Loading...
HomeMy WebLinkAboutContract 55972 Received Date: Jul 12,2021 Received Time: 11:57 am Developer and Project Information Cover Sheet: Developer Company Name: MCA Litsey Creek Owner,LP Address, State,Zip Code: 1601 S. Mapac Expt,Austin, TX, 78746 Phone &Email: 512-904-2227, dsimmonskcrea.com Authorized Signatory, Title: Dudley Simmons, Co-President Project Name: Litsey Creek Cottages Brief Description: Water, Sewer, Paving, Storm Drain, Street Lights Project Location: SWC Litsey Rd. and Endeavor Way Plat Case Number: Plat Name: Mapsco: Council District: CFA Number: CFA21-0045 City Project Number: 103173 OFFICIAL RECORD CITY SECRETARY City of Fort Worth,Texas FT. WORTH, TX Standard Community Facilities Agreement Rev. 10/5/19 [NPCI CSC No.55972 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between The City of Fort Worth ("City"), a home-rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and MCA Litsey Creek Owner, LP ("Developer"),acting by and through its duly authorized representative. City and Developer are referred to herein individually as a"party"and collectively as the "parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Litsey Creek Cottages ("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement("Community Facilities"or"Improvements"); and WHEREAS,as a condition of approval of the Project,Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land,pay fees or construction costs, or meet other obligations that are not a part of this Agreement.; and WHEREAS,the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exist between the terms and conditions of this Agreement and the CFA Ordinance,the CFA Ordinance shall control. 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been accepted by the City ("Engineering Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide City of Fort Worth,Texas Page 2 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPCI at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: ❑X Exhibit A: Water ❑X Exhibit A-1: Sewer ❑X Exhibit B: Paving ❑X Exhibit B-1: Storm Drain ® Exhibit C: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates conflict with the Engineering Plans,the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements on or before March 29,2022("Term"). If construction City of Fort Worth,Texas Page 3 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPCI of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement,becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including,but not limited,to being prequalified,insured,licensed and bonded to construct the Improvements in the City. City of Fort Worth,Texas Page 4 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPCI (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an oblige, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions, Chapter 2253 of the Texas Government Code,and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider,which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed, and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2)to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. 11. Easements and Rights-of-Way Developer agrees to provide,at its expense,all necessary rights-of-way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. City of Fort Worth,Texas Page 5 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPCI 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO,AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS,AGENTS AND EMPLOYEES FROMALL SUITS,ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED,BROUGHT FOR OR ONACCOUNT OF AN Y INJURIES OR DAMAGES SUSTAINED BYANYPERSONS,INCL UDING DEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN,PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQ UENCE OF ANY FAIL URE TO PROPERLY SAFEGUARD THE WORK, OR ONACCO UNT OF ANY ACT,INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCH INJURIES,DEATH OR DAMAGES ARE CAUSED,IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS,SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH,RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS,IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts Upon completion of all work associated with the construction of the Improvements,Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors,along with an assignment of all warranties given by the contractors,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. City of Fort Worth,Texas Page 6 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPCI 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees,and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars ($50.00),the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre-approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtainproof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a parry by hand- delivery or by mail, addressed to such parry at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: DEVELOPER: Development Coordination Office MCA Litsey Creek Owner, LP City of Fort Worth 1601 S. Mopac Expt 200 Texas Street Austin, TX 78746 Fort Worth, Texas 76102 With copies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 City of Fort Worth,Texas Page 7 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPCI and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other parry hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of three (3)years after final payment under the contract,have access to and the right to examine any directly pertinent books, documents, papers and records of such contractor, involving transactions to the contract, and further,that City shall have access during normal working hours to all of the contractor's facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants,officers,contractors, subcontractors,and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co-employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer,nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and City of Fort Worth,Texas Page 8 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPCI all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors,and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 20. Non-Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose, their attorneys, have had the opportunity to review and comment on this document;therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. City of Fort Worth,Texas Page 9 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPCI 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel;and(2)will not boycott Israel during the term of the contract. The term"boycott Israel"has the meaning ascribed to it by Section 808.001 of the Texas Government Code. The term "company"has the meaning ascribed to it by Section 2270.001 of the Texas Government Code. To the extent that Chapter 2270 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2)will not boycott Israel during the term of this Agreement. 26. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES,SUBCONTRACTORS,AGENTS,OR LICENSEES. City,upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 27. Amendment No amendment,modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 28. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 29. No Third-Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise,to any other person or entity. City of Fort Worth,Texas Page 10 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPCI 30. Compliance with Laws, Ordinances,Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 31. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order,resolution,ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 32. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. 33. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder,and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth,Texas Page 11 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPC] 34. Cost Summary Sheet Project Name: Litsey Creek Cottages CFA No.: CFA21-0045 City Project No.: 103173 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 193,615.00 2. Sewer Construction $ 350,536.80 Water and Sewer Construction Total $ 544,151.80 B. TPW Construction 1. Street $ 604,323.24 2. Storm Drain $ 401,848.50 3. Street Lights Installed by Developer $ 95,505.14 4. Signals $ - TPW Construction Cost Total $ 1,101,676.88 Total Construction Cost(excluding the fees): $ 1,645,828.68 Estimated Construction Fees: C. Construction Inspection Service Fee $47,000.00 D. Administrative Material Testing Service Fee $13,034.00 E. Water Testing Lab Fee $750.00 Total Estimated Construction Fees: $ 60,784.00 Choice Financial Guarantee Options, choose one Amount Mark one Bond =100% $ 1,645,828.68 Completion Agreement=100%/Holds Plat $ 1,645,828.68 Cash Escrow Water/Sanitary Sewer=125% $ 680 189.75 Cash Escrow Paving/Storm Drain =125% $ 1,377,096.10 Letter of Credit= 125% $ 2,057,285.85 x City of Fort Worth,Texas Page 12 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPC] IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH DEVELOPER MCA Litsey Creek