HomeMy WebLinkAboutContract 48662-A1 CSC No.48662-A1 o7yo 2020 AMENDMENT No.1 rysF��gF/�r,,y TO CITY SECRETARY CONTRACT No. 48662 WHEREAS, the City of Fort Worth (CITY) and Peloton Land Solutions, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 48662, (the CONTRACT) which was authorized by M&C no. C-28092 on the 29th day of August, 2017 in the amount of $ 685, 178.00; and WHEREAS, the CONTRACT involves engineering services for the following project: N Riverside Drive, From Shiver Road to North Tarrant Parkway; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $358,411.00 (See Attached Funding Breakdown Sheet, Page -4-) . 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1, 043, 589.00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a sigpatory, below. City of Fort Worth Professional Services Agreement Amendment Template Revised:March 9,2020 AL RECORD Pape 1 of 4 h -FoTV SECRETARY X APPROVED: City of Fort Worth ENGINEER Peloton Land Solutions, Inc. Dana&"( hdoFF Dana Burghdoff(Sul 10,202017:05 CDT) Dana Burghdoff Johh R. Alexander Assistant City Manager Vice President, Principal DATE: Jul 10,2020 DATE: (-A /Z,o-z.o APPROVAL RECOMMENDED: William M Johnson Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Bradley RTdovich(Jul 7,202017:08 CDT) Bradley M Radovich Senior Project Manager City of Fort Worth OFFICIAL RECORD Professional Services Agreement Amendment Template CITY SECRETARY Revised:March 9,2020 Page 2 of 4 FT WORTH,TX APPROVED AS TO FORM AND LEGALITY: M&C: 20-0433 Date: DBI!T(UJUI 10,=13:37 CDT) Douglas W. Black Ordinance 24161-04-2020 Assistant City Attorney 45 la95'. oq0DO -(ol3R93 ATTEST: Mary J. Kayser City Secretary NIB UFFILUAL RECORD ' R j City of Fort Worth CITY SECRETARY Professional Services Agreement Amendment Template T. WO TH Revised:March 9,2020 LFT. WORTH, TX Page 3 of 4 FUNDING BREAKDOWN SHEET City Secretary No. 48662 Amendment No. 1 Department Fund-Account-Center Amount 0200431 30104-0200431-5330500-100453-002330 $358, 411 . 00 Total : $358, 411. 00 City of Fort Worth Professional Services Agreement Amendment Template Revised:March 9,2020 Page 4 of 4 ATTACHMENT "A" Scope for Engineering Design Related Services for Street Improvements The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE Prepare revised Preliminary(60%) and Final(90% and 100%) construction documents for the construction of North Riverside Drive between Shiver Road and North Tarrant Parkway in north Fort Worth. Construction documents will include revisions to existing documents dated November 2018 and September 2019 as follows: • Re-design of the North Tarrant Parkway intersection as a 3 x 2 signalized intersection -ultimate configuration- with a 2 x2 to be constructed. The intersection is currently designed as a roundabout as originally directed by the City. WORK TO BE PERFORMED Task 1. Design Management Task 7 ConGi• sign Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7 ROWlEasement Se n ' c Task 8. Survey and Subsurface Utility Engineering Services Taciv rer nitting. Task 10. Plan and Submittal Checklists TASK 1. DESIGN MANAGEMENT. ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 1 of 23 1.2. Communications and Reporting Attend a pre design project knGkofF/chartering meeting with CITY staff to Gonfirm and Glarmfy scone understand CITY objectives and ensure economical and functional designs that meet CITY requirements • Conduct and document monthly project update meetings with CITY Project Manager • Conduct review meetings with the CITY at the end of each design phase • Prepare invoices, in accordance with Attachment B to this Standard Agreement and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the Transportation and Public Works Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub-consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • Temporary drainage for Traffic Control Plan (TCP) is not included in project. Project exists on a ridge and is assumed to sheet flow away from the intersection in all phases of the TCP and the permanent condition. • Intermittent roadway closures are assumed to be allowable on the project for the TCP. Closures anticipated to complete final concrete paving in each phase of construction during over night or off-peak closure periods. • Project to utilize existing public right-of-way. No additional right-of-way er easemen anticipated to be obtained. • Temporary Traffic Signals are anticipated for this project. Traffic control plan to include these temporary signals. • Traffic studies for temporary traffic signal layouts to be included. A maximum of three phases are included. City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 2 of 23 • A scale of 1-inch = 100-ft to be used for Traffic Control Plans. Intent is to reduce sheet count on project. DELIVERABLES (Consultant's QA/QC plan for the project shall be available for review by the City upon request) A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form G. Plan Submittal Checklists (See Task 10) TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The Goneeptual Design shall he submitted to CITY ner the approved Preieot Oohed le The pUrpese of the oonoeptu al design is fer the ENGINEER to identify, develop suGGessfully addFesses the design pmblem, and to obtain the r s endersement of this Enneept ENGINEER 'II utilize oon and oriteria oentained 'n the o��rrent CITY iC1A/AA vnccp��rvv mc�rc=wnra�crircccvrr6e�S-ar�crcrrccnzrcvrrcun�ca-n-r-a-rccarrcn Gr#e4a Manual for-Site Development and GenstFucation fOF GonGeptual planning and design, ENGINEER will develop the oonoeptu al design of the infraStrUotWe as follows. -he follo mnlen of aGtiy iec.that ENGINEER m.w re vice or expand upen7 2.1. Data GelleEtiian • In addotien to data obtained frem the CITY, CAI�EC eseaFoh and Make effects to obtain pertinent infOffn Lien to and in ooeFdinrtion of the proposed improve menu with any planner) future improvements that may infl uenge the n roieot ENGINEERwill also identify and seek to obtain d to for evicting pool-litinn� that may imnant the nrnien♦ innluding• utilities agennies (TxDOT and railroads), (amity Master Plans, andproperty ownership as available from the Taxw Acceccor'c of lee • The data oolleotion efforts will also inolu de oend Doting cpeGial 000rdinrtion meetings with r ffeoted property owners and businesses as necessary to develop '=.2. SubsuFfaGe Utility EngineeNmng Prev0de S bs urfr oe Utility Engineering (SUE) ner Tr oll 8. 2.3. The Goneeptual Design RaGkage shall OnGlude the following: [ENGINEER and P4*eG Manager, Delete nrl/er peffiens f items that am not cable, and add items. SG a of IA/o M City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 3 of 23 • Preliminary mover and index of sheets inGl u-linn project limits area lo cati o n man and beginning and end station limits • SUE Plan sheets sealed by a licensed prefessional engineer registered in the State of Texas • Traffic Control Plan: Develop a traffic control plan utilizing standard trafFin ier�e_configuFations posted s "ypiGals"on the CITY's BIII 360 �w�eebsaiiae The tt�icaais�need not n���ei-! GiQlifin Qer! in the sealed nnntrant Develop supplemental traffic ral drawings as needed for review �AC�eR�S�a��Op- rrnramcE ��cccrcc�vrTcv�cvv and appreval by the Traffic Division of the Transportation and Publio Works Dent. Provide a written summary of the distinct phases to take plane during cnnstn untinn operations to inGl ude road any!