HomeMy WebLinkAboutContract 43471-CO7 (2)FO RT WO RT H City of Fort Worth _ Change Order Request Project Name East Sitle II 54" Water Main Phase 1(Unit 1) and East Side Pump Station P�OjeCt N0.(S) P262-608140036983 (unit 1) P265-608160036983 (unit 2) DOE No. 6359 Project Description City Project Mgr j - r�= 's;;l.i - '=t� t ' �.�r:L "c .1:'.yi � �'� .__ �_..:r City Sec No. 43471 City Pro. No. 00369 54-Inch Water Main Installation on Beach Street and Avenue B antl Discharge Header Replacement at East Side Pump Station S.J. Louis Construction of Texas, Ltd. Susan Schwinger Phone Number: 817-392-6529 Dept. � Water (Unit 1) Original Contract Amount Extras to Date Cretlits to Date Pending Change Ortlers (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funtls Available for Change Orders Remaining Funtls Available for this CO Additional Funding (if necessary) 8,122,346.00 $177,329.85 $40,979.00 1,186,524.20 9,445,221,05 $244,000.00 $107,649.15 1,078,875.05 Change Order # �7 Date: 3/5/2014 City Inspector Raymond Brice Phone Number: 817-392-8452 Water (Unit 2) 9,812.00 1,313.68 2,176.00 $16,000. 1,592,00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%J JUSTIFICATION The change order will provide for the following: main in Avenue B. ORDER Totals $8,442,158.00 $228,643.53 $63,155.00 $8,607,646.53 $1,398,116.20 $10,005,762.73 $260,000.00 $107,649.15 $1,290,467.05 18.52% $10,552,697.50 Contract Time (Calendar Days) 260 30 290 197 Realignment of existing 36-inch water main discharge header to properly align with the project's 54-inch water Replacement of the old cast iron tees connecting to the discharge header. Lowering of the existing 8-inch sanitary sewer main in Avenue B to satisfy TCEQ separatio between water and sanitary sewer mains. �� �� • The installation of a looped 8-inch water main to replace the existing main connected to e� � «�o —_----tf"r�cherge hea er. ° ���Q�Q�r��4���� �� placement of the conflicting 16-inch main on Beach Street at Avenue A. ��' - • 4�' ���i�,��� f the suction head piping and valves on the Holly pressure plane side of the ea�t, ���� ��:� � � e , � ,- , � �' /' ! /.� /}. � ' _Sj .�14�n�r ���4 � � � �, �. �:��� ��, � �� __ . e contractors request for 197 additional calendar days � � � � � � � -:.: � J. �.: ' �.; It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time antl money) for all costs arising out of, or incidental to, the above Change Order. Fc�► �. �r �o x�r° � ----.,,,�.,.---- c�ty of Fo�t wo�tn Change Order Additions Project Name East Side II 54" Water Main Phase 1 Unit 1 and East Side Pum Station Project No.(s) P262-608140036983 unit 1 P265-608160036983 unit 2 DOE No. 6359 Project Description Contractor City Project Mgr City Sec No. City Pro. No. 43471 00369 I54-Inch Water Main Installation on Beach Street and Avenue B and Discharge Header Replacement at East Side Pump ( Station S.J. Louis Construction of Texas, Ltd. Change Order #�7 Date: 3/5/2014 Susan Schwin er City Inspector Ra mond Brice ADDITIONS Page 3 of 5 FO RT WC� RT H Project Name Project No.