Loading...
HomeMy WebLinkAboutContract 27615-A8 AMENDMENT NO. 8 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. A-IW5-Aar (M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Alan Plummer Associates, Inc. , (Engineer) made and entered into City Secretary Contract No. 27615, (the Contract) which was authorized by the City Council by M&C C-19022 on the 26th day of March 2002; and WHEREAS, the Contract involves engineering services for the following project: Design of the Wastewater Diversion from the Eagle Mountain Lake Drainage Basin to the Big Fossil Creek Drainage Basin and the Lake Worth South Shore Sewer, Project No. 1309 WHEREAS, it has become necessary to execute Amendment No. 8 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in M&C C-24751,adopted by the City Council on the 1st day of March 2011 and further amplified in a proposal letter dated November 10, 2010, copies of which are attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $63,512 . 00 . 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the City of Fort Worth,Texas Amendment to Engineering Agreement PMO Official Release Date:6.18.2010 Page 1 of 2 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX I total fee paid by the City for all work and services shall not exceed the sum of $1 ,599,226. 78 . 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the S day of 2010, in Fort Worth, Tarrant County, Texas . ATTEST: o % Marty Hendrix va °Zd o° City Secretary Q °oo o° d ��� °°°Ooo°oo�°°°mod a�A��a APPROVAL RECOMMENDED: APPROVED: L' 4 64 �� S . Frank Crumb, P .E . Director, Fernando Costa Water Department Assistant City Manager ALAN PLUMMER ASSOCIATES, INC. C- a i rj I ENGINEER Contract Authorization B _ __ . 3I �_1_---- Name: David A. Gudal, P.E. Principal 1320 S. University Drive, Suite 300 Fort Worth, Texas 76107 APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney City of Fort Worth,Texas Amendment to Engineering Agreement PMO Official Release Date:6.18.2010 Page 2 of 2 No ASSOCIATES, INC. ENVIRONMENTAL ENGINEERS•DESIGNERS•SCIENTISTS JAMES L.ALTSTAETTER,PE 03 1 8-028-01 STEPHEN J.COONAN,PE JOHN M.D'ANTONI,DE,PE November 10, 2010 PEGGY W GLASS,PhD DAVID A.GUDAL PE REX H.HUNT,PE BETTY L.JORDAN,PE Ms. Madelene Rafalko, P.E. ELLEN T.McDONALD,PhD,PE Project Manager JOHN R.MINAHAN,PE Water Department TIMOTHY J.NOACK,PE City of Fort Worth ALAN H.PLUMMER,JR.,PE,BCEE 1000 Throckmorton Street WILLIAM C.RACKLEY,PE Fort Worth, Texas 76102 ALAN R.TUCKER,PE Re: City of Fort Worth Water Department Wastewater Diversion from East of Eagle Mountain Lake Drainage Basin to Big Fossil Creek Drainage Basin and Low Pressure Sewer System to Serve the South Shore of Lake Worth Project Nos. P171-070171131 150 and P171-0701710140020 Contract Amendment No. 8 Proposal Dear Ms. Rafalko: This letter describes our proposal to perform additional design work, as an amendment to the above referenced project. As discussed at the January 14, 2009 meeting, specifically Alan Plummer Associates, Inc. (APAI) proposes the following: 1. Revisions: This project was on hold from mid-2003 until last year while possible re-alignment was being addressed between the City and developers in the area. In addition to "dusting off' the project after being on hold for so long; APAI has been requested to re-address certain items related to the design of the pipelines differently from when the project was put on hold in 2003, including: a. Re-location of the transition manhole between the force main and gravity sections — this involved additional meetings, preparation of a memorandum, and required re-work on several sheets that were previously at 90% complete. b. Re-alignment in area of new school —development of a new school along the alignment that was not previously known in 2003 forced some re- work. c. Further consideration of alternate pipe materials —APAI re-considered the appropriate piping material at the City's request; during the project re- start period this past year. 1320 SOUTH UNIVERSITY DRIVE SUITE 300 FORT WORTH,TEXAS 76107 PHONE 817.806.1700 METRO 817.870.2544 FAX 817,870,2536 www.apaie—com TSPE Firm No.13 Ms. Madelene Rafalko, P.E. Page 2 November 10, 2010 d.Further consideration of pipeline sizing and flows —APAI re-evaluated the pipeline size and flows at the City's request, during the project re-start period this past year. e. Check of options in potentially connecting the gravity pipeline downstream end into multiple locations of the Big Fossil interceptor. This evaluation was requested by the City to insure some flexibility in the alignment if the proposed ROW of Heritage Trace Parkway was revised. A memorandum was