Loading...
HomeMy WebLinkAboutContract 53510-PM1FORT WORTH ~ PROJECT MANUAL FOR CITY SECRETARY .,, · .. ~r.TNo. 535 to -PM 1 THE CONSTRUCTION OF McALISTER RD PHASE 1 AND WATER, SEWER, PAVING, DRAINAGE AND STREETLIGHT IMPROVEMENTS TO SERVE SOUTHGATE MARKETPLACE PHASE 1 Betsy Price Mayor City Project No.102205 Chris P. Harder, P.E. Water Director William Johnson David Cooke City Manager Director, Transportation and Public Works Department Prepared for The City of Fort Worth Water Project No: 560008-0600430-102205-001480 Sewer Project No: 560008-0 70 0430-102205-001380 2020 Manhard Consulting OFFICIAL RECORD CITY SECRETARY FT. WORTH , TX 0000 10- 1 PROJECT RECORD DOCUMENTS FOR DEVELOPER AWARDED PROJECTS Page 1 of 4 1 SECTION 00 00 10 2 TABLE OF CONTENTS 3 DEVELOPER AWARDED PROJECTS 4 5 Division 00 - General Conditions 6 ; 7 ; 8 00-4 0 Bid FWpubliely (Only advertised; other -wise r.,=,-emit) 9 00 42 43 Proposal Form Unit Price (Use DAP Version) 10 0043 13 Bid Bond (Optional) 11 0045 11 Bidders Prequalification's (Optional) 12 0045 12 Prequalification Statement (Use DAP Version) 13 0045 13 Bidder Prequalification Application (Optional) 14 00 45 26 Contractor Compliance with Workers' Compensation Law (Required) 15 00 45 40 Minority Business Enterprise Goal (If required by City) 16 00 52 43 Agreement (As provided by Developer or City's DAP Version) 17 0061 25 Certificate of Insurance (Use actual Acord Form) 18 0062 13 Performance Bond (Use DAP Version) 19 0062 14 Payment Bond (Use DAP Version) 20 0062 19 Maintenance Bond (Use DAP Version) 21 00 72 00 General Conditions (Optional) 22 00 73 00 Supplementary Conditions (Optional) 23 0073 10 Standard City Conditions of the Construction Contract for Developer Awarded 24 Projects (Required) 25 26 Division 01 - General Requirements 27 01 11 00 Summary of Work 28 now-25 00 Substitution ,... n..eduiys (Use my i f w ppli.,able) 29 01 31 19 Preconstruction Meeting 30 31 32 A132 33 Q„ st eti Vide (pre only if able) 33 01 33 00 Submittals 34 01 35 13 Special Project Procedures 35 01 4523 Testing and Inspection Services 36 01 5000 Temporary Facilities and Controls 37 01 5526 Street Use Permit and Modifications to Traffic Control 38 01 57 13 Storm Water Pollution Prevention Plan 39 0! 58 3 Temporary o,... eet e: e (Use .t. :r. p!i .,ble) 40 01 6000 Product Requirements 41 01 6600 Product Storage and Handling Requirements 42 43 ; other -wise strike Wu 44 01 7423 Cleaning 45 01 77 19 Closeout Requirements 46 01 7823 Operation and Maintenance Data 47 01 7839 Project Record Documents 48 49 CITY OF FORT WORTH Southgate Marketplace Phase I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 102205 Revised September 1, 2015 0000 10- 2 PROJECT RECORD DOCUMENTS FOR DEVELOPER AWARDED PROJECTS Page 2 of 4 1 2 3 4 5 6 7 8 9 10 Division 02 - Existing Conditions 0241 13 Selective Site Demolition 0241 14 Utility Removal/Abandonment 0241 15 Paving Removal Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 03Te3 Controlled Low ,. &FeFigh Material (rr &M) 12 13 Division 26 - Electrical 14 2605 000 Commen WeA Results for Ueetrieel 15 16 2605 33 Raceway and Boxes for Electrical Systems 17 2605 43 UndeF-gFokmd Ptietsa+td Rueeways f, Fl tFiOal Systems 18 19 Division 31 - Earthwork 20 31 1000 Site Clearing 21 3123 16 Unclassified Excavation 22 31 23 23 Borrow 23 24 31 24 nn Embankments 25 26 31 3600 Gablens 27 31 3700 Riprap 28 29 Division 32 - Exterior Improvements 30 31 32 01 1 8 L T-I-O 'Temper_ar., Asphalt Pavan Da,..�'� rGTfI-PO�C[r'rl"-C'P'i-S�'!L"]-[i'Tf1Tb^'ICC�.'fi�ir 32 33 32 €1 23 Flexi Courses 34 32 11 29 Lime Treated Base Courses 35 3211-33 Cement Treated Base 36 32 12 16 Asphalt Paving 37 32 1273 Asphalt Paving Gme e Sealaflts 38 32 13 13 Concrete Paving 39 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 40 41 32 14 16 _Brick l l.,k..I)a.,:n 42 32 16 13 Concrete Curb and Gutters and Valley Gutters 43 32 1723 Pavement Markings 44 9231 13 Chain Link Fenees and Gmes 45 3231 26 'Wire rend Gates 46 3231-29 Wood renees-and Gates 47 48 49 3292 13 Hydro -Mulching, Seeding, and Sodding 50 3293 3 TFees and Shnib CITY OF FORT WORTH Southgate Markelplace Phase 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 102205 Revised September 1, 2015 0000 10-3 PROJECT RECORD DOCUMENTS FOR DEVELOPER AWARDED PROJECTS Page 3 of 4 1 2 Division 33 - Utilities 3 33 01 30 Sewer and Manhole Testing 4 33 01 31 Closed Circuit Television (CCTV) Inspection 5 3303 10 Bypass Pumping of Existing bCfn'R^'vr—�Systems 6 3304 10 - j9i;lt-)3OHd i lig fiRd Bleetfieaal !so Iatien 7 33 04 '-r -r1Ge; l Control Test Stations 8 33 04 1�-,2 MagnesiLl 9 33 0430 Temporary Water Services 10 33 0440 Cleaning and Acceptance Testing of Water Mains 11 33 05 10 Utility Trench Excavation, Embedment, and Backfill 12 33 05 12 Water Line Lowering 13 33 05 13 FrEtMe, GSN'ef: ftHd Grade Rings 14 3305 14 AdjustingMinlets, Valve Boxes, � OtheF 84ti6t r�,ade es, aloe fes4 ., � nvr, irrna�mcr�crcicrwra�-ccrv-rxccxa 15 39 05 116 Concrete Water Vaults 16 33 05 17 Genmte Gellars 17 33 05 20 Auger Boring 18 3305 21 -:14inielW,eiF Plate 19 33 0522 Steel Casing­Xpe 20 33 95 ?3 1-land Tunneling 21 33 05 24 1 c.,s,lig Tunnel Li P'Me Hstallskien-e€-Ga n or F 22 33 05 26 Utility Markers/Locators 23 330530 E p!OFMG SNeWVRtiffil f F Bi stin . i tilitie 24 25 33 11 11 Ductile Iron Fittings 26 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 27 331-13 GeneFete Pfessury Pipe, Bar tat....pped, Steal C-.Y!i deF-rype 28 29 33 11 15 We S4essed Gener-ete Cylinder Pipe 30 33 12 10 Water Services 1-inch to 2-inch 31 32 33 1220 Resilient Seated Gate Valve 33 33-1221 A WWA R-Uh .e.. Seated Iibmer-A.. ■I..iyes 34 33 1225 Connection to Existing Water Mains 35 33 1230 Combination Air Valve Assemblies for- Ps4able Wa4er- Systems 36 33 1240 Dry -Barrel Fire Hydrants 37 33 1250 Water Sample Stations 38 33 1260 Blew owV.,lyes- 39 40 33 31 13 Fiberglass ReinfeFeed Pipe for- Gravit-y Sanitary Sewe 41 33 31 15 itaryse-;' erT(Gravity and Per-ee Mains� 42 3331 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 43 33�31 21 Pel)w' C) G lased ProAle r:ravit Sanitary Sewer- Pipe y 44 3.3 3! 22 Saflitaf:y Sewer- Slip Lining 45 46 33 31 50 Sanitary Sewer Service Connections and Service Line 47 731-31-70 _Combination A'r Valve for Sanit.,..., Sewef Fevee Mai Rs 48 33 39 10 Cast -in -Place Concrete Manholes 49 33 3920 Precast Concrete Manholes 50 33 3930 Fiberglass Manholes CITY OF FORT WORTH Southgate iLlarkelPlace Phase I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN. 102205 Revised September 1, 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 0000 10-4 PROJECT RECORD DOCUMENTS FOR DEVELOPER AWARDED PROJECTS Page 4 of 4 333940 Waslewaier Aeeess Chamber- (WAG 33 39 60 Epoxy Liners for Sanitary Sewer Structures 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 33 41 ' r HDPE Storm Sewer Np-e 33 46asorcocr-Storm srrxrnra 39 461'Tpns 3349 10 Cast -in -Place Manholes and Junction Boxes 33 49 20 Curb and Drop Inlets 33 49 40 Storm Drainage Headwalls and Wingwalls Division 34 — Transportation 34 41 20 Roadway Illumination Assemblies 34 41 30 Aluminum Signs 34-; 1 13 Tr-affie CeniffrOj Appendix GC-4.01 Availability of Lands GC-4.02 Subsurface and Physical Conditions GC-4.04 Underground Facilities GC-4.06 Hazardous Environmental Condition at Site GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates (If required by City) GC-6.09 Permits and Utilities GC-6.24 Nondiscrimination GR-01 60 00 Product Requirements 32 END OF SECTION CITY OF FORT WORTH Southgate Marketplace Phase I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN.• 102205 Revised September 1, 2015 SECTION 00 1113 2 DEVELOPER AWARDED CONTRACTS 3 SECTION 00 42 43 4 Developer Awarded Projects - PROPOSAL FORM 5 6 UNIT PRICE BID 00 42 43 DAP - BID Proposal Page 1 of 1 Bidder's Application Project Item Infonnation Bidder's Proposal Bidlist Item Specification Section Unit of Bid No. Description No Measure Quantity Unit Price Bid Value UNIT 1: WATER IMPROVEMENTS PVC, Ductile Iron, Concrete Pressure and Buried Steel Pipe 024114-D123 1 Pressure Plugs EA 54 $550.00 $29,700.00 2 Temporary Service Connection 33 04 30-D133 LS 1 $750.00 $750.00 Standard Cleaning Wye for Water Distribution Pipe (12" and 33 04 40-D135 3 Smaller) EA 8 $500.00 $4,000.00 Standard Cleaning Wye for Water Transmission Pipe (16" 33 04 40-D136 4 and Larger) EA 2 $650.00 $1,300.00 5 Embedment for Water Lines 12-Inch and Smaller 33 05 10-D101 CY 555 $15.00 $8,325.00 6 Embedment for Water Lines 16-Inch to 24-Inch 33 05 10-D102 CY 233 $17.00 $3,961.00 7 Embedment for Water Services 330510-D104 CY 6 $50.00 $300.00 8 Waterline Lowering Detail 33 0512-D162 EA 1 $1,200.00 $1,200.00 9 Ductile Iron Water Fittings 33 11 11 TON 1 $3,000.00 $3,000.00 10 Polyvinyl Chloride (PVC) Pressure Pipe 6" 33 11 12 LF 79 $17.00 $1,345.55 11 Polyvinyl Chloride (PVC) Pressure Pipe 8" 33 11 12 LF 535 $20.00 $10,690.00 12 Polyvinyl Chloride (PVC) Pressure Pipe 12" 33 11 12 LF 2272 $26.00 $59,072.00 13 Polyvinyl Chloride (PVC) Pressure Pipe 16" 33 11 12 LF 592 $67.00 $39,664.00 14 Fusion Polyvinyl Chloride (PVS) Pressure Pipe 12" 33 11 12 LF 15 1-1/2 & 2-Inch Water Service 331210-D112 EA 28 $750.00 $21,000.00 2-Inch Standard Concrete Meter Box (1-1/2 & 2-Inch Meters) 331210-D117 16 (Class C) EA 28 $850.00 $23,800.00 17 Water Distrbution Gate Valve & Box (12-Inch and Smaller) 33 12 20-D126 EA 31 $2,300.00 $71,300.00 Water Transmission Gate Valve & Vault (16-Inch to 36-Inch) 33 12 20-D127 18 EA 2 $6,500.0 $13,000.00 19 Connection to Existing Water Mains 33 12 25-D129 EA 2 $1,250.0 $2,500.00 20 Standard Fire Hydrant (Straight) 33 12 40-D120 EA 7 $3,000.0 $21,000.00 21 Water Sampling Station 331250 EA 28 22 Automatic Flush Valve w/ Sewer Service Line EA 1 $5,000.0 $5,000.00 23 Temporary Automatic Flusher EA 1 $2,500.013 $2,500.00 24 25 26 27 28 29 30 31 32 33 34 37 38 39 40 TOTAL UNIT 1: WATER IMPROVEMENTS T 5323.407.55 CITY OF FORT WORTH STANDARD CONSTRUCTION BID FORM — DEVELOPER AWARDED PROJECTS Form Revised April 2, 2014 00 42 43 Bid Proposal — DAP.docx SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP - BID Proposal Page 2 of 1 Bidder's Application Project Item Information Biddefs Proposal Bidlist Item Specification Section Unit of Bid No Description No_ Measure Quantity Unit Price Bid Value UNIT II: SANITARY S IER IMPROVEMENTS 1 Concrete Encasement for Utility Pipes 33 0510 Cy 10 $500.00 $5 00000 2 Pre -CCTV Inspection 33 01 31 LF 4953.5 $1.00 $4,953 50 3 Post -CCTV Inspection 33 01 31 LF 4953.5 $1.00 $4,95150 4 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 8" 33 31 20 LF 4953.5 $32.00 $158,512.00 5 Sanitary Sewer Service (Only serves 1 lot) 33 31 50-D214 EA 3 $1,500.00 $4,500.00 6 Manhole -4'Diameter 33 39 10/20-D137 EA 43 $4,500.00 $193,500 00 7 Manhole Vacuum Testing 33 01 30 EA 12 $200.00 $2,400.00 8 4' Drop Manhole 33 39 10/33 39 20 EA 2 $7,500.00 $15,000 .00 9 Epoxy Liners For Sanitary Sewer Structures 33 39 60 VF 141.1 $325.00 $45,857 .5 0 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $434,675.50 CITY OF FORT WORTH STANDARD CONSTRUCTION BID FORM — DEVELOPER AWARDED PROJECTS Form Revised April 2, 2014 0042 43 Bid Proposal — DAP.docx 1 2 3 4 s 6 8 9 10 11 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Project Item Infonnalion Bidlist Item No Description 1 Cast -In -Place Concrete 2 Reinforced Concrete Rip Rap 3 Standard 4' Square Junction Box 4 Standard 4' Drop Inlet with Lid 5 Manhole Steps 6 24" RCP Storm Sewer 7 21" RCP Storm Sewer 8 15' Curb Inlet 9 24" Flared Headwall, 1 pipe 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 CITY OF FORT WORTH STANDARD CONSTRUCTION BID FORM— DEVELOPER AWARDED PROJECTS Form Revised April 2, 2014 00 42 43 DAP - BID Proposal Page 3 of I Bidder's Application S pecificalion Section Unit of No Measure UNIT III: DRAINAGE IMPROVEMENTS 03 30 00 CY 3137 00-D419 SY 33 49 10-D409 EA 33 49 20-D408 EA 33 49 10-D414 EA 33 41 10-D416 LF 334110 LF 33 49 20 EA 33 49 40 EA TOT.AI UNIT III: n!:!41NAGEIMPROVEMENTS Bidder's Proposal Bid tantiri, Unit Price Bid Value 10 $750.00 $7,500.00 10 $700.00 $7,000.00 3 $6,500.00 $19,500 00 1 $5,500.00 $5,500,00 154 $50.00 $7,700.00 212 $60.00 $12, 720 00 92 $48.00 $4,416 00 4 $7,500.00 $30,000.00 1 $7,000.00 $7,000.00 $101,336.00 00 42 43 Bid Proposal — DAP.docx 2 SECTION 00 42 43 3 Developer Awarded Projects - PROPOSAL FORM 4 0 J1`Ikd;JNM =111=311] 00 42 43 DAP - BID Proposal Page 4 of 1 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Section Unit of Bid No Description No Measure Quantity Unit Pi ice Bid Value UNIT IV: PAVING IMPROVEMENTS 1 McAlister Road Concrete Paving (8") 32 13 13 SY 1993 $69.4C $138,314.20 2 Concrete Sidewalk 32 13 20 SY 1425 $41.88 $59,679.00 3 Temporary Asphalt Paving (3") 32 12 16 SY 947 $21.40 $20,265.80 4 Subgrade Preparation: Lime Treatment 32 11 29 SY 3234 $1.75 $5,659.50 5 Lime for Subgrade (36 Ibs/SY) 32 11 29 TN 59 $200.00 $11,800.00 6 Barrier Free Ramp, Type P-1 32 13 20 D-540 EA 2 $1,680.00 $3,360.00 7 Hydro -Mulching, Seeding, and Sodding 3292 13 SY 1490 $4.00 $5,960.00 8 TxDOT Driveways: Concrete Driveway 32 13 20 SF 24013 $9.6, $230,764 93 9 TxDOT Driveways: Subgrade Prep: Lime Treatment 32 1129 SY 2935 $1.75 $5,136.25 10 TxDOT Driveways: Lime for Subgrade (36 Ibs/SY) 32 11 29 TN 53 $200.00 $10,600.00 11 TxDOT Driveways: Concrete Curb and Gutter 32 16 13 LF 1866 $19 22 $35,864 .52 12 TxDOT Driveways: Concrete Sidewalk 321320 SY 898 $50.79 $45,609.42 13 TxDOT Driveways : Barrier Free Ramp,Type P-1 32 13 20 D-540 EA 6 $1,680.00 $10,080.00 14 24" SLD Pvmt Marking HAE (W) 32 17 23 LF 26 $12.50 $325.00 15 4" SLD Pvmt Marking HAS (Y) 321723 LF 972 $1.50 $1,458.00 16 4" BRK Pvmt Marking HAS (Y) 32 1723 LF 972 $1.50 $1,458.0 17 12" SLD Pvmt Marking HAW (W) 32 1723 LF 204 $7.5C $1,530.00 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 37 38 40 41 42 43 44 45 TOTAL U NIT IV: PAVING IM P nvs:M ENTS $587,864.62 CITY OF FORT WORTH STANDARD CONSTRUCTION BID FORM— DEVELOPER AWARDED PROJECTS Form Revised April 2, 2014 00 42 43 Bid Proposal — DAP.docx SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP - BID Proposal Page 5 of 1 Bidder's Application Project Item Infonnation Bidders Proposal Bidlist Item Specification Section Unit of Bid No Description No Measure Q iantit\ Unit Price Bid Value UNIT V: STREET LIGHTING IMPROVEMENTS 1 Street Luminaire Pole and Fixture Details 24 41 20-D621 EA 4 $4,180.00 $16,720.00 2 Communications Multi -Duct Conduit 26 05 30 LF 685 $30.00 $20,550.00 3 Raceways and Boxes for Electrical Systems 26 05 33 EA 4 $2,160.00 $8,640.00 4 Rdwy Ilium Foundation TY 1 344120 D622 EA 4 $1,225.00 $4,900.00 5 Furnish/Install Alum Sign Ground Mount City Std. 344130 EA 3 $550.00 $1,650.00 6 Furnish/Install Alum Sign Ex. Pole Mount 34 41 30 EA 1 $550.00 $550.00 7 Relocate Street Light Pole 34 41 20 EA 1 $900.00 $900.0 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 40 41 42 43 44 45 TOTAi UNIT V: STREET LIGHTING IMPROVEMENTS $53,910.00 CITY OF FORT WORTH STANDARD CONSTRUCTION BID FORM — DEVELOPER AWARDED PROJECTS Form Revised April 2, 2014 00 42 43 Bid Proposal — DAP.docx 2 SECTION 00 42 43 3 Developer Awarded Projects - PROPOSAL FORM 4 31 UNIT PRICE BID 00 42 43 DAP - BID Proposal Page 6 of 1 Bidder's Application Project Item lnfonnation Biddel's Proposal Bidlist Item Specification Section Unit of Bid No. Description No Measure Quantity Unit Price Bid Value UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS 1 2 3 4 5 6 7 B 9 10 11 12 13 14 15 16 1B 19 20 21 22 23 24 25 26 27 2B 29 30 31 32 33 34 35 36 37 3B 39 40 41 42 43 44 45 TOTAL UNIT VI: TRAFFIC SIGNAL IMPRnVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION BID FORM — DEVELOPER AWARDED PROJECTS Form Revised April 2, 2014 00 42 43 Bid Proposal — DAP.docx 1 2 3 4 5 6 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP - BID Proposal Page 7 of 1 Bidder's Application Project Item Infonnation Bidde(s Proposal istSpecification Section Unit of Bid Bid1No Item Description I p I Measure I Unit Price I Bid Value No Quantify 8 Bid Summ UNIT I: WATER IMPROVEMENTS $323,407. UNIT II: SANITARY SEWER IMPROVEMENTS $434,676, UNIT III: DRAINAGE IMPROVEMENTS $101,336. UNIT IV: PAVING IMPROVEMENTS $587,864. UNIT V: STREET LIGHTING IMPROVEMENTS $53,910. UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS Total Construction Bidl Sl 9 10 This Bid is submitted by the entity named below: 11 BY: Ri nni Avow ` 12 BIDDER: 13 Spring Valley Construction Company 10950 Alder Circle 14 Dallas, TX 75238 "1 ffLF : Vice Preaidcal n B �5unsttw ion 15 16 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 200 working days after the date when the 17 CONTRACT commences to run as provided in the General Conditions. 18 CITY OF FORT WORTH STANDARD CONSTRUCTION BID FORM — DEVELOPER AWARDED PROJECTS 00 42 43 Bid Proposal — DAP.docx Form Revised April 2, 2014 017839-1 PROJECT RECORD DOCUMENTS Page 1 of 3 1 SECTION 00 45 11 2 BIDDERS PREQUALIFICATIONS 3 4 1. Summary. All contractors are required to be prequalified by the City prior to submitting 5 bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification 6 Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is 7 not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder 8 Prequalification Application in accordance with the requirements below. 9 10 The prequalification process will establish a bid limit based on a technical evaluation and 11 financial analysis of the contractor. The information must be submitted seven (7) days prior 12 to the date of the opening of bids. For example, a contractor wishing to submit bids on 13 projects to be opened on the 7th of April must file the information by the 31 st day of March 14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's 15 Prequalification Application, the following must accompany the submission. 16 a. A complete set of audited or reviewed financial statements. 17 (1) Classified Balance Sheet 18 (2) Income Statement 19 (3) Statement of Cash Flows 20 (4) Statement of Retained Earnings 21 (5) Notes to the Financial Statements, if any 22 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 23 of Incorporation, Articles of Organization, Certificate of Formation, LLC 24 Regulations, Certificate of Limited Partnership Agreement). 25 c. A completed Bidder Prequalification Application. 26 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 27 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 28 number visit the Texas Comptroller of Public Accounts online at the 29 following web address www.wiudow.state.tx.usltaxpermitt and fill out the 30 application to apply for your Texas tax ID. 31 (2) The firm's e-mail address and fax number. 32 (3) The firm's DUNS number as issued by Dun & Bradstreet. This number 33 is used by the City for required reporting on Federal Aid projects. The DUNS 34 number may be obtained at www.dnb.com. 35 d. Resumes reflecting the construction experience of the principles of the firm for firms 36 submitting their initial prequalification. These resumes should include the size and 37 scope of the work performed. 38 e. Other information as requested by the City. 39 40 2. Prequalification Requirements 41 a. Financial Statements. Financial statement submission must be provided in 42 accordance with the following: 43 (1) The City requires that the original Financial Statement or a certified copy 44 be submitted for consideration. CITY OF FORT WORTH Southgate Marketplace Phase I SOUTHGATE MARKETPLACE PHASE I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN:102205 Revised April 2, 2014 01 78 39 - 2 PROJECT RECORD DOCUMENTS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital = current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Pregualification Application. A Bidder Prequalifcation Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 (2) A minimum of five (5) references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility to Bid 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. CITY OF FORT WORTH Southgate Marketplace Phase I SOUTHGATE MARKETPLACE PHASE 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN:102205 Revised April 2, 2014 1 2 3 4 5 6 7 8 01 78 39 - 3 PROJECT RECORD DOCUMENTS Page 3 of 3 c. The City will issue a letter as to the status of the prequalification approval. d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid the prequalified work types until the expiration date stated in the letter. 9 END OF SECTION CITY OF FORT WORTH Marketplace Phase 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 Southgate SOUTHGATE MARKETPLACE PHASE 1 CPN.- 102205 0045 12 DAP PREQUALIFICATION STATEMENT Page I of I SECTION 00 4512 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work Type" provide the complete major work type and actual description as provided by the Water Department for water and sewer and TPW for paring, Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Water New Development Open Rumsey Construction 4/30/2020 Cut (16" and under Wastewater New Development Rumsey Construction 4/30/2020 Open Cut (12" and under) Concrete Construction < 15,000 Pavecon Public Works 1 /1 /2021 SY, Asphalt Construction < 15,000 SY Street Lighting Bean Electric 3/12/2021 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Spring Valley Construction Company BY: Stephen J. Bruszer 10950 Alder Circle Dallas, TX 75238 (Signatu ) TITLE: Presj ent DATE: February 5, 2020 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT — DEVELOPER AWARDED PROJECTS IPRC19-0145 Contract Book.docx Form Version September 1, 2015 01 78 39 - 1 PROJECT RECORD DOCUMENTS Page 1 of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. <102205>. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Spring Valley Construction Company Company 10950 Alder Circle Address Dallas, TX 75238 City/State/Zip THE STATE OF TEXAS COUNTY OF DALLAS § By: Stephen J. Bruszer (Please Print) Signatu Title: President (Please Print) BEFOR E, the undersigned authority, on this day personally appeared known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that &she executed the same as the act and deed of for the purposes and consideration therein expressed and in the capacity therein stated. GIVENMER MY HAND AND SEAL OF OFFICE this day of U.lpc_A A , 2000 ,5111!! KIM YOUNG z;• Notary Public, State of. Texas Comm. Expires 11-10-2020 Notary Publsc in a 1d� r the Ee of Texas '•l���;�,,.� Notary ID 10687376 END OF SECTION CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [CPN.1022051 Revised April 2, 2014 00 52 43 - 1 Developer Awarded Project Agreement Page 1 of 4 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on January 17, 2020 is made by and between the Developer, (Ware 4 Vista Southgate #1, L.P.), authorized to do business in Texas ("Developer"), and Spring Valley 5 Construction Company, authorized to do business in Texas, acting by and through its duly authorized 6 representative, ("Contractor"). 7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project 11 identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is generally 14 described as follows: 15 McXiver Rd Phase I Extension and Public Im rovement to Serve Southgate Marketplace Phase I 16 CPN.•102205 17 Article 3. CONTRACT TIME 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents are 20 of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within (200) working days after the date when the 23 Contract Time commences to run as provided in Paragraph 2.04 of the Standard City Conditions of 24 the Construction Contract for Developer Awarded Projects. 25 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that Developer will suffer 27 financial loss if the Work is not completed within the times specified in Paragraph 3.2 above, plus 28 any extension thereof allowed in accordance with Article 10 of the Standard City Conditions of the 29 Construction Contract for Developer Awarded Projects. The Contractor also recognizes the delays, 30 expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the 31 Developer if the Work is not completed on time. Accordingly, instead of requiring any such proof 32 , Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay 33 Developer cone thousands Dollars ($1 0. 00.00) for each day that expires after the time specified 34 in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [CPN:102205] Revised April 2, 2014 005243-2 Developer Awarded Project Agreement Page 2 of 4 35 Article 4. CONTRACT PRICE 36 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 37 Documents an amount in current funds of One Million Five Hundred One Thousand One Hundred Ninety 38 Four and 67/100 Dollars ($1,501,194.67). 