/or lane nlos prep limited access to adjacent properties and limited access to pedestrian and blc\/cle trcraft. • Traffic Count Data: MiGreseft Excel spreadsheet of Ra.w. 74 hour and Turning Movement Count data gatherer! at 15 minute intewals at a minims rn on all ra�wi data Golleisted. PFev.de Daily Summaries by Approach and Peak Perigrl Summaries bpi App. —. Qdsheet shall uploadedto the BIII 360 fnlydeF 'TRW Traffic Count Data'. �' • Genceptual iC\A M Cheiskimst in acr.erdance with the currant CITY iC\A M Criteria Manual for Cite Deve ent and Constn udion, • Proposed f any water, sewer, work drainage ork that is � fob • Existing typical sections of the roadway to be constructed along with proposed typiGal seistions whiGh outline the proposed improvements. TypiGal seistions shall include existing and proposed ROW existing and proposed lane widths and doreistme .sting and proposed > > sidewalks, and retaining walls. • Geniseptual plan and prefile sheets showing existing and proposed herizental roadway alignments existing and proposer! ROW existing and proposed sidewalks and driveways proposed lane dimensions and lane arrows existing drainage stn d gyres city owned and franchise utilities, and existing rnad�wiav rn-cxn-r�.rcruc�ciarc�� c�rc-�r--vvv-���v-a-rya--rra-rT ��rrcr�n'�c'r'STvav�vuy vertical alignments (profiles). • Drainage area man with supporting drainage comps station in the CITY's standard tabular format. • Decumentatien of lied design decisions. • Estimates of probable eanstruction cast. ASSUMPTIONS � [CAIWEER INSERT A S WT 0NS A CCOC ATC/l MTH TbJ MS AGTII/ITICC AND DELIVERABLES ERE. (e.g. number-of reyie iterations, number-of usiness/nronerty owner cegrr/ination meetings etc.)] City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 4 of 23 All storm water nalnu lations and design shall nonform to the CITY ourrent iC1A/AA Criteria Manual for Site Development and Concert uctinn sets of size plans will be delivered for the 30% design. supplemental TrefFio/control drawings will be neerlei-l. DWF files Greeted from design CAD drawings will be uploaded to the designated nroieot folder in QIM360 ENGINEER shall not nroneed with Preliminary Design activities without written approval by the CITY of the Connentual Design PaGka e DELIVERABLES A Conoentu al Design I7a Gkaoe R. fFi Tran Count Data B. G. ConGeptual OSWIVI Che6kimst. TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. Development of Preliminary Design Drawings and Specifications shall include the following: • Traffic Control Plan updated to reflect any changes as a result of the proposed plan changes outlined in the preliminary submittal documents and herein; while also including all construction signage and pavement markings which will be in accordance with the latest edition of the Texas Manual on Uniform Traffic Control Devices. • A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument#8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). • Provide Subsurface Utility Engineering (SUE) per Task 8. • Preliminary iSWM Checklist in accordance with the current CITY iSWM Criteria Manual for Site Development and Construction. • Updated existing and proposed typical section sheets. • Updated roadway plan and profile sheets displaying station and coordinate data for all horizontal alignment P.C.'s, P.T.'s, P.I.'s; station and elevation data of all City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 5 of 23 vertical profile P.C.'s, P.T.'s, P.I.'s, low points, and high points; lengths of vertical curves, grades, K values, e, and vertical clearances where required. • No less than two bench marks plan/profile sheet. • Bearings given on all proposed centerlines, or baselines. • Station equations relating utilities to paving, when appropriate. • Overall project easement layout sheet(s). • Intersection layout sheets including ROW lines, horizontal alignments, utilities, curbs, sidewalks, driveways, lane dimensions and arrows, and existing and proposed contours (0.25' intervals) • Preliminary roadway details to include curbs, curb expansion joints, driveways, sidewalks, and pavement details. • ENGINEER will delineate the watershed based on contour data and field verification and document existing street, right-of-way and storm drain capacities for the subject site. A drainage area map will be drawn at maximum 1" = 200' scale from available 2-foot contour data with the contours labeled. Peloton has prepared a topographic survey along the proposed right-of-way. This data will be combined with available 2-foot contour data from the City to complete the drainage area map . Calculations regarding street and right-of-way capacities and design discharges (5-year and 100-year frequencies) at selected critical locations will be provided. Other frequencies as required by iSWM criteria may be appropriate for outfalls and sensitive locations. Capacities of existing storm drain will be calculated and shown. All calculations shall conform to CITY criteria delineated in the CITY's current iSWM Criteria Manual for Site Development and Construction. All locations in the project area where 100-year runoff exceeds available storm drain and right-of-way capacities shall be clearly identified. The ENGINEER's responsibility includes recommendations for improvements of the existing system as deemed reasonable and consistent with CITY standards. • Storm drain layout sheets showing location and size of all inlets, manholes, junction boxes, culverts and piping to include storm drain profiles showing existing and proposed flow lines, flows, lengths and slopes of pipe, top of ground profile over pipe and connections to existing or proposed storm sewer systems. • Preliminary signing, pavement marking, illumination and signal layouts. • Updated Estimates of probable construction cost. 3.2. veeeteGhnior,l In.iestigationlRavement ^r Design • Coil investigations, inGluding field and labeFatery tests herings rela�ei-1 mule In add itien to the above h0rings and appFOnriate field and labeFatery analysis will be Fnade at reasonable intewals along the prej alignment for the Genera GtOF'S use in determining sell oenditions for nrepaFino bids and Trenoh Safety Plan • The ENGINEER shall nrepaFe a detailed oeeteohniGal engineering study and pavement design in nenfO ffnanoe with the Gfty of Fed Werth Pavement Design City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 6 of 23 Stand.. ds Manua, 2005. The study shall inGlude reFiBrrtrrmendativCrcrvnsT ncsaMing Utility 4rennhinn and identify existing groundwater elevation at eanh hnrinn 3.3. Constructability Review • Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. 