Loading...
HomeMy WebLinkAboutContract 38733-A5 (2)►�luiaf�l� ul �- - � � - TO CITY SECRETARY CONTRACT r15 WHEREAS, the City of Fort Worth (CITY) and Jacobs Engineering Group, Inc, (ENGINEER) made and entered into City Secretary Contract No. 38733, (the CONTRACT) which was authorized by M&C-23511 on the 12th day of May, 2009 in the amount of $251,818.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $48,553.00 authorized by the City Council by M&C C- 24033 on January 26, 2010, Amendment Number 2 in the amount of $19,969.00 administratively authorized by the City on May 26, 2010, Amendment Number 3 in the amount of $37,616.00 administratively authorized by the City Council on September 30, 2010, and Amendment Number 4 in the amount of $0.00 administratively authorized by the City on June 27, 2011; and WHEREAS, the CONTRACT involves engineering services for the following project: North Beach Street from Vista Meadows Drive to south of Shiver Road; WHEREAS, it has become necessary to execute Amendment No. 5 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 17, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $24,475.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $382,431.00, � Page -1- 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE. 9 f /,Z APP AL RECO/MMIENtDE iD ENGINEER Jacobs Engineering Group, Inc. Scott Bussell Operations Manager DATE: 9/4/12 Douglas, Niersig, P.E. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: Douglas W. Black Assistant City Attorney Page -2- Date 1\•9��p1( ��l9�L�(t=111�1I1 0 ilTORNHt g hH for North Beach Street (Vista Meadows to Shiver) Additional Right -of --Way Services, Elimination of Pre -Construction Services City Project No. TPW=01292 SCOPE OF SERVICES This supplement to the design services contract provides the property/right-of-way services for revisions to the ROW and permanent easement preparation. In addition, the supplement provides for revisions to the Paving and Drainage plans to incorporate the ROW changes and allow for Bewley Drive, I. PROJECT MANAGEMENT AND DESIGN SERVICES 1. Project Management 2. Design Services a. Adjust ROW and easements shown in plan set b. Revise TCP, Paving, and Drainage sheets as necessary to allow for new ROW at Bewley Drive. c. Add intersection layout sheet (and median openings) as required for Bewley Drive, 3. SPECIFICATION AND BID DOCUMENT REVISIONS a. Revise specifications to incorporate the recently completed design manual and specifications. b. Revise Bid Item List format using BidTools to improve accuracy and enhance appearance. II. PRE -CONSTRUCTION SERVICES 1. Bidding Assistance —The Engineer shall assist the City during this phase including preparation and delivery of any additional addenda prior to bid opening to plan holders and respond to questions submitted to the City by prospective bidders. The Engineer shall upload all addenda onto Buzzsaw. 2. Recommendation of Award — The Engineer shall assist in reviewing the bids for completeness and accuracy. The Engineer shall attend the project bid opening, develop bid tabulations in hard copy and electronic format and return four (4) copies of the bid tabulation, along with the contract documents to the City within three (3) working days after bid openings. 3. Pre -bid Conference — The Engineer shall attend the pre -bid conference and the bid opening, prepare bid tabulation sheets and provide assistance to the owner in evaluating bids or proposals and in assembling and awarding contracts for construction, materials, equipment, and services. 4. Pre -Construction Public Meeting — After the contractor has been selected, the Engineer shall prepare project exhibits, provide an agenda, and attend a public meeting to help explain the proposed project to residents. The City shall select a suitable location and mail the invitation letters to the affected customers. The City shall be responsible for any fee assessed by the public meeting facility. North Beach Supplemental 5 Scope 2012-07-17.doc Page 1 III. RIGHT-OF-WAY SERVICES 1. PROPERTY SURVEY — Provide field survey for the new Heritage Addition to locate the subdivision boundary and ROW of Bewley Drive. Analyze and revise orginal property lines to adjust for the new Heritage Addition boundary. 