Loading...
HomeMy WebLinkAboutContract 39096 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS,the undersigned Independent School District, "Developer"desires to make certain improvements(refer to the name of the project at the bottom of the page)an addition to the City of Fort Worth,Texas; and WHEREAS,the said Developer has requested the City of Fort Worth,a home-rule municipal corporation situated in Tarrant,Denton,Parker, and Wise Counties,Texas,hereinafter called "City",to do certain work in connection with said improvements. Developer: Name:Dwayne Jones Title: Executive Director of Business Services Company: Crowley Independent School District Project Name: Crowley I.S.D. Middle School No.4 Paving&Drainage Improvements to Serve McCart Avenue Project Location: Streets:McCart Avenue Mapsco: 117ZQ Council District: 6 OFFICIAL RMORD CFA: 2009-036 DOE: 6165 City Project No.: 01278 CITY SECRETARY T WORTH, TX NOW,THEREFORE,KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy")dated March 2001,approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement("CFA")as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section 11, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires it to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub-contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water(A) , Sewer(A-1) ;Paving(B) X ; Storm Drain (B-1) X ; Street Lights & Signs (C) E. The Developer shall award all contracts for the construction of community facilities in accordance with Section Il, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be 2 administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent(100%) of the contract price of the infrastructure for a period of two(2)years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s)it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre-Construction Meeting. The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting.No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. City is requiring the widening and/or straightening of the City road(s) contemplated herein. City shall not be responsible for any costs that may be incurred for the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. I. Developer agrees that the City shall not be responsible for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement and hereby releases the City from same. J. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. K. Developer will require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed 4 and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. L. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. M. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%)for a total of 4%of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent(4%)and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent(4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. 5 COST SUMMARY TABLE Items Developer's Cost A. Water and Sewer Construction 1. Water $0.00 2. Sewer $0.00 Water/Sewer Construction Cost Sub-Total $0.00 B. TPW Construction 1. Street $709,990.76 2. Storm Drain $164,283.00 3. Street Lights $0.00 4. Street Name Signs TPW Construction Cost Sub-Total $874,273.76 Total Construction Cost(excluding fees): $874,273.76 Construction Fees: C. Water Inspection Fee (2%) $0.00 D. Water Material Testing Fee (2%) $0.00 Sub-Total for Water/Sewer Construction Fees $0.00 