3.4. Public Meeting • After the preliminary plans have been reviewed and approved by the CITY, the ENGINEER shall prepare project exhibits, and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location, prepare and mail the invitation letters to the affected customers. The ENGINEER shall coordinate with the CITY GIS staff to identify affected property owners/residents and develop a spreadsheet listing addresses of those to invite to the public meeting. The ENGINEER will attend the meeting and assist the CITY in the presentation as necessary. 3.5. Utility Clearance • The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible consider potential future utilities in designs. • The ENGINEER shall upload individual DWG files for each plan sheet of the approved preliminary plan set to the designated project folder in BIM 360 for forwarding to all utility companies which have facilities within the limits of the project. The DWG files should be created directly from the CAD files as opposed to PDF files. ASSUMPTIONS • All storm water calculations and design shall conform to the current CITY iSWM Criteria Manual for Site Development and Construction. • 4_sets of_half size plans will be delivered for the 60% design. • _1_sets of specifications will be delivered for the 60% design. • DWF files created from design CAD drawings will be uploaded to the designated project folder in the CITY's Electronic Document Management System (BIM360). • All submitted documents and checklists will be uploaded to the designated project folder in BIM360 • The CITY's front end and technical specifications will be used. The ENGINEER shall supplement the technical specifications if needed. City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 7 of 23 • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. • Geotechnical report previously prepared as part of original contract by Alpha Testing dated May 23, 2018 will be used for design recommendations. DELIVERABLES A. Preliminary Design drawings and specifications B. Preliminary iSWM Checklist C. Utility Clearance drawings D. Geotechnical Report E. Estimates of probable construction cost F. Public Meeting exhibits TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). • Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: • Final draft construction plans (90%) including iSWM Construction Plan and specifications shall be submitted to CITY per the approved Project Schedule. • Final iSWM Checklist in accordance with the current iSWM Criteria Manual for Site Development and Construction. • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Final Plans (100%)to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. • The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. ASSUMPTIONS • It is assumed that the drainage outfall into White's Branch will be located within the existing drainage easement at the Shiver Rd roundabout to avoid needing a parkland conversion. • _2_sets of_half_size drawings and_1_specifications will be delivered for the 90% Design package. • A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. • _15_sets of_full_size drawings and_6_specifications will be delivered for the 100% Design package. City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 8 of 23 • A DWF file for the 100 % Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. • ENGINEER to provide estimated final sheet list (cover/index, general notes, control point location, easement layout, SUE plan sheets, no. of plan/profiles, special detail shts, etc.) DELIVERABLES A. 90% construction plans and specifications. B. Final iSWM Checklist C. 100% construction plans and specifications. D. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. E. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support[the following are examples of activities that ENGINEER may revise or expand upon] • The ENGINEER shall upload all plans and contract documents onto BIM360 for access to potential bidders. • Contract documents shall be uploaded in a .xIs file. • Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to BIM360 in two formats, .pdf and Awf files. The .pdf will consist of one file of the entire plan set. The Awf will consist of individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. • The ENGINEER shall sell contract documents and maintain a plan holders list on BIM360 from documents sold and from Contractor's uploaded Plan Holder Registrations in BIM360. • The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's BIM360 folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto BIM360 and mail addenda to all plan holders. City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 9 of 23 • Attend the prebid conference in support of the CITY. • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. • When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. • Attend the bid opening in support of the CITY. • Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on BIM360. • Incorporate all addenda into the contract documents and issue conformed sets. 5.2 Final Design Drawings • Final Design Drawings shall be submitted as an Adobe Acrobat PDF format (version 6.0 or higher)file and DWF format. There shall be one (1) PDF file and one (1) DWF file (created from CAD application of drawing) for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall be created from the original CAD drawing filess and shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956—org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "—org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053 org3.pdf and K-0320 org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "—org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755 org18.pdf Both PDF and DWF files shall be uploaded to the projects Record Drawing folder in BIM360. • In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet as an individual DWG file with all reference files integrated into the sheet. If the plans City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 10 of 23 were prepared in DGN format, they shall be converted to DWG prior to uploading. The naming convention to be used for the DWG files shall be as follows: I. TPW files shall use the W number as for PDF and DWF files, but shall include the sheet number in the name—"W-1956—SHT01.dwg", "W- 1956 SHT02.dwg", etc. 11. Water and Sewer file names shall use the X number as for PDF and DWF files, but shall include the sheet number in the name — "X- 12155—SHT01.dwg", "X-12755—SHT02.dwg", etc. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number(817)392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS [INSERT ASSUMPTIONS ASSOCIATED WITH THE TASK ACTIVITIES AND DELIVERABLES HERE] • The project will^b^e,,b�iid,.,o�nlly�,on�ce and awarded to one contractor. 