Loading...
HomeMy WebLinkAboutContract 43862-A1 (2)AMENDMENT No. 1 TO CITY SECRETARY CONTRACT ©MN @jjrAkt 1S0jf0,t` WIIEREM39 the City of Fort Worth (CITY) and Shield Engineering Group, PLLC . , (ENGINEER) made and entered into City Secretary Contract No. 43862, (the CONTRACT) which was authorized by M&C C-25817 on the l`1 th day of September, 2012 in the amount of $131 , 2 91 . 00 ; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 86. WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article 1 of the CONTRACT is amended to include the additional engineering services specified in a proposal dated August 9, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $28,369.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $159,660.00. OFFICIAL RECORD CITY SECRETARY FT. WORTH TX RECEFJED AUG L 0 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EF aTECTIVf as of tho date last written by a signatory, below. APPROVED: ENGINEI t City of Fort Worth Shier, langineering Group, PLLC. 57,-4 Cs_ Fernando Costa Assistant City Manager DATE: 411, 1,7rMMiukeNDiviEly S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: fl4,4 04_4 I4 /1A • Douglas W. gl ask Assistant City Attorney ATTEST: Mary J. 1aear City Secretary Craig Barnes, P.E. .` Presi•ent DATE: d 5 . / 3 . /,3 M&C: N/A Date: N/A fil • lert Page - OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX August 9, 2013 S oon Wong P roject Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Sanitary Sewer Rehab Contract 86 CPN 01964 Dear Soon, Shield Engineering Group (SEG) is pleased to submit the following as amended services to the original contract shown above: • 81 Temporary Right of Entry (TROE's) outside of original contract. • 74 Private Service Exhibits for re-routing services to street from L-2058. • Plans to abandon L-2129 and install new lines in 4th and 5th Street to tie into • Survey for re -alignment of L-2129. • 26 Temporary Right of Entry (TROE's) for L-2129. • 26 Private Service Exhibits for re-routing services to street from L-2129. Subtotal change/addendum to the contract Total change/addendum to the contract Original contract Amendment 1 Original contract $131,291 $28.369 $159,660 10% sub $4,050 $5,500 M-146. $10,440 $3,625 $1,300 $875 $25, 790 markup $2.579 $28, 369 The new contract amount will be $159,660. The revised M/WBE participation will meet or exceed the 18% M/WBE goal established by the City on the original contract. P lease feel free to contact me with any questions or comments. S incerely, Jean-Marie Alexander, P.E. CEO Shield Engineering Group, PLLC shield Engineering Group, PLLC 1200 W. Freeway, Suite 300, Fort Worth, IX 76102 ® office (817) 810-0696 ® fax (817) 810-0372 Email: info©segnilr_rnm 9 www_shieIdengineeringgroup.cnrn