Loading...
HomeMy WebLinkAboutContract 49560-A3 AMENDMENT NO. 3 TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES SOUTHEAST (MLK) DROP-OFF STATION ADDITION STATE OF TEXAS CITY SECRETARY CONTRACT NO. 5b0-43 COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Elements of Architecture, Inc., (Consultant) made and entered into City Secretary Contract No. 49560 (The Contract) which was authorized by the City Council by M&C Reference No.: C-28324, the 15th day of August, 2017, for Southeast (MLK) Drop-Off Station Addition; and Amendment Nos. 1 & 2 were administratively executed in the amount of $40,736.00 for revisions to the PD site plan; and additional signage design services, security modifications to existing site surveillance, and additional construction administration services due to changes in the construction sequence, respectively; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional effort in coordinating with the contractor and City for water intrusion found on site at the Goodwill loading dock. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I — Scope of Services, Paragraph (2) shall be added to read as follows: (2) Provide additional design & construction administration services for the Drop-Off Station. The cost of this additional service is $5,320.00 with $200.00 additional reimbursable expenses. The scope of services is described more fully in Elements of Architecture, Inc. Letter dated March 16, 2020, subject: "Proposal for MLK Drop-Off Center — Additional Services 03, Water Intrusion unforeseen at the Goodwill Trailer Area". 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "D". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "D". However the total fee paid by the City shall not exceed a total of $146,022.00 including $3,900.00 in reimbursable expenses unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. RECENED _,),FFdL0AL [r,ECuk,;,i AP1 2 4 2020 ''1TV SK IErARY CFW Std.Agreement for Prof.Services AMENDMENT(Rev. 16 Aug 2016) ORTWORTH Page i � � •� Southeast(MLK) Drop-Off Station Addition—Water Intrusion/Goodwill Loading Dock—Amendmerti'%A��R�ARY April 20 O�Ky� EXECUTED this the �� day of AqV I , 2020, in Fort Worth, Tarrant County, Texas Elements of Architecture c. APPROVED: By: By: CAI_ Debbie Ful r, IA # a President -4-*db OWN APPROVAL RECOMMENDED: RECOR w- By: ao By: teve ooke, Director ary J. Kayser . 6 f f 8� Property Management Department City Secretary {r• ,N; APPRO ED A M AND LEGALITY: M&C Not Required ` ' Contract Authorizationf gym John . St ron Assistant City Attorney CONTRACT COMPLIANCE MANAGER: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. BY &_G1V%.'�' 04V9.0 Brian R. Glass, AIA Architectural Services Manager CFW Std.Agreement for Prof.Services AMENDMENT(Rev. 16 Aug 2016) Page 2 of 2 Southeast(MLK) Drop-Off Station Addition—Water Intrusion/Goodwill Loading Dock—Amendment No.3 April 2020 ATTACHMENT "D" ELEMENTS 1201 61h Ave, Suite 100 of Architecture, Inc. Fort Worth,Texas 76104 Phone 817.333.2880 Fax 817.333.2883 March 16, 2020 Alfonso Meza City of Fort Worth 401 West 13th Street Fort Worth, TX 76102 Re: Proposal for MLK Drop Off Center—Additional Services 03 Water Intrusion unforeseen at the Goodwill Trailer Area Dear Alfonso; Elements is pleased to provide to you this proposal for services associated with the effort in coordinating with the contractor and the city for the water intrusion found on site and assist with the efforts to mitigate the water for allowing construction to continue. This effort involves additional coordination, site visits and recommendations by both architectural and structural. TOTAL PROPOSED FEE Labor We propose to provide our services as identified in this proposal on an hourly basis with the not to exceed amounts as follows: Architectural Services $ 4,000 Structural Engineering ($1,200 x 1.l) 1,320 TOTAL ADDITIONAL SERVICES 03 $ 5,320 Fees listed above are for labor only. Expenses Reimbursable expenses as outlined in the Master Contract are estimated at$200. PROJECT TEAM The design team remains the same with RLWA and Elements providing services for this change to the scope. Both firms are SBE certified. If this proposal meets with your approval, we would anticipate an amendment to our contract for our services identified within this proposal. If you have any questions regarding this proposal or need to discuss, please call me. Thank you. Sincerely, Debbie Fulwiler, AIA President