0 sets of GenStYGGtilyl'I deGument will he sold to and Fnade available on L21�A4Q- far plan holders and!OF given to pla ine YFIS. sets of GenStF Gtien deouments will he printed and made available fer nUroha and/or given to pla ino ro )Fps • 1 sets of_11"X17" size plans and specifications (conformed, if applicable) will be delivered to the CITY. • PDF, DWF and DWG files will be uploaded to BIM360. DELIVERABLES A. Addenda B. Bid tabulations C. Recommendation of award D. Construction documents (conformed, if applicable) E. CFW Data Spreadsheet TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the project as follows. City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 11 of 23 6.1 Construction Support[the following are examples of activities that ENGINEER may revise or expand upon] • The ENGINEER shall attend the preconstruction conference. • After the pre-construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. • The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. • The ENGINEER shall review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. The ENGINEER shall log and track all shop drawings, samples and other submittals in BIM360. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. • The ENGINEER shall attend the "Final' project walk through and assist with preparation of final punch list. 6.2 Record Drawings • The ENGINEER shall prepare record drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: o As-Built Survey o Red-Line Markups from the Contractor o Red-Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions • The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: o These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 12 of 23 documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. • The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red-lined drawings shall be returned to the CITY with the mylars. • Record Drawings shall also be submitted as an Adobe Acrobat PDF format (version 6.0 or higher)file and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf' where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053 org3.pdf and K-0320 org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755 org18.pdf Both PDF and DWF files shall be uploaded to the projects Record Drawing folder in BIM360. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number(817)392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • 10 site visits are assumed. • 3 submittal reviews are assumed. • 5 RFI's are assumed. • _3_Change Orders are assumed. City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 13 of 23 • One copy of full size (22"x34") mylars will be delivered to the CITY DELIVERABLES A. Public meeting exhibits B. Response to Contractor's Request for Information C. Review of Change Orders D. Review of shop drawings E. Final Punch List items F. Record Drawings TASK 7. ROMEAS€MENT SERVICES. ENGINEER will suppert and perform activities related to ROW and land as outlined below, per sgoping diregtion and guidange from the (TTY's DroleGt Manager. [the A9110 iing are eva gos of activities that ENGINEER may revise or expand upon] 71.Rght of Way ReJeaFGh The ENGINEER shall determine rights of way, easements needs for constrUction of roe 'red t pomp y and n an t easements ill b identified the�rvJG�e�urGa-c eH�rn�eRTGcr�eFl�eRr�rve��eRrrrrGG based on available information and recommendations will be made for approval bey the he CITY. 7.2. Right of Wayl ement Preparation and Submittal. • The ENGINEER shall prepare decuments to be used to obtain right of way and permanent and/or temporapy easements req sired to constrUct the impreyements • The decumentatien shall be preyided in Genformance with the checldists and templates available on the /MTV's BIB 360 site, 7.3. T nppa Right of Preparation and Submittal •"��OY�'�`^�1 oe�UPtien,the CAI�cER c�pprrenare' mail and obtain Temnerapi Right of Entries from landowners It is assumed that letters will only be req sired for land owners adjacent to temporany constn notion easements or who are directly affected by the project and no easement is req sired to enter their • The decumentatien shall be preyided in conformance with the oheoldists and templates available on the /MTV's BIB 360 site ASSUMPTIGNS • Existing ROW is sufficient for proposed improvements. • [INSERT ASSUWT40NS A CCQGh4 TED 144TH TL TASK AGTIVIT ES A Al/l DE,UV HERE...(e.g. number-of easements, number-of pa Gels. number-of copies etc-.] City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 14 of 23 Right_of_Way researoh inGl u-!es review of property(rinht_of_way rennrrds based on Gurrent Internet based Tarrant Appraisal Distrint (TAD) information available at the staFt ofthe projP. er-ty;nformation (i a iron rends fenoes stakes eto ) ��rd It does not inGle effect for ohain of title researoh a rn parent trn4 reSeeh ei-. ....noel researnh for easements not inGl u-led in the T'— rinht_of_way takings easement variations and abandonments, right_of_wav vaoatien at oles gyres DELIVERABLES A Easement exhibits and meets and bounds preyi derd on CITY fnrmS L2. Temperary Right of Entry Letters B. TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER will provide survey support as follows. 8.1. Design Survey [the follouiino are eVamnfes of an+Nii+ies that ENGINEER may revice or-expand upon] • ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. • The minimum survey information to be provided on the plans shall include the following: — A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally on a scale of not less than 1:400: — The following information about each Control Point; a. Identified (Existing. CITY Monument#8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast comer of North Side Drive and North Main Street). — Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. — No less than two horizontal bench marks, per line or location. — Bearings given on all proposed centerlines, or baselines. — Station equations relating utilities to paving, when appropriate. City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 15 of 23 8.2. r P�'Tight of Entry Preparation and Submittal •"••PYr�o'•`^•1 enterinnrr9-property, the ENGINEER shall prepare, mail and nh4�in Temporary Right of Entry from landowners • The dons rnentation shall he provided in nonformanne with the nheGkIists and templates available on the (TTY's BIM360 site 8.3. Subsurface Utility Engineering Provide Subsurface Utility Engineering (SUE) to Quality Level A as described below. SUE level A shall be performed on any utilities where conflicts with proposed improvements are suspected based on level B SUE. SUE shall be performed before design on all utilities and, to confirm proper relocation and clearance after utility relocation is complete, on relocated utilities. The location of relocated utilities as determined by SUE shall be shown in the construction plans. RFOvide ,.�� l7 Utility (SUE)to Quality Lev /`�l rn� Q,nl, dec•i ped bCf6v.