owner,LP Oana doAc Dana Burghdoff(Jru17,2021 20:24 CDT) Dudley Sivnvnons Dana Burghdoff Dudley Simmons(Jul 3,202117:30 CDT) Assistant City Manager Name: Dudley Simmons Title: Co-President Date: Jul 7,2021 Date: Jul 3,2021 Recommended by: 9-2�- 0�-� Evelyn Roberts/Jennifer Ezemack Project Assistant Planning and Development Approved as to Form&Legality: Richard A.McCracken(Jut 6,202118:55 CDT) Contract Compliance Manager: Richard A. McCracken Sr. Assistant City Attorney By signing, I acknowledge that I am the person M&C No. responsible for the monitoring and Date: Jul 6,2021 poda��n��� administration of this contract, including O�oFORT��a ensuring all performance and reporting Form 1295: PA,o requirements. pro° o � ...o o�� ATTEST: a o o 0o 00 o o Ty� Laurie Lewis on hehalfof(Jul 6,202110:0o CDT) 0000000 nEXAS.oa Name: Janie Scarlett Morales Title: Development Manager Mary J. Kayser/Ronald Gonzales City Secretary/Assistant City Secretary OFFICIAL RECORD CITY SECRETARY City of Fort Worth,Texas FT. WORTH, TX Standard Community Facilities Agreement Rev. 10/5/19 [NPCI The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment ❑X Attachment 1 - Changes to Standard Community Facilities Agreement ❑X Attachment 2—Phased CFA Provisions ❑ Attachment 3 — Concurrent CFA Provisions ❑X Location Map 0 Exhibit A: Water Improvements 0 Exhibit A-1: Sewer Improvements 0 Exhibit B: Paving Improvements 0 Exhibit B-1: Storm Drain Improvements 0 Exhibit C: Street Lights and Signs Improvements 0 Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Page 14 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPCI ATTACHMENT"I" Changes to Standard Community Facilities Agreement City Project No. 103173 None City of Fort Worth,Texas Page 15 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPC] ATTACHMENT "2" Phased CFA Provision City Project No. 103173 The improvements being constructed by Developer pursuant to this Agreement will connect to improvements Developer is constructing under a separate Community Facilities Agreement that have not been completed and accepted by the City. Therefore, this Agreement shall be considered a"Phased CFA" and the provisions contained in this section shall apply to this Agreement. The improvements being constructed by Developer under the separate Community Facilities Agreement shall be defined as the "Parent Project." The improvements being constructed by Developer under this Agreement shall be defined as the "Child Project." Developer acknowledges and agrees that due to Developer's election to construct a Phased CFA, the potential exists for technical, delivery, acceptance or performance problems (hereinafter "Construction Problems"). Construction Problems may include, but are not limited to: failure of the improvements to comply with the approved plans or City Specifications; failure of the improvements in the Parent Project and the Child Project to properly connect to each other; changes to the design or construction of the improvements in the Parent Project that impact the design and construction of the improvements in the Child Project; construction delays, delay claims, or claims for liquidated damages; increased costs for the Developer; failure of the improvements to pass inspection or material testing; or rejection by the City of some or all of the improvements and Developer having to remove and reconstruct the improvements at Developer's expense. In addition, Developer understands and agrees that disputes may arise between Developer's contractors or their subcontractors relating to responsibility for the Construction Problems. Developer shall be solely responsible for resolving disputes between contractors or disputes between contractors and subcontractors. Developer further acknowledges and agrees that Developer has notified all of Developer's contractors for the Project that Developer has elected to construct a Phased CFA, the provisions of this section, the risks associated with a Phased CFA, and that the City shall not bear any responsibility for Developer's decision to proceed with a Phased CFA. Developer shall not make the final connection of the improvements in the Child Project to the improvements in the Parent Project until the improvements in the Parent Project have been constructed and accepted by the City and the City has consented to Developer making the connection. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more single family residential homes or structures, the City will not record the plat related to the Project until the improvements are constructed and accepted by the City. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more commercial buildings or structures, the Developer shall not receive a Certificate of Occupancy from the City for the building(s)related to the Project until the improvements in this Agreement are constructed and accepted by the City. Developer further understands and agrees that completion of the improvements under this Agreement does not entitle Developer to obtain a final plat of the property until all other requirements of Federal law, State law, or the City Code relating to the filing and recording of a final plat have been met by Developer. City of Fort Worth,Texas Page 16 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPC] BY CHOOSING TO CONSTRUCT A PHASED CFA, DEVELOPER ASSUMES ALL RISKS AND DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY AND ALL DAMAGES, INCLUDING BUT NOT LIMITED TO ANY AND ALL ECONOMICDAMAGESPROPERTYLOSS,PROPERTYDAMAGESAND PERSONAL INJURY, (INCLUDING DEATH), OFANYKIND OR CHARACTER, WHETHER REAL OR ASSERTED. DEVELOPER HEREBYEXPRESSL YRELEASESAND DISCHARGES CITY FROM ANY AND ALL LIABILITY FOR DAMAGES, INCLUDING, BUT NOT LIMITED TOANYANDALL ECONOMICDAMAGES,PROPERTYLOSS,PROPERTY DAMAGE AND PERSONAL INJURY(INCL UDING DEATH)ARISING OUT OF OR IN CONNECTION WITH,DIRECTLY OR INDIRECTLY, THE CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S DECISION TO CONSTRUCT A PHASED CFA. DEVELOPER,AT ITS SOLE COSTAND EXPENSE,AGREES TO AND DOES HEREBY INDEMNIFY, DEFEND PROTECT, AND HOLD HARMLESS CITY, AND CITY'S OFFICERS, REPRESENTATIVES, AGENTS, EMPLOYEES, AND SERVANTS FOR, FROMAND A GAINSTANYAND ALL CLAIMS(WHETHER A TLA W OR INEQUITY), LIABILITIES, DAMAGES (INCLUDING ANY AND ALL ECONOMIC DAMAGES, PROPERTY L OSS, PROPERTYDAMAGES AND PERSONAL INJURIES INCL UDING DEATH), LOSSES, LIENS, CAUSES OF ACTION, SUITS, JUDGMENTS AND EXPENSES (INCLUDING, BUT NOT LIMITED TO, COURT COSTS, ATTORNEYS' FEES AND COSTS OF INVESTIGATION), OF ANY NATURE, KIND OR DESCRIPTION ARISING OR ALLEGED TO ARISE BY OR IN ANY WA Y RELATED TO CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CFA, OR (2) BY REASON OF ANY OTHER CLAIM WHATSOEVER OF ANY PERSON OR PARTY OCCASIONED OR ALLEGED TO BE OCCASIONED IN WHOLE OR IN PART BY THE CONSTRUCTIONS OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CFA WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH,ITS OFFICERS, SERVANTS, OR EMPLOYEES. DEVELOPER MCA Litsey Creek owner,LP Dudley Slmmons Dudley Simmons(Jul 3,2021 17:30 CDT) Name: Dudley Simmons Title: Co-President Date: Jul 3,2021 City of Fort Worth,Texas Page 17 of 17 Standard Community Facilities Agreement Rev. 10/5/19 [NPCI x i b x� � �w _ w U �yLL� Y W W w U W V �4 Ll W W 2 z (n U r C)f (D �� z J �! w rYwzww0 'y _jzLU 0 � � � � U 0M > U) o w w � r/', LJJ LL w V�o LU CO O 0 Q N Z . O V 0 v 0 byJ � U w � ° X � LLB ~ cl > 3: 0- Uz � � 6 U < Ly W w0 0 � 0 LL U) —3 LU C) - U) 0 Ury Lu J � 0 3H33 MOlH13HdZI33 Y M O- e C/) v a _ w H Jam = ON� M N O Z Z a ��U WV 01'A1 IZOZ/ll/9 a3Avs lsvl 0Ma'AlINpN\NoAV3aN3\V!0\51191KK3\av3\s3oviio3 4mn-0dN—ZO1909L90\IIAIO—Au\:N 3NVN 0Ma Nd 9Z;l IZOZ/9I/9 3NVf'A3d801 A9 a3LLOld N Ol a C3 w Z a m Z Tcy J a M o w z W Z s/y a Q N FT O o 2 LU J y __ W LU a, WU) �� ^ d' H a N /� F Q L L U fi� >% S W LU W �aC/l Z W�2 W Z ¢(n J =LU / O ao LU mv�0 2 u~i / p Z p LU < J Z } LU LU LU J = N LU Q LU Cl) LL Q LL ' z c? Z o z o w cn LLjMU —Ip O O z p U p U) p 0 o NORTH U a w a a z < I c� p 3c c I I 1 Q Cl) 1 1 � JC', \ J p 11 zcn `�° ~ W p U a � u1 U cv p z \ O O � \ U 0O z p 37 w \ \ '`YWCA Q \ Jryz 3 \ \ m CoLLJ p Z QUN O � Lr Q _ Cn Li J p Z w LU o !n 00 m w V z U) U\ ��2 Ix 3 X X Q w (w) N 0 \ \ w a \ \ F- z 0 \\ \ \ 0 � W � \ \ mItz �\ M W \ ap E X \ ~ v LU M = W W oN� �/ �NM u _ ofZZ W Cn 7i NV L4:OI IZOZ/9I/9 03AVS 1SVl OMO'1191HX3 NaLVM\NoAV30N3\V!0\51191HX3\OW3\S3;1Vll00 4mn-OdN-Z01909L90\1IA10-Au\:N 3NVN OMO Nd 6Z;I IZOZ/9I/9 3XVf'A3d801 A9 03L101d N (Jl LL ,n p LQ Z a m Z MATCH LINE SHEET 3 ,-0 g a �r LuW� W Zw L Z r c� opt = w Ui LU ^ = X w N w ��� � rX Lu =w M ❑ y p of LU Ux W aw > r r z M I W r Lr cn Z7ff LU 0 zO_� 2 LUmLn0Lrn 005 I a �; co Quo I zco — U z I I } cD � 0 LU} I no N Z W Q Jzo J } a � w w = ui[.J) LL Q W \ � I _ az z LL ❑ ❑ \ > w w CD w w I Q O O Z O 0 � d U) U � ° U) ° z �Q� C a w a a O 3 3e Li N O U J co I � I I o < < 00 z "' � (D U) I Ld C UJ C'1 CDz01 0 Q � � � � I Q I 0o � z LLJ z O woJ Jo I Z � I a � Joo J I U)az > I z a \ 3 I \ co I I LU w� I Q I W UJ co U- _j