(s) City of Fort Worth Change Order Deletions East Sitle II 54" Water Main Phase 1(Unit 1) antl East Sitle Pump Station City Sec No. P262-608140036983 (unit 1) P265-608160036983 (unit 2) DOE No. 6359 City Pro. No 43471 00369 Project Description 54-Inch Water Main Installation on Beach Street antl Avenue B and Discharge Header Replacement at East Side I Pump Station Contractor S.J. Louis Construction of Texas, Ltd. Change Order #�7 Date 3I512014 City Project Mgr. Susan Schwinger City Inspector Raymond Brice DELETIONS Page 4 of 5 M&� Review Page 1 of 3 Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA COUNCIL ACTION: Approved As Corrected on 3/4/2014 DATE: CODE: 3/4/2014 :�7 Net Amount REFERENCE NO.. TYPE: FORTV4'URTfI -�'t`'-- 60ES54P1 ESPSRC07- SJLOUIS � SUBJECT: Authorize Execution of Change Order No. 7 to City Secretary Contract No. 43471 with S.J. Louis Construction of Texas, Ltd., in the Amount of $1,398,116.20 for Water Main Phase I and East Side Pump Station Discharge Header Replacement on Beach Street, Scott Avenue and Avenue B for a Revised Total Contract in the Amount of $10,005,762.73 (COUNCIL DISTRICT 8) RECOMMENDATION: It is recommended that the City Council authorize Change Order No. 7 to City Secretary Contract No. 43471 with S.J. Louis Construction of Texas, Ltd., in the amount of $1,398,116.20 for Water Main Phase I, and East Side Pump Station Discharge Header Replacement, for a revised total contract in the amount of $10,005,762.73. DISCUSSION: On July 10, 2012, (M&C C-24715) the City Council authorized a contract with S.J. Louis Construction of Texas, Ltd., in the amount of $8,442,158.00 for Water Main Phase 1 and East Side Pump Station Discharge Header Replacement. The contract was subsequently revised by five change orders (to facilitate current and future water system operations and maintenance) with a net total of $165,488.53 that are further described as follows: Change Order No. 1 f�: 3 ►� ($40,979.00) $97,146.66 176.0 C-26701 NON- CONSENT Date Reason Approved Deletion of 42-inch connection on 2/16/13 Scott Avenue and installation of additional footage of 54-inch water main on Beach Street 5/30/13 7/15/13 LOG NAME: PUBLIC HEARING: Installation of two 54-inch vertical risers north and south of the West Fork Trinity River tunnel crossing to avoid damaging an existing 42-inch water main on the north and an existing 20- inch high pressure gas main on the south. In addition, modifications were made to the discharge piping at the Eastside Pump Station item unit price revision Installation of two 96-inch diameter $74,650.00 08/8/13 access manholes and two 2-inch combination air release and vacuum alves C05 was voided and http://apps.cfwnet.org/council�acket/mc review.asp?ID=19527&councildate=3/4/2014 3/5/2014 M&(: Review Page 2 of 3 Change Order No. 7 will provide increased and additional pay item quantities on the project for additional improvements as described below that are necessary to rehabilitate the 1949 East Side Pump Station including replacement of the suction piping. The 54-inch water main constructed under this contract and the East Side 54/inch Water