—The SUE shall be performed in accordance with Cl/ASCE 38-02. Quality Level D • Conduct appropriate investigations (e.g., owner records, County/CITY records, personal interviews, visual inspections, etc.), to help identify utility owners that may have facilities within the project limits or that may be affected by the project. • Collect applicable records (e.g., utility owner base maps, "as built" or record drawings, permit records, field notes, geographic information system data, oral histories, etc.)on the existence and approximate location of existing involved utilities. • Review records for: evidence or indication of additional available records; duplicate or conflicting information; need for clarification. • Develop SUE plan sheets and transfer information on all involved utilities to appropriate design plan sheets, electronic files, and/or other documents as required. Exercise professional judgment to resolve conflicting information. For information depicted, indicate: utility type and ownership; date of depiction; quality Ievel(s); end points of any utility data; line status (e.g., active, abandoned, out of service); line size and condition; number of jointly buried cables; and encasement. Quality Level C (includes tasks as described for Quality Level D) • Identify surface features, from project topographic data and from field observations, that are surface appurtenances of subsurface utilities. • Include survey and correlation of aerial or ground-mounted utility facilities in Quality Level C tasks. • Survey surface features of subsurface utility facilities or systems, if such features have not already been surveyed by a professional surveyor. If previously surveyed, check survey data for accuracy and completeness. • The survey shall also include (in addition to subsurface utility features visible at the ground surface): determination of invert elevations of any manholes and vaults; sketches showing interior dimensions and line connections of such manholes and vaults; any surface markings denoting subsurface utilities, furnished by utility owners for design purposes. City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 16 of 23 • Exercise professional judgment to correlate data from different sources, and to resolve conflicting information. • Update (or prepare) plan sheets, electronic files, and/or other documents to reflect the integration of Quality Level D and Quality Level C information. • Recommend follow-up investigations (e.g., additional surveys, consultation with utility owners, etc.) as may be needed to further resolve discrepancies. • Provide Quality Level C to identify overhead utilities on the project and provide the overhead utility information on the SUE plan sheets. Level B (includes tasks as described for Quality Level C) • Select and apply appropriate surface geophysical method(s) to search for and detect subsurface utilities within the project limits, and/or to trace a particular utility line or system. • Based on an interpretation of data, mark the indications of utilities on the ground surface for subsequent survey. Utilize paint or other method acceptable for marking of lines. • Unless otherwise directed, mark centerline of single-conduit lines, and outside edges of multi-conduit systems. • Resolve differences between designated utilities and utility records and surveyed appurtenances. • Recommend additional measures to resolve differences if they still exist. Recommendations may include additional or different surface geophysical methods, exploratory excavation, or upgrade to Quality Level A data. • As an alternative to the physical marking of lines, the ENGINEER may, with CITY's approval, utilize other means of data collection, storage, retrieval, and reduction, that enables the correlation of surface geophysical data to the project's survey control. Level A • Expose and locate utilities at specific locations. • Tie horizontal and vertical location of utility to survey control. • Provide utility size and configuration. • Provide paving thickness and type, where applicable. • Provide general soil type and site conditions and such other pertinent information as is reasonably ascertainable from each test hole site. 8.4. ConnstFue4m nSuwey�rMe follouiing are examples ofFet�M6sthat ENGI oIEC a • Be available ble to the CITY on mrJtters oonoerning the layout of the nreieot r6 gyring itc gonstn uot•on 4�1TJLfQri Cf�ff • CAI�cC set Gentrel points /• toe survey to peffnanent menument s soh as TRW menuments and1OF nroneFty oorners one leor Lion er oh at beginning and end of oieot\for-the proje^t� points must be indivisible. Streets yer�ft in length or Streets on ou pyes m greater density of oentrol points to maintain —NGINEER shall establosh a minimum of two benoh FnaFks per plan sheet (banish FnaFks shall be leor ted adjacent to nreieot)and shall provide the following oonStrl Uotion staking ceniine�• City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 17 of 23 STORM DRAIN STAKING! Provide an offset stake at 400' ontpp (50'als /5 o ntepials in curves if required) and at all proposed manholes poiin`4^c��`'o�f curie points of tangent, of nine size changes and at all horizental OF vertical mole points with a cut to flow line and a cut/fill to the ton of proposed manholes Provide centerline elevation at 400' intervals and at all gradebreaks On the natural ground. Levi-! lines shall also he staked with grades if greater than 50' in length, whereOF substantial alignment andlor grade are needed Provide two offset stakes at end or eanh wing of each cUrb inlet with a cut to flow line and a cut/fill to the ton of cUrb elevar one and grade shall be set tic-ce-a ioolleram.e of 1/_0.1 f.. for storm drain none and 1/_0.04 ft for curb inlets RAAf1W" EXCAVATION STAVING! Pr vide W or proper-ty line at 50' int gals and at all points of curie points of tangent and at all horizontal or vertmisal angle points with a Gut/fill to the ton of proposed cUrb The right of way shall also be flagged d�gyring this process along with rline and grade stakes for exisavation poses. Stake all YeFti crnl and hor• tal c�pries at 50' •nt als gFade shall be set to a rrvrF�6l�Curcvr-vc�-iarvv�-rceRiur�. tolerance of 1/ 0.1 ft. FINAL ROADWAY STAKING! Preyide A' or 5' offset stakes at 50' vv�vc-rv��.�rr�c�ucuicc�-ur.