39 Article 5. CONTRACT DOCUMENTS 40 5.1 CONTENTS: 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 A.The Contract Documents which comprise the entire agreement between Developer and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequalification Statement 3) State and Federal documents (project specific) b. Insurance ACORD Form(s) c. Payment Bond (DAP Version) d. Performance Bond (DAP Version) e. Maintenance Bond (DAP Version) f. Power of Attorney for the Bonds g. Worker's Compensation Affidavit h. MBE and/or SBE Commitment Form (If required) 3. Standard City General Conditions of the Construction Contract for Developer Awarded Projects. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [CPN:102205] Revised April 2, 2014 005243-3 Developer Awarded Project Agreement Page 3 of 4 73 Article 6. INDEMNIFICATION 74 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, 75 the city, its officers, servants and employees, from and against any and all claims arising out of, 76 or alleged to arise out of, the work and services to be performed by the contractor, its officers, 77 agents, employees, subcontractors, licenses or invitees under this contract. This indemnification 78 provision is specifically intended to operate and be effective even if it is alleged or proven that 79 all or some of the dam es beine sou ht were caused in whole or in part., bv any act omission 80 or negligence of the city. This indemnity provision is intended to include, without limitation, 81 indemnity for costs, expenses and legal fees incurred by the city in defending against such claims 82 and causes of actions. 83 84 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, 85 its officers, servants and employees, from and against any and all loss, damage or destruction 86 of property of the city, arising out of, or alleged to arise out of, the work and services to be 87 performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees 88 under this contract. This indemnification provision is snecifically intended too erate and be 89 effective even if it is alleged or proven that all or some of the damages being Sought were caused 90 in whole or in part, by any act, omission or negligence of the city. 91 92 Article 7. MISCELLANEOUS 93 7.1 Terms. 94 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of the 95 Construction Contract for Developer Awarded Projects. 96 7.2 Assignment of Contract. 97 This Agreement, including all of the Contract Documents may not be assigned by the Contractor 98 without the advanced express written consent of the Developer. 99 7.3 Successors and Assigns. 100 Developer and Contractor each binds itself, its partners, successors, assigns and legal representatives 101 to the other party hereto, in respect to all covenants, agreements and obligations contained in the 102 Contract Documents. 103 7.4 Severability. 104 Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable 105 by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall 106 continue to be valid and binding upon DEVELOPER and CONTRACTOR. 107 7.5 Governing Law and Venue. 108 This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue 109 shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, 110 Fort Worth Division. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [CPN:102205] Revised April 2, 2014 005243-4 Developer Awarded Project Agreement Page 4 of 4 111 112 113 7.6 Authority to Sign. 114 Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized 115 signatory of the Contractor. 116 117 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 118 counterparts. 119 120 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 121 Contractor: Developer: Spring Valley Construction Vista Ware Southgate #l, L.P. Stephen J. Bruszer Colton Wright (Printed Name) Title: President Company Name: Address: 10950 Alder Circle (Printed Name) Title: Vice President Company name: Address: 8350 N. Central Expressway Suite 1750 City/State/Zip: Dallas, TX 75238 City/State/Zip: Dallas, TX 75206 January 17, 2020 Date Date 122 CITY OF FORT WORTH [Southgate Marketplace Phase I] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [CPN:102205] Revised April 2, 2014 00 61 25 - 1 PROJECT RECORD DOCUMENTS Page 1 of 3 1 SECTION 00 62 13 2 PERFORMANCE BOND Bond No. 46BCSIF2215 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF DALLAS § 7 That we, Spring Valley Construction Company, known as "Principal" herein and 8 Hartford Fire Insurance Company , a corporate surety(sureties, if more than 9 one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one 10 or more), are held and firmly bound unto the Developer, (Ware Vista Southgate #1, L.P.), 11 authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal 12 corporation ("City"), in the penal sum of One Million Five Hundred One Thousand One Hundred 13 Ninety Four and 67/100 Dollars ($1,501,194.67), lawful money of the United States, to be paid in 14 Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made 15 jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, 16 administrators, successors and assigns, jointly and severally, firmly by these presents. 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 19 CFA Number <CFA 1 9-0093>; and 20 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded 21 the 16th day of December, 2019, which Contract is hereby referred to and made a part hereof for 22 all purposes as if fully set forth herein, to furnish all materials, equipment labor and other 23 accessories defined by law, in the prosecution of the Work, including any Change Orders, as 24 provided for in said Contract designated as < Southgate Marketplace Phase 1 >. 25 NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall 26 faithfully perform it obligations under the Contract and shall in all respects duly and faithfully 27 perform the Work, including Change Orders, under the Contract, according to the plans, 28 specifications, and contract documents therein referred to, and as well during any period of 29 extension of the Contract that may be granted on the part of the Developer and/or City, then this 30 obligation shall be and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [CPN: 102205] Revised January 31, 2012 00 61 25 - 2 PROJECT RECORD DOCUMENTS Page 2 of 3 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 3 Worth Division. 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 17th day of January , 20 20 . (Principal) Secr M as to Principal JLNAAX���� Witness as to Surety PRINCIPAL: Spring Valley Construction Company BY: ure Stephen J. Bruszer, President Name and Title Address: 10950 Alder Circle Dallas, TX 75238 SURETY: Hartford Fire Insurance Company BY: Signature Amber Jones Attome -in-Fact Name and Title Address: One Hartford Plaza Hartford, CT 06155 Telephone Number: (860) 547-5000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [CPN: 102205] Revised January 31, 2012 006125-3 PROJECT RECORD DOCUMENTS Page 3 of 3 The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [CPN: 102205] Revised January 31, 2012 00 61 25 - 1 PROJECT RECORD DOCUMENTS Page 1 of 2 1 SECTION 00 6214 2 PAYMENT BOND 3 Bond No. 46BCSIF2215 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Spring Valley Construction Company, known as "Principal" herein, and 8 Hartford Fire Insurance Company , a corporate surety ( or 9 sureties if more than one), duly authorized to do business in the State of Texas, known as "Surety" 10 herein (whether one or more), are held and firmly bound unto the Developer, (Ware Vista Southgate 11 #1, L.P.), authorized to do business in Texas "(Developer"), and the City of Fort Worth, a Texas 12 municipal corporation ("City"), in the penal sum of One Million Five Hundred One Thousand One 13 Hundred Ninety Four and 67/100 Dollars ($1,501,194.67), lawful money of the United States, to 14 be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be 15 made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, 16 executors, administrators, successors and assigns, jointly and severally, firmly by these presents: 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth, by and through a Community Facilities Agreement, 19 CFA Number <CFA19-0093>; and 20 WHEREAS, Principal has entered into a certain written Contract with Developer, awarded 21 the 16' day of December, 2019, which Contract is hereby referred to and made a part hereof for all 22 purposes as if fully set forth herein, to furnish all materials, equipment, labor and other accessories 23 as defined by law, in the prosecution of the Work as provided for in said Contract and designated 24 as <Southgate Marketplace Phase 1 >. 25 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 26 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 27 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 28 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 29 force and effect. CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [CPN:102205] Revised January 31, 2012 006125-2 PROJECT RECORD DOCUMENTS Page 2 of 2 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 17th day of January, 2020. in 7 8 9 10 11 12 AT ST: (Principal) Secretary Witness as to Principal ATTEST: ind" AkZA4 (Surety) Secretary Witness as to Surety PRINCIPAL: Spring Valley Construction Company BY: u Stephen J. Bruszer, President Name and Title Address: 10950 Alder Circle Dallas, TX 75238 SURETY: Hartford Fire Insurance Company BY: L_ Signature Amber Jones, Attomey-in-Fact Name and Title Address: One Hartford Plaza Hartford, CT 06155 Telephone Number: (860) 547-5000 Note: If signed by an officer ofthe Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [CPN:102205] Revised January 31, 2012 006125-3 PROJECT RECORD DOCUMENTS Page 3 of 2 END OF SECTION CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [CPN:102205] Revised January 31, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 SECTION 00 62 19 MAINTENANCE BOND 00 61 25 - 1 PROJECT RECORD DOCUMENTS Page I of 3 Bond No. 46BCSIF2215 THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we Spring Valley Construction Company, known as "Principal" herein and Hartford Fire Insurance Company , a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, (Ware Vista Southgate #1, L.P.), authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the sum of One Million Five Hundred One Thousand One Hundred Ninety Four and 67/100 Dollars ($1,501,194.67), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 21 CFA Number <CFA19-0093>; and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer 23 awarded the 16th day ofDecember, 2019, which Contract is hereby referred to and a made part 24 hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and 25 other accessories as defined by law, in the prosecution of the Work, including any Work resulting 26 from a duly authorized Change Order (collectively herein, the "Work") as provided for in said 27 Contract and designated as < Southgate Marketplace Phase I >; and 28 29 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 30 accordance with the plans, specifications and Contract Documents that the Work is and will 31 remain free from defects in materials or workmanship for and during the period of two (2) years 32 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 33 CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [CPN:102205] Revised January 31, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 006125-2 PROJECT RECORD DOCUMENTS Page 2 of 3 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the Maintenance Period. NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by Developer or City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance Bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH !Southgate Marketplace Phase IJ STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [CPN:102205] Revised January 31, 2012 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 006125-3 PROJECT RECORD DOCUMENTS Page 3 of 3 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 17th day of January, 2020. A (Principal) Secret W itn Prtncipal ATTEST: 4 (Surety) Secretary Witness as to Surety �Y PRINCIPAL: Spring Valley Construction Company BY: ode Stephen J. Bru_ •rer, President Name and Title Address: 10950 Alder Circle Dallas, TX 75238 SURETY: Hartfprd Fire Insurance Company BY: tL,_WA_yY1__ Signature Amber Jones, Attorney -in -Fact Name and Title Address: One Hartford Plaza Hartford, CT 06155 Telephone Number: (860) 547-5000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [CPN: J02205] Revised January 31, 2012 Direct lnquiriesJClaims to: POWER OF ATTORNEY THE HARTFORD Bond T-4 One Hartford Plaza Hartford, Connecticut 06155 call.