Loading...
HomeMy WebLinkAboutContract 48760-FP3 City Secretary 48760 FP3 Contract No. FORTWORTH. Date Received Aug 30,2021 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Harley Ave & Trail Drive City Project No.: 100570 Improvement Type(s): ❑x Paving ❑x Drainage ❑x Street Lights ❑ Traffic Signals Original Contract Price: $1,491,695.05 Amount of Approved Change Order(s): $618,245.62 Revised Contract Amount: $2,109,940.67 Total Cost of Work Complete: $2,109,940.67 Tulle Hachanan Aug 24,2021 Julie Buchanan(Aue 24.202114:19 rr)T` Contractor Date Project Manager Title Scott Dennett Construction, LC Company Name as Aug 24,2021 -19WRry1-1 man(Aug 24,202115:59 CDT) Project Inspector Date EhRL �.'15 Aug 24,2021 KM laafari P F �Aug 24,7021 1 R 54 C'117) Project Manager ,,c Date C-m-y Rabe-rt-r ys 6�`! �aytie-M. Aug 27,2021 CFA Manager Date Dana E",r doAc Aug8 2021 Dana Burghdolf ug 28,202113:35 CDT) g Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Notice of Project Completion Project Name: Harley Ave & Trail Drive City Project No.: 100570 City's Attachments Final Pay Estimate ❑x Change Order(s): M Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid I Consent of Surety Statement of Contract Time Contract Time: 1001 CD Days Charged: 1243 Work Start Date: enter a date.03/13/2017 Work Complete Date: 8/6/2020 Page 2of2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name HARLEY AVE&TRAIL DRIVE Contract Limits Project Type STORM DRAIN&PAVING City Project Numbers 100570 DOE Number 0570 Estimate Number 1 Payment Number I For Period Ending 8/6/2020 CD City Secretary Contract Number Contract Time 100(ED Contract Date Days Charged to Date 1243 Project Manager NA Contract is 100.00 Complete Contractor SCOTT DENNETT CONSTRUCTION,INC. 2808 W.7TH ST.,#B FORT WORTH, TX 76107 Inspectors CORDOVA/ HICKMAN Tuesday,August 17,2021 Page 1 of 7 City Project Numbers 100570 DOE Number 0570 Contract Name HARLEY AVE&TRAIL DRIVE Estimate Number I Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 8/6/2020 Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- I REMOVE 10'CURB INLET 2 EA $1,207.72 $2,415.44 2 $2,415.44 2 EXPLORATORY EXCAVATION OF EXISTING 5 EA $2,903.17 $14,515.85 5 $14,515.85 UTILITIES(CO 8) 3 TRENCH SAFETY(CO 91,2) 520 LF $10.03 $5,215,60 520 $5,215.60 4 21"RCP(CO#1) 37 LF $395.54 $14,634.98 37 $14,634.98 5 24"RCP(CO#1) 318 LF $131.37 $41,775.66 318 $41,775.66 6 30"RCP(CO#2) 165 LF $165.98 $27,386.70 165 $27,386.70 7 T STORM JUNCTION BOX 3 EA $9,165.88 $27,497.64 3 $27,497.64 8 10'CURB INLET 2 EA $6,901.41 $13,802.82 2 $13,802.82 9 T GRATE INLET 2 EA $8,637.50 $17,275.00 2 $17,275.00 10 OLDCASTLE PRECAST CATCH BASIN 2 EA $6,354.45 $12,708.90 2 $12,708.90 11 4'STACKED MANHOLE(CO#1) 2 EA $17,419.00 $34,838.00 2 $34,838.00 48 12"WATER LINE LOWERING(CO#2) 1 EA $24,493.66 $24,493.66 1 $24,493.66 12 MANHOLE ADJUSTMENT MAJOR W/COVER 1 EA $4,908.00 $4,908,00 1 $4,908.00 (CO#3) -------------------------------------- Sub-Total of Previous Unit $241,468.25 $241,468.25 PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 MOBILIZATION 1 LS $29,009.24 $29,009.24 1 $29,009.24 2 REMOVE SIDWALK(CO 1,3,5,9) 6455 SF $4.65 $30,015.75 6455 $30,015.75 3 REMOVE ADA RAMP(CO#8) 3 EA $1,219.33 $3,657.99 3 $3,657.99 4 REMOVE FENCE 381 LF $5.81 $2,213.61 381 $2,213.61 5 REMOVE CONC PVMT(CO#1,4,6,8) 1227 SY $5.81 $7,128.87 1227 $7,128.87 6 REMOVE ASPHALT PVMT(CO#6) 3049 SY $4.65 $14,177.85 3049 $14,177.85 7 REMOVE BRICK PVMT 129 SY $5.81 $749.49 129 $749A9 8 REMOVE CONC CURB&GUTTER(CO 1748 LF $5.81 $10,155.88 1748 $10,155.88 #1,3,4,5,6,9) 9 REMOVE AND TRANSPLANT 2"TREE(CO#1) 3 EA $603.86 $1,811.58 3 $1,811.58 10 REMOVE AND