�v 0nt gals and at all points of ints of tangent and at all h&zenta7 OF eFtica�l angle points with as G �t/fill to the ton of proposedd c�orb. Stalling �o for crb grade `and intersecting streets if required, shall he performed under final rival pavement sta niets shall be stalled •f needed Set ta� cCrl'1"I�ccCfriCT. OGTCQ on offset hubs f r strum t Stake all cal and hori tal c��nms m-vir�cTrravv�eracrc m�rvcrncc-un��� �Curca'rvc�� at 50'Ont gals and previde inteffnediate stakes between curie points if the rad•��s is less 400' Lone and de shall be set to a tolerance of tirra�uv'iaTrsrc�� rrun--w� +1 0.01 . SANITARY SEWER STAKING! Provide an offset stake at 50' intervals (25 intervals in cuNes if required) and at proposed manholes points of curie' points of tangent' and at all horize�nta�ertiGa�l angle points, with a cut to flow line and a cut/fill to ton of proposed manholes Preyide centerline elevation at 50' intervals ProVide lecation of proposed serrices for constrUction pUrposes and for as built pUrposes In cage the proposed SS lone woll be constructed on a locatoon other than the existing lone log repent of serrioe locations or by lecating the evicting serrice at the time of on Stake easements and prop lines whre�e m�nc-crE6R�FkfC�Fvr,:-vcrnc�ccra�eRr�-cxr,v-prcp�y-, c+pp„Gable—Lone and grade shall be set to a teleFanGe of i/ n n 1 ft. WATER STAKING! ProVide an offset stake at rn�teFyals /z?�teNalj on curies if required) and at valves tees and at all horizontal or vertical angle points with a cut to ton of nine or flOW line of nine (depending on the proposed size). Dreyide centerline elevation at 50' intervals Preyide a lecation of proposed services for constrUction pUrposes and for as built pU FPOOssee?. Preyide offset lecati� on and grade stakes Tor�Qsed fore hydrants and water meters with a cut/fill to the proposed ton of cUrb Stake easements -pFspeFty lines whereapplicable. Provlde propert�v City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 18 of 23 toes to all valves, hydrants, tees, h&zental OF YeFtmisal bends and othe ap�rtena.annne�s. Lone and gFade shall be set to a tnleranne of 1/_ 0.0ift. "AS STAKED" RECORD AC THE CONSTRUCTION! Thrn,ighni,t the rvc,�,�vur-mc prooess of all r.onstrUotion leoate and reoerd an!hhing that does not nnnfnrm w0th the nnnstri,ntinn plans A dravyinn of the prnoent layout with domensmons and a r.oerdinate list must be suhmittei-1• A Gnpv of sample field notes that must be prnvoded is atdanhed The field notes must onnl,,de the following information: a Cor storm drain lined and starm drain laterals; Done size and Mine pernent of grade of main line laterals henry motion boxes manholes and leoation of inlets Cut and fill , , d eo,,me ntat•e n roadways;b. FOF Field notes signed and sealed by a imeensed suFveyOF FnU s,,bmotted to the CITY Inspentnr prior to the beginning of Gnnstrudinn d M size size L and percen of grae of sey,er laterals ole T' �* , t d , manh leoations, y ,,tied to propert line inolding nerth/so,nth and easU west lines, R.G.'s, T's or G 's ton of ground elevation and flowline elevation of eaoh station n,ember referenr.ed Cut and fill deo,,mentation Property toes to alll-leeGatmens. dv. FOF wateF line , Pope size and type, its leGation On the street along with toes to pFope lanes and a water onterse�onn sketoh Cut and foil dnni,mentatonn Property toes to all sewmise leisatmen-&. COORDINATION WITH CITY INSPE '`TORICONTRACTAR! CAl�NGINEER's suFyevor is expected to Work with the CITY inspector and oentraotor to provide anyany sp I rep opts contra r may have gthe scone of Wark described ec�a,T �.r-..�rtcru ,av above is not exceeded It is expected that a few, stakes will be knocked o,h d,gyring dirt Work Providing that the number of dist,,rbed stakes is minor(less than 10% of the stakes for any phase of the project) the ENGINEE 's surveyor shall , r r plane these stakes at no extra cost If additional major restaking is regired the � CAl�cER's suFveyOF shall �w,reyide the additional ork at an ho,,rhy rate of , $- Pe r hoUr for a field Grew. Mayor restaking may be required if a substantial number of the onotoal stakes are Irnnnked down as a result of the cnntradnr's uGtmvmty and here are not enough stakes left to Gemple# the-project. nentraotnr shall be responsible for paying the ENGINEER for this additional Work City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 19 of 23 INCIDENTAL PRE CONSTRUCTION STARING! Right_of_�wia y flagging, back of •�vrvrv�-vruy�TvcJ9Tr'9,�u�.cvr curb loGatjon driveways walks and retaining walls as requested by the GITV Inspec4er, curb radon (to determine construc4ion Iecation)for utility clearance • SPECIAL CONDITIONS: a. The CITY InspeGtor assogned to the project shall oversee all construction staking uact yity and shall be responsible for all field Goordination All decumentation mCudinn field notes, cut and/or foil notes, grades, "as staked" information etG., shall be provided to the CITY insn ctor and shall be sealed and sinned by a �rrarr-vc-prv-rev eccvr-arm.mom--vc�cc..cv--ar,a-�g^cv--v�u su Fyeyor licensed on the State of Texas h The ENGINEE 's Su Fyevor shall attend the pre constn uc4ion GonferenGe G. The ENGINEE 's Sunievor shall meet with CITY Inspe Gtor and Gentracter to d The ENGINEE 's Su Fyevor shall stake each utility separately and at different timed with Of applicable sanitani sexier fi ffit water secend storm drain 4hjrd and real-way GonstFu6tion fourth and shall provide enough Genstn action Stalrino i nformatjen so that the prejec4s can be cens4n uc4ed as designed e A m ber of ENGINEE 's firm familiar with project shall be available at all timed �rrrneFl�ccrvr�rry me cc to immediately respend to questions from the field ASSUMPTIONS • [INSERT ASSUWT40NS ACC/ Ch4TEED KgTLJ TL MSK ACT WTI S AAl/l DE, iVERAQI CC HERE] • North Riverside Drive from Shiver Road roundabout to 450 feet south of North Tarrant Parkway. North Tarrant Parkway approximately 650 feet on either side of centerline of intersection. • SUE plan drawings sealed by a professional engineer registered in the State of Texas. 8 potential conflicts were assumed to require Level A SUE. • Design survey that was performed as part of the original contract will be supplemented in areas where there has been new development, or significant changes. Specifically around the new Police Department that was constructed after the original design survey. DELIVERABLES A Copies of field su Fyey data and noted signed and sealed by a licensed sunievor B. Ilrawino of the project layo��t with dimensions and coordinate Ijs4 n TASK 9. PERMITTING. ENGINEER will provide permitting support for the CITY to obtain any and all agreements and/or permits normally required for a project of this size and type, as follows. Me Wowing are evamnles of activities that ENGIAICCO may revise or expand upen7 City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 20 of 23 9.1 Grading Permit • Engineer will submit documents to City to obtain grading permit for the project. 9.2. Storm Water Pollution Prevention Plan • For projects that disturb an area greater than one (1) acre, the Contractor will be responsible for preparing and submitting the Storm Water Pollution Prevention Plan (SWPPP)with appropriate regulatory agencies. The Engineer will prepare the iSWM Construction Plan according to the current CITYiSWM Criteria Manual for Site Development and Construction which will be incorporated into the SWPPP by the contractor. 