• 888-266-3488 or fax: 860-757-5835) KNOW ALL PERSONS BY THESE PRESENTS THAT: Auency Code: 4 6 - 5 0 8 8 94 © Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut 0 Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana © Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut 0 Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a cot pomlion duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of Unlimited Julie Baumberger, Amber Jones, April Penny, Darrin J. Weber of DALLAS, Texas their true and lawful Attomey(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on August 1, 2009, the Companies have caused these presents to be signed by its Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Altomey. j ��� �`++nnm. f+„ 'V►� y�ti74 y� �r�74� :� 7P70 John Gray, Assistant Secretary STATE OF CONNECTICUT ss. Hartford COUNTY OFHARTFORD r M. Ross Fisher, Vice President On this 12th day of July, 2012, before me personally came M. Ross Fisher, to me known, who being by me duly swom, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. Kathleen T. Maynard CERTIFICATE Notary Public My Commission Expires July 31, 2016 I, the undersigned, Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of January 17, 2020. Signed and sealed at the City of Hartford. �sr ry,, y*ys�ites•,y a cep 'a"b ►goIF �_ �y� µ�++areriW f„ � �/►Ayll' y�lYy4 �i �2079 '� � 4C ■ S.L��, +ri '���� ■ ''rr[HVL 'Anna. Kevin Heckman, Assistant Vice President POA 2012 IMPORTANT NOTICE To obtain information or make a complaint: You may contact your Agent. You may call The Hartford's Consumer Affairs toll - free telephone number for information or to make a complaint at: 1-800-451-6944 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Web: www. tdi. texas. g_ov E-mail: ConsumerProtection tdi. texas. qov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the (agent) (company) (agent or the company) first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener informaci6n o para presentar una queja: Usted puede comunicarse con su Agente. Usted puede llamar al numero de telefono gratuito de The Hartford's Consumer Affairs para obtener informacion o para presentar una queja at: 1-800-451-6944 Usted puede comunicarse con el Departamento de Seguros de Texas para obtener informacion sobre companias, coberturas, derechos, o quejas at: 1-800-252-3439 Usted puede escribir at Departamento de Seguros de Texas a: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Sitio web: www. tdi. texas. gay E-mail: ConsumerProtection tdi. texas. gov DISPUTAS POR PRIMAS DE SEGUROS 0 RECLAMACIONES: Si tiene una disputa relacionada con su prima de seguro o con una reclamation, usted debe comunicarse con (el agente) (la compania) (el agente o la compania) primero. Si la disputa no es resuelta, usted puede comunicarse con el Departamento de Seguros de Texas. ADJUNTE ESTE "ISO A SU POLIZA: Este aviso es solamente para prop6sitos informativos y no se convierte en parte o en condicion del documento adjunto. 0201e by The Her". C?a! iF W1h)n: Intemelly Co mfled. All dphts reserved. No pert of Mis document maybe reproduced, publahedor used Mlhwd the pom i smn of The Hertford. Producer Compensation Notice TxE lf IIARTFORD You can review and obtain information on The Hartford's producer compensation practices at www.thehartford.com or at 1-800-592-5717 HR 00 H093 00 0207 © 2007, The Hartford Page 1 of 1 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Article 1 — Definitions and Terminology 1 1.1 Defined Terms.. 1.2 Terminology..... Page ............... 1 ............... 5 Article 2 — Preliminary Matters 6 2.1 Before Starting Construction......................................................................................................... 6 2.2 Preconstruction Conference........................................................................................................... 6 2.3 Public Meeting............................................................................................................................... 6 Article 3 — Contract Documents and Amending 6 3.1 Reference Standards....................................................................................................................... 6 3.2 Amending and Supplementing Contract Documents.................................................................... 6 Article 4 — Bonds and Insurance 7 4.1 Licensed Sureties and Insurers...................................................................................................... 7 4.2 Performance, Payment, and Maintenance Bonds.......................................................................... 7 4.3 Certificates of Insurance........................................................................................... ..... ................ 7 4.4 Contractor's Insurance................................................................................................................... 9 4.5 Acceptance of Bonds and Insurance; Option to Replace............................................................ 12 Article 5 — Contractor's Responsibilities 12 5.1 Supervision and Superintendent.................................................................................................. 12 5.2 Labor; Working Hours................................................................................................................. 13 5.3 Services, Materials, and Equipment............................................................................................ 13 5.4 Project Schedule...........................................................................................................................14 5.5 Substitutes and "Or-Equals"........................................................................................................ 14 5.6 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) ...................................... 16 5.7 Concerning Subcontractors, Suppliers, and Others..................................................................... 16 5.8 Wage Rates...................................................................................................................................18 5.9 Patent Fees and Royalties........................................................................................ .................... 19 5.10 Laws and Regulations............................................................................................................... 19 5.11 Use of Site and Other Areas........................................................................................................ 19 5.12 Record Documents....................................................................................................................... 20 5.13 Safety and Protection................................................................................................................... 21 5.14 Safety Representative................................................................................................................... 21 5.15 Hazard Communication Programs.............................................................................................. 22 5.16 Submittals.....................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee........................................................................... 23 CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 5.18 Indemnification............................................................................................................................. 24 5.19 Delegation of Professional Design Services................................................................................ 24 5.20 Right to Audit: .... **"* ......... * ..... * ....... — ............ * .................. * ...... * ................ * ... —'— .............. * ......... 25 5.21 Nondiscrimination........................................................................................................................25 Article 6 — Other Work at the Site.................................................................................................................... 26 6.01 Related Work at Site.................................................................................................................... 26 Article 7 — City's Responsibilities.................................................................................................................... 26 7.1 Inspections, Tests, and Approvals............................................................................................... 26 7.2 Limitations on City's Responsibilities.......................................................................... ............... 26 7.3 Compliance with Safety Program................................................................................................ 27 Article 8 — City's Observation Status During Construction............................................................................. 27 8.1 City's Project Representative....................................................................................................... 27 8.2 Authorized Variations in Work.................................................................................................... 27 8.3 Rejecting Defective Work..........................................................................................................27 8.4 Determinations for Work Performed...........................................................................................28 Article9 — Changes in the Work....................................................................................................................... 28 9.1 Authorized Changes in the Work................................................................................................. 28 9.2 Notification to Surety................................................................................................................... 28 Article 10 — Change of Contract Price; Change of Contract Time.................................................................. 28 10.1 Change of Contract Price............................................................................................................. 28 10.2 Change of Contract Time............................................................................................................. 28 10.3 Delays........................................................................................................................................... 28 Article 11 — Tests and Inspections; Correction, Removal or Acceptance of Defective Work ....................... 29 11.1 Notice of Defects.......................................................................................................................... 29 11.2 Access to Work............................................................................................................................ 29 11.3 Tests and Inspections............................................................................... .................... 29 11.4 Uncovering Work.......................................................................................................................30 11.5 City May Stop the Work.............................................................................................................. 30 11.6 Correction or Removal of Defective Work................................................................................30 11.7 Correction Period......................................................................................................................... 30 11.8 City May Correct Defective Work.............................................................................................. 31 Article12 — Completion............................................................................................................ .................... 32 12.1 Contractor's Warranty of Title..................................................................................................... 32 12.2 Partial Utilization......................................................................................................................... 32 12.3 Final Inspection............................................................................................................................ 