E. TPW Inspection Fee(4%) $34,970.95 F. TPW Material Testing (2%) $17,485.48 Sub-Total for TPW Construction Fees $52,456.43 Total Construction Fees: $52,456.43 6 The Checked Must be Included as Attachments to this Agreement Included Attachment ® Location Map ❑ Exhibit A: Water Improvements ❑ Water Estimate ❑ Exhibit A-1: Sewer Improvements ❑ Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 7 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City Secretary,with the corporate seal of the City affxed, and said Developer has executed this instrument in quadruplicate,at Fort Worth,Texas this_1 t�day of 2009. CITY OF FORT WORTH DEVELOPER Crowley Independent School District Fernando Costa D ay Jo Assistant City Manager E cutive ctor of Business Services Recommended by: Transportation&Public Works Department Wi liam .Verkest, . — Director Water Department /(A-- Wendy Chi-Babulal,EMBA,P.E. Water Development Engineering Manager Approved as to Form&Legality: Amy J.Rams Assistant City Atto ey ATTEST: l -- ENO M&C REQUIRED 1�QUIRI:D fal Hendrix ty Secretary OFFICIAL RECORD CITY SECRETARY 8 FT WORTH,TX STUART - FELTZ I t o I z ; / z � I I I, I gPATR' 3 COLONY RACE PG SKELL WEST CLEBURNE - CROWLEY i HAL STRICKLAN Y p w�FF` a AR H N 0 3 MAIN w o AHOL !3 MEADOWCRES ' = M DOWVIE o Li I c� BRIAR = MEADOWLARKCROWLEY - CLEBURNE > I SITE J o , Li 0 PARK w CREST I w CROWLEY - PLOVER 1187 187 z e� ppp 1 187 } V) o Q a � W Z U Z. - F -j DONALD ui DRIVE U Z N a f LOCATION MASCALE I P N.T.S. T miff NALL AND PERKINS an of Foal WORTH. TEXAS LOCAMON MAP 1100 Macon street Y HO SCM 04 Fort Worth, roxoo 7sios rhos.:(et7)aae-a77a.F.,t:(st7)880-:sts LOCATION MAP rl DULY 2009 IMF N� 0,vAl,RM rrw.tnr-onttno.0o0 PROPOSED 2-1 CURB INLETS I PROPOSED 24"ROD PROPOSED 211 RL-P PROPOSED 4'SO PROPOSED 54"RCP MANHOLE PROPOSED 4 W'DROP INLET-- NTH 240 RCP I-0 PROPOSM.-O'-Sa MANHOLE PROPOSED R RCP i—i---i —T T -T T- F, + + 4 4- 0 0 71 I L j— 1-1 L1,L 41— L L---j T PROPOSED 10' -�-KET WZY 2r--*Qb� 0 PROPOSED-2177JIMP T—FRWW MANHOLF, Pj?a60$m 1 1,0 —7 ED,,1,0), Z PROPOW 24 T- ATbD6sm,24, ` All ova 1.��OWF C VARY GRAPHIC SCALE 300 0 300 600 OTY OF FORT IAKWTH. TEXAS 1" YEAGM NAU AND MRKINS PAVK A*W.AkhZ—NFQM60 IWO 1100 Al000n 9froof MOO am SDM 14 AlL Fort Worth. To x a T8102 Phoao:(Blr)s8a-fTT8*F:x.!(8lr)8,,5-2518 ENTs B-1 XLY 20MI MV Ib-ft-i N,F-M wwwAnp-ofill DRAINAGE IMPROVEM TARRANT COUNTY/CITY OF FORT WORTH ETJ DATE: August 21,2009 DEVELOPER CHANGE ORDER PROJECT NAME: Paving and Drainage Improvements to serve McCart Avenue(Crowley Middle School#4 CONTRACT: Conatser Construction TX,LP CHANGE ORDER No: 1A Paving Contract CITY PROJECT NO. 01278 DOE NO: 6165 WATER PROJECT# NIA SEWER PROJECT# NIA FILE# I W-2092 INSPECTOR: Not Assigned Yet PROJECT MANAGER: Raul Lopez Phone No.817-392-7818 WATER SEWER PAVING DRAINAGE MISC. DAYS ORIGINAL CONTRACT $ 0.00 $0.00 $792,081.50 $160,553.00 $50,000.00 70 EXTRAS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 0 CREDITS TO DATE $0.00 $0.00 $0.00 $DAO $0.00 0 CONTRACT TO DATE $0.00 $0.00 $792.081.50 $160.563.00 $50,000.00 70 PROP.CHANGE ORDER $0.00 $0.00 ($82,090.75) $3,720.00 $0.00 0 REVISED CONTRACT $0.00 1 $0.00 $709,990.75 $164,283.00 $50,000.00 70 TOTAL(REVISED CONTRACT) WATER DEPARTMENT TRANSPORTATION AND PUBLIC WORKS BY CITY DEPARTMENT $0.00 $924,273.75 TOTAL REVISED CONTRACT $924,273.75 Revised:7/24/06 You are directed