2. ROW ACQUISITION DOCUMENT PREPARATION — Prepare one (1) ROW acquisition document that includes a legal description with exhibit to CoFW standards. An additional fee of $1800.00 will be required for additional ROW acquisition document preparation. 3. PERMANENT EASEMENT DOCUMENT PREPARATION — Prepare two (2) permanent slope easement documents that include a legal description with exhibit to CoFW standards. An additional fee of $1000.00 will be required for additional permanent slope easement document preparation. IV. ATTACHMENTS A1. Fee Proposal Calculation Worksheet A2. Gorondona's Invoice for Additional Easements ASSUMPTIONS 1. Any additional work not specifically included in the above scope of services will be accomplished as Additional Services, after approval by the Client. 2. If additional meetings or additional meeting duration are required, they wilt be performed as additional services. North Beach Supplemental 5 Scope 2012-07-17.doc Page 2 d LO LTMM ++ O � � O ar 0 Lm WLO Q U Q V Z Q Q O L � a cn N � N P t, co 3t a dLM 1 + F— O O Z Cc M V O d •0 m 2 /LM in Z tttmmim000 > C) tea)` 00 Ellm Y .0 O r4� M U N N M O o y 69 O Lot y0 O 7 y m m W LO `ate c a U fD C a 609. 0 N O NE a L:^ (� 0 N LO (.0 M �t ch _o LO 'cF cn Efl ER ER 6c3 N_ O O N m CO N O C\ Efl fA E9 Efj cf? EA MLO O CO N d `N 0 M ►-i g C O C,1 a� e 0 c ;y U Q O w C4 "".. d y.. LUp N G y G � ,w U v a u to a v a k No a C C C C d C C am •:° Gl O m 01 Gl -i y + L Not..a ca Gl to c o� c o a o m U �+ a Q)z a` a � (a m a a` a` r N M c' N M qq4t MEMEMMEMEN _ _ _ _ w O O !� DO O 64 Efl ce Im m cD N U vim+ U fq y o V y C O C y > IM o c Oa Q o m o C Ott Q a) (0)N Q O a a)a c 9 O m M m e O ° U m p C (6 E c O, U O Q C U' > C N U O 7 .N W 3 U) a- C 4: C Q c § Ca. a) a` Of e N CO) P � r- O �r3 N Q) 6F? � a Q Q L X W LO Q U) co N N N O C C (N o O � N _ C U � € L U) a co U �0 N m z Gorrondona & Associates, Inc. March 28, 2012 Jacobs Attn: Mr. Scott Yates, PE 777 Main Street Fort Worth, Texas 76102 Re: Revised Right -of -Way Acquisitions and Permanent Slope Easements for North Beach Street Project, City of Fort Worth, Texas Dear Mr. Yates: Gorrondona &Associates, Inc. (G&AI) is pleased to submit this proposal for professional land surveying services for the above referenced project. The following itemized surveying services are to be provided by G&AI: PROPERTY/RIGHT-OF-WAY SERVICES 1.) PROPERTY SURVEY —Provide field survey for the new Heritage Addition to locate the subdivision boundary and right-of-way of Bewley Drive. Analyze and revise original property lines to adjust for the new Heritage Addition boundary. AMOUNT $ 2,714.00 2.) RIGHT-OF-WAY ACQUISITION DOCUMENT PREPARATION -Prepare one (1) right-of-way acquisition document that includes a legal description with exhibit to City of Fort Worth standards. An additional fee of $ 1800.00 per document will be required for additional right-of-way acquisition document preparation. AMOUNT $ 1,800.00 3.) PERMANENT EASEMENT DOCUMENT PREPARATION -Prepare two (2) permanent slope easement documents that include a legal description with exhibit to City of Fort Worth standards. An additional fee of $ 1,000.00 per document will be required for additional permanent slope easement document preparation. AMOUNT $ 2,000.00 Gorrondona &Associates, Inc. can provide the above professional land surveying services for a lump sum fee of $6,514.00. If you have any questions or require additional information please contact me at (817) 496-1424. Sincerely, - GORRONDONA &ASSOCIATES, INC. Richard Kennedy, R.P.L.S. Project Manager Page 1 of 1 7524 Jack Newell