Main Phase III contract (M&C C-25982, November 12, 2012), will help to meet water demands to the north from the Rolling Hills Water Treatment Plant. It was originally planned to build the Phase II I pipeline and a new larger Eastside Pump Station ($10 Million estimated cost) at a later date to meet water demands in the east from the Holly Water Treatment Plant, however, updated water demand projections indicate the Phase II I pipeline is needed now but the new pump station can be deferred. Change Order No. 1 modified this contract to delete the 42-inch connecting pipe segment on Scott Avenue, which was no longer required, and added 54-inch pipe segments in Avenue B and Beach Street to connect the Phases I and II I work. The additional work in Change Order No. 7 will allow the existing East Side pump station to continue operations and eliminates replacing it at a different site. In lieu of replacement, the existing pump station will be rehabilitated by upgrading the old electrical service and equipment and replacing the suction piping and valves. Water Production staff will perform the electrical upgrade and replace pumps and piping inside the pump station to expand the capacity from 32 MGD to 41 MGD and improve reliability. It is anticipated that the useful life of the pump station will be extended by at least 15 years and a cost savings of $8,400,000.00 will be realized by rehabilitating the existing pump station as opposed to constructing a new pump station. Rehabilitation must be completed by May in order to satisfy peak 2014 summer demand. Both Phases I and III pipelines are under construction. In addition to replacing the suction piping, the change order will allow for the replacement of the existing 36-inch water main that was encountered at a different location than depicted on existing records, the replacement of the deteriorated cast iron tees connecting to the discharge header and aligning the discharge piping with the proposed 54-inch water main in Avenue B. Additional site piping necessitates the lowering of the existing eight-inch sanitary sewer main on Avenue B to satisfy Texas Commission on Environmental Quality (TCEQ) separation requirements. A new eight-inch water line is required for service to an adjacent apartment complex. M/WBE Office - S.J. Louis Construction of Texas, Ltd., agrees to maintain its initial M/WBE commitment of 13 percent that it made on the original contract and extend and maintain that same M/WBE commitment of 13 percent to all prior change orders up to and inclusive of this Change Order No. 7. Therefore, S.J. Louis Construction of Texas, Ltd., remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. The project is located in COUNCIL DISTRICT 8, Mapsco 78J. