Loading...
HomeMy WebLinkAboutContract 37044COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract Noel /(�'/�p� WHEREAS, Sol No. 3 Ltd., hereinafter called "Developer", desires to make certain improvements to Sol Addition, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal ""d corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called City, to o certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy far the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. Sol Addition -Drainage 1 CFA# 2007106 Dec. 212007 F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the GV of Fort Worth, its o&cers, servants, or employees H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. I. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City _Council approval _ of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to Sol Addition -Drainage 2 CFA# 2007106 Dec. 21 2007 f construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1) None; Paving (B)Atfxch ct- Storm Drain (B4) Attached, Street Lights and Signs (C)lhek N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developers) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibi&W B 1 and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached ExhibitsAlRI , and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $ 14,299.40 Sol Addition -Drainage 3 CFA# 2007106 Dec. 212007 SUMMARY OF COST S 97 Addition Item Developer Cost City Cost Total Cost A. Construction $ - 1. Streets $0.00 $ - 2. Storm Drainage $13,490.00 13,490.00 3. Street Lights $0.00 $ - 4. Street Name Signs $0.00 $ B. Engineering Design $ C. Construction Engineering and Management by DOE (4%) $ 539.60 $ 539.60 D. Materials Testing by DOE (2%) $ 269.80 $ 269.80 TOTALS 141299A0 $ - 14,299.40 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. Sol Addition -Drainage 4 CFA# 2007106 Dec, 212007 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Dev Loper has executed this instrument in triplicate, at Fort Worth, Texas this the Lday of 2007. Approval Recommended: ATTEST: I / i f�iGtl L� �� Mart Hendrix c City Secretary ATTEST: Corporate Secretary Sol Addition -Drainage CFA# 2007106 Dec. 212007 Transportation and Public Works City of Fort Worth .—Mar�6tt� , lip c Assistant City Manager DEVEL�I By: Jorg Ma t s Vice -President �! HAMIL ON 4TH � � ~ 6TH t— o z � W7T! A RN RYCE z w J J_ SHAMROCK CULLEN SHOTT TILLAR WHITE SETfLEME w w HITM RE Q �_ � W ISENB RGE � � WIN ATE _ �I z w �- z w 0 DARNEL�IMORT�ON -- ,' � • • � I:/ ERRI � _ poi-= o Q � � Q �r U L OCA TION MAP MAPSCO PAGE 76, B J � IIII6TH � �� �- �� O zg - z ���- a � � N CASTER W W EL PA C RIO GRAN E r DAGGETT � BROADWAY � � Q �_ LA \ m = o~o can Q �. m TEAGUE NALL AND PERK►NS itoo Maeon Stroot Fort Wort A, T�x�a 7e1 �:_esr� cirr LOCATION MAP REMOVE EX 21" RCP " PROP 36" RCP PROP SD MANHOLE _--___ �� 10 LLR _ [X I'd _ --- me ao ar.5 ---- __- ---------- ---�i---- f _ �------- �.�'---iYtzss _��---------------- g- Ncc Na mo ------ � ----- �r---------- 4r n v in[ wu •-nsa) ------------------ s�z ------ram-. �.jr� �+r�+ ----5 1� 1 1 � ti7 1 e---------� iY FL 92a52&88 fY FL OVT�529.8] 24' FL N�SN.J6 2{' R N�SSU6 {Y R Off=57181 --------- i�.f /LJ� 'LJ /Ll�f/� GRAPHIC SCALE 60 0 30 60 CALE 1'EgGUE NALL AND PERK/NS �y�i60{ 1f00 M/con 3tr//t �/A Fort Worth. T/u/• 7810_ ..ewe EXHIBIT B-1 OPINION OF PROBABLE CONSTRUCTION COST PROJECT: Drainage improvements to serve Lot 1, Block 1, SO 7 Addition TNP JOB # GFF05334 ITEM DESCRIPTION QTY. I DRAINAGE IMPROVEMENTS 30 36" KUr 1 tH 4' S ware SD Manhole 1 EA Cut & plucl Existincl 21" RCP 12 LF Remove Existil icil 21 RCP 28 LF Concrete Pavement Repair 12 LF Concrete Curb Re air 1 EA Lower Existin 10,, Water Line 30 LF Trench Safe 1 LS SWPPP Im lementation & Maintanence 1 LE DATE: 1 y10/2007 !,500.00 $2,5 $500600 $5 $10.00 $1 $101'00 $2,8 $10.00 $1 3,000'00 $3,C �1.00 9 E' III STREETLIGHTS QUANTITY UNIT COST TOTAL COST INTERSECTIONS 0 EA $ 2,600 $00,000000 MID -BLOCK RESIDENTIAL 0 EA $ 2,600 $00,000000 CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2,600 $00,000200 MID -BLOCK COLLECTOR 0 EA $ 2,600 $00,000.00 MID -BLOCK ARTERIAL 0 EA $ 3,200 $00,000000 MID -BLOCK ARTERIAL MEDIAN 0 EA $ 3,200 $00,000.00 RELOCATE EXISTING LIGHT 0 EA $ 1,650 �uu,uuu. Subtotal $00,000.00 City's Cost $00,000.00 Developer's Subtotal $00,000.00 4% Inspection fee Project Total Adjacent Developer's Cost Developer's Cost DEVELOPERS COST: $0.00 (streetlights are existing) CFA CODE # 2007106 S07 Addition Fort Worth, Texas PAGE 1 OF EXHIBIT "C" November 26, 2007 $0,000.00 $00,000.00 $00.000.00 $0,000.00 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in exhibit tic ", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and/or collector streets can be installed singoverhead or and Public underground conductors with the approval of the director of transportation Works. 3. The City of Fort Worth will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the City of Fort Worth the amount shown below prior to the City starting its design efforts, at the option of the developer and at their expense they may purchase the poles, fixtures, and mast arms from the City in or to assure compliance with city material standards ...............__. 4. hts on arterial streets shall be installed with underground conducto Street ligrs 5. The developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operations of the street light system 6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is summarized below. The streetlights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPERS COST: $0.00 (streetlights are existing) November 26, 2007 CFA CODE # 2007106 S07 Addition PAGE 2 OF EXHIBIT "C" LOCATI CFA C®DE # 2007106 S07 Addition PAGE 3 OF EXHIBIT "C" Iv STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $245.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This deve opmen crea es e o owing zero m ersec ions a a to the Developer of $0.00: (No new intersections) S07 Addition CFA code: 2001106 November 21, 2007