CO I I ° � oc� � Q � UJ co Z C) > U wwJJo coLU I I I � J °O QLL w U)Qz ' � O W I I I U M = W W 0' W Wo 6 133HS 3NIl HClbW of Z W Cn J O?v NV L4:OI IZOZ/9I/9 03AVS 1SVl OMO1181H)(3 NaLVM\NoAV30N3\V!0\51181HX3\OV3\S3;1Vll00 4mn-OdN-ZO1909L90\1IA10-Au\:N 3NVN MCI Nd 6Z;I IZOZ/9I/9 3)iVf'A3d8Dl AB 03LLOld m N 01 w u O Qz IL M z 0 LUW� LUzw L z w Z O p w �Lu LLI LU wCnNo LLJ Cu fr p N /`� � _ U ^ ^� =w }pX LU wl =o~F Q cwi�w~ LU ��Ow 3 z Jmu� ? =w3o LU LITSEY ROAD ag " ~¢ N O �vo W ! my cn W x A VARIABLE WIDTH R.O.W. — o W z N Z W J Z � LULU LU J = Q W w I I C) z o � o w W C w Lf� J U) U) z C) Lo V o a z a co W O iQ O x m ti NORTH U a w a LU c14 m O U = Q O x w N 0 Q m w F — zcj z LU . 0 O J 3 C U) ~w O u � of (A F— w w LU Z 3 Z z — 3 p as I U ~ LU LLJ O U z z Of J I Qz 0 W I C/) IZ co Z _ w Q Cl) / W z "' ~ Q � No w � ° o Q Q / o U) > U �v Q LL W co U >- W W 0N� N M _ �LU zCD W U) °�� NV L1:O1 IZOZ/®l/9 03AVS 1SY1 OMO'11BIH*u3lVM\wAym0 3\Y!0\51181HX3\OYO\531Y1100 1aun-Odtl-ZOISOBL90\11Ail !\N 3WVN ON Nd 6Z4 IZDZ/91/8 3NVI''A3dwi AS 03JI(ld m N 01 LL u O z IL M z 2 0 �� a WzW O Y N = W �w V LLI LU cn LL �� LLJ � w Wo0LL 0 w �m� z 3 Lu a w / ��� O On�vo Z W � mvio z u~i Q z _ C J Q co / LLJco z � w / W aa Lf) / O J z � z} N Q / " ~N W O W z O z � L LLI / z w z Z_ t U) O z H1bON o U) QC a w � � a I co Ul co U C9 O I z6 L z � o fA O Ci = IZ z 2 0 U I J Q Ll LU = LO Of 13 z ULo 3 ILU mN � moU z IQ N Q � z IQ o 0 Z 0 w I `� Q of 0 wz z z z I LU U z z Z I (n JJ w w o w _ ' � - N QD L.(1 U) O w x 'M'Q($ HlalM DIOVI2JVA H U CIV?� A� Isil-1 Q w N � O w < — — U = W w 0NF N CD M Zz W U) °�o Rd I£x'i IZaZ/Ll/9 a3AVS 1SY7 a3 DMa'1181NX3 M3s AaV1iNvs\wAymN3\vlo\siisiNx3\avo\s3Dvuoo AMln—oda—ZDISDBLSD\IIAID—MLll M 3WVN DMa Nd M"IZDZ/Ll/8 3XVI''A3dwi AS 03llald N Ol a C3 ,4 z Z 2 133HS 3Nl1 H`OiVN J a O w = ~ �� W Z Wc W L Z c� ui q wu~io /� ui = �cn F Q W U S W w �a'(n Z W�3 = W W Z ¢ tom~ [if W co O Q Q ry 0 d W � c�0 -L) H I Z Q o p I w Q � Ofco � I z O z w ❑ ❑ O z WJ � H z w Q O O> cn I W Q z w z M 0` J as I �� OV aw L'i N + I U� \ I = \ I Q III LO w a z U- U J � L 0000 C9 n CD m v' o < < O U " IoI WCO co & ❑ m - � z � Q op wM I � W' CDWi z p p Z J 0 Oz I O O0 QF I a L) z z a zCD Iz \ J \ _ m Iof U) 13 LI_II W WM � IN > Q Qa0 I� } } cv ❑ a Q \ w spa t= ❑ zo IQ OU o U) I Ln Oval zz M W p Q IL W u) z I 1-- O E W w I I mN U M = w w 0ZM 6 1�3HS 3NIl HOiVN � _ Zz W U) Rd I£'S IZOZ/Ll/9 a3nvs lsvl aMa'1191H)3 N3M3s 12N11NVs\NoAV3aN3\V!0\51191HX3\av3\s3oviio3 4mn—OdN—ZO1909L90\1IA10—Au\:N 3NVN OMa Rd L£:S IZOZ/LL/9 3>W'A3dtl01 A9 a3L101d N Ol w \ Q Z a m Z o O L W LU H m a:LUZ LUL Z � c� � �� �� w No ^ = U) LU ^ x U o x L =LU d' LUU~ W �0Cwo \ Z J Q Z W w = W Q U ~ 2 M W m(n�(~n W — Z w L LJ N J CDz M J , d CN LW I 3 x L LJ o — �, 3 z`LL, LU Ln LLJ J � O Z W V) O\m O J Z CV Lo W N H N Of J Z 3 � x LL.I W x W w LLI LU L w Ln a N m LL_ LLl w i-4 C:) Z w cn \ — COCDx O LEI o z y� J O p u z QC) w x L) a w u N a zC) u J 0 0�LL_ U J 0 a LO U)LU ry LU LU U \ Q co \ Q w O J J � 00 \ J Z > Q - U 0 \ \ 7� o \ U \ d,o cn m z � 7Z- L>LJ LUoho Q LLJ z0 \ z \1 O U 1 c1r) Y 1 QLL w N O U W I I m � M = W W 0 W N M o x _ �LU Zz Z 133HS 3NIl HOiVh W Cn J Lev Rd I£-9 IZOZ/Ll/9 a3AVS lsvl aMa'1191HX3 N3M3s 12N11NVs\NoAV3aN3\V!0\51191HX3\av3\s3oviio3 4mn-OdN-ZO1909L90\1IA10-mu\:N 3NVN OMa Rd L£:9 IZOZ/LI/9 3XVf'A3dtl01 A9 a3L101d N Ol LL C3 ,4 Z a m Z o O <� J� wZLU Lz P w a > 0_'to N ^ H Q w n n x �b ❑ �` _w � ��~ w moo C cQ Ch / C CD C9 w U >- No / � o0�' < � O / Q/ oU zz / Y � >' J Z�LLI LU LU ' I ❑ > IL o in a Q U ti w w w � w m V z z z w IQ Z � 0 w O O U o Ups W Q � za � ❑ ❑ 0- Q w w w � a a a = I z 0 ° 0 � � I I I mti � Q mod wNo I� • 0 Z 0 I� � c to w z la LL o to o w�� U z Q \ r N LLI LLI 'M'O'2] HlaIAA EPW JVA V LL 0 clvo�j AD Sl l l w o0 w N H12JON Q o 0 E X O w Nr U =o = W W 0, �/ N M Q x _ �Zz LLI U) J °Z�)C) 0 Nd I£'S IZOZ/Ll/9 a3nvs lsvl OMa'1191H)3 1N3N3AvANoAV3aN3\V!0\51191HX3\av3\s3oviio3 xmn—OdN—ZO1909L90\1IA10—Au\:N 3NVN OMa Nd Z£;S IZOZ/LI/9 3NVf'A3d801 A9 a3L101d N £133HS AW HO1HW �o n Qz a m z Q W zw L z PE Q a 3~ _ a� O o w � `w Lu LU I w ��N /�� =w ❑ p Y r I J LL U a ��a =�o Q z � ¢ cn OLU 0MaU 2 w in I z � < C � l Q Lu ui:1 < Z > U I I I \ I Y z J w \ I L" w ui N I O Q Q a < LU U co CD W CD a ~ w w ti Z � Qo � p U U U)Ld Q I I � � CD a z p p w z p p z w U U U ci () O p W J J 0 W 'IT ti az 0 I a z > J ❑ ❑ ❑ U U) Q a a a O O O a a a I • Z I \ a c; I \ � co o w "' ~ I c w zry I Uti !n } N z W \ zZ V � z I O � C / QI- I O � �N Q zz I Quo Ld O cn ' Y LJ z Z COm w