to make the following changes in the contract documents: Pay DESCRIPTION Original Quantity Revised Unit Unit Cost Item Quanta Adjustment Quantity Price Ad ustment A-1-2 Undassified Street Excavation 4 468 1,060 6.530 CY $2.25 $2.385.00 A-1-3 64nch Lime Stabilized Subgrade 17.260 17.260 0 SY $2.00 $34 520.00 A-1-4 Lime for Stabilized Sub rade 27#fS 237 (2371 0 TN $145.00 36S.00 A-1-5 12-Inch Reinforced Con-Pavement 11,700 (11,700) 0 SY $42.00 $491,400.00 A-1.6 9-inch Reinforced Conc.Pavement 2,600 9100 11,700 SY $35.00 $318 500.00 A-1-9 4-ft Standard Concrete Sidewalk 7,550 8113 16,663 SF $2.25 $20.504.25 A-1-10 Type'l-I'l-laoicap Accessible Ramp 1 1 2 EA $1.W0.00 $1 000.00 A-1-13 2"PVC Conduit and Pull Boxes for Street Lights 2.650 (2,336) 314 LF $5.00 $11680.00 A-1-18 Standard City of Fort Worth Street Lights 14 14 0 EA $3,000.00 $42 000.00 A-1-19 Wire for Installation of Street Linhis 2 80D 2,600 0 LF $2.50 $6 500.00 A-1-21 8-inch Ume Stabilized Subarade 312 15,510 15,822 SY $3.00 $46 530.00 A IAa Lime for Stabilized Sub 49#/S 0 387 387 TN $145.00 $56115,00 A-1-5a 7.54nch Reinforced Cone.Pavement 0 2,600 2,600 SY $34.00 $88 400.00 A-1-22 I Chain Link Fence 6'He' ht 0 67 67 LF $20.00 $1340.00 A-1-23 12'Chain Link Gate 6'HeIgUt 0 2 2 EA $1,800.00 $3 600.00 Subtotal f$82.090.7 A-II-5 24-Class III RCP 848 744 1592 LF $50.00 $37 200.00 A-II-6 21_Class Ill RCP 975 744) 231 LF $45.00 $33.480,00 Subtotal $3.720.00 TOTAL ($78.3T0.76) RECOMMENDED: APPROVED: APPROVED: Teague Nall and Perkins CrtrMey I.S.D. ZConsr Co n By. E-��—j- By: S Print Name Print Name Prl t Name Sr. F�xs�►�t /rf�e�r..r� '�r/l:• I�•f7� V7y r -Tftte Title TNIe Revised:724/06 REASON(S)FOR CHANGE ORDER(""Keen on separate oaae"") Pavement revisions are due to the acquisition of the Geotechnlcai Report(Project No.04-4006-1016)by Fugro Consultants, Inc.dated April 2009. ■ Final City Comments addressed as shown on construction plan sheets 5 thru 14,15,17,19,20.27 thru 31. ■ Nb change to number of days. NO CITY FUNDS INVOLVED IN THIS PROJECT. DEVELOPER IS RESPONSIBLE FOR 100%OF THE CHANGE ORDER COST AND NO REIMBURSEMENT WILL BE REQUESTED FROM THE CITY Revised:7/24/06 PART B - PROPOSAL DEVELOPER AWARDED CONTRACTS This proposal must not be removed from this book of Contract Documents. TO: Crowley I.S.D. 512 Peach Street Crowley, Texas 76036 PROPOSAL FOR: UNIT A: CITY OF FORT WORTH, ETJ PROJECT NAME: Paving and Drainage Improvements to serve McCart Avenue (Crowley I.S.D. Middle School No. 41 CITY PROJECT No. TBD D.O.E. No. TBD FILE No. TBD UNIT B: CITY OF CROWLEY PROJECT NAME: Paving and Drainage Improvements to serve I.S.D. Middle School No. 4 Includes the furnishing of all materials, except materials specified to be furnished by the City, I equipment and labor for the installation of paving facilities and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: Plans for: Paving and Drainage Improvements to serve McCart Avenue (Crowley LS.D. Middle School Now A nd Plans for: Paving and Drainage Improvements to serve Crowley I.S.D. Middle School No. 4 Note: Construction staking for this project shall be performed by the Contractor. Part C General Conditions for Developer Awarded Project C5-5.7 and Part D Special Conditions D-63 shall be reworded accordingly to state that the Contractor is responsible for all construction staking. Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, the General Contract Documents and General Specifications for Water Department Projects, the General Contract Documents and General specifications for Transportation and Public works Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be B-1 1 furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Department of Engineering of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: J 1 l I J } B_2 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) UNIT A-I: PAVING IMPROVEMENTS 1. 1 LS Right of Way Preparation Per Lump Sum; Per Item GP-100: Two Thousand Dollars and No Cents $ 2,000.00 $ 2,000.00 2. 4,468 CY Unclassified Street Excavation Per Cubic Yard; Per Item GP-106: Two Dollars and Twenty Five Cents $ 2.25 $ 10,053.00 3. 17,260 SY 6-inch Lime Stabilized Subgrade Per Square Yard; Per Item GP-210: Two Dollars and No Cents $ 2.00 $ 34,520.00 4. 237 TN Lime for Stabilization (27#1SY) Per Ton; Per Item GP-212: One Hundred Forty-Five Dollars and No Cents $ 145.00 $ 34,365.00 5. 11,700 SY 12-inch Reinforced Conc. Pavement Per Square Yard; Per Item GP-314: Forty-Two Dollars and No Cents $ 42.00 $ 491,400.00 6. 2,600 SY 9-inch Reinforced Conc. Pavement Per Square Yard, Per Item GP-314: Thirty-Five Dollars and No Cents $ 35.00 $ 91,000.00 7. 345 SY 6-inch Drive Approach Reinforced Conc. Pavement Per Square Yard; Per Item GP-314: Thirty-Four Dollars and No Cents $ 34.00 $ 11,730.00 B-3 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) 8. 55 LF Concrete Header Per Linear Foot; Per Item GP-514: Twenty Dollars and No Cents $ 20.00 $ 1,100.00 9. 7,550 SF 4-ft Standard Concrete Sidewalk Per Square Foot; Per Item SP-52 & GP-504: Two Dollars and Twenty-Five Cents $ 2.25 $ 16,987.50 10. 1 EA Type 'H' Handicap Accessible Ramp Per Each; Per Item SP-52 & GP-504: F One Thousand Dollars and No Cents $ 1,000.00 $ 1,000.00 11. 1 LS Pavement Striping, Buttons and Signage Per Lump Sum; Per Plans (Sheets 19-22): Twelve Thousand Dollars and No Cents $ 12,000.00 $ 12,000.00 12. 54 LF Place Barricades Per Linear Foot; Per Plans (Sheets 19-22: Thirty Dollars and No Cents $ 30.00 $ 1,620.00 13. 2,650 LF 2" PVC Conduit and Pull Boxes for Street Lighting Per Linear Foot; Per Item GP-522: Five Dollars and No Cents $ 5.00 $ 13,250.00 14. 1 LS Traffic Control Per Lump Sum; Per Item GP-524: One Thousand Dollars and No Cents $ 1,000.00 $ 1,000.00 B-4 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) 15. 1 LS Erosion Control Per Lump Sum; Per Item SP-90: Three Thousand Dollars and No Cents S 3,000.00 $ 3,000.00 16. 62 SY 6" Rock Rip-Rap Per Square Yard; Per Details on Plans: Eighty-Five Dollars and No Cents $ 85.00 $ 5,270.00 17. 1 LS Hydromulch Seeding Per Lump Sum; Per GP-120: Thirty Five Hundred Dollars and No Cents S 3,500.00 $ 3,500.00 18. 14 EA Standard City of Fort Worth Street Lights Per Each; Per Details on Plans: Three Thousand Dollars and No Cents $ 3,000.00 $ 42,000.00 19. 2,600 LF Wire for Installation of Street Lights Per Linear Foot; Per Plans and Details: Two Dollars and Fifty Cents $ 2.50 $ 6,500.00 20. 295 SY 6" HMAC Transition Pavement Per Square Yard; Per Item GP-312: Thirty Dollars and No Cents $ 30.00 $ 8,850.00 21. 312 SY 8-inch Lime Stabilized Subgrade Per Square Yard; Per Item GP-210: Three Dollars and No Cents $ 3.00 $ 936.00 B-5 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) UNIT A-1: TOTAL AMOUNT BID PAVING IMPROVEMENTS $ 792,081.50 } B-6 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items UNIT A-II: DRAINAGE IMPROVEMENTS 1. 