Loading...
HomeMy WebLinkAboutContract 41992 (2)THE STATE OF TEXAS COUNTY OF TARRANT CLV( SECRETARY CONTRACTS 140. INTERLOCAL AGREEMENT BACKGROUND This Interlocal Agreement is between County of Tarrant ("COUNTY"), and the City of Fort Worth ("Fort Worth") acting through its duly authorized Assistant City Manager, Fernando Costa. Sections 791.001 — 791.029 of the Texas Government Code provide legal authority for this Agreement; During the performance of the governmental functions and the payment for the performance of those governmental functions the parties will make the performance and payment from current revenues legally available to that party; and The Commissioners Court of the COUNTY and the City Council find: a. This Agreement serves the common interest of all parties; b. This Agreement will benefit the public; c. The division of costs fairly compensates all parties to this Agreement; and d. All parties have authorized their representative to sign this Agreement. The Parties therefore agree as follows: TERMS AND CONDITIONS 1. COUNTY RESPONSIBILITY 1.1 The COUNTY will furnish the labor and equipment necessary for the reconstruction and resurfacing of Shelby Road from Race Street to 1,585' East of Rendon Road; being that section exclusively within the City of Fort Worth's jurisdiction. Length Average Width 6,416 linear feet 25 feet Square Feet 160,400 square feet 1.2 The project will reclaim the existing asphalt pavement, stabilize with 5% cement, re -grade the roadbed, and resurface with a four inch (4") HMAC binder course and a two inch (2") HMAC surface. 1.3 The COUNTY will furnish the labor equipment necessary to reconstruct Shelby Road as described above. 1.4 The COUNTY will coordinate the utility line locations before construction begins by utilizing Dig Tess or a similar service. 1 OFFICIAL RECORD CITY SECRETARY Ft WORT% TX 1.5 The COUNTY will monitor and coordinate the maintenance of the Stonii Water Pollution Prevention Plan. 2. CITY RESPONSIBILITY 2.1 The CITIES agrees to pay one-half of the total cost of the materials for Shelby Road reconstruction at an estimated cost not to exceed $168,332.40. 2.2 The CITIES will pay for one-half of the total cost of traffic controls during the construction phase of the projects at an estimated cost not to exceed $3,000.00. 2.3 If the Storni Water Pollution Prevention Plan is required, the CITY will pay for all cost (including subcontractor materials, labor and equipment) associated with the implementation and maintenance of the Plan at an estimated cost not to exceed $2,000. 2.4 If required, the CITY of Fort Worth and the CITY of Everman will furnish all right of way plans, engineering drawings, and specifications to the COUNTY. 2.5 The CITY of Fort Worth and the CITY of Evennan will coordinate, negotiate and pay for applicable utility relocation costs if required. 2.6 The CITY will pay the total cost for 2 inches (2") of Type D HMAC and 2 inches (2") of Type B HMAC for the reconstruction of the 1,585 feet East of Rendon Road creating a total cost of $59, 332.00 for this section. 3. PROCEDURES DURING PROJECT COUNTY retains the right to inspect and reject all materials provided for this project. If CITY has a complaint regarding the construction of the project, the CITY must complain in writing to the COUNTY within 30 days of project completion Upon expiration of 30 days after project completion the CITY becomes responsible for maintenance of the project within their respective jurisdiction. 4. NO WAIVER OF IMMUNITY This agreement does not waive COUNTY rights under a legal theory of sovereign immunity. This agreement does not waive either City's rights under a legal theory of sovereign immunity. 5. OPTIONAL SERVICES 5.1 If necessary, COUNTY may furnish flag persons 6. TIME PERIOD FOR COMPLETION CITY will give the COUNTY notice to proceed at the appropriate time. However, COUNTY is under no duty to commence construction at any particular time. o 0 * ° 00 °°O000o0°0 cy co noon County Commissioner Precinct No. 1 June 27, 2011 Mr. George Behmanesh 5001 James Avenue, Suite 200 Fort Worth, Texas 76115 Dear Mr. Behmanesh, 4° ° r° ° 0 0 0 Please be advised that Tarrant County Precinct 1 has agreed to limit the cost allocated to the City of Fort Worth for the reconstruction of Shelby Road. to $179,503.00. This will be the cities total cost for the project. Thank you for your cooperation in helping us work through this matter. Sincerely, Roy C. Brooks cc: T.C. Webster, Director of Operations, Tarrant County Precinct One 6551 Granbury Road Fort Worth, Texas 76133 817-370-4500 ■ 817-370-4503 (Fax) ■ ■ 3212 Miller Avenue Fort Worth, Texas 76119 817-531-5600 ■ 817-531-5633 (Fax) ■ City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 7/12/2011 DATE: Tuesday, July 12, 2011 REFERENCE NO.: **C-24992 LOG NAME: 20ILA--SHELBY RD ,SUBJECT: Authorize Execution of an Interlocal Agreement with Tarrant County for Reconstruction of Shelby Road from Race Street South to 1,585 Feet East of Rendon Road with City Participation in the Amount of $184,503.00 (COUNCIL DIS I'RICT 8) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute an Interlocal Agreement with Tarrant County for Reconstruction of Shelby Road from Race Street South to 1,585 feet east of Rendon Road with City participation in the amount of $184,503.00 which includes furnishing necessary materials, traffic control and other incidentals. DISCUSSION: In the Fiscal Year 2010-2011 Contract Major Maintenance Program, various types of street maintenance techniques are grouped into specific contract packages including interlocal agreements with other governmental entities. At the request of City staff, Tarrant County has agreed to enter into an Interlocal Agreement for the reconstruction of Shelby Road from Race Street South to 1,585 feet east of Rendon Road and will be funded from the Contract Street Maintenance Fund. Shelby Road is a border street between Fort Worth and City of Everman. Under the Agreement, Tarrant County will provide all necessary labor and equipment to perform this work and each City agrees to pay their share for the cost of materials, traffic controls and other incidentals. Additionally, the City agrees to closing of the road to through traffic for the duration of the project or as deemed necessary by Tarrant County. This project is located in COUNCIL DISTRICT 8. FISCAL INFORMATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Contract Street Maintenance Fund. FUND CENTERS: TO Fund/Account/Centers CERTIFICATIONS: ,Submitted for City Manager's Office by: Originating Department Head: Additional Information Contacts ATTACHMENTS 1. 201NTERLOCAL SHELBY RD (2).pdf 2. FAR Shelby Road.pdf FROM Fund/Account/Centers C293 523010 208600175280 C293 539120 208600175280 Fernando Costa (6122) Doug Wiersig (7801) George Behmanesh (7914) $181.503.00 $3,000.00