prepared. f. 2„d 90% QC review — the force main segment had previously been reviewed at the 90% complete level in 2003, prior to the project being put on hold. 2. Additional survey work: Also due to the length of time this project was on hold, property ownership changes have occurred, and new easements are needed to obtain right-of-way. The Amendment is related specifically to the Wastewater Diversion portion of the above-referenced contract. APAI will perform all of the work associated with this proposal in house, except for the survey work, which will be performed by Spooner & Associates, Inc., as a subcontract. As discussed with Andy Cronberg at a meeting November 9, the Pre-Construction Assistance and Construction Assistance components of the original contract scope of work are no longer needed, due to the delay in construction. Therefore the budget allotted for those tasks can be utilized to help fund the additional work described here. The amendment should therefore reflect that these construction related tasks have been deleted from the scope of work. It is envisioned that a new contract will be enacted to cover construction related tasks, when the project is slated for construction. The Amendment includes the following: Task Unit Cost Total Cost 1. Revisions $ 114,933.00 2. Additional Survey/Easement work $ 19,410.00 3. CREDIT for unused Pre-Construction and $ (70,831.00) Construction Assistance tasks budget TOTAL $63,512.00 The addition of this Amendment would revise the total contract amount to $1,599,226.78. 1::\prgjeets`.03. I K028-00\11rojectR a.rnI.Contracts\10-11-I o let to mrafaIko.doc Ms. Madelene Rafalko, P.E. Page 3 November 10, 2010 The total above includes the subconsultant's portion of the work. The table below provides a breakdown of their sub-contract amounts. Spooner&Associates (M/WBE Firm—Surveying) $15,000 Enclosed are four original copies of the Amendment. APAI is ready to work with you on this important project. Sincerely yours, ALAN PLUMMER ASSOCIATES, INC. f l� David A. Gu a , E. Principal Enclosures DAG/PCD/vlw P:\pmjccts'W;18`,028-00`.1'rojectMamt\Contracts\10-1 1-10 let to mrafalko.Joc Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 3/1/2011 DATE: Tuesday, March 01, 2011 REFERENCE NO.: **C-24751 LOG NAME: 60APAI AMEND 8 SUBJECT: Authorize Amendment No. 8 in the Amount of$63,512.00 with Alan Plummer Associates, Inc.,for Services Related to the Wastewater Diversion from the Eagle Mountain Lake Drainage Basin to the Big Fossil Creek Basin (COUNCIL DISTRICTS 2 and 7 and ETJ) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 8 in the amount of$63,512.00 with Alan Plummer Associates, Inc.,for services related to the Wastewater Diversion from the Eagle Mountain Lake Drainage Basin to the Big Fossil Creek Basin increasing the contract cost to $1,599,226.78. DISCUSSION: On March 26, 2002, (M&C C-19022), the City Council authorized the City Manager to execute an Engineering Agreement with Alan Plummer Associates, Inc.,for the Wastewater Diversion from the Eagle Mountain Lake Drainage Basin to the Big Fossil Creek Basin and the Lake Worth South Shore Sewer for a fee not to exceed$958,152.00. Subsequent amendments increased the contract amount to $1,535,714.78. The design of the Wastewater Diversion from the Eagle Mountain Lake Drainage Basin to the Big Fossil Creek Basin was 90 percent complete, and then put on hold due to a lack of construction funding. During this time, development in the area occurred and therefore changes to the construction plans and specifications are necessary. The proposed Engineering Amendment No. 8 will compensate the engineer for additional survey, geotechnical engineering and testing services necessary to modify the alignment from the original routing due to recent development activity in the area and to update the plans to reflect current conditions. M/WBE -Alan Plummer Associates, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional 24 percent participation on this Amendment No. 8. The City's goal on this Amendment is 10 percent. This project is located in COUNCIL DISTRICTS 2 and 7 and the ETJ. FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers P258 531200 707140130930 $63.512.00 CERTIFICATIONS: http://apps.cfwnet.org/ecouncil/printme.asp?id=14646&print=true&DocType=Print 3/3/2011 a Page 2 of 2 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8207) Additional Information Contact: Madelene Rafalko (8215) ATTACHMENTS 1. 60APAI AMEND 8 FAR.pdf (CFW Internal) 2. 60APAI AMEND 8 MWBE.idf (CFW Internal) 3. 60APAI-AMEND8.pdf (Public) http://apps.cfwnet.org/ecouncil/printmc.asp?id=14646&print=true&DocType=Print 3/3/2011