38 LF 54"Class III RCP Per Linear Foot; Per GP-440: One Hundred Fifty Dollars and No Cents $ 150.00 $ 5,700.00 2. 110 LF 48" Class III RCP Per Linear Foot; Per GP-440:: One Hundred Twenty Five Dollars and No Cents $ 125.00 $ 13,750.00 3. 58 LF 36"Class III RCP Per Linear Foot; Per GP-440: Seventy Five Dollars j and No Cents $ 75.00 $ 4,�50.00 J 4. ITEM DELETED 5. 848 LF 24"Class III RCP Per Linear Foot; Per GP-440- Fifty Dollars and No Cents $ 50.00 $ 42,400.00 6. 975 LF 21"Class III RCP Per Linear Foot; Per GP-440- Forty-Five Dollars and No Cents S. 45.00 $ 43,875.00 7 7 EA 10' Recessed Curb Inlet Per Each; Per GP-444: Twenty-One Hundred Dollars and No Cents $ 2,100.00 $ 14,700.00 B-7 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written In Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) 8. 3 EA 10'Curb Inlet Per Each; Per GP-444: Two Thousand Dollars and No Cents $ 2,000.00 $ 6,000.00 9. 2 EA 4'x4' Drop Inlet with Concrete Apron Per Each; Per GP-444: Twenty-Five Hundred Dollars and No Cents $ 2,500.00 $ 5,000.00 10. ITEM DELETED 11 1 EA 24"Type B Headwall Per Each; Per GP-410: Fifteen Hundred Dollars and No Cents $ 1,500.00 $ 1,500.00 12. 2 EA 6'x6' Storm Drain Manhole Per Each; Per GP-444: Twenty-Five Hundred Dollars and No Cents $ 2,500.00 $ 5,000.00 13. 2 EA 4'x4' Storm Drain Manhole Per Each; Per GP-444: Two Thousand Dollars and No Cents $ 2,000.00 $ 4,000.00 14. 2,985 CY Unclassified Channel Excavation Per Cubic Yard: Three Dollars and No Cents $ 3.00 $ 8,955.00 B-8 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) 15. 15 SY 12" Rock Rip-Rap Per Square Yard; Per GP-418: Eighty-Five Dollars and No Cents $ 85.00 $ 1,275.00 16. 2,029 LF Trench Safety Per Linear Foot; Per GP-525: Two Dollars and No Cents $ 2.00 $ 4,058.00 UNIT A-II: TOTAL AMOUNT BID DRAINAGE IMPROVEMENTS $ 160,563.00 B-9 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) UNIT B-I: PAVING IMPROVEMENTS 1. 1 LS Right of Way Preparation Per Lump Sum; Per SC-50: One Thousand Dollars and No Cents $ 1,000.00 $ 1,000.00 2. 344 CY Unclassified Street Excavation Per Cubic Yard; Per SC-50: Two Dollars and_. Twenty-Five Cents $ 2.25 $ 774.00 3. 2,955 SY 6-inch Lime Stabilized Subgrade Per Square Yard; Per SC-50: Two Dollars and No Cents $ 2.00 $ 5,910.00 4. 40 TN Lime for Stabilization (27#/SY) Per Ton; Per SC-50: One Hundred Forty-Five Dollars and No Cents $ 145.00 $ 5,800.00 5. 2,390 SY 9-inch Reinforced Conc. Pavement Per Square Yard; Per SC-50: Thirty-Six Dollars and No Cents $ 36.00 $ 86,040.00 6. 135 SY 6-inch Drive Approach Reinforced Conc. Pavement Per Square Yard; Per SC-50: Thirty-Four Dollars and No Cents $ 34.00 $ 4,590.00 7. 480 SY Flex Base Drive Per Square Yard; Per SC-50: Five Dollars and No Cents $ 5.00 $ 2,400.00 B-10 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) 8. 37 LF Concrete Header Per Linear Foot; Per SC-50: Twenty Dollars and No Cents $ 20.00 $ 740.00 9. 2,185 SF 4-ft Standard Concrete Sidewalk Per Square Foot; Per SC-50: Two Dollars and Twenty-Five Cents S 2.25 $ 4,916.25 10. 655 LF 2" PVC Conduit and Pull Boxes for Street Lighting Per Linear Foot: Per SC-50: Five Dollars and No Cents $ 5.00 $ 3,275.00 11. 1 LS Hydromulch Seeding Per Lump Sum; Per SC-50: Two Thousand Dollars and No Cents $ 2,000.00 $ 2,000.00 12. 