HomeMy WebLinkAboutContract 43184-A1 (3)AMENDMENT No .1 C11010E, Rio my ,21,, CONTRACT NO. t'ddis. TO CITY SECRETARY CONTRACT No. 43184 WHEREAS, the City of Fort Worth (CITY) and Charles Crook Consulting, Inc., (ENGINEER) made and entered into City Secretary Contract No. 43184, (the CONTRACT) which was administratively authorized on the Wm day of May, 2012 in the amount of $ 36,754.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Harlanwood Drainage Improvements, Project No. 01892; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional e ngineering services specified in a proposal dated June 9, 2013, a copy o f which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $13,245.00. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in t he fee to be paid to Engineer for all work and services performed under t he Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $49,999.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Professional Services Agreement Amendment Template PM0 Official Release 8/1/2012 Page 1 of 3 flEERE 1 `; AM 1 1 1 OFFICIAL RECORD CITY SECRETARY Ft YIIORTH,'7X mit City of Fort Worth Ift>04:Afrisse‘404:41____, Fernando Costa Assistant City Manager DATE: APPROVAL RECOMMENDED: wcJ Dougia W. Wiersig, P Director, Transportation and Public bloc Works Department ENGINEER Charles rook Co do Charles Crook, Owner DATE: APPROVED AS TO FORM AND LEGALITY: tkI4 L k-itL/ ful - Deg-1 as --W , u -Bite* /1-7 r c i e• Assistant City Attorney OL // 'Mary J. Kayser City Secretary City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 3 fl /Cr-c f-Z M&C• Date: cy-useSS�i1yg4tet 2964 o���QOpp tf, '411tiWtoe in /ea\ tilting, Inc. 1 OFFICIAL RECORD', CDTY SECRETARY FT. WORTH, TX FUNDING BREAKDOWN SHEET City Secretary No. 41003 Amendment No. 2 Department TPW City of Fort Worth Professional Services Agreement Amendment Template PM0 Official Release 8/1/2012 Page 3of3 Fund -Account -Center P227-531200-203280189230 Amount 13,245.00 Total: 13,245.00 July 2, 2013 Mr. Michael A. Owen, P.E. Senior Professional Engineer Transportation and Public Works City of Fort Worth 1000 Throckmorton Street Fort Worth, Tx 76102 817-392-8079 Re. City Project # 01892 Harlanwood Drainage Improvements Amendment No.1 Northern Route - Revised Professional Fees Dear Michael: Additional services have been requested '5y the City of Fort Worth for the Harlanwood Drainage Improvement Project (Project No. 01892). i he additional scope of work includes the following: 1. Provide additional survey services (field and office) to obtain data north of original route, ending at Lynncrest Drive bridge. 2. Provide additional SUE cata for new northern route. 3. Route 12" 8. 15" PVC storm drain northward in lieu of original south route (approx. 385 feet total) 4. Eliminate proposed 12" PVC storm drain between private lots. 5. Design modified curb inlet for upstream end of new storm drain system. 6. Remove and replace approx. 1,000 sq.ft. street pavement. The total for the revised survey and design services (Amendment No. 1) is $13,245, and the total amount is 349,999.00. A revised LOE spreadsheet is attached to this -letter. Please contact me if you have any questions at 817'274-7788. Sincerely, Charles Crook Consulting, Inc. Charles Crook, P.F. President attachments c 11-072 file Task No. Task Description 1.0 Revised Project Management 1.1 Managing the Team 1.1.1 Internal Team Meetings 1.1.2 QA/QC 1.2 Communications and Reporting 1.2.1 Pre -Design Coordination Meeting 1.2.2 Periodic Project Update Meetings 1.2.3 Design Submittal Review Meetings 1.2.4 Prepare Baseline Schedule Prepare Monthly Progress Reports with 1.2.5 Schedule 1.2.6 Prepare Monthly MWBE Reports 1.2.7 Invoicing 2.0 Revised ROW/Easement Services 2.1 Right -of -Way Research Right-of-Way/Easement Preparation and 2.2 Submittal . 2.3 Temporary Right of Entry Submittal Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Revised Harlanwood Drainage Improvements - NORTHERN ROUTE AMENDMENT City Project No. 01892 Project Project CADD Administrative Total Labor Manager Engineer Cost Rate r $150 '!''.;' $120 :",, $75 $50 9 3 2 3 $2,010 r'2 01 01 1 1 3.0 Revised Survey 11 11 11 3.1 Design Survey 11 11 11 3.2 Temporary Right of Entry Submittal 01 1 I 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 5.0 Revised Preliminary Design (60 %) Data Collection Drainage Computations Subsurface Utility Engineering (SUE) Preliminary Design Drawings Constructability Review Utility Clearance Traffic Control Plan Project Decision Log Construction Estimate Revised Final Design City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 8.5 0 1 1 4 0.5 0.5 0 0.5 22:5) 121 4 1 15 0.5 0.5 0.5 0.5 0.5 01 0 12 • 0 $345 $300 $0 0 $345 $150 $270 1 $200 1 $200 1 $200 Subconsultant Expense Total Expense Travel Reproduction Cost Task Sub Total MWBE Non-MWBE $0 $0 $0 S0 S0 $2.010 $0 $01 $o1 $0 $0 1 I $0 $o 0 $345 $345 $0 $5,075 $0 $630 $270 2 $3,400 $135 $135 $60 $135 2 $310 $2,5001 $01 $0 $2,5001 $2,000 $2,000 $01 $01 $0 $0 $0 $345 $0 $300 $0 $0 $0 $345 $0 $150 $0 $270 $0 $200 $0 $200 $0 $200 $0 $0 $o $0 $0 $0 $0 $0 $0 $2,500 $2,845 $2,500 $2,845 $0 $0 $120 $2,120 $7,195 $0 $0 $01 $630 $2,0001 $2,270 $120 $1201 $3,520 $01 $135 $01 $135 1 $01 $60 $01 $135 1 $01 $310 $01 501 $2051 $2051 $205 1 of 2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Revised Harlanwood Drainage Improvements - NORTHERN ROUTE AMENDMENT City Project No. 01892 Expense Task No. Task Description Project Project CADD Administrative Total Labor Subconsultant Total Expense Task Sub Total Manager Engineer Cost Travel Reproduction Cost Rate $150 ''', $120 $75 $50 MWBE Non-MWBE 5.1 Final Draft (90%) Construction Plans 0 0 0 $0 $100 5.2 Construction Estimates (90% and 100%) 0 0 0 $0 5.3 Final (100%) Plans 0 0 0 $0 $105 5.4 Project Decision Logs (90% and 100%) 0 0 $0 6.0 Revised Permitting 2 2 0 0 $540 $0 $0 $0 $0 $0 $540 6.1 Floodplain Services 2 2 $540 $0 $540 6.2 TxDOT $0 $0 $0 6.3 Railroad $0 $0 $0 6.4 I DLK $0 $0 $0 Totals 20.5 28.5 15 7 $7;970 4500 0 0 325 $4,825 $12,795 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 $100 $100 $0 $0 $105 $105 $0 $0 Revised Project Summary Total Hours 71 Total Labor $7,970 Total Expense $4,825 MWBE Subconsultant $4,500 Non-MWBE Subconsultant $0 10% Sub Markup $450 MWBE Participation 34.0% Total Project Cost $13,245 2of2