LL W U) U) m N U L 133HS 3W HOlbW d �_// w Lu 3:p Q x _ ofZZ ui Cn J °Z�)C) 0 Nd W'S IZOZ/Ll/9 a3nvs lsvl aMa'1191H)3 1N3N3AvANoAV3aN3\V!0\51191HX3\av3\s3oviio3 4mn—OdN—ZO1909L90\1IA10—mu\:N 3NVN OMa Nd ZV;9 IZOZ/LI/9 3NVf'A3dtl01 A9 a3LLOld m N 01 W u O y z IL Mz O wzw Lz � / a 3:~ C a� / \ OOY N = � J w d w W H N \ \ wW \ < \\\\ Q JJ � ❑� ¢y�gig c, �L�O O w LUwX w mu� Z w oo�o~� o M LU LUWzO g v�acl W ! iu�~i c' tl \ z u) - ~ \ o � z 0 \ \ \ � wz \ \ Q' J N CY) Q \ � JCD \ zU) co— , \ \ \ \ -�,e ~ Q W z U 0 \ w o \ o Q IL U) o z o / w w w WU \ LU L m Z y m \ / p U U fn 1 z Z Z w w O O U W v i` Q LLj U o 0 0 z 0 0 0 / oo 0 0 0 / I Q ? o a a a N I I z I I z � � I zoo I • oo � QZo ' z 1 C� w / z Q / ~N W L ^ 0 o < < - Z coW LU L) Hi ON Q o � O z � Qoo q — M U z / � � o � N m woz Jo =o = W W oNF af ¢ zp �� �/ W (n �WCD U Q ^ _ ~ lwzz � W Cn °�� 0 ` nd l"lz oe.9 D3A V5 lSVI MOL8KK 1N3I13AVd\�V3N3\VlO\S1181KK3\DWJ\S31V100 131n-Ddtl-ZDl9L9 - 3WVN O NdZ �a IZDZ/Ll/a 3NVI 'A3&m AB03Li(ld m N 01 w u O Q Z q a Mz Tay �a C?0 w z s W Z yF a �_ aCD OOP = °� L w > U W '0 1 S w / X W o F / cwi�w~ LU ��Ow Z W w0 Z S w ¢gig C� ���� O o W !2 my ou~i L u / Q w / / Z_ J / / / LU X CDLL c~i) o J LLI � m ' Z J nS Z Z a g ' U M (If 0 w L) Z 0) a I rn U U www w -iwz O 0 O O O O O I I Q Z O O O O O Q O a = a z I I - 1 J Ch \ u Q U N \\ \ w � Jo \ \ \ z �zcn ~ \ U w a z !!nn \ \ � O ? 0 V \ \ U) 0 � 0 Q \ \ \ LLJWU) z \ \ \\ co w N \\ y \ � \ \ Z LLI < � �\ \\ Qo NN W � J� �� \ V) L.I. Q wUNQ2� 0 O ~ \ D \ \ as U) ~ F- Z 0 \ \ ' 0 W F- \ \ _j � z \ � M Y m\ \\ mO W \ < \ U m � / NORTH = W W 0NI- N M X = ofZZ W U) °�ICL) Rd 114 IZDZ/®l/9 03AVS 1SY7 DMO'1181KK3 Ntl015\NOAV30N3\V10\51181HX3\OV0\531V1100 AMLn—Ddu—ZOISDBL90\iiAil 9,N 3WVN DMO Rd DC4 IZDZ/91/8 3NVI''A3dwi AS 03JI(ld N Ol LL ,9 z � Z a m Z MATCH LINE SHEET 3 ,J a g a �r W WZw L Z r a 3:_ a� c� Oo� = w �� woo ^ LU �cn zMO 0 ❑_LuZ� � N z r XLoW ` wu LU 0 wLu Wy ,o �� Z w� 0 Lu � O 2am LU w M°z a rr Opp I 2 (D � w acn I i z } NQ z I I o °zo W o O> a Q � w J W co \ \ I wLLJ I Ln z z �❑ ❑ z❑ a❑ J ° =❑ I � O O z CO U) U W W W W J W❑ O O O O O a a a a ❑ a a a a a = a co � CD I Um I II Ln L-' O u LI U Q of Ln z z p U- F- - I I — I ° per `nLn :z LLJ z IC I Quo z W N I U„ Ln ? W a X O u r^ L,J Y I \ V � L,1 L.w a z LU I \ Z J p] Q of I I I o z W Ln I �N Q LU I I z I U � I z Q CD UJI L w I ao cE W � UJ � I w Of �'� O Q I U wMU) aU I I ° < OC� _LO r^ C� � QCD W coCD Q VJ O CD � pz Q I Z � � � p C90 U J J z > I w W J J p W CO W Q � JOO LL uJ cn I Uz > � O W I N U M = W W oa' N M W (1) - w o 6 133HS 3NIl HClbW Lu Cn J O?v Rd*14 IZOZ/91/9 03AVS 1SVl OMO'11swu Ntl01S\NoAV30N3\V!0\S1191KK3\OV3\S3;1Vll00 4mn—OdN—ZO1909L90\1IA10—Au\:N 3NVN OMO Rd OF;I IZOZ/9I/9 3NVf'A3dtl01 A9 03L101d N Ol LL U ,4 z a m z o O of W H m LU z LU L Z c� Ooo, = w �LU >LLI LU co it �Un Q w U 0 / � 1 S W LU u x LU af w �frC, z C W�3 G S W LITSEY ROAD 0 '0¢ z A VARIABLE WIDTH R.O.W. _ x w O 3 I 3�. w m = w ZuiLU 14 1 0-�S O m < U = z I I 2 0, O O a z o o U Lo Ln C`N7 W N 0 0 0 LU z U w w w w -j w Of o o co I m ti w cn cn U) Q cn ~ zC� H m o U O O O O O � LU cn uj Cy) U I I WNp 0 0 0 OQ O oLo OOp I OO a a a a = a z a Q z 0 I I c zoo - I-- I I zz � - Lo d' Y z LUI o II LLf) CDu o U WLUro � Lu LU O d Z ll_ u u tz I o I In I W — V 1 o z 1 0 Lv N Q Z w Li 2 rn Z Q ro LLICD W JO G Q o; c) LU CO Np N O Q L'i / p Z U O �� J O d U a o co a U) O Q� Z Z 0 1 V / r M LU LL W u) / 1-- 0 W / co NORTH = LwLJ U o�M —/, (6� x _ of /W Cn °zC) Rd*14 IZOZ/91/9 03AVS 1SVl 0M0'1199OC3 Ntl01S\NoAV30N3\V!0\S1199DC3\OW3\S3;1Vll00 4mn-OdN-Z01909L90\1IA10-Au\:N 3NVN OMO Rd OF;I IZOZ/9I/9 3NVf'A3d801 A9 03L101d N LL lC�Q �Z a m Z o m O N F m CL Z w L Z LQ y ao� C � aCD S p o U) = F cU Lu CE LU W F N W 0 X U)yJ wm�� ^ ~X coo =w a OX W ��ofr w LZE 6 z =��a Z ¢ < ` U F � zQ o w i �U�Cl) = O Q CM LO G9 W ' U N p / O / Qz0 / aQ U) / z z / X m _0 _ 1 / Z ::) LU W ~ o U c� = I N � CO a a a I U Z a CO a a w w 'W LLI � U 0-1Q I zoo az0 — En Q ❑ 2 ~ ~ I z ui w O I J LO o WN N wN m ti H N W W oo CD I Y Lf w I = Z � z � a I LO LO Q � U) I I o I W ag Z = wz a I I p l En � C7 z — �O a I W v~i U O I_I_I W W � W J C� i w Q o w Cn w O M'02i HiGIM 3�9HIH A V U clvo�j A�I Sl I l jC/) M W — — _ Hi ON 1— 06 O W CO = W W/) pN� W � �NM O LU X = (ifzZ W V) U) Nd Lf:l IZOZ/91/9 034V919V1 0M0'1I81HX3 1H011 133815\80AV30N3\V!0\SLIBIHX3\M\530VllW A3sin-Od8-Z01909L90\,mID Mld\:X 3NVN OMO Nd Of:9 IZDZ/Ll/9 3XVf'A3d801 A9 031101d N £1�3HS 3NI� HOlb'W �o _ Tz a mz o m O wzw 15 s1 a �� O = No � 0� = W 0W c� of > rr ^ �a 0 2 W Lu U- U � >> ��� z � LU ° ¢ a I > V oQ z o 0 w M CD a H I O vo U Q o ❑ I I< fl coo LUwoo ❑ I Qz > U I li ILO Lu I� I0-1 QI I m Ln I J I� m o z w I� 0 � z } O Cq w O Ion � U _jw co co uwi N a s ° Q Q a a a ti I - � Ca O O O zI? I � I oC? IL IL CL wC � I I I a � � CD � z 0') z ❑ J Q z ° I � ¢ a > - � I C) z o iz w O I I uj W w Qm co I N� z = co O �zm Iw W ti oI C W w < N Qz & a ° � Q Wo p o O CnW ¢ w Z ° Oz Q U o U)z COCH� U) U- w Q �,y � 06O � W N U mz � M 6 133HS 3W HOlbW = �I� w 0C) X �J Na_ = ofzz W (� Cn 71 Md Lf:l IZOZ/91/9 034V9 1SVl DMO'1I81HX3 1HDIl 133815\80AV30N3\V!0\SLIBIHX3\OVO\530VllW A3sin-Od8-Z01909L90\,mID Mld\:X 3NVN OMO Nd Of:9 IZDZ/Ll/9 3XVf'A3d801 A9 031101d N 9 LL n O �z a Mz W W/ L ~ oo�Wz z � a .. � � aCD \ / \ J y _ LU CD lu WVJ \ \ W K�� ^ to =X U� \ W Q x W C O Lu \ J W Ha'u~j LLJ Z 79 w�2 0 LLLU \ aUN acd z t: \ J o 0 'T0 W MEDLLW \\ \ \ zU CO ) —,i \ \ \ \\ z L) \ J \ O 2 U N a F- J CD F- p J \ \ 0 W p a - � � \ Z LU W zwov LLJW � \ o U) W () N Q = Q \ p p p z0 � „� \ o 0 0 Cl) 0 \ / a a a � > a a a Wca � \ J z � � y � CD w NO J a s 1 I M 6) / I m . z� � ❑o/ I 0 G I Q 0 0 I � � I T wN z � � I I � W (� ui� c� Z � z 0 I W Q � a ? o ' <p Z = z I C)o W J W / � W CD 0 o O� W ~ / WLu U / OfWr, � � Y o < < - (� U� co W � � � E � Hl�ION W / z � Qoo ~ � � U LU z� a � z � d m (n F-wo J � � — zW W oN� 0 0 (7 W U)z > O U x — _ � �z z W (n (n °�L) ` Rd Lf l D:OL/Bl/B 03tVS iw OMO'119HX3 1Fpll 133iLLS\EgAV30N3\VlO\SLIBIKK3\OVJ\530V11W A351n- DMO Odtl-Z01908L90�1N1�-M1d��N 31WN OMO Nd Of;4 IZDZ/LV9 3NVf'A3dMD1 AB 031101d SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project hem information Bidders Proposal Bidlist Description Specification Section No. Unit ofMeasure Bid Quantity Unit Pnce Bid Value Item No UNIT I:WATER IMPROVEMENTS 1 3305.0101 Fire Hydrant Stem Extension 3305 14 EA 1 $ 4,420.00 $4,420.00 2 3305.0109 Trench Safety 3305 10 LF 2923 $ 1.00 $2,923.00 3 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 4.5 $ 968.00 $4,356.00 4 3311.0131 6"PVC Water Pipe 33 11 12 LF 102 $ 27.00 $2,754.00 5 3311.0251 8"PVC Water Pie 33 11 12 LF 2525 $ 35.00 $88,375.00 5 3311.0264 8"PVC Water Pipe,CLSM Backfill 33 11 12 LF 110 $ 96.50 $10,615.00 7 3311.0461 12"PVC Water Pipe 33 11 12 LF 171 $ 48.00 $8,208.00 8 3311.0467 12"PVC Water Pipe,CLSM Backfill 33 11 12 LF 15 $ 104.00 $1,560.00 9 3312.0001 Fire Hydrant 331240 EA 2 $ 4,180.00 $8,360.00 10 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 2 $ 847.00 $1,694.00 11 3312.2103 1 1/2"Water Service 33 12 10 EA 4 $ 2,300.00 $9,200.00 12 3312.2203 2"Water Service 33 12 10 EA 4 $ 2,900.00 $11,600.00 13 3312.2802 4"Water Meter and Vault 33 12 11 EA 2 $ 11,800.00 $23,600.00 14 3312.3002 6"Gate Valve 33 12 20 EA 3 $ 1,050.00 $3,150.00 15 3312.3203 8"Gate Valve 33 12 20 EA 6 $ 1,400.00 $8,400.00 16 3312.3005 12"Gate Valve 33 12 20 EA 2 $ 2,200.00 $4,400.00 TOTAL UNIT I:WATER IMPROVEMENTS $193,615.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43_Bid Proposal_DAP.As SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application UNIT II:SANITARY SEWER IMPROVEMENTS 1 0241.2015 Remove 12"Sewer Line 0241 14 LF 1400 $ 25.00 $35,000.00 2 0241.2201 Remove 4'Sewer Manhole 0241 14 EA 2 $ 800.00 $1,600.00 3 0330.0001 Concrete Encase Sewer Pipe 03 30 00 CY 2 $ 280.00 $560.00 4 3201.0656 Conc Pvmt Repair,HES,Arterial/Industrial 3201 29 SY 201 $ 410.80 $82,570.80 5 3301.0001 Pre-CCTV Inspection 33 01 31 LF 1400 $ 1.00 $1,400.00 6 3301.0002 Post-CCTV Inspection 3301 31 LF 2706 $ 1.00 $2,706.00 7 3301.0101 Manhole Vacuum Testing 33 01 30 EA 13 $ 100.00 $1,300.00 8 3305.0106 Manhole Adjustment,Major 33 05 14 EA 1 $ 9,194.00 $9,194.00 9 3305.0109 Trench Safety 33 05 10 LF 2770 $ 1.00 $2,770.00 10 3305.0112 Concrete Collar 3305 17 EA 5 $ 500.00 $2,500.00 11 3331.3101 4"Sewer Service 3331 50 EA 4 $ 1,096.00 $4,384.00 12 3331.3201 6"Sewer Service 3331 50 EA 1 $ 1,300.00 $1,300.00 13 3331.4115 8"Sewer Pie 33 11 10,3331 12,3331 20 LF 68 $ 36.00 $2,448.00 14 3331.4201 10"Sewer Pipe 33 11 10,3331 12,3331 20 LF 1135 $ 41.00 $46,535.00 15 3331.4208 12"Sewer Pipe 33 11 10,3331 12,3331 20 LF 1178 $ 17.00 $20,026.00 16 3331.4209 12"Sewer Pipe,CSS Back-fill 33 11 10,3331 12,3331 20 LF 45 $ 103.00 $4,635.00 17 3331.4215 15"Sewer Pie 33 11 10,3331 12,3331 20 LF 324 $ 84.75 $27,459.00 18 3331.4216 15"Sewer Pipe,CSS Back-fill 33 11 10,3331 12,3331 20 LF 20 $ 140.95 $2,819.00 19 3339.0001 Epoxy Manhole Liner 33 39 60 VF 232 $ 195.00 $45,240.00 20 3339.1001 4'Manhole 33 39 10,33 39 20 EA 