1 LS Traffic Control Per Lump Sum; Per SC-50: One Thousand Dollars and No Cents $ 1,000.00 $ 1,000.00 13. 42 SY 6" Rock Rip Rap Per Square Yards; Per SC-50: J Eiahty-Five Dollars and No Cents $ 85.00 $ 3,570.00 14. 1 LS Erosion Control Per Lump Sum; Per SC-50: 1 One Thous@nd Dollars and No Cents $ 1,000.00 $ 1,000.00 B-11 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) 15. 1 LS Pavement Striping, Buttons and Signage Per Lump Sum; Per SC-50: Three Thousand Dollars and No Cents $ 3,000.00 $ 3,000.00 16. 4 EA Adjust Manhole Rim to Grade Per Each; Per SC-50: Three Hundred Dollars and No Cents $ 300.00 $ 1,200.00 17. 3 EA Standard City of Fort Worth Street Lights Per Each; Per Details on Plans: Three Thousand Dollars and No Cents $ 3,000.00 $ 9,000.00 18. 600 LF Wire for Installation of Street Lights Per Linear Foot; Per Plans and Details: Two Dollars and Fifty Cents 5 2.50 $ 1,500.00 UNIT B-I: TOTAL AMOUNT BID PAVING IMPROVEMENTS $ 137,715.25 B-12 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) UNIT B-II: DRAINAGE IMPROVEMENTS 1. 44 LF 5'x4' RCB Per Linear Foot, Per SC-50: One Hundred Ninety Dollars and No Cents $ 190.00 $ 8,360.00 2. 30 LF 48" Class III RCP Per Linear Foot, Per SC-50: One Hundred Twenty Five Dollars and No Cents $ 125.00 $ 3,750.00 3. 453 LF 30" Class III RCP Per Linear Foot, Per SC-50: Sixty-Five Dollars and No Cents $ 65.00 $ 29,445.00 4. 31 LF 24"Class III RCP Per Linear Foot, Per SC-50: Fifty Dollars and No Cents $ 50.00 $ 1,550.00 5. 52 LF 21"Class III RCP Per Linear Foot, Per SC-50: Forty-Five Dollars and No Cents $ 45.00 $ 2,340.00 6. 2 EA 10' Curb Inlet Per Each, Per SC-50: Two Thousand Dollars and No Cents $ 2,000.00 $ 4,000.00 7. 1 EA 7' Square Storm Drain Manhole Per Each, Per SC-50: Forty-Five Hundred Dollars 1 and No Cents $ 4.500.00 $ 4,500.00 J B-13 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) 8. 1 EA 4' Square Storm Drain Manhole Per Each, Per SC-50: Two Thousand Dollars and No Cents $ 2.000.00 $ 2,000.00 9. 1 EA 5'x4' RCB Flared Wing Headwall Per Each, Per SC-50: Forty-Five Hundred Dollars and No Cents $ 4,500.00 $ 4,500.00 10. 3,190 CY Unclassified Channel Excavation Per Cubic Yard, Per SC-50: Three Dollars and No Cents $ 3,00 $ 9,570.00 11 506 SY 18" Rock Rip-Rap Per Square Yard, Per SC-50: Eicahty-Five Dollars and No Cents $ 85.00 $ 43,010.00 12. 610 LF Trench Safety Per Linear Foot, Per SC-50: Two Dollars and No Cents $ 2,00 $ 1,220.00 13. 306 LF 33"Class III RCP Per Linear Foot; Per SC-50: Seventy Dollars and No Cents $ 70.00 $ 21,420.00 14. 2 EA 33" Double Barrel Sloped End Headwall Per Each; Per SC-50. Two Thousand Dollars and No Cents $ 2,000.00 $ 4,000.00 B-14 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) UNIT B-II: TOTAL AMOUNT BID DRAINAGE IMPROVEMENTS $ 139,665.00 B-15 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) UNIT B-III: SEWER IMPROVEMENTS 1. 438 LF 8" Sanitary Sewer SDR-26 Per Linear Foot, Per SC-49: Forty Dollars and No Cents $ 40.00 $ 17.520.00 1b. 393 LF 8"Sanitary Sewer SDR-35 Per Linear Foot, Per SC-49: Thirty-Five Dollars and No Cents $ 35.00 $ 13,755.00 2. 2 EA 6' Sanitary Sewer Manhole Per Each, Per SC-49: Thirty-Five Hundred Dollars and No Cents $ 3,500.00 $ 7,000.00 3. 1 EA 6' Sanitary Sewer External Drop Manhole Per Each, Per SC-49: Four Thousand Dollars and No Cents $ 4,000.00 $ 4,000.00 4. 