Loading...
HomeMy WebLinkAboutContract 37696 (2)Amendment No. 1 STATE OF TEXAS § CITY SECRETARY NO. � 10 ('P COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and DeOtte, Inc. (Engineer) made and entered into City Secretary Contract No. 35548 (the Contract) which was authorized by the City Council by M&C C-22182; and WHEREAS, the Contract involves engineering services for the following project: Westcreek-Kellis Park Drainage Improvements Project No. 00630 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 9, 2008, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by. Engineer total $37,300.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $169,845.00, 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. �IrY SFI✓HErA�Y Far WORTH, TX I ORIGINAL Contract Amendment No. 1 Page 1 of 2 Executed on this the ? day of � - 2008, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: ���� A. Douglas Rademaker, P.E. Director, Department of Engineering DeOtte, Inc. ENGINEER Name: Richard W. DeOtte, P.E. President 2553 E. Loop 820 North Fort Worth, TX 76118 APPROV,C�'D/AS TO Amy Ram,�y/ Assistant City Attorney LEGALITY: APPROVED: �..w�-- Fernando Costa Assistant City Manager ATTEST: ti Marty Hendri City Secretary .. ��. � 1. F, . - _ OFFICfAL RECORD CITY SECRETARY FT. WORTH, TX Contract Amendment No. 1 Page2of2 June 9, 2008 Mr. Richard Argomaniz, P.E. Project Manager; Consultant Service Division Department of Engineering City of Fort Worth 1000 Throckmorton Fort Worth, Texas 76102-6311 Re: Addendum No. 1—Upstream Drainage Improvements Design Westcreek - Kellis Park Storm Water Improvements City Project No. 00630 Dear Mr. Argomaniz: Please find the enclosed documentation for Addendum No. 1 for the Westcreek —Kellis Park project which include supporting cost estimates and fee calculations in addition to the prepared city contract form for the addendum. The total amount for the addendum is calculated at $37,300 with a MWBE participation of 20%. Design assistance from ANA Consultants, LLC will be included in the contract to meet the 207o goal of the project. Please call with any questions. Sincerely, DeOtte, Inc. Richard W. DeOtte, P.E. fax (817) 590-8600 2553 East Loop 820 North •Fort Worth, Texas 76118 (817) 589-0000 EXHIBIT 1'13-3A" (Supplement to Attachment B) SUMMARY OF TOTAL PROJECT FEES Street and Drainage Reconstruction, Water and Sanitary Sewer Replacement On WESTCREEK — KELLIS PARK STORMWATER IMPROVEMENTS CITY PROJECT NO. 00630 ADDENDUM NO. 1 (ENGINEERING CONTRACT) Consulting Firm Prime Responsibility Amount Prime Consultant: DeOtte, Inc. Engineering Design, Project Management $29,840 80.0 Proposed M/WBE Sub -Consultants Amount % ANA Consultants, LLC Engineering $7,460 20.0 Non-M/WBE Consultants: NONE TOTAL $37,300 100.0 (Supplement to Attachment B) PROFESSIONAL SERVICES FEE SUMMARY Street and Drainage Reconstruction, Water and Sanitary Sewer Replacement On WESTCREEK — KELLIS PARK STORMWATER IMPROVEMENTS CITY PROJECT NO. 00630 ADDENDUM NO. 1 (ENGINEERING CONTRACT) Part A —Conceptual Design, and Part B —Plans and Specifications Transportation &Public Works: (Construction Cost x ASCE Curve "A" x 85) Paving &Drainage $522,500 x 8.40 % x 85% _ Water Department (Construction Costs x ASCE Curve "A" x 85%) Water Improvements (0) $0 Sanitary Sewer Improvements ($0) $0 Total Water and Sewer T&PW, Water and Sewer: Basic Services Total Additional Services: Transportation &Public Works: Water Department: T&PW, Water and Sewer: Additional Services Total: TOTAL PROJECT FEE $37,300 $37,300 E� $ 37,300 O O O O O O O O O N O O O O N m f 0 0 0 0 0 0 0 o N n o 0 0 o N m f O 1f) O O O O O a N m O N f0 N m m t O m O N 0 v(D m O m yy m m f J CJ n N m O N m m m (O m N (D n to t P7 n V t F t9 EA f9 fA fA f9 to to fA 4! fA to 69 to fo f9 O O O O O O O N 0 0 0 0 N O O 0 0 0 0 0 n 0 0 0 0 n J p N o. O V O qT ' OD O o. V t�7f cd O r N N 0 m O n (mD 0 0 C> 0 (V C6 N (O n v' N (h 0 17 m N N J m W LL U) F m t9 t9 to to E9 f9 to 69 (A f9 fA fA f9 sA to)W o n o co .