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. http://apps.cfwnet.org/council�acket/mc review.asp?ID=19527&councildate=3/4/2014 3/5/2014 M&G Review TO Fund/Account/Centers Page 3 of 3 FROM Fund/Account/Centers P265 541200 608140036983 $1,398,116.20 Submitted for City Mana�er's Office bv: Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8207) Additional Information Contact: Susan Schwinger (6529) ATTACHMENTS 60ES54WPIESPSRC07-SJLOUIS MAP01 R.pdf SJLOUIS MAP02R.pdf http://apps.cfwnet.org/council�acket/mc review.asp?ID=19527&councildate=3/4/2014 3/5/2014 Contractor's Modification Request ...._ ---- PraporolNa Ihrre ..._ e II 54" Water Mam- Phase i E(evcrt� 01l07/14 Reqntred By Tiansmitted I3y � / y Sholola, P.E. - - - - Pct� Stah! !e�- I- -: � ;''_ � -- ort Worth Department of Enginecrin�__ Ama 7v1an er \ roclanorton Sirect, Fort Wortb. Te�sas 76107 -- - --�- - �n s must oe must be wmpiea th rohl amount East Side Pump Station Suction Fieader Replacement (Phase 1, Unit 2) Itent l Lf % i-(New} 2-(2-t) 3-(2-2) � k'$ 4-(New) 5{2-3) / � 6-(New) 7-(1-54) g-(2-4) l S 4 9-(Newl �sl �sz l53 /SY ISS 1SG ]0{2-� � �{NBW� ,12{2-10) t3-(Ncw) 14{New) 15{2-1 i) 16{2-17) l7{2-I8) 18{2-19) 19{I-05) 20{2-21) >_ 1 {New) / S 7 26{New; 27{2-27J 28{i-� 29{I-0) 30{2-29) 31{2-30) ( S � 32-(Ncw) 33{2-31) / 5 q 34-(New) 35{I-79) l40 36-(New) �(� / 37{rrew) �Gz 3s-�xcW� 39{t-37) �(! 3 ' 40-(New) � (� cf 41-(New) 42{2-33) 43{I-28) �4 5 aa-(N�w) 45{1-49) 46{ �-74) Descripaon Remove IO" Water Line Remove 16" WatcrI.ine Remove IS" WaterLine Remove ZO" Wazer Line Removc 24" WaterLinc Remove 30" Water Lino Remove 36" Water Line "kemove Asphatl Pavement Rclocate Light Stnndard Remov6Curli `8� Gtiiter' $8�V8g1.' 2�� W8}Cf LIOC , Salvagc 24' Water Linc Safvege 30" Watcr Linc Remove IQ" Watet Va�,ve Remove Conctete Water Vault 6" Conc Curb & Guttcr 6' Chain Link, Stxl Fence Setding Hydromulch Temporary Asphalt Pavement Repair Trcnch Safety Ducdlc Iron Water Fittin6s from t6" to 30" Duc6te Iron Water Fittings Crreater than 30" ]0'DIP Water 16' DIP Water 18` DIP Watcr 20' DIP Water 24' DIP Water 36' DIP Water 42' DIP Water Councetion to existing 16' Water Mnin Connection co existing 18' Wacer Main Conncccion w cxisting 20' Watcr Main Connection to existing 24" Water Ivlain � Connection [o e�cisting 30" Water Main Connxtion tn existing 36" Water Main Connxtion ro 20" pipe line inside PS Wall panetretion fof20" WL I" Air Release Vatve 2" Watcr Scrvice 10" Cr.�te Valve 20' Gate Valve wNault 24" Gate Valve wNault 36" Gste Va1ve wNault az^ sFv ana Manho�e Exptoratory Excavation of Existing Utilitites Importcd Bacl�ll, GT;SM (Ilowable Fill) Imponcd Embedmcnt Backfilt, Crushed Stonc 7Lb e6in�ew�wiD�requirc�aii�iddi6udp[�1D6.'cIIlende'�dapi�days f � _. . _ . pleut provide an anthor'vatioa Units Quantity UnuPiice LF I.F L�F 1.F � LF l.k' SY EA I.F EA EA En EP� EA LF � SY I.F I.F TON TON �.� LF LF � I.F � LF EA EA EA FA �A i:A Pvl IiA EA TA EA EA EA IiA EA EA CY CY 65 v'— 55 �" I S �' I S v� 415 �� 45 I� 16 ✓ 200 � t✓ 30 � 2 ✓ 3 �. i� 2 ✓ 7 `� 30 � 40 �"" 1550 � 180'V'� 590 �" ~ 7.32 � 12.8? � 70 �` 10� S '� 65 ✓ 3I2 � 37 ✓ 91 �` I� l� 2 � /114f I� 1� 3 "`� 3 �", 1 �✓� 1 �'���^ 2 �/ 5 � 4 rr. 7 � 2 � � 1 QO t� I50 � TOTAL COST below and ret¢ra one (1) mpy to onr office. P.Q Baz d3! Man�eld, Tems �6063 520.00 524.00 525.00 525.00 526.00 526.00 St5.00 55.00 S6,Q00.00 55.00 52.a00.00 5700.00 sToo.00 5700.00 S1,400.00 SI5.00 520.00 50.30 55.00 50.20 59,869.00 S 17,244.00 stso.00 518Z.00 5210.00 5240.00 S242.00 5723.00 S426.00 52,200.00 S3,100.00 53,500.00 53,800.00 54,300.00 54,400.00 53,500.00 53,000.00 S 14,000.00 31,800.00 S 1,800.00 524,000.00 S2d,500.00 SS0,500,00 543,700,00 S 1.00 S60,00 520.00 �$ Cas7 S I,: 31,3 S3 S3 S I0,7 Sl,l , S2 51,0� S6,Oi Sl: S4,Oi 52,1( sn S L4( Sil 372,24 S221,99 SI2,6a SI,82i S 1,051 S 15,601 536,751 538,766 53,1 S14 SI 543,7C SI 898,491.71 ' /' ".