13 $ 2,630.00 $34,190.00 21 13339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 89.5 $ 200.00 $17,900.00 21 19999.0001 Connect to Ex.Sewer Manhole 00 0000 EA 2 $ 2,000.00 $4,000.00 TOTAL UNIT II:SANITARY SEWER IMPRQVEMENTSI $350,536.80 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43_Bid Proposal_DAP.As SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application UNIT III:DRAINAGE IMPROVEMENTS 1 0241.3013 Remove 18"Storm Line 0241 14 LF 51 $ 47.50 $2,422.50 2 0241.4401 Remove Headwall/SET 024114 EA 2 $ 500.00 $1,000.00 3 3137.0101 Concrete Riprap 31 3700 SY 240 $ 60.00 $14,400.00 4 3305.0109 Trench Safety 33 05 10 LF 1969 $ 1.00 $1,969.00 5 3341.0201 21"RCP,Class III 3341 10 LF 397 $ 59.00 $23,423.00 6 3341.0205 24"RCP,Class III 3341 10 LF 120 $ 63.00 $7,560.00 7 3341.0302 30"RCP,Class III 3341 10 LF 562 $ 79.00 $44,398.00 8 3341.0402 42"RCP,Class III 3341 10 LF 459 $ 132.00 $60,588.00 9 3341.0409 48"RCP,Class III 3341 10 LF 431 $ 155.00 $66,805.00 10 3349.4107 30"SET,1 pipe 33 49 40 EA 2 $ 7,000.00 $14,000.00 11 3349.4111 42"SET,1 pipe 33 49 40 EA 3 $ 8,100.00 $24,300.00 12 3349.5002 15'Curb Inlet 3349 20 EA 5 $ 5,900.00 $29,500.00 13 3349.5003 20'Curb Inlet 3349 20 EA 1 $ 9,600.00 $9,600.00 14 3349.7001 4'Drop Inlet 3349 20 EA 3 $ 6,100.00 $18,300.00 15 3341.0205 24"RCP,Class III 3341 10 LF 120 $ 63.00 $7,560.00 16 3341.0201 21"RCP,Class III 3341 10 LF 397 $ 59.00 $23,423.00 17 3305.0109 Trench Safety 33 05 10 LF 2525 $ 1.00 $2,525.00 18 3137.0101 Concrete Riprap 31 3700 SY 240 $ 60.00 $14,400.00 19 3349.0002 5'Storm Junction Box 3349 10 EA 4 $ 6,500.00 $26,000.00 20 9999.0002 Remove 6'x4'Storm Culvert 00 00 00 EA 1 $ 1,800.00 $1,800.00 21 19999.0003 Connect to Ex.Storm RCP 00 00 00 EA 3 $ 1,750.00 $5,250.00 22 19999.0004 Connect to Ex.Junction Box 00 0000 EA 1 $ 2,625.00 $2,625.00 TOTAL UNIT III:DRAINAGE IMPROVEMENTS1 $401,848.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43_Bid Proposal_DAP.xls SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application UNIT IV:PAVING IMPROVEMENTS 1 0241.0100 Remove Sidewalk 0241 13 SF 48 $ 1.00 $48.00 2 0241.0500 Remove Fence 0241 13 LF 1304 $ 1.00 $1,304.00 3 0241.1000 Remove Conc Pvmt 0241 15 SY 160 $ 7.00 $1,120.00 4 0241.1100 Remove Asphalt Pvmt 0241 15 SY 545 $ 5.00 $2,725.00 5 3211.0501 6"Lime Treatment 32 11 29 SY 9282 $ 3.00 $27,846.00 6 3213.0102 7"Conc Pvmt 32 13 13 SY 9282 $ 38.00 $352,716.00 7 3213.0301 4"Conc Sidewalk 32 13 20 SF 23731 $ 5.88 $139,538.28 8 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 14 $ 2,350.00 $32,900.00 9 3217.0002 4"SLD Pvmt Markin HAS Y 32 1723 LF 4652 $ 4.48 $20,840.96 10 3217.0501 24"SLD Pvmt Marking HAE(W) 32 1723 LF 72 $ 13.00 $936.00 11 3292.0100 Block Sod Placement 3292 13 SY 2722 $ 8.00 $21,776.00 12 9999.0006 Remove Gravel Pavement 0000 00 SY 2573 $ 1.00 $2,573.00 TOTAL UNIT IV:PAVING IMPROVEMENTS $604,323.24 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43_Bid Proposal_DAP.As SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application UNIT V:STREET LIGHTING IMPROVEMENTS 1 2605.0111 Furnish/Install Elec Sery Pedestal 25 05 00 EA 1 $ 1,173.94 $1,173.94 2 2605.3014 2"CONDT RM(Riser) 26 05 33 LF 20 $ 8.20 $164.00 3 2605.3015 2"CONDT PVC SCH 80(T) 26 05 33 LF 4928 $ 1.15 $5,667.20 4 3441.1502 Ground Box Type B,w/A ron 3441 10 EA 21 $ 210.00 $4,410.00 5 3441.1646 Furnish/Install Type 33B Arm 3441 20 EA 15 $ 556.00 $8,340.00 6 3441.3201 LED Lighting Fixture 3441 20 EA 15 $ 1,100.00 $16,500.00 7 3441.3301 Rdwy Ilium Foundation TY 1,2,and 4 3441 20 EA 15 $ 850.00 $12,750.00 8 3441.3351 Furnish/Install Rdway Ilium TY 11 Pole 3441 20 t EA 15 $ 3,100.00 $46,500.00 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS1 $95,505.14 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version May 22,2019 00 42 43_Bid Proposal_DAP.As SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Bid Suan—ey UNIT I:WATER IMPROVEMENTS $193,615.00 UNIT II:SANITARY SEWER IMPROVEMENTS $350,536.80 UNIT III:DRAINAGE IMPROVEMENTS $401,848.50 UNIT IV:PAVING IMPROVEMENTS $604,323.24 UNIT V:STREET LIGHTING IMPROVEMENTS $95,505.14 Total Construction Bid $1,646,828.68 This Bid is submitted by the entity named below: ! ` BIDDER: BY: Ridgemon Commercial Construction 1520 W Walnut Dill Lane Irving,TX 75038 TITLE: \ Contact:Brendan Kenny-214-492-8900 DATE: 6/1 8/21 Contractor agrees to cmnplete WORK lot FINAL ACCEPTANCE within 150 wmidng days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Farm Version May 22,2019 00 42 43_Bid Proposal_DAP.As