $1,875,324,65 $1,875,324.65 202 Extras to Date $0.00 Credits to Date Pending Change Orders(in M&C Process) $0.00 Contract Cost to Date $1,875,324.65 202 Amount of Pro osed Chan Order - 78,866.20 15fl / Revised Contract Amount 1, 4_ ,45 - _ .. -. _ _._ .: ..__. $1,796,438.45 352 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO :$Q 00 I Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) It was discovered during utility locate for construction that an AT&T fiber optic main cable was in conflict with the approved construction plans, This cable runs the length of the trial from STA 2+22 to Parkview. TRWD has constructed the trail from STA 6+40 to STA 17,79.5(end of trail). Most of the construction has been completed from STA 0+00 to 2+20. Redesign of the trail to accomodate the fiber optic cable from STA 2+20 to 6+40 has been completed,signed,and sealed for construction coniinp .. At • i`�fI�. ���r3 Mary J. ser, City Secretary It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order, The Project/Program Manager signing below acknowledges that he/she is the person responsible for the nxx ftoring and administration of this contract,including ensuring all performance and reporting requirements. 2L Construction LLC I Chip Eisher I M&C Number NA M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH.TIC rn a rn m m rn 0 N fA N O Lo C/7 = U 0 c N Y T W E O � `a T�i o m n N U d eDoo D. t U C G'p H s-o W Q ~ a 4-0tic X a 5 ti, vED m u z U d _ o = •y m LU c Y 'C m V J ti N w ID Z] m m imp Z5 m � +`� m t0� H c c c � c U �o H C) H N U 2 O m C a e � 3 Z ucai m a [L v g U a 0 0 vs c 0 C< 4 � 0 0 m a w m a c 0 Q d O d m C 10 U � CD ■uli / 0 \ a) e � Li � _ ƒ # # 3 k � � & $ % k OL & c A M o n § 0 2 B z � LLJ \ o ■ a w � �2 O 2 O 2 �& k c # ` V2 R E U k ■ 8 C e gn 7 � 2 mQ � m� g � En / Z © - / § / - / W 3 m = I ( 7 2 f LU O 7 N tp do m 69 co c d O � Q � O O N m ro a VI C O a+ N N Q! O ovo c ro t U MWWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO American Striping Striping ($ 5,062.90) Texas Environmental Landscape/Erosion Control $ 15,919.41 Buyers Barricades Traffic Control ($ 15,960.00) Total ($5,103.49) Previous Change Orders Co# DATE AMOUNT None Total $0.00 mom HALFFe man 1201 North Bowser Road Rlohardeon,Telma 75081 ATrACHIAENT A (214)346E-200 1-(214)739 M Project:TRINITY TRAILS EAST BANK EXTENSION City's Project No.:02156-TXD(TT Project No.:CS)0902-48-969 L DECRFASE CITY7DIpCF MCRiA9E QTYNPoL4 ha).n Nnn1 bbnwW„ DryNNl Fuvat Ib.bec4,o.n iat nemN DexrlPno� ypKy HAIFf 1111xhb vab UNd NALFF U11a P,b IINv4r niRAci oaRv 4116 2-2539 Unit 1-Earthwork and landscape O- PREPARING ROW(TREE)(W T06'DIN EA 4 $ Wo.$2,000.00 EA 6 $ Wo.$3,000.00 $1,000.00 0100-EC09 PREPARING ROW rrREE)(6'T024'DUQ EA 6 $ 4�00$2,700.00 FA 2 $0bo4$1,100.00 ($1,600.00) 01D4-6m2 REMOVECONCRET-RVIEW CY 4I $ lm.m$4,200.00 CY 4I $ IOD.m$4,200.00 $0.00 0104-60D3 REMOVE CONCRETE RIPRAP 9I 381 $ 14.00$5.334.00 Sr W 2511f7$20,600.00 $5,266.00 OIDI-6029 REMOWNGCOW(CURRANOGIITTER) LF $330.00 R 30 $ 11.