7 EnViFenm tal Seni'oes provide a deta#ed Gene if I IC' Armv Corpof Cnoineerc� vz. �neRzurvcrriccr�prvvrvc-crvccrnrccT.rcvp �rrgn-rccrs Condon 404 Nationwide Permit or inrlh4dual Permit is requked] • Negotiating and noordinating to obtain approval of the an the agreement and/or permits. • Completing all fo FFFIsl ppliGations neoessary. • Submitting f0ffnslappliG Liens for CITY review • Submitting revised forme fer rJoenoI rev ie�wi 9.3. Floorinlr in CeFvtces(pFevide-detta:led sGepe-if C anrl/er floodplain p "`�M emV is • Meet negotiate and 000rrlinr to to obtain appFovr l of the rJoe nn�i i���vino the agreement and/OF nermitS • Completing all fo FFFIsl nnlior Lions neoessary. • Submitting f0ffnsiappliortiens for CITY review • Submitting revised forme for rJoenoI rev ie�wi • Responding to enennv oomments and requests 4.TexasDepartment of Transportation (TxDOT) Permit �irnro detailed T DQT neFm"i(cal .ire rei uim• rl7 Meet negotiate and coordinate to obtain approval of the age nn�i i���vino the agreement and/OF nermitS • Completing all forms/annllcations necessary. • Submitting f0ffnsiannlicatiens for CITY and TxDQT revie�wi • Submitting revised forme for agencI rev ie�wi • Responding to enennv comments and requests 9.5. Railroad Reffnit[pr detalescope if Oailmad n it,(-O amTGqOire City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 21 of 23 • Meet negotiate and goorrlinate to obtain approval of the anenn�i i���jinn the agreement and/or permits • Completing all f0ffnslapplioatiens neoessary. • Submitting forme/applications for CITY review • Submitting reviser) forms for agennI reviecwi • Responding to agency comments and requests 9.6. Texas Department of LiGensinn and Regulation (TDLR) [providedetailed SGOpe p rreoj s_ubj regulatory is of the Texas Arnh'4e6turel Qerriers ec�+s ehe� 7tl-IfeR�eRra-vrzr�cTe-ica���rcrriccccurur-vuiTrcra AGt, Chapter 68 Texas Administrative Code, (the "Barriers AnQ • identify and analyze the requirements of the Texas Ar hitent ral Barriers Art, oh,api 68 TexasAdministretive Code, and bbeG me familiar with the governm^e^.n�ttall,�y "l a authorities hhavi}n^g j Urisdiotien to approve the design of the Rrolegt • Submit Gen StFUGtie -deGuments to the TDL • Completing all TD R f0ffnsiapplioatiens neoessani • Obtainh NetnGe of Substantial Comnlianee frem the TvL-R • Request an inspection frem Trll R or a Trll R legally appreved Registered Aooessibllity Cpeoial0st no later than 30 calendar days after oenStrUotion substantial oemnletion Advice the / ITV in Writing of the results of the inspection • Responding to agenGy Gamments and requests ASSUMPTIGNS • [INSERT ASSUWT40NS A CCOGh I TC/) KgTLJ T!J TASK AGTIVIT/CC A Al/l IICI ll/COAQI CC LERE=(e.g. number-of permits iterations number-of conies �/I • Rermit preparatien will begin after appreval of the Genoeptual design. 0 meetings with forthe pelf iit DELIVERABLES f- TASK 10. PLAN SUBMITTAL CHECKLISTS Engineer shall complete and submit Plan Submittal Checklists in accordance with the following table: PLAN SUBMITTAL CHECKLIST REQUIREMENTS Storm Storm Traffic Traffic Traffic Attachment"A" Traffic Water Water Street Water Traffic Control Control Control Type Signal 30% 60% Lights /Sewer(Submit (Submit Engineering 30% 60% 90% City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 22 of 23 (Submit All All @ All @ (Submit All Required for all work in City @ 30%) 30% 60%) @ 60%) ROW Street X X X X X* X X X X Storm Water X X X X X Water/Sewer X X X X *If included in street project ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the Scope of Services—CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre-qualification, bid protests, bid rejection and re-bidding of the contract for construction. • Construction management and inspection services • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth,Texas Attachment A PMO Release Date:02.06.2015 Page 23 of 23 ATTACHMENT B COMPENSATION Design Services for North Riverside Drive— Phase 4 City Project No. 100453 Time and Materials with Rate Schedule Project I. Compensation A. The ENGINEER shall be compensated for personnel time, non-labor expenses, and subcontract expenses in performing services for Task Order No. 4 up to $482,382.80 unless amended. CITY and ENGINEER have agreed upon compensation for Task Order No. 4 prior to starting work. The Task Order compensation shall be based on time and materials. The work to be performed generally consists of revisions to construction documents dated November 2018 and September 2019 related to a redesign of the North Tarrant Parkway intersection as a 3 x 2 signalized intersection (ultimate configuration) with a 2 x 2 to be constructed. The intersection is currently designed as a roundabout as originally directed by the City. i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Category Rate for the ENGINEER's team member performing the work and includes all direct salaries, overhead, and profit. Labor Category Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category 2020 Rate 2021 Rate $/hour $/hour Principal 240.00 245.00 Project Manager 205.00 215.00 Senior Engineer 165.00 170.00 Engineer 150.00 150.00 Junior Engineer/ EIT 120.00 125.00 CAD Technician 105.00 105.00 QA/QC Support 115.00 120.00 Administrative Support 85.00 90.00 ii. Non-Labor Expenses. Non-labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. City of Fort Worth,Texas Attachment B PMO Official Release Date:8.09.2012 Page 1 of 4 B-1 ATTACHMENT B COMPENSATION Direct Expenses (non-labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of five percent(5%). iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports City of Fort Worth,Texas Attachment B PMO Official Release Date:8.09.2012 Page 2 of 4 B-2 ATTACHMENT B COMPENSATION A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. IV. Summary of Task Order No. 2 Firm Primary Responsibility Fee Amount Prime Consultant Peloton Land Solutions, Surveying, Roadway Design, $297,488.66 61.67% Inc. Project Management Proposed MBE/SBE Sub-Consultants The Rios Group Subsurface Utility $46,460.00 9.63% Engineering Non-MBE/SBE Consultants Burns& McDonnell Traffic Engineering $133,284.14 27.63% Baird, Hampton & Electrical Engineering (Street $4,000.00 0.83% Brown Lights) Barrier Free Texas TDLR $1,150.00 0.24% TOTAL $482,382.80 100% Project Number& Name Total Fee MBE/SBE Fee MBE/SBE 100453 N. Riverside Drive— $482,382.8 $46,400.00 9.63% Phase 4 City of Fort Worth,Texas Attachment B PMO Official Release Date:8.09.2012 Page 3 of 4 B-3 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Note: Exhibit B-1 is invoice#31 from contract 48662, dated June 12, 2019 (Task Order 3). This is provided as documentation of remaining contract balance. City of Fort Worth,Texas Attachment B PMO Official Release Date:8.09.2012 Page 4 of 4 B-4 cq rs \ pr § 0 /q � �2 § [ �� 2 § <#& § / � ® � � ¥ O ƒ k / 22 00 ] ] t a © § ( ■ m§ C <s& / § E; C@ a § « _ , � � '0 � - to } Ek � ��� § | o , ; m E ) ) co E L U- / f§ q k � 0 \ u - 2 I - ! k \} } 2 § a. 0n 0 � ac, � | $ ■ ; ■ § »»� 3 a �0 /2 \7 2 f2A; m J ( a am § ; $ ! w 2 § 2 � 2 k� I. § § E� E■a ■ . I � 00 LL ■ . � ƒ c � ry &@@@ cr � ddd e 0 . � 6 ■ 2 2 2 a & § > LU § § § § k a 2 vI `■ kk _ ) n \\§ 40 \ \ � ■ U) ■ 0 E2 z 0,2 " a =0 > ?