Loading...
HomeMy WebLinkAboutContract 42525-CO2 (2) .s Crnr SECRETARY —0?� r FORT WORTH City of Fort Worth COT Change Order Request Project Namel Sanitary Sewer Rehabilitation,Contract LXXI(71)-Part 3 City Sec No. 42525 Project No.(s) P258-708170041487 DOE No. 6582 City Proj.No. 00414 Project Description Sanitary Sewer Rehabilitation on Whistler Drive(Trail Lake Drive to Westrock Drive),Westrock Drive(360 feet North of Wrigley Way to Wri le Way)and Two Alleys Contractorl Cleburne Utility Construction,Inc. Change Order# 0 Date: 7/19/2012 City Project Mgr. Susan Schwin er City Inspector I Jerry Taliaferro Phone Number: 817-392-6529 Phone Number: 817-223-2276 Dept. Water Sewer Totals Contract Time (Calendar days) Original Contract Amount $276,354.50 $276,354.50 120 Extras to Date $5,393.40 $5,393.40 35 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $281,747.90 $281,747.90 155 Amount of Proposed Change Order -$16.00 416.00 010 Revised Contract Amount $281,731.90 $281,731.90 165 Original Funds Available for Change Orders $13,800.00 $13,800.00 Remaining Funds Available for this CO 1 $8,406.60 $8,406.60 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 1.95% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $345,443.13 The change order will provide for the rehabilitation of an existing manhole of Station 0+00 of lateral L-7001 located within an easement shared with other utilities. The manhole was schedule for removal and replacement. However, due to close proximity to existing utility poles and underground electric service lines it is impossible to remove and replace10"Q4nAt> the manhole as originally designed. The cost to relocate the conflicting facilities is `prohibitive,6O'I OF �a�(000000000 0 0� The change order will also allow for the deletion of pay item quantities of additional paven;r4t o o repair beyond the trench width that are no longer needed on the project. o $ 0 o d Staff recommends th approva o 0 calend ir days on this change order. °oo a OFFICIAL RECORD Attested by: �� 00000 0 0 0 ,a CITY SECRETARYILI It is understood and agreed t at the acceptance of this Chang Order by the contractor co a yment o in full(both time and money) or Fa cos s ansing out of,or incidental to,the above Change Order. :o l i Clebume Utility Construction,Inc. Billie Shaw Cfon� -6-/2X- Z .V M&C Number N/A M&C Date Approved �F"-Wr NORTH City of Fort Worth Change Order Additions Project Name Sanitary Sewer Rehabilitation,Contract LXXI 71 -Part 3 City Sec No. 42525 Project No.(s) P258-708170041487 DOE No. 65ti2 City Proj.No. 00414 Project Sanitary Sewer Rehabilitation on Whistler Drive(Trail Lake Drive to Westrock Drive),Westrock Drive(360 feet North Description of Wrigley Way to Wrigley Way)and Two Alleys Contractor Cleburne Utility Construction,Inc. Change Order# Date: 7/19/2012 City Project Mgr. Susan Schwinger City Inspector [—Jerry Taliaferro ADDITIONS ITEM —DESCRTPTION DEPT Qty Unit Unit Cost Total 35 Manhole-Paint&Coating-Interior Protective Coating—Install Sewer 11.00 VF $241.00 $2,651.00 Collar-Manhole-32 Inch-Locking Frame&Cover—Install(Pamrex or Equiv) Sewer 1.00 EA $1,725.00 $1,725.00 36 (rplc ex 24"opening w/30"opening cone)—Install Water Sewer $4,376.00 Page 2 of 4 Additions Sub Total $4,376.00 r FORT WORTH City of Fort Worth Change Order Deletions Project Name Sanitary Sewer Rehabilitation,Contract LXXI(71)-Part 3 City Sec No. 42525 Project No.(s) P258-70817OD41487 DOE No. 6582 City Proj.No. 00414 Project Description Sanitary Sewer Rehabilitation on Whistler Drive(Trail Lake Drive to Westrock Drive),Westrock Drive(360 feet North of Wrigley Way to Wrigley Way)and Two Alleys Contractor Cleburne Utility Construction,Inc. Change Order#F2 , Date 7/19/2012 City Project Mgr. Susan Schwinger City Inspector FJerry Taliaferro DELETIONS ITEM DESCRIPTION DEPT Oty Unit Unit Cost Total 13 Pavement—Install(additional HMAC pavement repair beyond trench Sewer 366.00 SY $12.00 $4,392.00 width) Water Sewer $4,392.00 Deletions Sub Total $4,392.00 Page 3 of 4 MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 4 of 4 N 1 N a)r U O � M 3 U) O rn oo c10 Lf) o y U d m � rn v ci o 0 2 -� C 3 ch ch to ` to a0 v ti Cl) co °D OD co .. N N N V X a J c a O 2 Q M M O ti l co d� nLOi U H ca & V V eh 00 co co W �-- O .Y N N N N H W �;, V N W t V) a) cc >, E t m = 0 V U m L Q L co OD LCL Q 3 � N L ti L a Npo °D O72 vi O Z` mQ .. N cm rna cc N cm N � N M L W s cn aaoUIV � Go L O U o '2 a U Z, z O Q L a m a c _ O a% m f0 U o > — � rn 0 p � E Q m cc Q o 0 o am Q cn Q cm W L .. +. p 5 C � C o U cLa n m � � Q o Z O .- m o o li c Z J Z o comma o w U E a o 0 � ci H H N O Z N 0 U Q o U �� C c0 N O U cA U +-' p� '� O W a W U cc z a) C '� O >, C Q f0 "p O) C O > C E 12m0U6Q1— 0 0 Q of 0Q� Q