Blvd. So. •Fort Worth, Texas 76118 •817.496.1424 •Fax 817.496.1768 • www.ga-inc.net City of Fort Worth, Texas • • • • • ' COUNCIL ACTION: Approved on 8/21/2012 DATE: Tuesday, August 21, 2012 LOG NAME: 20N BEACH AMEND 5 REFERENCE NO.: **C-25794 SUBJECT: Authorize Execution of Amendment No. 5 to an Engineering Services Agreement, City Secretary Contract No. 38733, with Jacobs Engineering Group, Inc., in the Amount of $24,475.00 for the Design of North Beach Street from Vista Meadows Drive to South of Shiver Road, Thereby Increasing the Total Contract Cost to $382,431.00 (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 5 to City Secretary Contract No. 38733, an Engineering Services Agreement with Jacobs Engineering Group, Inc., in the amount of $24,475.00 for the design of North Beach Street from Vista Meadows Drive to south of Shiver Road, thereby increasing the total contract cost to $382,431.00. DISCUSSION: The 2008 Capital Improvement Program (CIP) includes funding for the design and construction of this project. This contract amendment is needed to revise the ROW and easement documents and design plans due to new development along North Beach Street, incorporate the new City standard specifications and contract documents, add bidding services, and add a public meeting for the project. City Council authorized the City Manager to execute Engineering Services Contract No. 38733 with Jacobs Engineering Group, Inc., for the design of North Beach Street from Vista Meadows Drive to south of Shiver Road as a four lane divided roadway. The following table summarizes previous contract action and amendments. nitial Contract i Amendment No. 1 I __.____ ndment No. 2 _u• $251,818.00 $48,553.00' $19, 969.00 sign of North Beach Street m Vista Meadows Drive to uth of Shiver Road M&C Number t z� -r_�_T �_--. �C-23511 -_ Flood Study, Letter of Map Revision, and Storm Drain C-24033 emporary Traffic Signal resigns at the Alta Vista Road �N/A nd Shiver Road Intersections l Additional Right -of -Way � mendment No. 3 � $37,616.00�Surveys and Exhibits, Design of N/A ( Storm Drain South of Heritage rp Quad to 5/12/2009 1 /26/2010' 6/2010 0/2010 Logname: 20N BEACH_AMEND 5 Page 1 of 2 dment No. 4 ndment No. 5 tract Subtotal !Glen and Retaining Walls Additional Right -of --Way $0.00#Surveys and Exhibits and Remove Bidding Services .Revise Right of -Way and $24,475.00Design Plans, New City jspecifications, Bidding Services !and Public Meeting 382,431.00 N/A 6/27/2011 Jacobs Engineering Group, Inc., proposes to complete Amendment No. 5 for a lump sum fee of $24,475.00, for a total contract amount not to exceed $382,431.00. Staff considers this fee to be fair and reasonable for the scope of services to be performed, including revisions to the right-of-way documents and design plans due to new development along North Beach Street, incorporation of the new City standard specifications and contract documents, and the addition of bidding services and attendance at an additional public meeting for the project. Jacobs Engineering Group, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional 27 percent M/WBE participation on this Amendment No. 5. The City's goal on this Amendment is 27 percent. This project is located in COUNCIL DISTRICT 2, Mapsco 22S, 22W and 3bA. FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements 2008 fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers C204 531200 202230129230 $24,475.00 CERTIFICATIONS: Submitted for City Manager's Office bv: Fernando Costa (6122) Originating Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Michael Weiss (8485) ATTACHMENTS 1. 01292 FAR 4.pdf (CFW Internal) 2. 20N BEACH JACOBS AMEND5 6223 MAP .pdf (Public) 3. 20N BEACH AMEND 5 01292- MWBE .pdf (CFW Internal) 4. 20N BEACH AMEND 5 FAR for Jacobs Amendment 5.pdf (CFW Internal) 5. 27. 20N Beach Amend 5(JCT 8-2-2012).PDF (CFW Internal) Logname: 20N BEACH AMEND 5 Page 2 of 2