- v m 0 LO r o cND (mo 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o u> 00 0 0 N J O 0 O O (7 (O (V O (n 'Q N m Q V m 0 0 0 m O C N N m f• N O N n N V m O N m 7 0 0 (3i o- r R N N CN') w N � m N g U' J fA f9 t9 t9 m E9 fA E9 fA 6% fA to f9 fA f9 m F9< O _ M 7 ON0 (D 0 0 0 0 0 0 0 o O N o 0 0 0 F O O O O O O O N N O O O O N N N O N O(D m 6O N (OD C 0M m m U �- mCD E wo Z > fo EA EA f9 (9 !A to f9 EA f9 to m di mO. CEA E E n LL, 0 Q m > 0 oo E mf~i> E € z E w y `o m N f0 C 0 W Lu u� Z a :D a z m - W Y Z U Y D EL m C N � 0 0 O 2 J Z w w - 0 u E m C N F W w > t m a w i o m E t w It — m m x 0 m 'O J N LL t (0 Q N C N Q C A% t L H O C C= 0 Q— U C C o N W 1° m t > (� > c H c a (o Ill o m— t m o= Z W Z= t t 0 p x W LL LL o¢ m v (o = t = 'n i (D U w U O N N X X o 2 L y m E 0 = N a = <? L U U N U J U U N LL (n U F>> N G o C E m to C V O O t L L C [V O a Z 0 0 0 C C C 0 0 r U C V KM CDN C N 0 0 U U a O U C m U 0 0 0 0 0 t0 _ 0 O F L C a 0 a a x X 0 X 0 0 O0 O N o U C a 2 a a d m m m W a C� m FO a (0 LL a a LL lL Y i LL i Z U U UJ J J J J J J J U U J m # N N .- N O O m N m n m m n N 7 m 0 0 m n 0 m m n (D m V m 2 O o 0 m 0)O m m 0 0 IL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U 9 9 9 9 0 9 9 9 9 9 9 9 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m m m m m m m m m m m m m m QW � N m V N m n m m iL M&C Request Review Page 1 of 2 City of Fort Worth Employee Intranet Staff Action Tracking I Council Agenda M&C 'Employee Directory ACToday ,Employee Classifieds ; PRS : IT Online Departments i%�� Print M&C COUNCIL ACTION: Approved on 9/16/2008 DATE: 9/16/2008 REFERENCE **C-23037 LOG NAME: 30AMEND1WESTCRE NO.. CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 1 in the Amount of $37,300.00 to City Secretary Contract No. 35548 with DeOtte, Inc., for Westcreek-Kellis Park Drainage Improvements (Project. No. 00630) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 in the amount of $37,300.00 to City Secretary Contract No. 35548 with DeOtte, Inc., thereby, revising the total cost to $169,845.00. DISCUSSION: The Storm Water Management Program was established to reduce flooding in Fort Worth, preserve streams, minimize water pollution and to operate the storm water system in a more effective manner to fully comply with state and federal regulatory requirements. On October 16, 2007, (Ordinance No. 17840-10-2007) City Council authorized the issuance and sale of $25,000,000.00 in Storm Water (Drainage) Revenue Bonds, Series 2007, to fund a two year Storm Water Capital project program. On June 12, 2007, (M&C C-22182) the City Council authorized the City Manager to execute an engineering agreement with DeOtte, Inc., in the amount of $132,545.00 for the design of the Westcreek-Kellis Park drainage improvements and water and sewer replacement. The design resulted in the recommendation to upgrade the existing storm drain facilities and replace the existing water and sewer lines at the following locations: • Westcreek Drive, (Medina Avenue to Southridge Terrace); and • Southridge Terrace, (Westcreek Drive to Spurgeon Street West). The drainage study also recommended the upgrading of existing drainage culverts and installation of miscellaneous channel improvements upstream from the current project in order to convey the 100-year storm flow in the facilities and right-of-way and prevent flooding in the properties within the Westcreek Drive and Kellis Park neighborhood. These recommended improvements will be located in the drainage channel adjacent to Westcreek Drive, from Medina Avenue to Westfield Avenue. The street reconstruction improvements on Westcreek Drive are included under a separate project that is part of the 2004 Capital Improvement Program. Amendment No. 1 will allow DeOtte, Inc., to perform the necessary design work for the proposed drainage improvements on Westcreek Drive, from Medina Avenue to Westfield Avenue. DeOtte, Inc., proposes to provide the necessary engineering services for a lump sum fee of $37,300.00. Staff considers the fee to be fair and reasonable for the scope of services provided. This project is located in COUNCIL DISTRICT 3, Mapsco 89M, 89R and 90N. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Storm Water Capital Projects 2007 Revenue Bond Fund. file://C:\Docuuments and Settings\ArgomaR\My Documents\DRAINAGE\WESTCREEK\M&C Re... 9/18/2008 M&C ,Request Review Page 2 of 2 TO Fund/Account/Centers Submitted for City Manager's Office b� Originating Department Head: Additional Information Contact: FROM Fund/AccountlCenters P229 531200 203280063032 $37,300.00 Fernando Costa (8476) A. Douglas Rademaker (6157) Richard Argomaniz (8653) ATTACHMENTS 30AMEND1 WESTCRE.pdf file://C:\Documents and Settings\ArgomaR\My Documents\DRAINAGE\WESTCREEK\M&C Re... 9/18/2008