Loading...
HomeMy WebLinkAboutContract 52792-A1 Id AMENDMENT NO. 1 TO AGREEMENT STANDARD AGREEMENT FOR TECHNICAL SERVICES 1"11c�cs�2ZO Existing Drop-Off Station — Building Addition and Site Modifications: Brennan STATE OF TEXAS CITY SECRETARY CONTRACT NO. 5a'1 9 a-A l COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Basecom, Inc. (Contractor) made and entered into City Secretary Contract No. (The Contract) which was authorized by the City Council by M&C C-29078, on the 26th day of March, 2019, for the addition of a new office building, the repurposed of an existing covered Swap Shop and site improvements; and WHEREAS, further amendment is necessary to clarify timing of bonding and insurance until with the Notice to Proceed. NOW THEREFORE, City and Contractor, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. ADDITIONAL INSURANCE REQUIREMENTS: item shall be added to read as follows: n. The Contractor shall provide the City of Fort Worth, required bonds and insurance prior to the Issuance of Notice to Proceed, and prior to starting any work on the site. Notice to Proceed shall be in writing, in the form of Attachment "A" 2. ATTACHMENTS: The Notice to Proceed form shall be included as Attachment "A". 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. OFFICIAL. RECORD CITY SECRETARY CFW Standard Agreement for Professional Services AMENDMENT(16Aug2016) FT. WORT° ,tgT*,,f Basecom Inc.—Brennan DOS—Amendment No.1 JuIv 201 EXECUTED this the 3A41 day of_ Sgkmbtl 2019, in Fort Worth, Tarrant County, Texas. Ba om In APPROV D: ,." 1 By: L J By: Os r Oaxac Kevin Gunn President Interim Assistant City Manager F �FORT� APPRO L RECOMMENDED: C RDED: �® By. By. ist'eve ook4Director M ry J. Kayser y Prope y Management Department Ci y Secretary �XAS APPROVED AS TO FORM AND LEGALITY: M&C Not Required Contract Authorization By: �Joh B. Strong sistant City Att/neyy CONTRACT COMPLIANCE MANAGER: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. A, �'� 0, By: I'C4./ Brian R. Glass, AIA Architectural Services Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX CFW Standard Agreement for Professional Services AMENDMENT(16Aug2016) Page 2 of 2 Basecom Inc.—Brennan DOS—Amendment No.1 July 2019 FORTWORTH Attachment"A" Date: NOTICE TO PROCEED Contractor Address Phone:(xxx)xxx-xxxx Project Name: Gentlemen: Pursuant to the provisions of City Secretary Contract Number xxxxx this is your authority to proceed on the referee ton date!Visor to commel ing work,it wOl be nece r you to contact James DicAel, Constr<ic t `Supermtertdelf who will iaharge of subt jro�ectmak6,arrangetents with him tninspect pmict construction He;tn ;be contacted at. $17)392-8 72 Sincerely, y James Diestel Construction Superintendent Cc: M/WBE Office File PROPERTY MANAGEMENT DEPARTMENT FACILITIES DIVISION THE CITY OF FORT WORTH*401 WEST 13'11 STREET*FORT WORTH,TEXAS 76102 (817)392-2586*FAx(817)392-8488 General Conditions of the Contract for Construction Lump Sum Contract Page 27 of 27 CFW PMD—Project Name May 2019