Loading...
HomeMy WebLinkAboutContract 52221-CO1 CITY J' aaa►-co► 1 2d19 - C\��F RAP T WORTH City of Fort worth Change Order Request Pn4wfipxhe:l Forest Park-Zoo Creek Drainage Water&Sewer Improvemnets City Sec No.: 1 52221 Project No.(s): 56002 0600430 5470010 CO2447 C01783 56002117004 DOE No. N/A CityPmj.No,:l CO2447 Project Description: replacement/relocation of a 24 main,a 12 inch water service line,replacement/relocation of 8-inch sanitary sewer main, installation of drainage structures (dam/floodgate),and replacement/installation of paving within Forest Park Contractor: North Texas Contracting Inc. Change Order# 1� Date: 1 811412019 City Project Mgr.1Bryan Lyness—� City Inspector: I Shawn Fargo Phone Number: 817-392-5728 Phone Number 682-760 7195 Dept. F;717,037.00 ater Park& TPW Stormwater Totals Contract Time Recreation (Calender days) Original Contract Amount $689,527.50 1,480,000.00 2,10;W4.50 270 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $717,037.00 $689,527.50 $1,484,00Q,00 $248W.564.50 270 Amount of Proposed Change Order $T .00 $4,000.00 `St1,M00 030 Revised Contract Amount $724,277.00 $693,527.50 $1;480,00000 $2,1�7;$f}45t}_ 30Q r;�'° V tY]�jL� Original Funds Available for Change Orders T- �$5 $200,000,00 Remaining Funds Available for this CO t 6 2• $200,000.00 3 .o ?• �?. Additional Funding(if necessary) t CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) ,.,. ... .. . A _ This change order is to document project adjustments that have been discussed at the initial construction site meeting on 7/31119. Tti' " changes include the following: 1. Change CLSM to CSS on sections of 24",12"water and 8"Sanitary Sewer-no change in unit price,as shown on the attached revised sheets. 2. Changing CLSM to acceptable backfill on sections of 24"water and 8"sanitary sewer. Reducing quantity paid for under the exisitng CLSM bid items,and providing for bid items for each utility with acceptable backfill. �. 3. Addition of 4 "Manhole-Major Adjustment with Frame and Cover'to remove the existing manhole cones and to provide for new cones, V rims,30"Water Tight Hinged Manhole Frame,Cover,and Grade Rings per Detail 33 0513-D008,Sheet C3.6.as shown on the attached a revised plans,and 4 additional concrete collars per details 33 0513-D010 or 33 0513-D012 for final adjustments to proposed pavement. Permanent pavement repair is not part of this bid item as permanent pavement is provided under existing pay items. 4. Adjust the size of the 10"water meter vault to accomodate the OMNI F2 meter. ' It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Q� , e North Texas Contracting Inc. ISteven Lollar p- Shawn Fargo .-as-I Bryan Lynes - a 10 39 (f Scott Penn oft Joel McElhany 0 tVlhn Kasavich 'r S•Fi T-14 1 I Tony Sholola T S I1 4 (y R z a _ X Laura Wilson T- L IJ it lah4 Doug Black 1c161(f 1 Fernando Cos - - -�-- -- :: RECORD LL M&C Number N1A M&C Date Approved I NIA-�� �(Ef >-;'rARY TX FO_ax W RTH City of Fort Worth Change Order Additions Project Name I Forest Park-Zoo Creek Drains a Water&Sewer Im rovemnets City Sec No.: 5222 Project No.(s): 1 56002 0600430 5470010 CO2447 CO1783 56002 0700430 5470010 DOE No.[= City Proj.No.: 02 Project replacement/relocation of a 24 main,a 12 inch water service line,replacement/relocation of 8-inch sanitary sewer main, Description I installation of drainage structures(damlfloodgate),and replacemenUinstallation of paving within Forest Park Contractor I North Texas Contracting Inc. Change Order. Date: 8/ 4 20 9 City Project Mgr. I Bryan L ness City Inspector Shawn Fargo ADDITIONS am DUCRUTION DEPT OW !Unit , Unit Gosh Total 1-3 24"DIPWater ipe(Restrained Joints) (Acceptable ac i I Water 230M LF 4515.76 103,500.00 U1-39 24"DIP Water Pipe(Restrained Joints) (CSS Backfill) Water 360.00 LF $ 500.00 f 180,000.00 0 0Water Meter Vault(increased Size for Omni F2 Meter) Water 1.00 EA $ 42,600.00 42,600.00 1-41 Vertical be down block@ 24"45D Bend(CIP wl Reba r(net change) Water 4. 0 EA 2,7 55.00 $ 11,140.00 2Concrete Collar Park&Recrea 4.00 EA 250.00 $ 1,000.00 U2-10 3305.0106,Manhole-Major Adjustment with Frame and Cover Park&Recrea 4.00 EA $ 5,000.00 20,000.00 U2- 66 8"PVC SDR-26 Sewer Pipe,Acceptable Bacill Park&Recrea 340.00 LF $ 260.00'1 85,000.00 U2-27 8"PVC SDR-26 Sewer Pipe,CSS Backfill Park&Recrea 366.00 LF $ 300.00 109,800.00 Water $337,240.00 Park&Recreation $215,800.00 TPW Stormwater Additions Sub Total $553,040.00 Page 2 of 4 Fo ll W10 P"r H City of Fort worth ' v — Change Order Deletions Project Name Forest Park-Zoo Creek Drainage Water&Sewer Improvemnets City Sec No.: 1 52221 Project No.(s): Juuuf DOE No. = City Proj.No.: CO2447 Project Description replacement/relocation of a 24 main,a 12 inch water service line,replacementirelocation of 8-inch sanitary sewer main,installation of drainage structures damMood ate,and replacement/installation of paving within Forest Park Contractor North Texas Contracting Inc. Change Order: 1� Date 8/14/2019 City Project Mgr. Bryan Lyness City Inspector: F7Shawn Fargo DELETIONS ITEM DESCRIPTION DEFT t2ty JUnlit _ Unit Cost Total 2a 24"DIP Water Pipe(Restrained Joints) (CLSM) Water 590.00 LF $ 500.00 $ 295,000.00 12 10"Water Meter Vault Water 1.00 EA $ 35,000.00 $ 35,000.00 2 8"PVC SDR-26 Sewer Pipe,CLSM Backfill Park&Recreation 706.00 LF $ 300.00 $ 211,800.00 Water $330,000.00 Park&Recreation $211,800.00 TPW Stormwater Page 3 of 4 Deletions Sub Total 1$541,800.00 MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total I<0:0la Previous Change Orders cot DATE AMOUNT Total $0 00 Page 4 of 4 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. -------------------- Si tore es S Name of Employee r � Title OFFICIAL RECORD . CITY SECRETARY FT. WORTH,TX