Loading...
HomeMy WebLinkAboutContract 37221 CITY 8 CREYA"Y .3-1 tea,}CONTF.- AMENDMENT NO. 2 STATE OF TEXAS § COUNTY OF TARRANT § WHEREAS, the City of Fort Worth(City) and TCB INC. (ENGINEER) made and entered into City Secretary Contract No. 35467, (the CONTRACT) which was signed and executed by the City of Fort Worth on the 29th day of June, 2007; and WHEREAS, the Contract involves engineering services for the following project: Preparation of Synchro Analyses for Camp Bowie/Camp Bowie West. WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I, referencing Attachment A, Scope of Services, is amended to include additional engineering services for the incorporation of geometric modifications to the proposed layouts and for project representation, as needed. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended not to exceed$19,620.00. The additional services described in Article 1 above will be billed monthly to the CITY on a time and materials basis (using a 3.0 multiplier.) 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. ........ 06-18-08 A09 : ?8 IN RIM EXCUTED on this the o}� day of , 2008, in Fort Worth, Tarrant County, Texas. ATTEST: APPROVED: f Marty Hen ix Fernando Costa City Secretary Assistant City Manager APPROVAL RECOMMENDED: - - � AI&C ",E'�UlitED Gre o , P.E. Acti ctor Trans ortation/Public Works Department Donald J. Szczesny, P.E., P.T.O.E. Project Director TCB INC. BY: APPROVED AS TO FORM AND LEGALITY IL'0—�. Am am y Assistant ity Attorney -2- r