32 12.4 Final Acceptance.......................................................................................................................... 33 Article13 — Suspension of Work...................................................................................................................... 33 13.01 City May Suspend Work.............................................................................................................. 33 CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 Article14 — Miscellaneous............................................................................................................................... 34 14.1 Giving Notice............................................................................................................................... 34 14.2 Computation of Times ................... .............................................................................................. 34 14.3 Cumulative Remedies.................................................................................................................. 34 14.4 Survival of Obligations................................................................................................................ 35 14.5 Headings....................................................................................................................................... 35 CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.1 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right -of- way or easement on a recorded plat. 8. Contract—Theentire and integrated written document incorporating the Contract Documents between the Developer, Contractor, andlor City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH [Southgate Marketplace Phase 1 ] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond It. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions M. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor --The individual or entity with whom Developer has entered into the Agreement. 11. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH [Southgate Marketplace Phase 1 ] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verb that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a. in. and ending at 6: 00 p. m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 00 73 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made apart of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a. m. and ending at 5: 00 p. m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. 1.2 Terminology A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH [Southgate Marketplace Phase 1 ] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 00 73 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 - PRELIMINARY MATTERS 2.1 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.2 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.3 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 - CONTRACT DOCUMENTS AND AMENDING 3.1 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.2 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH [Southgate Marketplace Phase /] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.1 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.2 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.3 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.4 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10-11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: None 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: None Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence:: None Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroadcompany is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised December 20, 2012 0073 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.5 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.1 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH [Soulhgale Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised December 20, 2012 0073 10-13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.2 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.3 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH [Southgate Marketplace Phase 1 ] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.4 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.5 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if. a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH [Southgate Marketplace Phase /] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised December 20, 2012 0073 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnij� and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.13. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.6 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.7 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH [Southgate Marketplace Phase !] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. (Check this box if there is any City Participation) XNot Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10-18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.8 Wage Rates ❑ Required for this Contract. XNot Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a fmal determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the IIth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a parry in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.9 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemni and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised December 20, 2012 0073 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH [Southgate Marketplace Phase /] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised December 20, 2012 0073 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.13. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. TIHS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGUG NCCE OF THE C LU. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS ][NDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED_ IN WHOLE OR IN PART_ BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised December 20, 2012 0073 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH [Southgate Marketplace Phase I] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a parry to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.1 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.2 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised December 20, 2012 0073 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.3 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.1 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.2 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.3 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised December 20, 2012 0073 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.4 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.1 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.2 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.1 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.2 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.3 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH [Southgate Marketplace Phase /] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.1 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.2 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.3 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.4 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.5 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.6 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.7 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised December 20, 2012 0073 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.8 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.1 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.2 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.3 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.4 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.1 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.2 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.3 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0073 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.4 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.5 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised December 20, 2012 006125-1 DAP PROJECT RECORD DOCUMENTS Page i of 3 1 SECTION 01 1100 2 SUMMARY OF WORK 3 GENERAL 4 SUMMARY 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 0061 25 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 All Work shall be in accordance with railroad requirements set forth in Division 7 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, 18 plants, lawns, fences, culverts, curbing, and all other types of structures or 19 improvements, to all water, sewer, and gas lines, to all conduits, overhead pole 20 lines, or appurtenances thereof, including the construction of temporary fences 21 and to all other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or 23 private lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of 25 the Work. 26 b. Notices shall be applicable to both public and private utility companies and 27 any corporation, company, individual, or other, either as owners or 28 occupants, whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character 30 resulting from any act, omission, neglect, or misconduct in the manner or 31 method or execution of the Work, or at any time due to defective work, 32 material, or equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the 35 Project to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the 37 Work is not in progress and when the site is vacated overnight, and/or at all 38 times to provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH [Southgate Marketplace Phase /] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 00 61 25 - 3 DAP PROJECT RECORD DOCUMENTS Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 10 11 12 13 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised December 20, 2012 00 61 2519 - 1 DAP PROJECT RECORD DOCUMENTS Page 1 of 3 1 SECTION 01 31 19 2 PRECONSTRUCTION MEETING 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. No construction schedule required unless requested by the City. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Coordination 20 1. Attend preconstruction meeting. 21 2. Representatives of Contractor, subcontractors and suppliers attending meetings 22 shall be qualified and authorized to act on behalf of the entity each represents. 23 3. Meeting administered by City may be tape recorded. 24 a. If recorded, tapes will be used to prepare minutes and retained by City for 25 future reference. 26 B. Preconstruction Meeting 27 1. A preconstruction meeting will be held within 14 days after the delivery of the 28 distribution package to the City. 29 The meeting will be scheduled and administered by the City. 30 2. The Project Representative will preside at the meeting, prepare the notes of the 31 meeting and distribute copies of same to all participants who so request by fully 32 completing the attendance form to be circulated at the beginning of the meeting. 33 3. Attendance shall include: 34 a. Developer and Consultant 35 b. Contractor's project manager 36 c. Contractor's superintendent 37 d. Any subcontractor or supplier representatives whom the Contractor may 38 desire to invite or the City may request 39 CITY OF FORT WORTH [Soulhgale ti/arketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 00 61 2519 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing cc. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH [Southgate Marketplace Phase 1 ] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August 30, 2013 00 61 2519 - 3 DAP PROJECT RECORD DOCUMENTS Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 10 11 12 13 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August 30, 2013 006125-1 DAP PROJECT RECORD DOCUMENTS Page 1 of 8 1 SECTION 0133 00 2 DAP SUBMITTALS 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following Work- 7 related submittals: 8 a. Shop Drawings 9 b. Product Data (including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. No 20 separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals 25 from the requirements of the Contract Documents. 26 2. Coordination of Submittal Times 27 a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing 28 the related Work or other applicable activities, or within the time specified in the 29 individual Work Sections, of the Specifications. 