HomeMy WebLinkAboutContract 46106-FP1 (2)Department 9w P &W Const. Services
DOF#i Date i
Project Manager - Ylf r
Risk Managemen J. Page
D.O.E. Brotherton — -t
CFA Westerman/Scanned i l
i ne rroceebmg people nave been Co�jAcfed conceming the r�uest for final
payment & have released this project for such payment.
Clearance Conducted By Shameka Kennedy
► I MRET, ltJ I C� C�
;7041r0APT NOV
T WORTHC.,
vpo��
TION AND PUBLIC WORKS
PROJECT COMPLETION
s"9Uo 1-LO;qq D
D.O.E. Ns: 7340
46/ o6
Regarding contract 117340 for PRESIDIO TOWNE CROSSING- WATER & SEWER as required by the
WATER DEPARTMENT as approved by City Council on N/A through Ai&C N/A the director of the
WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation & Public Works
Department has accepted the project as complete. _
Original Contract Prices:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
Recommended for Acceptance
Asst. Director, TPW - Infrastructure Design and Construction
cepted
sst. Director, WATER
� _
Asst, City Manager
DEPA
VComments: P265-541200-607150240583, P275-541200-707130240583
OL 1 2015
5268,209.60
5268,209.60
$268,209.60
$0.00
52682209w6O
Date
Date
Date
Days @ $210.00/ Day
r
WORTH, Vrx
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name PRESIDIO TOWNE CROSSING
Contract Limits
Project Type WATER & SEWER
City Project Numbers 02405
DOE Number 7340
Estimate Number 1 Payment Number 1
City Secretary Contract Number 117340
Contract Date
Project Manager Ehia
Contractor C-CON SERVICES, INC.
2230 JOE FIELD RD
DALLAS, TX
Inspectors LAYER / DOVERS
Friday, September 18, 2015
For Period Ending 9/18/2015
CD
Contract Time 12(FD
Days Charged to Date 278
Contract is 100.00 Complete
75229
Page 1 of 5
City Project Numbers 02405
Contract Name
Contract Limits
Project Type
Project Funding
WATER
PRESIDIO TOWNE CROSSING
►tivr� z�y�.v�t�
DOE Number 7340
Estimate Number I
Payment Number I
For Period Ending 9/18/2015
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
I CONNECTION TO EXISTING 4".12" WATER 3 FA $11504,00 $4,512.00 3 $47512.00
MAIN
2 12" PVC WATER PIPE 2140 LF $35.00 $74,900.00 2140 $74,900.00
3 8" PVC WATER PIPE 140 LF $33.00 $4,620.00 140 $4,620.00
4 6" PVC WATER PIPE 36 LF $32.00 $1,152.00 36 $1,152.00
5 2" WATER SERVICE 12 FA $1,445.00 $17,340.00 12 $173340,00
6 1" WATER SERVICE 3 FA $17304,00 $3,912.00 3 $3,912.00
7 SALVAGE EXISTING 8" GATE VALVE 1 EA $250,00 $250,00 1 $250,00
8 12" GATE VALVE 11 EA $27008,00 $2208.00 11 $2208.00
9 8" GATE VALVE 5 FA $17175.00 $57875.00 5 $51875.00
10 6" GATE VALVE 5 FA $868,00 $4,340.00 5 $4,340.00
11 REMOVE 8" WATERLINE 41 LF $9.00 $369,00 41 $369,00
12 FIRE HYDRANT 7 FA $2,389,00 $16,723,00 7 $16,723.00
13 TRENCH SAFETY 2411 LF $1.00 $2,411.00 2411 $2,411,00
14 12" PVC WATER PIPE, CSS BACKFILL 95 LF $42.00 $3,990.00 95 $37990,00
15 DUCTRX IRON FITTINGS/W RESTRAINT 3.7 TN $2,678.00 $%908.60 3.7 $%908.60
16 CONCRETE ENCASE WATER PIPE 4.6 CY $65.00 $299.00 4.6 $299.00
17 12" TAPPING SLEEVE & 8" VALVE 2 FA $5,036.00 $10,072,00 2 $10,072.00
18 12" TAPPING SLEEVVE & 6" VALVE 1 EA $4,632,00 $4,632.00 I $4,632.00