■ � z ) z ® �' u ; e a-�� �� , ■ , % o\ �) C Eiga � 202 o o . . 0 > M ; « ; IL IL va Q u>ILLL ■ mow ■ ; § E a & | ! ■ a@ � k3 | � � , a & | | , � a & | � |� k3 | ! ka & �z © B 9 � f two and aSr . E ■� w « o. )x - mI i2R# �� 2u E 0 ■ !� 2 §� � � ■. �- § ■ !! !° !| f 2 � / }k \ ! » .e■ ; |! . §!|!! ��$ 0 �§ ag/ j¥.«|- e:� -• �|a Sk°E-��kl----B �..2§!|����#�_ . 0�f � --- - --- ull"I c"F:1 ld,:171"Pll f f I NNNNNN \\0 � ■ � a & | FORMER" Maggiol: 1-2##7§k | ! ¥a aaaal;aaa § a| as � �J& � ,-2&-- � � , a & | | , � a & | � k8 | ! k ■ ! & s 1 ��8 2 2 |§ ■a |, ( allM}a ( §�§}}}k x w E ■- « o. i2) mom �2�# z ■ �i 2■@ m ■ 2 §� � ■g, , 2■@ ■ !! !' !| � 7,�.= !||/•!�! All � \\� | k § � a a | ! [ aaaa a a[ � aaaa aaa77a � � , a a | | , � a a | � � �■ r | ! k� ! 2 | a z © B %0 C, 2 , C§ ®a k, § }}}a }}a & 2}}} }}}§�§ 9 � f;fw :Ed a§f77 �. E ■° w « o im ) . x - m� i ff 0 ■ s© a B � !� 2 � - ;� �� ■ , ■ !! !° !| \ E § ! § !I ! | !! | k, ;Z |!#`!!) - 2. 2 :a|l . , & « ! ©2- ■•|2 ! !� !;|«,«a |kk)§�$ ! §£ ] 2§!J| t \\ !■!! § !; �k!!!|!!!»;|� �!- §\]] ] ]\ §]]] ]W.. \{/ � 4k0 E a & a a as ass aea ©,§aaaa! , ° �[[; E :f\£J2�¥ 2 | "' |�!!■■|,: ! w)E� m,p a & a a MW E! � ! , | � | ! ka & a ¥ �§ © B %8i§§ as �e ©�, .■;m § f 12 | . §� � d tf:Sr ■ . E ■° w « o. )x - mI i2R# �� 2u E 0 ■ § 2� !� 2 � � ■� , §° ■ ■ !! &© R !| ! k \\ § | � ! :W . ({|/$ £! 22( 2!!�.■ �k !!! & ��£�r� .|moo ��M |Vf =w ::z ;�; ;�;;;;; /)0 5/22/2020 B2Gnow CITY OF FORT WORTH CONTRACT COMPLIANCE MEMORANDUM AMENDMENT THIS FORM MUST BE ATTACHED TO THE ROUTING "M & C" BEFORE LAW DEPARTMENT AND CITY MANAGER APPROVAL To: Department Project Manager From: Office of Business Diversity Date: May 22, 2020 In the Amount of: $1 ,167,561 .00 TPW-100453 DOE/Project No. Project/Bid: Amendment - #1 - Design Services for North Riverside Dr, Phase 4 1. Compliance with the City's Business Diversity Enterprise (BDE) Ordinance has been achieved by the following method: PELOTON LAND SOLUTIONS, INC. is in compliance with the City's BDE Ordinance by committing to 10% SBE participation on this project. The City's SBE goal on this project is 10%. https://fortworth.diversitycompliance.com/FrontPage/DiversityMain.asp?XI D=2546 1/1 City of Fort Worth, Texas Mayor and Council Communication DATE: 06/16/20 M&C FILE NUMBER: M&C 20-0433 LOG NAME: 20NORTH RIVERSIDE DRIVE DESIGN AMENDMENT NO 1 SUBJECT Authorize Execution of Amendment No. 1 to the Professional Engineering Services Agreement with Peloton Land Solutions, Inc. for North Riverside Drive Phase IV, from Shiver Road to North Tarrant Parkway, in an Amount Not to Exceed $358,411.00 for a Total Revised Contract Amount of $1,058,411.00 (COUNCIL DISTRICT4) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 1 to City Secretary Contract No. 48662, a Professional Engineering Services Agreement with Peloton Land Solutions, Inc., in an amount not to exceed $358,411.00 for the design of North Riverside Drive from Shiver Road to North Tarrant Parkway Phase IV (City Project No. 100453). DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to seek authorization of Amendment No. 1 to the existing engineering services agreement with Peloton Land Solutions, Inc. for improvements to North Riverside Drive from Shiver Road to North Tarrant Parkway (N Riverside Dr(Shiver NT Pkwy) - City Project No. 100453). Peloton Land Solutions, Inc. was awarded contract No. 48662, M&C number C-28092, by City Council on January 31, 2017 and the contract has not been amended to date. The original contract scope included the design of a 4-lane divided roadway with drainage, street lights, 10-foot shared paths, and a roundabout at the intersection of North Tarrant Parkway and North Riverside Drive. The consultant has achieved the 90% milestone of the contract scope and an intersection analysis recently performed indicates a traffic signal would be more effective in the long term. The intersection currently experiences high traffic, growth is anticipated to increase with the development of the area. Approval of this amendment will provide for the re-design of the intersection improvements to construct a signalized intersection in lieu of a roundabout. In addition, certain areas will be re- surveyed to reflect recent development and utility relocation activity. The remainder of the project scope will remain unchanged. Peloton Land Solutions proposes to complete the additional work for a fee not to exceed $358,411.00. Staff considers the fee to be fair and reasonable for the scope of services proposed. The following table summarizes services for the project. Contract Description Amount M&C No. Initial Contract, CSO Professional C-28092 No. 48662 Engineering Services $700,000.00 for N. Riverside Drive Additional Amendment No. 1 Professional $358,411.00 Engineering Services for Revised Scope 11 M/WBE Office— Peloton Land Solutions, Inc. agrees to maintain its initial SBE commitment of 10% that it made on the original agreement and extend and maintain that same SBE commitment of 10% up to and inclusive of this Amendment No. 1. Therefore Peloton Land Solutions, Inc. remains in compliance with the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous SBE Commitment form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICT 4. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Developer Contribution Fund for the N Riverside Dr(Shiver NT Pkwy) project to support the approval of the above recommendation and amendment to the engineering services agreement. Prior to an expenditure being incurred, the Transportation & Public Works Department has the responsibility of verifying the availability of funds. Submitted for City Manager's Office by: Dana Burghdoff 8018 Originating Business Unit Head: William Johnson 7801 Additional Information Contact: Monte Hall 8662 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2020-613293 Peloton Land Solutions Fort Worth,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 04/29/2020 being filed. City of Fort Worth Date Acknowledged: g Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 100453 Engineering design and consulting services for North Riverside Dr.and N.Tarrant Pkwy. (Amendment#1) 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Clegg,Travis Fort Worth,TX United States X Head,Aric Fort Worth,TX United States X Payne, Richard Fort Worth,TX United States X Thompson, Nathan Fort Worth,TX United States X Smith, Patrick Fort Worth,TX United States X Alexander, Randy Fort Worth,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION TTION My name is R&"a, (fo L A and my date of birth is /I a /19 7 0 My address is_If 2 f �`��� �P� 9�11, M i (K U S A (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in C Gf ra County, State of S on the O day of ,20 Z-- (month) (year) Sign ure of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.1.3a6aaf7d