$33o.G0 $0.00 011-3 EXCAYATON(WECIAL) a 3- $ 22.m$95,392.00 CY MG $ 2W$34,250.00 0132-6006 EMBANKMENT NNALXDENS COW)(IY C) CY 491 $ B.m$3,928.00 CY S® f 2$40$14,075.00 $10,147.00 .1-1 BACKFlUINGPAVEMENT ELX£5(TY A) a lab $ 25.m$4,700.00 n' I. $ 25.00$2,500.00 ($2,200.00) 0162-60N -500DING(BERMUDA) w a. $ 4m$974400 SY 11. 4 $40$lo,807.50 $1,063.50 016E-6m1 WGETATNEWATERING MG 21 $ -oo$6,300.00 MG 14 $. 95Dm$15,200.00 $8,900.o0 0169-6001 SOIL RFTENWN BLANKET CLI TY A SY 121 5 2.m 3,045.00 SY 758 $ 2.50 1,895.00$ $ ($1,150.00) Subtotal UNIT 1$127,663.00 $97,957.50 ($29,705.50) halm 41n NBv,,,albn OH4bl Cue,�rt MY,d 6,vaat BIdINtltem na. D 0 n unAd HALFF �� FNv� M4 NAIfF Wv� WMCT piRwNCE 41-i6 215-19 Unit 4-Structures 0300-EOCB SgLNWL AIICNORS U 12604 5 26.m$327,704.00 LF o 5 2600$0.00 ($327,704.00) D4Q663P.3- BF D ilm 21r4 ,$ 0423-6mB RET,NNINGWALL(CASTINh E) SF 5145 $ 52.00$291,060.00 EF 93® 7040$651,220.00 $370,150.00 0423-6022 RETAINING WAIL(SOILXNAIL(FACM) SF 9427 $ 37.00$348,799.00 SF O $ 37.m 0.00 -2-1 RIPRAP(CONCK4IN) a 3 $ 4-0D $1,380.00 CY 3 $ -oo $1,380.00 $0.00 0432-W24 R-(STONE COMMONXDRYX321N) Dy 382 $ 181.m$45AM.00 CY 381 I-On$49,660.00 $3,820.00 0432-17 CONCRETE MOW SRIP(6') LF - $ 14.00$6,020.00 R q4 '$ D$6,149.00 $228.00 P150.fi047 PEDFSTRIAN RAK{ADA gCCFSSIBIE H/.NORAK) lF 92 5 95.m$50,540.00 R .2 Moo$71,820.00 $21,280.00 045E-6047 PEDESTRIAN RMR.(SRU LF 2387 $ 9O.m$205,830.00 LF 1173 A IaW'.$246,625.00 ($59,205.00) 0464-6m3 RCPIPE(CLIH)USIN1 U 72 5 SO.m$3,600.00 U 46 $ $O.m$2,300.00 ($1,300.00) 04ME004 RC PIPE(CI IIIX241N) LF 31 S Wano$2,960.D0 IF 37 5 4Om$2,960.00 $0.00 04fH-ECUR MPIPE(CLIIIX361N) LF 63 $ 140m$8,820.00 LF '0 $ IaW $8,540.00 ($280.00) A -60X1 HILET(COMRXPSLXRCX3FT0FT) EA 1 5 2,300.m$2,300.00 EA I $ 2,3m.0o$2,300.00 $0.00 0465-6152 INLET(COMPLXPA2DXRCX3FroFT) EA 3 $ 2,4mm$7,200.00 EA 2 $ 2,4m.m$4,800.00 1$2,400.00) M67-63M SET(TY II)(24 INXRCP)(3:1) EA 1 $ 2,-0D$2,000.00 EA 1 $ 2.000.m$2,000.00 $0.00 A67-6448 SET(TV IIXWINXRCPK3:11 FA 1 5 3,3m.m$3,300.00 FA 1 $ 3.3DOm$3,300.00 $0.00 049E-6m2 REMOVE-oNLET) EA 1 5 1,Omm$1,m0.00 EA 1 5 1.Dm.m$1,000.00 $0.00 049E-6m7 RENCAni R(PIPE) LF so $ za.m$1,400.00 IF a $ zfi.m$1,344.00 1556.001 OISE-WI2 REMOVE -ER1RIAP SY 39a $ 16.m$6,368.00 U 39a $ 1Gm$6,368.00 $0.00 Subtoal UNIT4$1,306,121.00 $1,129,005.00 ($177,116.00) ha14e Nwn bbvbl DryNal Cuvar MW CA,u4a is<Immry DeY�P�mn 4.3�-16 uli Pda4 WY4b 2-2539 u,t Prb WVY NIMCT MfRRF Unit 5.Miscellaneous Construction I--, MONUlATpN 1 I 5 115,Omm$115,000.00 1 1 5 115.000.m$125,000.00 $0.00 0502-E001 BARRKJV1g,9GN5,TRAFFK HANDLING MO 9 $ 6.m0m$54,000.00 NO 9 $ 6p00.m$54,000.00 $0.00 050E-6020 CONSTRUCTION UM(INSTALL)(TY 1) SY R3 $ 27.00$2,241.00 SY M WAG,$3,071.00 ,83- 050E-6024 CONSTRUCTION EXf (REMOVE)IV 1) 5y LO 5 20m$1,660.00 SY o 5 20.00$1,660.00 $0.00 0506-M TEMP W MT COW FENCE IINSTALL) LF 2624 $ z.m$5,248.00 LF 338 ;$ $4,403.75 1$844.25) 050E-6m9 TEMP SD Mr COW FENCE(REMoVE) LF I624 $ 0.90$2,099.20 LF 13S $1,219.50 ($879.70) 050E-6041 MODEGRADEARE EROSION CONTROL 1OGS(12-DIA(INSTAO) LF 120 $ ]m 840.00 U, 110$ $1,260.00 $420.00 1SOfi-6043 BIODEGRADEFBIE ER0310N CONTROL