Sub -Total of Previous Unit $187,393.60 $187,393.60
Ttem Descripfion of Items Estimated Unit Unit Cost Estimated Compteted Completed
No. Quanity Total Quanity Total
1 8" SEWER PIPE 1055 LF $24.00 $25,320.00 1055 $25,320.00
2 4' MANHOLE 9 FA $3,400.00 $30,600.00 9 $302600,00
3 MANHOLE ADJUSTMENT, MINOR 1 FA $150,00 $150,00 1 $150.00
4 8" SEWER PIPE, CSS BACKFILL 140 LF $32.00 $4,480.00 140 $42480,00
5 TRENCH WATER STOPS 8 FA $351,00 $2,808.00 8 $2,808,00
6 16" CASING BY OTHER THAN OPEN CUT 20 LF $35.00 $700.00 20 $700.00
7 TRENCH SAFETY 1195 LF $1.00 $1,195.00 1195 $1,195.00
Friday, September 18, 2015 Page 2 of 5
City Project Numbers 02405
Contract Name PRESIDIO TOWNE CROSSING
Contract Limits
Project Type
Project Funding
DOE Number 7340
Estimate Number 1
Payment Number I
For Period Ending 9/18/2015
8 4'EXTRADEPTHMANHOLE 47 VF $280.00 $13,160.00 47 $13,160.OD
9 MANHOLE VACUUM TESTING 9 EA $105,00 $945,00 9 $945.00
10 6" SEWER SERVICE 2 EA $729.00 $1,458.00 2 $1,458.00
Sub -Total of Previous Unit $80,816.00 $K816.00
Friday, September 18, 2015
Page 3 of 5
City Project Numbers 02405
Contract Name PRESIDIO TOWNE CROSSING
Contract Limits
Project Type
Project Funding
Contract Information Snmmary
Original Contract Amount
Change Orders
Inspection
v
Design and Cprt
nAte. /V Za
/Contracting
lY�,i6
R'
Total Contract Price
DOE Number 7340
Estimate Number 1
Payment Number I
For Period Ending 9/18/2015
$268,209.60
$268,209.60
Total Cost of Work Completed
Less % Retained
Net Earned
Earned This Period $2681209060
Re coinage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$268,209.60
$0.00
$268,209,60
$0.00
$0.00
$0.00
$0.00
$0.00
$268,209.60
Friday, September I8, 2015 Page 4 of 5
Y
CCl 2U1� a
City Project Numbers 02405-.-•-t.. ^. _,�
Contract Name PRESIDIO TOWNE CROSSING
Contract Limits
Project Type
Project Funding
Project Manager Ehia
Inspectors LAYER / DOVERS
Contractor C-CON SERVICES, INC.
2230 JOE FIELD RD
DALLAS , TX 75229
Sq & o 1-co 02Lf 05
DOE Number 7340
Estimate Number 1
Payment Number 1
For Period Ending 9/18/2015
City Secretary Contract Number
Contract Date
Contract Time
Days Charged to Date
Contract is .000000
CITY OF FORT WORTH
SUMMARY OF CHARGES
117340
120 CD
278 CD
Complete
Line Fund Account Center Amount Gross Retainage Net
Funde-------------------------------------
Friday, September 18, 2015
Total Cost of Work Completed $268,209.60
Less % Retained $0.00
Net Earned $2683209.60
Earned This
Period
$268,209.60
Retainage This
Period
$0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $268,209.60
Page 5 of 5
FORTWORTH re" 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FIN.aL STATEMENT NO.:1
\'AIL OF PROJECT: Presidio Towne Crossincy
PROJECT NO.: 02405 CONTRACTOR: C-Con Ser�ices
DOE NO.: 7340
PERIOD FROM 11/1714 TO: 08/21/15 FINAL INSPECTION DATE: 23-Sep-15
WORK ORDER EFFECTIVE: I1/17/2014 CONTRACT TIME: 120 O WDO CD
DA1OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
DURING DURING
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
I. 16.
?. 17.
3. 18.
4. 19.
S. 20.
6. 21.
7, 22.
8. 23.
9. 24.
t 0. 25.
I. 26.
12. 27.
13, 28.
I -4. 29.
15. 30.
31.
