Loading...
HomeMy WebLinkAboutContract 53941-A1 CSC No.53941-A1 AMENDMENT No.1 TO CITY SECRETARY CONTRACT No. 53941 WHEREAS, the City of Fort Worth (CITY) and Lockwood, Andrews and Newnam, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 53941, (the CONTRACT) which was authorized on the 26th day of May, 2020 in the amount of $ 15, 000; and WHEREAS, the CONTRACT involves engineering services for the following project: HROM Design Jump-Start 3; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee . NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT : 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $30,000. (See Attached Funding Breakdown Sheet, Page -4-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $45,000. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth Professional Services Agreement Amendment Template OFFICIAL RECORD Revised:March 9,2020 Page 1 of CITY SECRETARY FT. WORTH, TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Lockwood, Andrews and Newnam, Inc. Dana BurandaFF Dana Burghdoff ran 11,202112:37 CST) �Q—, C Dana Burghdoff Ju tinJsident eeves Assistant City Manager Vic DATE: Jan 11, 2021 DATE: 12/28/2020 APPROVAL RECOMMENDED: JLn-L_ William Johnso (Jan 11,202109:03 CST) William Johnson Director, Transportation & Public Works Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements . �wsEiv�ua�C�-N Justin Naylor Project Manager City of Fort Worth Professional Services Agreement Amendment Template OFFICIAL RECORD Revised:March 9,2020 Page 2of4 CITY SECRETARY FT. WORTH, TX APPROVED AS TO FORM AND LEGALITY: M&C: n/a DECIOV7 Date: DBlack(Jan 11,202112:27 CST) Douglas W. Black Assistant City Attorney ATTEST: 00 co p� o 1.FORl&Oa Po odd FYI.FYI.o �d 7 �0`16lGlil iy 60&9GPI p v o 0. °_0 for Ronald P.Gonzales(Jan 11,202112:55 CST) �� o * d oo a Mary J. Kayser �aaa�nEoopSgpo City Secretary City of Fort Worth Professional Services Agreement Amendment Template OFFICIAL RECORD Revised:March 9,2020 Page 3of4 CITY SECRETARY FT. WORTH, TX FUNDING BREAEMOWN SHEET City Secretary No. 53941 Amendment No. 1 Department Fund-Account-Center Amount 0200431 52002-5330500 $30, 000 Total : $30, 000 City of Fort Worth Professional Services Agreement Amendment Template Revised:March 9,2020 Page 4 of 4 PLANNING Lan ENGINEERING PROGRAM MANAGEMENT December 28,2020 TEXAS AUSTIN COLLEGE STATION Mr.Justin Naylor, P.E. CORPUS CHRISTI Senior Professional Engineer DALLAS City of Fort Worth I TPW Capital Delivery FORT WORTH FRISCO 200 Texas Street HOUSTON Fort Worth,Texas 76102 LAREDO MONTGOMERYCOUNTY SAN ANTONIO Mr. Naylor: SAN MARCOS WACO It is our understanding that the City of Fort Worth would like to amend the current HROM CALIFORNIA Design Jump-Start3 contract(City Secretary Contract Number53941) to include the current LOS ANGELES contract scope of services in addition to,but not limited to,transition from project ORANGE development to project design,evaluation of potential easement or right-of-way SAN JOSE acquisition,and bounds and other services as needed for HROM site design. Additionally, FLORIDA with this amendment,the scope shall include delivery of a summary basis of design MIAMI memorandum to document our understanding of the conceptual design developed and provided to date. ILLINOIS CHICAGO Therefore,we respectfully request a contract amendment in the amount of$30,000.With MICNIGAN approval of this amendment,the amended contracttotal is $45,000. FLINT LANSING Sincerely, OKLAHOMA Loc w od, AndreW Newnam,Inc. NORMAN I:sti . Reeves, PE Vice President I Team Leader Jreevec" CC: Linda Young (City of Fort Worth I TPW Capital Delivery) Michael Wellbaum (City of Fort Worth I TPW Capital Delivery) Mathew Busby(Lockwood, Andrews& Newnam,Inc.) Lockwood,Andrews Matt Manges(Lockwood,Andrews &Newnam,Inc.) &Newnam, Inc. A LEO A DALY COMPANY 1320 South University Drive University Centre II,Suite 450 Fort Worth,TX 76107-5765 817.820.0420 Ian-inc.corn