Loading...
HomeMy WebLinkAboutContract 52481-AR3 FORT WORTH City of Fort worth CSC No.52481-AR3 Construction Allowance Request Construction FDA# u Date 5/112020 City Sec# 1 52481 Client Project#(s)l 02388&02445 FAC#(s)l 56002139007/34014-M301700430200431-5740010-0O24451CO2388-0017871E02183 Project Name FY17-CD 9 Street Repair and Recon Program.This is a combined street paving improvements and water and sanitary Description Sewer main replacements project in the Near Southside Medical District Contracts Stabile&Winn,Inc. City Inspector Lorrie Pitts Funding Water Unit 1 Sewer Unit 2 T/PW Unit 3 Select Day Type Allocation Account Totals Original Contract Amount $1,166,158.50 $446,236.00 $2,290,810.50 $3,903,205.00 365 Extras to Date $42,009.00 $42,009.00 49 Credits to Date Current Contract Amount $1,208,167.50 $446,236.00 $2,290,810.50 $3,945,214.00 414 Amount of Proposed Allocation $6,600.00 $800.00 $38,755.25 $46,155.25 15 Original Allowance Available for Allocation $80,000.00 $50,000.00 $100,000.00 $230,000.00 Allowance Funds Previously Allocated $23,900.00 S43,892.50 $67,792.50 Remaining Funds Available for this Allocation $56,100.00 $50,000.00 $56,107.50 $162,207.50 JUSTIFICATION SUMMARY IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request: This Construction allowance will 1)Increase the quantity for 8"Water line lowering for additional locations needed to lower the new waterline under existing stormdrain lines.2)Add bid item to re-stake the sewer line in Broadway due to revised design to avoid stormdrain lines at the intersection of Broadway Ave and Hemphill St. 3)Increase the quantity for Remove& Dispose Railroad Tie Bed bid item for additional railroad ties discovered along the Daggett St between Adams and Henderson.4)Add bid items to remove and replace an existing stormdrain inlet and 18"RCP in Broadway Ave that we found during construction in a bad condition and needed to be replaced.5)Add a bid item for construction staking of Travis Ave(150 FT)which was added as part of this project.6)Add a bid item for the brick pavers at 815 W.Daggett Ave. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. Co ors edtativ Date Inspector Date ' !µ1121�if May 12,2020 Project Manager Date Program Manager Date May 12,2020 May 12,2020 Capital Project Officer Date Asst Director Date May 12,2020 May 13,2020 Director Date Asst.City Attorney Date -112 May 13,2020 May 18,2020 sn Mau.mxol Asst.City Manager Date �7 &lC" ll May 18,2020 n. id 1'%J May 2 2020 OFFICIAL RECORD} CITY SECRETARY C1 C110YFSEC�flETA FT. WORTH,TX Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Mary Hanna / Mary Hann ay 12,2020) Name of Employee/Signature Sr. Project Manager Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature "Q .� ATTEST: �g1 Mary J.Kayser,City Secretary y .: IL OFFICIAL RECORD CITY SECRETARY ti FORT WORTII... City of Fort Worth Construction Allowance Request Construction FOA# 3 Date 5/11/2020 City Sec# 52481 Client Project#(s) 02388&02445 FAC#(s)l 56002139007I34014-600430I700430I200431-574001O-CO24451CO2388-COl7871EO2183 Project Namel FY17-CD 9 Street Repair and Recon Program.This is a combined street paving improvements and water and sanitary sewer main Descriptionj replacements project in the Near Southside Medical District Contractor Stabile&Winn,Inc. City Inspector Lome Pitts ADDITIONS ITEM DESUKIPTIUN DepVFAG Qty UnitUnit Cost Total Water line lowering a er m . Re-Stake Sewer Line Broadway ewer nd . III-66 Remove&Dispose Railroad Tie Bed TIPW Unit 3 297.00 SY 23.25 7 ass III RGP Storm Drain Pipe nd 5 . III-68 Remove&Repalce 5'Curb Inelt TIPW Unit 3 1.00 EA 6,500.00 111-69 Staking-I ravis Avenue TIPW Unit III-70 Additional(Hand Removal)Protect Brick TIPW Unit 3 1.00 LS 5,050.00 Water Unit 1M6�6Sewer Unit 2 TIPW Unit 3 $38,755.25 Sub Total Additions 1 46,155.25 Construction Allowance Additions Page 2 of 4 FORT WORTH... City of Fort Worth Construction Allowance Request Construction FOA# 3 Date 5/11/2020 City Sec# 52481 Client Project#(s) 02388&02445 FAC#(s)l 56002139007I34014-600430I700430I200431-574001O-CO24451CO2388-COl7871EO2183 Project Namel FY17-CD 9 Street Repair and Recon Program.This is a combined street paving improvements and water and sanitary sewer main Descriptionj replacements project in the Near Southside Medical District Contractor Stabile&Winn,Inc. City Inspector Lome Pitts CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED ITEM DESUKIPTIUN DepVFAG Qty UnitUnit Cost Total ons ru ion owance a er m Construction Alowance ewer nd 5 , . III-64 9999.1003 Construction Allowance TIPW Unit 3 0.38755250 LS 100,000.00 Water Unit 1 6,600.00 Sewer Unit 2 $800.00 TIPW Unit 3 1 $38,755.25 Sub Total Deletions 46,155.25 Construction Allowance Deletions Page 3 of 4 MWWBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0.00 Previous Construction Allowance Requests CO# DATE AMOUNT Total $0.00