30 b. Contractor is responsible such that the installation will not be delayed by processing 31 times including, but not limited to: 32 a) Disapproval and resubmittal (if required) 33 b) Coordination with other submittals 34 c) Testing 35 d) Purchasing 36 e) Fabrication 37 f) Delivery 38 Similar sequenced activities 39 c. No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised August 30, 2013 00 61 25 -2 DAP PROJECT RECORD DOCUMENTS Page 2 of 8 1 d. Make submittals promptly in accordance with approved schedule, and in such 2 sequence as to cause no delay in the Work or in the work of any other contractor. 3 B. Submittal Numbering 4 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- 5 reference identification numbering system in the following manner: 6 a. Use the first 6 digits of the applicable Specification Section Number. 7 b. For the next 2 digits number use numbers 01-99 to sequentially number each 8 initial separate item or drawing submitted under each specific Section number. 9 C. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. 10 A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical 11 submittal number would be as follows: 12 13 03 30 00-08-B 14 15 1) 03 30 00 is the Specification Section for Concrete 16 2) 08 is the eighth initial submittal under this Specification Section 17 3) B is the third submission (second resubmission) of that particular shop 18 drawing 19 C. Contractor Certification 20 1. Review shop drawings, product data and samples, including those by 21 subcontractors, prior to submission to determine and verify the following: 22 a. Field measurements 23 b. Field construction criteria 24 c. Catalog numbers and similar data 25 d. Conformance with the Contract Documents 26 2. Provide each shop drawing, sample and product data submitted by the Contractor 27 with a Certification Statement affixed including: 28 a. The Contractor's Company name 29 b. Signature of submittal reviewer 30 c. Certification Statement 31 1) "By this submittal, I hereby represent that I have determined and verified 32 field measurements, field construction criteria, materials, dimensions, 33 catalog numbers and similar data and I have checked and coordinated each 34 item with other applicable approved shop drawings." 35 D. Submittal Format 36 1. Fold shop drawings larger than 8 '/z inches x 11 inches to 8 % inches x 11 inches. 37 2. Bind shop drawings and product data sheets together. 38 3. Order 39 a. Cover Sheet 40 1) Description of Packet 41 2) Contractor Certification 42 b. List of items / Table of Contents 43 c. Product Data /Shop Drawings/Samples /Calculations 44 E. Submittal Content 45 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH [Southgate Marketplace Phase /] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August 30, 2013 0061 25 -3 DAP PROJECT RECORD DOCUMENTS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of- 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product, with the Specification Section number, page and 8 paragraph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 F. Shop Drawings 16 1. As specified in individual Work Sections includes, but is not necessarily limited to: 17 a. Custom -prepared data such as fabrication and erection/installation (working) 18 drawings 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 f. Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. Where correct fabrication of the Work depends upon field measurements 31 Provide such measurements and note on the drawings prior to submitting for 32 approval. 33 G. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List, clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List, submittal data may include, but is not necessarily limited to: 38 a. Standard prepared data for manufactured products (sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation instructions 41 2) Availability of colors and patterns 42 3) Manufacturer's printed statements of compliances and applicability 43 4) Roughing -in diagrams and templates 44 5) Catalog cuts CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 00 61 25 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 8 6) Product photographs 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August 30, 2013 006125-5 DAP PROJECT RECORD DOCUMENTS Page 5 of 8 1 a. Shop Drawings 2 1) Distributed to the City 3 2) Copies 4 a. 8 copies for mechanical submittals 5 b. 7 copies for all other submittals 6 c. If Contractor requires more than 3 copies of Shop Drawings returned, 7 Contractor shall submit more than the number of copies listed above. 8 b. Product Data 9 1) Distributed to the City 10 2) Copies 11 a) 4 copies 12 e. Samples 13 1) Distributed to the Project Representative 14 2) Copies 15 a) Submit the number stated in the respective Specification Sections. 16 3. Distribute reproductions of approved shop drawings and copies of approved product 17 data and samples, where required, to the job site file and elsewhere as directed by 18 the City. 19 a. Provide number of copies as directed by the City but not exceeding the number 20 previously specified. 21 K. Submittal Review 22 1. The review of shop drawings, data and samples will be for general conformance with 23 the design concept and Contract Documents. This is not to be construed as: 24 a. Permitting any departure from the Contract requirements 25 b. Relieving the Contractor of responsibility for any errors, including details, 26 dimensions, and materials 27 c. Approving departures from details furnished by the City, except as otherwise 28 provided herein 29 2. The review and approval of shop drawings, samples or product data by the City does 30 not relieve the Contractor from his/her responsibility with regard to the fulfillment of 31 the terms of the Contract. 32 a. All risks of error and omission are assumed by the Contractor, and the City will 33 have no responsibility therefore. 34 3. The Contractor remains responsible for details and accuracy, for coordinating the Work 35 with all other associated work and trades, for selecting fabrication processes, for 36 techniques of assembly and for performing Work in a safe manner. 37 4. If the shop drawings, data or samples as submitted describe variations and show a 38 departure from the Contract requirements which City finds to be in the interest of the 39 City and to be so minor as not to involve a change in Contract Price or time for 40 performance, the City may return the reviewed drawings without noting an exception. 41 5. Submittals will be returned to the Contractor under 1 of the following codes: 42 a. Code 1 43 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or 44 comments on the submittal. 45 a. When returned under this code the Contractor may release the equipment 46 and/or material for manufacture. 47 b. Code 2 CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 00 61 25 - 6 DAP PROJECT RECORD DOCUMENTS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a. The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August 30, 2013 00 61 25 -7 DAP PROJECT RECORD DOCUMENTS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be used 9 on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications 11 If specifically required in other Sections of these Specifications, submit a P.E. Certification 12 for each item required. 13 N. Request for Information (RFI) 14 1. Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. When the Contractor believes there is a conflict between Contract Documents 17 c. When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Sufficient information shall be attached to permit a written response without further 21 information. 22 23 24 25 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised August 30, 2013 006125-8 DAP PROJECT RECORD DOCUMENTS 2 3 M 5 PART 2 — PRODUCTS [NOT USED] Page 8 of 8 6 PART 3 - EXECUTION [NOT USED] 7 8 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August 30, 2013 00 61 25 - I DAP PROJECT RECORD DOCUMENTS Page 1 of 7 1 SECTION 0135 13 2 SPECIAL PROJECT PROCEDURES 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 f. Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include, but are not necessarily limited to: 22 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 — General Requirements 24 3. Section 33 12 25 — Connection to Existing Water Mains 25 26 1.2 REFERENCES 27 A. Reference Standards 28 1. Reference standards cited in this Specification refer to the current reference standard 29 published at the time of the latest revision date logged at the end of this Specification, 30 unless a date is specifically cited. 31 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High 32 Voltage Overhead Lines. 33 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 34 Specification 35 1.3 ADMINISTRATIVE REQUIREMENTS 36 A. Coordination with the Texas Department of Transportation 37 1. When work in the right-of-way which is under the jurisdiction of the Texas Department 38 of Transportation (TxDOT): 39 a. Notify the Texas Department of Transportation prior to commencing any work 40 therein in accordance with the provisions of the permit CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August, 30, 2013 00 61 25 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 7 1 a. Notify the Texas Department of Transportation prior to commencing any work 2 therein in accordance with the provisions of the permit 3 b. All work performed in the TxDOT right-of-way shall be performed in compliance 4 with and subject to approval from the Texas Department of Transportation 5 B. Work near High Voltage Lines 6 1. Regulatory Requirements 7 a. All Work near High Voltage Lines (more than 600 volts measured between 8 conductors or between a conductor and the ground) shall be in accordance with 9 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 10 2. Warning sign 11 a. Provide sign of sufficient size meeting all OSHA requirements. 12 3. Equipment operating within 10 feet of high voltage lines will require the following 13 safety features 14 a. Insulating cage -type of guard about the boom or arm 15 b. Insulator links on the lift hook connections for back hoes or dippers 16 c. Equipment must meet the safety requirements as set forth by OSHA and the safety 17 requirements of the owner of the high voltage lines 18 4. Work within 6 feet of high voltage electric lines 19 a. Notification shall be given to: 20 1) The power company (example: ONCOR) 21 a) Maintain an accurate log of all such calls to power company and record 22 action taken in each case. 23 b. Coordination with power company 24 1) After notification coordinate with the power company to: 25 a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower 26 the lines 27 c. No personnel may work within 6 feet of a high voltage line before the above 28 requirements have been met. 29 C. Confined Space Entry Program 30 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA 31 requirements. 32 2. Confined Spaces include: 33 a. Manholes 34 b. All other confined spaces in accordance with OSHA's Permit Required for 35 Confined Spaces 36 D. Use of Explosives, Drop Weight, Etc. 37 1. When Contract Documents permit on the project the following will apply: 38 a. Public Notification 39 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior 40 to commencing. 41 2) Minimum 24 hour public notification in accordance with Section 01 31 13 42 E. Water Department Coordination 43 CITY OF FORT WORTH [Soiahgale Markelplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August, 30, 2013 00 61 25 -3 DAP PROJECT RECORD DOCUMENTS Page 3 of 7 1 1. During the construction of this project, it will be necessary to deactivate, for a 2 period of time, existing lines. The Contractor shall be required to coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line system with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named project. 10 C. In the event that a water valve on an existing live system be turned off and 11 on to accommodate the construction of the project is required, coordinate 12 this activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. 