SAT, SUN,
RAIN, TOO WET,
UTILITIES
DAYS
TOTAL
OTHERS �
& HOLIDAYS
&TOO COLD
RELOCATIONS
CHARGED
DAYS
THIS
278
PERIOD
PREVIOUS
PERIOD
TOTALS
278
TO DATE
�REMAI2KS:
TOR DATE PECTOR
ENGINEERING DEPARI.MENT
The Litt- of Fort \\'orth • 1000 Throckmorton Street •Fort \Forth, T.l" %G012-G311
(817) 392 - 7941 • Fxx: (8 17 ;') 392 - 78�45
DATE
pF�IC1AlRE�AIaQ
CIiY SECItEXAIiY
6�'r. WORTH, '
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
D CONTRACTOR &PROJECT DATA
REV: 02/20/07
Nance of Contractor
Project Nance
C-Con Services, Inc
Presidio Towne Crossing
DOE Inspector
DOE Number
Jim Diestel
7340
DOE Inspector
Project Manager
O Water O Waste Water O Storm Drainage El Pavement
Fred Ehia
Initial Contract Amount
Project Difficulty
$268,209960
O Simple O Routine O Complex
Final Contract Amount
Date
$2%209.60
9/23/2015
In PERFORMANCE EVALUATION
�0 - Inadequate 1 - Deficient 2 - Standard 3 - Good 4 - Excellent
ELEMENT
Im
WEIGHT (X)
APPLICABLE (Y / N)
RATING (0 - 4)
MAX SCORE
SCORE
1 Submission of Documents
2
Y
4
8
8
2 Public Notifications
5
N
3 Plans on Site
5
Y
3
20
15
4 Field Supervision
15
Y
4
60
60
5 Work Performed
15
Y
3
60
45
6 Finished Product
15
Y
4
60
60
7 Job Site Safety
15
Y
3
60
45
8 Traffic Control Maintenance
15
Y
4
60
60
9 Daily Clean Up
5
Y
3
20
15
10 Citizen's Complaint
Resolution
5
N
11 Property Restoration
5
Y
4
20
20
12 After Hours Response
5
N
13 Project Completion
5
Y
4
20
20
TOTAL ELEMENT SCORE (A)
BONUS POINTS (25 Maximum) (B)
TOTAL SCORE (TS)
IIn CONTRACTOR'S RATING
Maximum Score (MS) = 448 or sum of applicable element score maximums which =
Rating ([TS / MS] * 100%) 348 / 388
Performance Category Excellent
<20% = Inadequate 20% to <40% = Deficient
=
90%
40%
to <60% =Standard 60% to <80% =Good >_80% =Excellent
Inspector's Comments (INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector
Signature DOE Inspector's
CONTRACTOR'S COMMENTS
Ccif�
tre Contractor /J (�-�
TR�INSPORTATION �1ND PUBLIC WORKS
The City of Fort Worth • 1000 Throckmorton Street •Fort Worth, TX 76012-6311
(817) 392 - 7941 9Fax: (817) 392 - 7845
:f
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
REv: oa/22/o 1
I) PROJECT INFORMATION Date:
9/23/2015
Name of Contractor
Project Name
C-Con Services, Inc.
Presidio Towne Crossing
DOE Inspector
Project Manager
Jim Diestel
Fred Ehia
DOE Number
JProject Delculty
Type of Contract
7340
10 Simple O Routine O Complex
O Water 121 Waste Water ❑ Storm Drainage ❑ Pavement
Initial Contract Amount
Final Contract Amount
$2685209.60
$268,209.60
In PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT
RATING
(0 - 4)
ELEMENT
RATING
(0 - 4)
INSPECTION EVALUATION
PLANS & SPECIFICATIONS
I
Availability of Inspector
1
Accuracy of Plans to Existing Conditions
2
Knowledge of Inspector
2
Clarity & Sufficiency of Details
�(
3
Accuracy of Measured Quantities
3
Applicability of Specifications
�(
4
Display Of Professionalism
4
Accuracy of Plan Quantities
5
Citizen Complaint Resolution
PROJECT MANAGER EVALUATION
6
Performance - Setting up Valve Crews, Labs
1
Knowledge And/Or Problem Resolution
ADMINISTRATION
2
Availability of Project Manager
C
1
Change Order Processing Time
13
Communication
Y
2
Timliness of Contractor Payments
`
4
Resolution of Utility Conflicts
�/-
3
Bid Opening to Pre -Con Meeting Timeframe
III) COMMENTS &SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRr1NSPORTr�TION r1ND PUBLIC WORKS
s' The Ciry of Fort Worth • 1000 Throclunorton Street •Fort Worth, TX 76012-6311
(817) 392 - 7941 9 Fax: (817) 392 - 7845
PROJECT NAME:
PROJECT NUMBER:
DOE NUMBER:
PIPE LAID
FIRE HYDRANTS: 7
PIPE ABANDONED
N/A
DENSTTIES:
NEW SERVICES:
PIPE LAID
PIPE ABANDONED
N/A
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
Presidio Towne Crossing
2405
7340
DENSITIES:
NEW SERVICES:
WATER
SIZE TYPE OF PIPE
12" PVC
PVC
PVC
VALVES (16" OR LARGER) _
TYPE OF PIPE
Yes
2" Copper
1" Copper
SEWER
SIZE TYPE OF PIPE
S" PVC
SIZE TYPE OF PIPE
Yes
6
"
PVC
TRt1NSPORTr1TION r1ND PUBLIC WORKS
LF
2140
140
36
LF
250
60
LF
1055
LF
25
CONSENT OF OWNER
SURETY COMPANY ARCHITECT
TO FINAL PAYMENT CONTRACTOR
SURETY
AIA DOCUMENT G707 OTHER
Bond No. 1009930
PROJECT:
(name, address)
TO (Owner) [
Public Improvements to serve Presidio Towne Crossing -Water and Sanitary Sewer
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102-6312
CONTRACTOR: C-Con Services, Inc.