� �. 'rJ1 ! 'r'/ :� �',!l/, uject Name C.. e9i R. - P�oposa! Nn. 1}ate �ast Side II 54" Water �2ain- Phase 1 C:�Ii2 - � Reviscd June 6, Z�l,i Respolrse Reqttired 6y Tra+asntitted Ry \ir.'I'ony Shotola, E'.�. Justin Whitman City of 1'ort Worth. `['exas Pr�ject Manager llcp�vtmeni of F;nginccring Sig�eature 1000 Thraclunorton Street r ort t�tTorth, T� '761 �2 tlescriptio�r of Work This prapasal rcpresents tlie pricing rcquested by '!'h� C:ity of I�ort �Vorth and Frecsc & Nichots for the scopc of work described belaw. Per your requesl, the foilowing pricing ecnmpasses the scope of �vork fletaileci on sheet 87 of 8H afthe cor�struction drawings f�r the abov� referenced projeci. This includes tNe 3G' 1}uctiie Iroi� I'ipe waterline section. 'I'he pay items as listed below include all maierial, (abor, and equipment to provide the City of Fort Worth with ail applicable dct�3ils ot�tlincd on the ahove mentioned plan sheets compl�te in place. Pfe�rse not�, �rte tn !he curre�tt seJaeclyde of nurnfpe crews, tle�s prop�srrf l�as heera prepctred bas�rl an usiitg tltc crew �fia! is on-sii� Tftisprice/�ro�nsa! is baset! oji receiving your ap�rovat no i�rter tTean t/te e�zd of l/ee dny t�Ionday, Ji�ne 10, 2013. Ifyour �rcceptunce is nc>t receiverl by tl�is tirt:e, we will revi.re tlee pronosal ro er:ctude an rrdriitiar:ai rnahii�xatio�� Let us knoiv if you have any questions. Please revie�r• this proposal as soon as possible and let i�s know ho�i� you �i�ould likc us to praceed.. . Sreakdow�a ajPrvposul Cify ai ]Fort Worth, Texas �astside iI 54" Watermain 1'hase I Item riescription U»its Quantit}� G'�:it /'rice Gnst 113 36" I)IP (Non-Restrained) Wateriine �v/ C•low Fill Encasement LF Y 112 $830.0tS $92,9GO.U0 � i Ifi 24" D1P (Idon-Itestrained) ti'atedme w! Plow Pill Lncesement LF �" 29 A898,QU $2G,042.0� ' I 17 2d" Gate Valve (Direct Bury) £A � 1 $1 R,6�O.OP $l8,GUU,Ut1 79 Conncct [o Existing 36" WL GA 1/1 $4.400,00 $�i,1()().UD -- - - 118 Conriect to Existing 24" WL GA n' 1 �3,800.00 $3,ti00.00 I 19 I2emnve and Salvagc F.xisting �6" I3IP Watcr T,inc I.F `� 100 $72.Q0 $7,200.00 54 Grout PilllAbandonment �f iizisting Water Line CY v' 17 511Q.00 $l,S7Q00 12d Rensove and Sslvage Existing 24" Gatc Vatve EA r 1 $bOQ.O(; $6UQ,OU 121 [�emovc and Sah�age Lxisting 20" Ciate Valve LA � 3 $500A0 $1,5U0.(}U 122 Cut & Plug Existing 20° Watcr Linc (Pressurc Plu�; EA � 4 $1,2QO.UU $�,RpU,00 �` I 23 'Cemporary Pavcment Patch (2" Aspiiait �it 6" Plexbese) SY 3t1(? $30.OD $9,{)Oi).