14 a) Failure to comply will render the Contractor in violation of Texas 15 Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the 16 Contractor will be prosecuted to the full extent of the law. 17 b) In addition, the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 F. Public Notification Prior to Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis, prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction. The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a) Name of Project 29 b) City Project No (CPN) 30 c) Scope of Project (i.e. type of construction activity) 31 d) Actual construction duration within the block 32 e) Name of the contractor's foreman and phone number 33 f) Name of the City's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre -construction notification' flyer is attached as Exhibit A. 36 3) Submit schedule showing the construction start and finish time for each block 37 of the project to the inspector. 38 4) Deliver flyer to the City Inspector for review prior to distribution. 39 b. No construction will be allowed to begin on any block until the flyer is delivered to 40 all residents of the block. 41 G. Public Notification of Temporary Water Service Interruption during Construction 42 1. In the event it becomes necessary to temporarily shut down water service to 43 residents or businesses during construction, prepare and deliver a notice or flyer of 44 the pending interruption to the front door of each affected resident. 45 2. Prepared notice as follows: 46 a. The notification or flyer shall be posted 24 hours prior to the temporary 47 interruption. CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 00 61 25 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 7 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. I. Coordination within Railroad Permit Areas At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. Obtain any supplemental information needed to comply with the railroad's requirements. J. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. K. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 00 61 25 -5 DAP PROJECT RECORD DOCUMENTS Page 5 of 7 1.4 SUBMITTALS [NOT USED] 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.6 CLOSEOUT SUBMITTALS [NOT USED] 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.8 QUALITY ASSURANCE [NOT USED] 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.10 FIELD [SITE] CONDITIONS [NOT USED] 1.11 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.3.13 — Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 00 61 25 -6 DAP PROJECT RECORD DOCUMENTS Page 6 of 7 EXHIBIT A (To be printed on Contractor's Letterhead) Date CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August, 30, 2013 pi 3 00 61 25 -7 DAP PROJECT RECORD DOCUMENTS Page 7 of 7 EXHIBIT B FORT WORTH DOE NO. Xl= Project maw. NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTF:NI)ENT) OR MR. (CITY INSPECTOR) AT (TELEPHONE NUMBER) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August, 30, 2013 00 61 25 - l DAP PROJECT RECORD DOCUMENTS Page 1 of 2 1 SECTION 0145 23 2 TESTING AND INSPECTION SERVICES 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails, the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City, notify City, sufficiently 31 in advance, when testing is needed. 32 b. When testing is required to be completed by the Contractor, notify City, 33 sufficiently in advance, that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another form of distribution approved 38 by the City. 39 40 CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August 30, 2013 00 61 25 -2 DAP PROJECT RECORD DOCUMENTS Page 2 of 2 1 2) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution (if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered 11 load of Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 23 24 25 26 27 28 29 30 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Soulhgale Markelplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised August 30, 2013 006125-1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 1 SECTION 0150 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1 — General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised JULY 1, 2011 00 61 25 -2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 1 d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work, including 6 testing of Work. 7 Provide power for lighting, operation of equipment, or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off -site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner. 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting, and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH [Southgate Marketplace Phase /1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised JULY 1, 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 00 61 25 -3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH [Southgate Allarketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised JULY 1, 2011 00 61 25 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work, 2 to a condition equal to or better than prior to start of Work. 3 3.12 PROTECTION [NOT USED] 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised JULY 1, 2011 006125-1 DAP PROJECT RECORD DOCUMENTS Page 1 of 3 1 SECTION 0155 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 — General Requirements 15 3. Section 34 71 13 — Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. When traffic control plans are included in the Drawings, provide Traffic 30 Control in accordance with Drawings and Section 34 71 13. 31 b. When traffic control plans are not included in the Drawings, prepare traffic 32 control plans in accordance with Section 34 71 13 and submit to City for 33 review. 34 1) Allow minimum 10 working days for review of proposed Traffic Control. 35 B. Street Use Permit 36 1. Prior to installation of Traffic Control, a City Street Use Permit is required. 37 a. To obtain Street Use Permit, submit Traffic Control Plans to City 38 Transportation and Public Works Department. 39 40 CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised July 1, 2011 00 61 25 -2 DAP PROJECT RECORD DOCUMENTS Page 2 of 3 1 2 1) Allow a minimum of 5 working days for permit review. 3 2) Contractor's responsibility to coordinate review of Traffic Control plans for 4 Street Use Permit, such that construction is not delayed. 5 C. Modification to Approved Traffic Control 6 1. Prior to installation traffic control: 7 a. Submit revised traffic control plans to City Department Transportation and 8 Public Works Department. 9 1) Revise Traffic Control plans in accordance with Section 34 71 13. 10 2) Allow minimum 5 working days for review of revised Traffic Control. 11 3) It is the Contractor's responsibility to coordinate review of Traffic Control 12 plans for Street Use Permit, such that construction is not delayed. 13 D. Removal of Street Sign 14 1. If it is determined that a street sign must be removed for construction, then contact 15 City Transportation and Public Works Department, Signs and Markings Division to 16 remove the sign. 17 E. Temporary Signage 18 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 19 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 20 Devices (MUTCD). 21 2. Install temporary sign before the removal of permanent sign. 22 3. When construction is complete, to the extent that the permanent sign can be 23 reinstalled, contact the City Transportation and Public Works Department, Signs 24 and Markings Division, to reinstall the permanent sign. 25 F. Traffic Control Standards 26 1. Traffic Control Standards can be found on the City's Buzzsaw website. 27 1.5 SUBMITTALS [NOT USED] 28 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 29 1.7 CLOSEOUT SUBMITTALS [NOT USED] 30 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 31 1.9 QUALITY ASSURANCE [NOT USED] 32 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 33 1.11 FIELD [SITE] CONDITIONS [NOT USED] 34 1.12 WARRANTY [NOT USED] 35 PART 2 - PRODUCTS [NOT USED] 36 PART 3 - EXECUTION [NOT USED] 37 END OF SECTION 38 CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised July 1, 2011 00 61 25 - 3 DAP PROJECT RECORD DOCUMENTS Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised duly 1, 2011 00 61 25 - 1 DAP PROJECT RECORD DOCUMENTS Page 1 of 3 1 SECTION 0157 13 2 STORM WATER POLLUTION PREVENTION 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the 11 Contract 12 2. Division 1 — General Requirements 13 3. Section 3125 00 — Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than 1 acre of disturbance 17 A. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 Measurement and Payment shall be in accordance with Section 31 25 00. 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent: NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 B. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. 38 CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised July 1, 2011 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 00 61 25 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 31 25 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) 'TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 42 43 44 45 46 47 .• A. SWPPP Submit in accordance with Section 01 33 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised July 1, 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 00 61 25 -3 DAP PROJECT RECORD DOCUMENTS Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 01 33 00. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - -PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised July 1, 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 006125-1 DAP PROJECT RECORD DOCUMENTS Page I of 2 SECTION 0160 00 PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. A list of City approved products for use is located on Buzzsaw as follows: 1. Resources\02 - Construction Documents\Standard Products List B. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. C. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. D. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. E. See Section 01 33 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH [Southgate Markelplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 00 61 25 -2 DAP PROJECT RECORD DOCUMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] ON 7 g END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 1 2 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 016600-1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page I of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 016600-2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 1. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C. Storage Requirements 11 1. Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a. Arrange storage to provide easy access for inspection. 22 4. Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5. Provide off -site storage and protection when on -site storage is not adequate. 25 a. Provide addresses of and access to off -site storage locations for inspection by 26 City's Project Representative. 27 6. Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 016600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 01 7423- 1 DAP CLEANING Page i of 4 SECTION 0174 23 CLEANING PART 1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 01 7423 -3 DAP CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 01 74 23 - 4 DAP CLEANING Page 4 of 4 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH [Southgate Marketplace Phase /] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 0177 19- 1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 SECTION 0177 19 CLOSEOUT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 1. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 01 77 19 - 2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PAT 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 A. Prior to requesting Final Inspection, submit: 10 1. Project Record Documents in accordance with Section 01 78 39 11 2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23 12 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 13 01 7423. 14 C. Final Inspection 15 1. After final cleaning, provide notice to the City Project Representative that the Work 16 is completed. 17 a. The City will make an initial Final Inspection with the Contractor present. 18 b. Upon completion of this inspection, the City will notify the Contractor, in 19 writing within 10 business days, of any particulars in which this inspection 20 reveals that the Work is defective or incomplete. 