Loading...
HomeMy WebLinkAboutContract 35696-A2 AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. S(,°I -AX (MSC Not Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and CH2M Hill, Inc. , (Engineer) made and entered into City Secretary Contract No. 35696, (the Contract) which was authorized by the City Council by MSC C-22312 on the 14t' day of August, 2007 and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: M-244B Emergency Sanitary Sewer Rehabilitation. WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 271, 2010, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $22,508.15. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $314,658.15. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of Q)Q)G bX.. 2010, in Fort Worth, Tarrant County, Texas. ATTEST: L L L-1-"� - Marty Hendri ,y'd 'FO City Secretary p 0'oposcaofl®pp�®�� :1'wo c ¢ o° Ff APPROVAL RECOWENDED: � r oo° � APPROVED: 0 y / dt o,00 000 009 TAy thEi S. Frank Crumb, P.E. Fernando Costa Director, Water Department Assistant City Manager CH2M HILL, INC. Engineer NO M&C REQUIRED By: Name:Ken C. Hall P.E. Vice President 309 West 7 Street, Suite 1020 Fort Worth, TX 76102 APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX -2- CH2M HILL 309 West 7"Street Suite 1020 Fort Worth,TX 76102 C H 2M H I LL Tel 817-870-1129 Fax 817-8785753 September 27,2010 Mr. Liam Conlon,P.E. City of Fort Worth Water Department 1000 Throckmorton Fort Worth,Texas 76102-6311 Subject: M-244B Emergency Sanitary Sewer Rehabilitation City Project No. 00834 Amendment No.2 Dear Mr.Conlon: The purpose of this letter is to request authorization for an additional$36,111.90. Because there is$13,603.75 of unauthorized funds remaining on the project,the requested additional contract funding is$22,508.15. The additional funding is needed to address additional design services. Project History The M-244B Emergency Sanitary Sewer Rehabilitation project has been successfully designed,bid and awarded. During construction,a portion of existing reinforced concrete pipe (RCP) failed during sliplining operations with high density polyethylene pipe (HDPE). The City has requested CH2M HILL evaluate the failure and provide additional design services for supporting the HDPE piping. Request for Additional Funding The following outlines our request for additional funding. Additional Meetings Since October,2008,over five additional meetings were held with the City to discuss options for supporting the HDPE piping. Labor Labor Category Hours Hourly Rate Total Project Manager 24 hrs $150 $3,600.00 Labor Subtotal $3,600.00 Additional Design CH2M HILL developed two design options for the City's consideration. Additional geotechnical information was required to facilitate the design.CH2M HILL will deliver signed and sealed drawings for the selected option of drilled pier supports and concrete encasement of the piping. Labor Labor Category Hours Hourly Rate Total Project Manager 48 hrs $150 $7,200.00 Project Engineer 45 hrs $155 $6,975.00 Staff Engineer 21 hrs $101 2,121.00 Office , 12 hrs $66 $792.00 Estimating 13 hrs $118 $1,534.00 Technician 32 hrs $120 $3,840.00 Senior Consultant 8 hrs $210 $1,680.00 Labor Subtotal $24,142.00 Expense Geotech (Fugro) $7,609.00 10%Mark-up $760.90 Expense Subtotal $8,369.90 A summary of the total project is as follows: Contract Description Fee Original Contract Design, bid, and construction services for M-244B Sanitary Sewer $292,150.00 Rehabilitation Project Amendment No. 1 Additional Bidding and Construction Assistance $0.00 Amendment No.2 Additional Design Services $22,508.15 TOTAL PROJECT $314,658.15 a The actual cost of Amendment No. 1 was$24,648.00. However,since there was$38,251.75 of unused funds left in the original contract, the actual cost of Amendment No. 1 was deducted leaving a balance of$13,603.75 b The actual cost of Amendment No.2 is$36,111.90. However,since there is$13,603.75 left in the contract,the actual cost of Amendment No. 2 has been deducted necessitating $22,508.15 in additional funding. Sincerely, CH2M HILL CH2M HILL :� C_ • `A�e Chad Simmons,P.E. Ken C.Hall,P.E. Project Manager Vice President Encl.: Amendment No. 2 Breakdown cc: Mr. Robert Terrell w/ encl.