LOGS(12-DIAXREMOW) U, u0 $ 3.m$360.00 L7 1Io $ 3.m$3611.00 $0.00 05126045 POWM(STKPLXLOW PROF)WI U U $ 25a.m $3,500.00 LF 14 5 25O00 $3,500.00 $0.00 0531-600, CONC 90 LKS(4-) SY 3625 $ 41.m 150,437.50 SY 2033 $91,485.00$ ($58,9s2.50) 0531-6Do4 CURB RAMPS IN l) EA z $ 1,30D00$2,W0.00 EA 2 &VW$2,800.00 $200.00 0542 6m1 REMOVE METAL BEAN GUARORAIL U 3D 5 13.03$390.00 U 0 5 l.m$0.00 ($390.00) Subtotal UNIT 5$338,375.]0 $278,759.25 ($59,616.65) nem IM«marbn O,NIM Comrxt Ra.ixd mmran Esc l,emH Desmm�e� nB of HALF: Do W. lidI.I. HAIiF nn w,ce Bb valve niMCT mFRR6 4-1-16 2-25-19 Unit 6-Lighting,Signing,Marking and Signals 610 LED STEP LIGHT ILUMINAIRE AI G 36 $ I,100.W$39,600.130 EA 36 $ 1.100.E$39,600.00 $0.DO 610 LED BRIDGE FLOOD LIGHT(LUMINAIRE BI E4 5 $ -DO $4,500.00 FA 5 $ 900.00 $4,500.00 $0.00 0618-W14 3/4-PVC PIPE SCH 40 11 552 $ 5.50$3,036.00 LF si2 5 5.50$3,036.00 $0.00 06186023 2'PVC PIPE WH 40 LF 700 $ 13.E$9,100.00 LF $ 13.E$8,801.00 ($299.00) 0618-6 16 2-PVC PIPE SCH 80 D AO $ 13.00$520.00 e $ 13 W$520.DC $0.00 0618 W,A V RMC IF 640 $ 11.00$7,040.00 LF 6. $ li.W$7,040.00 $0.00 0620-fi006 KSO AAWG%NHW GND LF 1931 $ W$1,931.00 LF 1893 $ 1.10$2,082.30 $151.30 0620-6006 d10AWGK11HW LF 4325 $ L.$4,325.00 LF 4211 $ 1.10$4,632.10 $307.10 0620-6008 48 AWG%HHW GND LF $ 1.10$132.00 UP130 $ 1.30$143.00 $11.00 0620-WW 111 XHHW 11 64D $ 1.20$704.00 LF 11. $ 1.30$780.00 $76.00 M24-FOUR GROUND BOX WA EA ll $ 7W.W $7,700.00 G 11 $ 715.00 $7,865.00 $165.00 0628-6013 SERWCE ENTRANCE u 1 s s,SW.W$5,500.00 u I s s.sW.W$s,soo.oa 1$0.00 0644--1 IN S1dRDSN&AMW10BWGI%)sA(P) LF 5 $ 500.E $2,500.00 1: 4 5 5U3.a1 $2'000Do ($500p0) 0666 LOOP REFL PAV MRK TV I4-WHITE(RD) LF 4301 $ I.W$4,101.00 LF 1822 120$2,186.40 0666-6224 PAVEMENT SEALER FOR MRKE(4.1 LF 4101 $ 0W 2,460.60 L: 1822 5 a60$1,093.20$ ($1,367.40( 0678-fi001 PAV SURF PREP FOR MRK(4") IF 4101 $ 0,35$1,435.35 IF 182E $ 0.35$637.70 ($797.65) Subtotal UNIT 6$94,584.95 $90,416.7. ($4,168.25) eidl::r nem no. Oex�P HALFF n,ce vaw HALFF nnn a Bid valve HFBACT."FFREN 44-16 n 2-2519 Unit 7-Special Specifications 1W26W2 GMVEL(DECOMPOSED GRANITE) sr 1g2 s 4D.m$],zao.00 '. las IS 6aaD$e,700.00 $1,420.00 1001-6W1 THEEPROTECTION cs. s 130.00 $1,300.00 EA a $ 4GD W::$1,600.00 5300.00 Subtotal UNIT 7$8,580.00 $30,300.00 $1,720.00 «aa rcem Ib«nmron org6,.l c«nr.n Re,wd mMran isl nem Ho Dess.iPr NAIFF HAIFF wFMCr DIFFERS NCE U 4-1-36 n nke vaw 2-25-19 nn wKe vaw Add On Items oeluznno" Ls so.00 $o.Da s390,W0.00 $190,000.00 $190,000.00 Subtotal ADDITIONAL$0.00 $190,000.00 $190,000.00 Original CP- Reai-C.... mN1MCI-FER.cs 4-1-16 2-25-19 Subtotal UNIT $127,663.00 $97,957.50 ($29,705.50) Subtotal UNIT $1,306,121.00 $1,129,005.00 ($177,116.00) Subtotal UNIT 5 $338,375.70 $278,759.2S ($59,616.45) Subtotal UNIT $94,584.95 $90,416.70 ($4,168.25) Subtotal UNIT 7 $8,580.00 $10,300.00 $1,720.00 Subtuml ADDITIONAL $0.00 $190,000.00 $190,000.00 Project Combined Total $1,875,324.65 $1,796,438.45 ($78,886.20) Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee Ar Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature CIT SECkE E ;