2 EA 4' Sanitary Sewer Manhole Per Each, Per SC-49: Twenty-Five Hundred Dollars and No Cents $ 2,500.00 $ 5,000.00 5. 5 LOT 4"Sanitary Sewer Service Per Lot, Per SC-49: 1 Four Hundred Dollars and No Cents S. 400.00 $ 2,000.00 6. 5 EA Water Tight Manhole Inserts Per Each, Per SC-49: Fifty Dollars and No Cents 51 50.00 $ 250.00 B-16 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) 7. 1 EA Concrete Collar Cover& Ring Per Each, Per SC-49: Three Hundred Dollars and No Cents $ 300.00 $ 300.00 8. 5 EA Vacuum Test Manhole Per Each, Per SC-49: Fifty Dollars and_ No Cents $ 50.00 $ 250.00 9. 39 VF Additional Depth SSMH >6' Per Vertical Foot, Per SC-49: One Hundred Fifty Dollars and No Cents $ 150.00 $ 5,850.00 10. 7,866 VF/FT Additional Depth SS Line>6' Per Vertical Foot per Foot, Per SC-49: No Dollars and Twenty-Five Cents $ .25 $ 1,966.50 11. 1,041 LF Post Construction TV Inspection Per Linear Foot, Per SC-49: Two Dollars and No Cents $ 2.00 $ 2,082.00 12. 1,041 LF Trench Safety Per Linear Foot, Per SC-49: Two Dollars and No Cents $ 2.00 $ 2,082.00 UNIT B-111: TOTAL AMOUNT BID SEWER IMPROVEMENTS $ 62,055.50 B-17 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, DOE No. TBD, FILE No. TBD Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following items.) UNIT C-IV: MISCELLANEOUS IMPROVEMENTS 1 1 LS Owner's Betterment Per Lump Sum: One hundred thousand Dollars And zero Cents $ 100,000 $ 100,000 UNIT C-IV: TOTAL AMOUNT BID MISCELLANEOUS IMPROVEMENTS $ 100,000 B-18 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. 01278, DOE No. 6165, FILE No. W-2092 Item Approx. Description of Item With Unit Total No. Quantity Unit Bid Price Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place the following ite SUMMARY-UNIT A (Fort Worth ETJ) UNIT A-I: TOTAL AMOUNT BID PAVING IMPROVEMENTS $ 792,081.50 UNIT A-II: TOTAL AMOUNT BID DRAINAGE IMPROVEMENTS $ 160,563.00 TOTAL IMPROVEMENTS-UNIT A $ 952,644.50 SUMMARY-UNIT B (Crowley) UNIT B-I: TOTAL AMOUNT BID PAVING IMPROVEMENTS $ 137,715.25 UNIT B-II: TOTAL AMOUNT BID DRAINAGE IMPROVEMENTS $ 139,665.00 UNIT B-III: TOTAL AMOUNT BID SEWER IMPROVEMENTS $ 62,055.50 TOTAL IMPROVEMENTS-UNIT B $ 339,435.75 SUMMARY-UNIT C UNIT C-IV: TOTAL AMOUNT BID MISCELLANEOUS IMPROVEMENTS $ 100,000 SUMMARY-TOTAL UNIT A: TOTAL AMOUNT BID $ 952,644.50 UNIT B: TOTAL AMOUNT BID $ 339,435.75 UNIT C: TOTAL AMOUNT BID $ 100,000.00 TOTAL IMPROVEMENTS $ 1,392,080.25 B-19 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, D.O.E. No. TBD, FILE No. TBD After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Developer. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Constructi.)n, which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 5 calendar days after issue of the work order, and to complete the contract within 70 working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. _�<_B. The principal place of business of our company or our parent company or a majority owner is in the State of Texas. B-20 Crowley I.S.D. Middle School No. 4 CITY PROJ. No. TBD, D.O.E. No. TBD, FILE No. TBD I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) Respectfully submitted, Conatser Construction TX LP By: Mark Pappas,Vice-President of (itle Conatser Management Group,Inc.G.P. ddres .a �x �rJ4} ip Fi4 I&I n& .Tew ��o�� f Telephon 311 5J4 — 1-14 (Seal) Date: - END OF PROPOSAL- J 1 B-21 I