()G _ _ 4� D-Hole (E�ploratory Exaatiation) Pe;quires speciat handling i;ot coveced rt`� 1 �1.00 $1.4U I�teti Cha�ge: $17Q,fi73AU if accspt:tble, piease �rovide ttn aathorizatio;� si„nature Uelow and rettErn one (I) ¢apy to our once. This cdraf�g� wiI! elso rcqairc r�x cx�errsiorr of a!l miles7o�re cltttec trnd evntrn�f tnne Gp 4S dt�t�s. xc: S.J. t�ouis Yro'ect No. 21217 Pro"c�ct Pilc � ?b`� _�.,...,_. � U �� `� S.J. LouisConsiruction of't'e.rns-LtrL 520-A S'. fith Av�tue Man.sfreld, Tezas 7bOb3 ($17J 477-03Z0 Ojfice (817} 477-(lSS2 F�ix C`ontractor's .l�odificatir�n R�q�aest - Pro,�nsal Prr�ju! Nume' C:bI.R. - Proposuf �Va Dptc Gast Side tI 54" Water Main- Phase I CtvS�Z - t3 June 6, 20 3 3 Respur,se Rc+ruired I3y 7ransmilted Xv Mr. Tony Sholota, P.F,. Justin Whitman C:ity of I'art \�Vorth, Texas Project Manager Department of Eaginccring S�rra�ure [000 Tlirockmorton Strect rort Worth,'i'x 7G102 neuription ojt3'o�k 'fhis proposal represents thu pricing requesied By "Ctte City of Port WcsrQl and Frecse & Niohols for the scope of �r•ork descri�nd below. Per your requcst, the foifowing pricing ecompass��s tite iwo seperate scopes ai �rork as detailed �n pages 7b nf 89 �nci 88 of 8� of the construction drawici�s for the abave referenced project. This inclu�cs the 8" YVC 1�+aterline section and ali appurtenance,, and the 8° PVC Sanitary Sewer �vith all apgurtcnances. 'Che pay iteins 8s Iisted bel��v include all maierial, iabor, nnd equipment to provide the City of Port Worfh ��rith aIl npplicable details oudined nn the above mentioned plan shee�,ti camplete in placc. Nlcase revicw this proposal <�s soon as pnssible and let us know }mw you t�bul�i like as to proceed.. Rrvakda�wi of Fropam! Cily of Fort 14'orih,l'csas Eastside tI S4" Watea•main Phase I ftem n�•scripHun ['nits �t�axiity UnilPrire Gosf 124 8" G906 DRtd PtiG 1H'ntcr Ltne I.F Y' 379 5175.G0 $tiG,?25.00 125 36" x 8" Ta�t�ing Sieeve and Vaivc LiA � 3 SI I,(H72tH7 $22,G60.Op 1^6 Fire Hpdrnnt Assemnly GA .✓ t �i,640.0U 53,6(}U,ix} 127 5' Gate Vah•o EA ✓ I $�.00 3900.IN1 128 1"BuliHeadlV.terSuviceAssembiv EA ✓ 8 51300.()t} SIQ,A00.(Hl 129 2'1YaterServic^.AssranUly L''A "� 2 St,700.0� $3,4()6.t;0 I30 I" Water Service P;pe l.r ✓ f�h 530.00 $1,92U.UU l3i 2" Watcr Servicc Ytpc LF ��1S S40.00 S1.920.(M> 132 tia C-90011R25 PVC San�t..ry Se�ver Line LF 3p3 St 65.00 E49,995.OD 133 fiuwabteFetl[iitenszmznto(SewerLine CY +/12 570.�I9 SS40.W t3A 4' Diameter Hydreulic Slide Manhole {0'-6' dep:h) GA 1/ 1 SS,70Q.(Hl $>,7tlo t7ti t(W 4' piameu-r prop Manhala fiA S4,OOO.GR $S,dOU OU 135 4'llCametcrExfraDepthManhpic VF / t3 $ISQ.PO S1,9�0.OQ 336 Cspoxy Lining of4' Oiameter Manholc V�' r 31 �]40.00 �4,340.OD id4 Concrcre Collnr �:A 3 SSQ�.04 S1,5D0.00 145 VacmunTest L`h 3 $100.00 S3t1�.iX7 t37 Pre-TV Inspecuon LF "="�500 SiA(? S4(%0.0� 1�8 Past-TVinspection Lr' `�303 SitYO 3303.Od 134 Removc Existing �inn};otes F.A ✓' d S:t,S00A4 SG,OOO.ti6 t�70 Remove E�;ist�r,g [ 6" Samtary Sc�a•er I,r �✓3t33 $Z5.00 S7,i7S.00 141 A' Wide Asphatt Pavcment Repair, Industrial LF 45 �59-t10 S5,605,!?Q 44 Asphalt pavement Repair Eles�ond Defired li'idth, Indus�friel SY ✓ 3� 546.OQ Si,38U,(H) � 123 Tempotary Pa��ement Fatcii (a" ns>>hate wt c+° Fiexbnse) SY 76T. 330.00 $23,010.OG d0 Curla and Guttcr Rcptascmcn[ Li� ✓RO SI5.00 Sf,200.