21 2. Upon receiving written notice from the City, immediately undertake the Work 22 required to remedy deficiencies and complete the Work to the satisfaction of the 23 City. 24 3. Upon completion of Work associated with the items listed in the City's written 25 notice, inform the City, that the required Work has been completed. Upon receipt 26 of this notice, the City, in the presence of the Contractor, will make a subsequent 27 Final Inspection of the project. 28 4. Provide all special accessories required to place each item of equipment in full 29 operation. These special accessory items include, but are not limited to: 30 a. Specified spare parts 31 b. Adequate oil and grease as required for the first lubrication of the equipment 32 c. Initial fill up of all chemical tanks and fuel tanks 33 d. Light bulbs 34 e. Fuses 35 f. Vault keys 36 g. Handwheels 37 h. Other expendable items as required for initial start-up and operation of all 38 equipment 39 D. Notice of Project Completion 40 CITY OF FORT WORTH [Southgate Marketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:1022051 Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 0177 19 - 3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 017823-1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 '/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH [Southgate Allarketplace Phase l] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 01 7823 -2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 1 d. Drawings 2 1) Provide reinforced punched binder tab, bind in with text 3 2) Reduce larger drawings and fold to size of text pages. 4 e. Provide fly -leaf for each separate product, or each piece of operating 5 equipment. 6 1) Provide typed description of product, and major component parts of 7 equipment. 8 2) Provide indexed tabs. 9 f. Cover 10 1) Identify each volume with typed or printed title "OPERATING AND 11 MAINTENANCE INSTRUCTIONS". 12 2) List: 13 a) Title of Project 14 b) Identity of separate structure as applicable 15 c) Identity of general subject matter covered in the manual 16 3. Binders 17 a. Commercial quality 3-ring binders with durable and cleanable plastic covers 18 b. When multiple binders are used, correlate the data into related consistent 19 groupings. 20 4. If available, provide an electronic form of the O&M Manual. 21 B. Manual Content 22 1. Neatly typewritten table of contents for each volume, arranged in systematic order 23 a. Contractor, name of responsible principal, address and telephone number 24 b. A list of each product required to be included, indexed to content of the volume 25 c. List, with each product: 26 1) The name, address and telephone number of the subcontractor or installer 27 2) A list of each product required to be included, indexed to content of the 28 volume 29 3) Identify area of responsibility of each 30 4) Local source of supply for parts and replacement 31 d. Identify each product by product name and other identifying symbols as set 32 forth in Contract Documents. 33 2. Product Data 34 a. Include only those sheets which are pertinent to the specific product. 35 b. Annotate each sheet to: 36 1) Clearly identify specific product or part installed 37 2) Clearly identify data applicable to installation 38 3) Delete references to inapplicable information 39 3. Drawings 40 a. Supplement product data with drawings as necessary to clearly illustrate: 41 1) Relations of component parts of equipment and systems 42 2) Control and flow diagrams 43 b. Coordinate drawings with information in Project Record Documents to assure 44 correct illustration of completed installation. 45 c. Do not use Project Record Drawings as maintenance drawings. 46 4. Written text, as required to supplement product data for the particular installation: 47 a. Organize in consistent format under separate headings for different procedures. 48 b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 01 7823 -3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 1 5. Copy of each warranty, bond and service contract issued 2 a. Provide information sheet for City personnel giving: 3 1) Proper procedures in event of failure 4 2) Instances which might affect validity of warranties or bonds 5 C. Manual for Materials and Finishes 6 1. Submit 5 copies of complete manual in final form. 7 2. Content, for architectural products, applied materials and finishes: 8 a. Manufacturer's data, giving full information on products 9 1) Catalog number, size, composition 10 2) Color and texture designations 11 3) Information required for reordering special manufactured products 12 b. Instructions for care and maintenance 13 1) Manufacturer's recommendation for types of cleaning agents and methods 14 2) Cautions against cleaning agents and methods which are detrimental to 15 product 16 3) Recommended schedule for cleaning and maintenance 17 3. Content, for moisture protection and weather exposure products: 18 a. Manufacturer's data, giving full information on products 19 1) Applicable standards 20 2) Chemical composition 21 3) Details of installation 22 b. Instructions for inspection, maintenance and repair 23 D. Manual for Equipment and Systems 24 1. Submit 5 copies of complete manual in final form. 25 2. Content, for each unit of equipment and system, as appropriate: 26 a. Description of unit and component parts 27 1) Function, normal operating characteristics and limiting conditions 28 2) Performance curves, engineering data and tests 29 3) Complete nomenclature and commercial number of replaceable parts 30 b. Operating procedures 31 1) Start-up, break-in, routine and normal operating instructions 32 2) Regulation, control, stopping, shut -down and emergency instructions 33 3) Summer and winter operating instructions 34 4) Special operating instructions 35 c. Maintenance procedures 36 1) Routine operations 37 2) Guide to "trouble shooting" 38 3) Disassembly, repair and reassembly 39 4) Alignment, adjusting and checking 40 d. Servicing and lubrication schedule 41 1) List of lubricants required 42 e. Manufacturer's printed operating and maintenance instructions 43 f. Description of sequence of operation by control manufacturer 44 1) Predicted life of parts subject to wear 45 2) Items recommended to be stocked as spare parts 46 g. As installed control diagrams by controls manufacturer 47 h. Each contractor's coordination drawings 48 1) As installed color coded piping diagrams CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— Developer Awarded Projects [CPN:102205] Revised April 7, 2014 01 7823 -4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 1 i. Charts of valve tag numbers, with location and function of each valve 2 j. List of original manufacturer's spare parts, manufacturer's current prices, and 3 recommended quantities to be maintained in storage 4 k. Other data as required under pertinent Sections of Specifications 5 3. Content, for each electric and electronic system, as appropriate: 6 a. Description of system and component parts 7 1) Function, normal operating characteristics, and limiting conditions 8 2) Performance curves, engineering data and tests 9 3) Complete nomenclature and commercial number of replaceable parts 10 b. Circuit directories of panelboards 11 1) Electrical service 12 2) Controls 13 3) Communications 14 c. As installed color coded wiring diagrams 15 d. Operating procedures 16 1) Routine and normal operating instructions 17 2) Sequences required 18 3) Special operating instructions 19 e. Maintenance procedures 20 1) Routine operations 21 2) Guide to "trouble shooting" 22 3) Disassembly, repair and reassembly 23 4) Adjustment and checking 24 f. Manufacturer's printed operating and maintenance instructions 25 g. List of original manufacturer's spare parts, manufacturer's current prices, and 26 recommended quantities to be maintained in storage 27 h. Other data as required under pertinent Sections of Specifications 28 4. Prepare and include additional data when the need for such data becomes apparent 29 during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings 37 CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 01 78 23 -5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 'n 7 g PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 — title of section removed 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH [Southgate Marketplace Phase /] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 01 78 39 - 1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 1 SECTION 0178 39 2 PROJECT RECORD DOCUMENTS 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Work associated with the documenting the project and recording changes to project 7 documents, including: 8 a. Record Drawings 9 b. Water Meter Service Reports 10 c. Sanitary Sewer Service Reports 11 d. Large Water Meter Reports 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.3 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE 30 A. Accuracy of Records 31 1. Thoroughly coordinate changes within the Record Documents, making adequate 32 and proper entries on each page of Specifications and each sheet of Drawings and 33 other Documents where such entry is required to show the change properly. 34 2. Accuracy of records shall be such that future search for items shown in the Contract 35 Documents may rely reasonably on information obtained from the approved Project 36 Record Documents. 37 CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 01 78 39 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2-PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH [Southgate tilarketplace Phase 11 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN: [022051 Revised April 7, 2014 01 78 39 - 3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time, the probable number of occasions 3 upon which the job set must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed, devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City, until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum clearly mark any deviations from Contract Documents 11 associated with installation of the infrastructure. 12 4. Making entries on Drawings 13 a. Record any deviations from Contract Documents. 14 b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the 15 change by graphic line and note as required. 16 c. Date all entries. 17 d. Call attention to the entry by a "cloud" drawn around the area or areas affected. 18 e. In the event of overlapping changes, use different colors for the overlapping 19 changes. 20 5. Conversion of schematic layouts 21 a. In some cases on the Drawings, arrangements of conduits, circuits, piping, 22 ducts, and similar items, are shown schematically and are not intended to 23 portray precise physical layout. 24 1) Final physical arrangement is determined by the Contractor, subject to the 25 City's approval. 26 2) However, design of future modifications of the facility may require 27 accurate information as to the final physical layout of items which are 28 shown only schematically on the Drawings. 29 b. Show on the job set of Record Drawings, by dimension accurate to within 1 30 inch, the centerline of each run of items. 31 1) Final physical arrangement is determined by the Contractor, subject to the 32 City's approval. 33 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in 34 ceiling plenum", "exposed", and the like). 35 3) Make all identification sufficiently descriptive that it may be related 36 reliably to the Specifications. 37 c. The City may waive the requirements for conversion of schematic layouts 38 where, in the City's judgment, conversion serves no useful purpose. However, 39 do not rely upon waivers being issued except as specifically issued in writing 40 by the City. 41 B. Final Project Record Documents 42 1. Transfer of data to Drawings 43 a. Carefully transfer change data shown on the job set of Record Drawings to the 44 corresponding final documents, coordinating the changes as required. 45 b. Clearly indicate at each affected detail and other Drawing a full description of 46 changes made during construction, and the actual location of items. 47 c. Call attention to each entry by drawing a "cloud" around the area or areas 48 affected. CITY OF FORT WORTH [Southgate Marketplace Phase l] STANDARD CONSTRUCTION SPECIFICAT[ON DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH [Southgate Marketplace Phase 1] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [CPN:102205] Revised April 7, 2014