2230 Joe Field Road
Dallas, TX 75229
ARCHITECT'S PROJECT NO:
CONTRACT FOR: Construction
CONTRACT DATE: 10/6/2014
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(here insert name and address of Surety Company)
Oklahoma Surety Company
1437 South Boulder, Suite 200
Tulsa, OK 74119
on bond of (here insert name and address of Contractor)
SURETY COMPANY,
C-Con Services, Inc.
2230 Joe Field Road
Dallas, TX 75229 , CONTRACTOR,
hereby approves of the final payment to the Contractors, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102-6312 ,OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 17th day of August , 2015
Oklahoma Surety Company
SuYety Company,
U 0s,,
Signature of Authorized Representative
Attest: l
(Seal): Andrea Rose Crawford Attorp_ev-In-Fact
Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
AIA DOCUMENT G707 CONSENT OF SURETY COMPANY TO FINAL PAYMENT APRIL 1970 EDITION AIA ONE PAGE
1970 THE AMERICAN INSTITUTE OP ARCHITECTS, 1735 New York Ave., NW, WASHING"TON, D.C. 20006
any and an bonds, unaertaKings ana contracts of suretyship, or other wntten obngations in the nature thereof. Patricia Lee Bartlett, Andrea
Rose Crawford, Aaron Endris, Carolyn J. Goodenough, Troy Russell Key, Debra Lee Moon, Sammv Joe Mullis Jr., John
<SARA AND SON Assistant Secretary
-Con Services, Inc.
2230 Joe Field Road Office (972) 243-5455
Dallas, Texas 75229 Metro (972) 988-0200
AFFIDAVIT Fax (972) 243-5227
STATE OI' TEXAS
COUNTY OF DALLAS
Before me, the undersigned authority, a notary public in the state and county
aforesaid, on this day personally appeared Earl Cotton, of C-Con Ser,�iccs, Inc., known to
me to be a credible person, «°ho being by me duly s��orn, upon his oath deposed and said;
That all persons, lirms, associations, corporations, or other organizations
funiishing lab andlor materials have been paid in lull;
That the wage scale established by the City Council in the City of Fort Worth has
been paid in full;
'That there are no claims pending for personal injury and/or property damages;
On Contract described as; Presidio Towne Crossing, Fort North, Texas.
Contract Description; Site Utilities.
Cotton -President
Sub cri e •nd sworn before me on this the 21'` day of Au7ust, 201 4z.
r456 tot, 4804.DANDTA KAYE MEEKS
MY CG`AMISSION EXPIRES
January31, 2018
Notary Public �.-�--_-
Dallas County. Texas
REAL ESTATE DEVELOPMENT/INVESTMENTS
September 24, 2015
C-Con Services
Attn: Michael Johnson
2230 Joe Field Road
Dallas, Texas 75229
Re: Community Facilities Agreement
Presidio Towne Crossing
City Secretary Contract No. 46106
City Project No. 02405
CFA: 2014=062
DOE: 7306
Dear Mr. Johnson,
Please accept this letter as our acknowledgement there will be no claims against
C-Con for liquidated damages under the referenced Community Facilities
Agreement.
The property description is as follows:
Lots 8R-12R,14R-15R & 17-20, Block A
The Presidio
An addition to the City of Fort Worth, Tarrant County, Texas
Should you have any questions or need any additional information, please call me at
972-739-8405.
Sincerely,
ureg rraniz
Sr. Vice President
16000 Dallas Parkway, Suite 300 • Dallas, Texas 75248 • 972/739-8400 • Fax 972/739-8491
12600 Deerfield Parkway, Suite 100 • Alpharetta, Georgia 30004 678/566-3727 Fax 678/566-3728