(Yl 49. U-Hale (Exploratory Exc:avetaon) AccEuires special hanviiag not cavered F.A 2 $I.UO 52.00 142 Bypass Pumping for Sanitary 5cwcr T,S 7 1 St3,U0QOf7 $12,qD0.U0 14.; 7'renchWaterSiop EA 1 S1.000.00 $1.000,(10 ' t44 CanorcteCollnr - �1 3 SSISU.O� SI,SCQ.ii;; lA5 VlcuumTest GA SfOQ.OD $300.00 t46 Sueciat shoriag at Sanieap� Sewer line S4� 4+U7,44 8c Sta 5 t02.s8 N:A z �,995.00 �7,990 00 S� �itr so.�o 1'teY �itategc,: �25i,3�.�'i.eDU` ifncecptA6lc pler+se Qrovide nn Authnrixation signature 6elow and refurn one{I) copy Io nur o�ce. This ahan�e �vilr a(a'n re.quire un �tensiat� ojv!( uulestone daler and coxtrncl ll:ne hy q3 du}'s xc: S.11.ouis i'ro'ect No. 21217 Pro'ect File S.J. Cauis Canstruetir�n njTexas l,�d i20-�1 S. bth Ai�em�z IrJaii��ld, Ti xas�GOG,i (A77) 477-d.i20 O�ce (8t 7) d77-0552 I�ha � �' � �� ! / ' � �� � /l / � P'roject Name GM.R. - Propnsa! N� Date _ _-- _ - - �___ _ - -- _ .�__ . _ - -- -- - — - 21217 - East 5ide II 54" Water Main - Phase I _..______ . _- --- _..�.__--- - Twelve Jan 26 2Q14 City of Fort Worth —��F _ uary , Response Required By T���� gy _.. _ �____ _ - _-----_ _ _-----_- _ Mr. Daniel Stoutenberg 1r•, P.E. _� _��,,1Cod Sears — - --- - - _--�. -- --�` ---- Freese and Nichols Project Coordinatar - -- _. . __. . �. ___ _ _______ _ _ _ _� _ __ ___ ___ 4455 Infemational Piaza, Suite 200 Sign�nure .. �... _ _------ _ _ _____ _ -- ___.-- __ _ - _ _ _ Fort Worth, TX 76109-4$95 � ,, , - - __ - _._T._ Via Email - -- _ __ _ _ _.� - -- ---- cc: Mr. Tony Sholala, P.E: w/ COFW (via email Description af Wark CMR No.12 - Dated 1 26.-2014 IncIudes the following: S.J. Louis acknowledges receipt of email dated 12-16-2013 for Line BB ai Station 3+75 - 36" Bk'V Vault modifications regarding conflict with 4" gas line. Structure details were included with a wali and roof step down. Special shoring needs required the existing 16" water lie temporary removed and replaced. the structure detail revisions also required the per plan operator on the butterfly valve be movsd to the apposite side of the valve as well. The below unit price breakdown includes all the above work for the total amount of $ 17,696.49. Please process a project change order so these costs can be reimbursed. Breakdown of Prvp�sa! East Side II 54" Water Main Yhase I -- _ . _.____.. _ _ __ _____.____-- - - -_______ _____ — Remova[ & Replacement of E�sting 1G" at Be�c6 Street and Avenue A Item Descriplion Units Qrrantity Unil Price Cost New - 1 Removai & Replacement �f existing I6" line at �3each St. and Ave. A LS i $15,9G1.65 515,961.65 New - 2 Rotate Worm Gear on 36" Butterfly Vfllve t,S 1 $7,734.84 $ I,734.84 $0.00 $0.00 $0_OU $OAO I I I Net Change: $17,696.49 Additional Time to be :Added tu Contract (Calendar Days): 7 i9�ys If acceptabte, piease provide an authorization signature below and return one (1) co[ry to our office. S.J. Louis Construction Action. xc; S.J. Louis Pro'ect No. 21217 i'ro'ect File S.J. Couis Conayruciioir of T'e.xas �,id 520-A'S. 6ih Avenr�e Ma�tsfield, Texas i6063 (SI7) 477-0320 Of, f�ce