TRANSPLANT 3"TREE(CO 1,4) 7 EA $754.82 $5,283.74 7 $5,283.74 11 UNCLASSIFIED EXCAVATION BY PLAN 316 CY $182.14 $57,556.24 316 $57,556.24 Tuesday,August 17,2021 Page 2 of 7 City Project Numbers 100570 DOE Number 0570 Contract Name HARLEY AVE&TRAIL DRIVE Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 8/6/2020 Project Funding 12 SWPPP 1 LS $78,095.17 $78,095.17 1 $78,095.17 13 ASPHALT PVMT REPAIR SEWER SERVICE(CO 287 #I DELETE) 14 ASPHALT PVMT REPAIR WATER SERVICE(CO 143 1 DELETE) 15 ASPHALT PVMT REPAIR BEYOND DEFINED 287 SY $35.48 $10,182.76 287 $10,182.76 WIDTH(CO#1,2) 16 CONC PVMT REPAIR(CO#1,2) 143 SY $69.68 $9,964.24 143 $9,964.24 17 7"CONC PVMT(CO#9) -1 SY $60.39 ($60.39) -1 ($60.39) 18 10"CONC PVMT(CO 41,4,6,8,9,2) 4490 SY $75.48 $338,905.20 4490 $338,905.20 19 4"CONC SIDEWALK(CO 1,3,5,9) 8384 SF $7.55 $63,299.20 8384 $63,299.20 20 BARRIER FREE RAMP 2 EA $3,019.29 $6,038.58 2 $6,038.58 21 BARRIER FREE RAMP(CO#5) 2 EA $3,019.29 $6,038.58 2 $6,038.58 22 BARRIER FREE RAMP(CO#1) 6 EA $3,019.29 $18,115.74 6 $18,115.74 24 6"CONC CURB AND GUTTER(CO#1,4,6) 1264 LF $20.90 $26,417.60 1264 $26,417.60 25 4"SLD PVMT MARKING HAS 2343 LF $3.40 $7,966.20 2343 $7,966.20 26 4"BRKPVMT MARKING HAS 512 LF $4.59 $2,350.08 512 $2,350.08 27 8"SLD PVMT MARKING HAS 173 LF $10.57 $1,828.61 173 $1,828.61 28 8"SLD PVMT MARKING TAPE 332 LF $10.47 $3,476.04 332 $3,476.04 29 24"SLD PVMT MARKING HAE 52 LF $36.85 $1,916.20 52 $1,916.20 30 LANE LEGEND ARROW 1 EA $487.73 $487.73 1 $487.73 31 LANE LEGEND ONLY 2 EA $381.48 $762.96 2 $762.96 32 REFL RAISED MARKER I 1 EA $18.69 $205.59 11 $205.59 33 REFL RAISED MARKER 31 EA $11.87 $367.97 31 $367.97 34 REMOVE 4"PVMT MARKING 1286 LF $1.25 $1,607.50 1286 $1,607.50 35 REMOVE 8"PVMT MARKING 213 LF $2.87 $611.31 213 $611.31 36 REMOVE 24"PVMT MARKING 12 LF $15.48 $185.76 12 $185.76 37 REMOVE LANE LEGEND ARROW I EA $174.19 $174.19 1 $174.19 38 PLANT 3"TREE(CO#9) 3 EA $2,090.28 $6,270.84 3 $6,270.84 39 FURNISH/INSTALL ALUM SIGN MAST ARM 8 EA $1,161.27 $9,290.16 8 $9,290.16 MOUNT 40 FURNISHANSTALL ALUM SIGN GROUND 2 EA $1,161.27 $2,322.54 2 $2,322.54 MOUNT CITY 41 TRAFFIC CONTROL(CO#9) 17 MO $5,748.27 $97,720.59 17 $97,720.59 42 4"TALL 12"WODE ROLLOVER CURB 289 LF $34.84 $10,068.76 289 $10,068.76 43 LANDSCAPE&IRRIGATION(CO#4) 1.141685 LS $50,097.03 $57,195.03 1.141685 $57,195.03 Tuesday,August 17,2021 Page 3 of 7 City Project Numbers 100570 DOE Number 0570 Contract Name HARLEY AVE&TRAIL DRIVE Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 8/6/2020 Project Funding 44 TREE PROTECTION(CO#1,4) 20 EA $487.73 $9,754.60 20 $9,754.60 45 REMOVABLE BOLLARDS(CO#4,9) 3 EA $1,851.26 $5,553.78 3 $5,553.78 46 CUSTOM BRICK PAVERS TYPE 1-ANTIQUE 391 SY $136.38 $53,324.58 391 $53,324.58 RED(CO 2,6) 47 CUSTOME BRICK PAVERS TYPE 1I(CO#2,6) 93 SY $136.38 $12,683.34 93 $12,683.34 48 INSTALL CUSTOM BRICK PAVERS TYPE I 1614 SY $93.74 $151,296.36 1614 $151,296.36 ANTIQUE RED ON EX CONC(CO#6) 49 INSTALL CUSTOM BRICK PAVERS TYPE II 249 SY $93.74 $23,341.26 249 $23,341.26 CHARCOAL ON EX.CONC.(CO 6) 50 REMOVE BRICK PVMT(CO#6) 251 SY $23.43 $5,880.93 251 $5,880.93 51 EXISTING BRICK PAVER AND MARTAR 1906 SY $18.43 $35,127.58 1906 $35,127.58 REMOVED(CO#6&9) 52 1"SURFACE MILLLING(CO 47) 1863 SY $32.85 $61,199.55 1863 $61,199.55 52 6"FLEXIBLE BASE TYPE A GR-1(CO 8) 512 SY $46.07 $23,587.84 512 $23,587.84 53 BARRIER FREE RAMP TYPE H(CO#8) 1 EA $38,227.00 $38,227.00 1 $38,227.00 54 IRRIGATION REPAIRS(CO#8) 1 LS $34,891.00 $34,891.00 1 $34,891.00 56 INSTALL CUSTOME BRICK PAVERS TYPE I 43 SY $176,80 $7,602.40 43 $7,602.40 ANTIQUE RED RUNNING BOARD(CO#9) 57 RE-WORK AT SIDEWALK(CO#9) 1 LS $4,885.91 $4,885.91 1 $4,885.91 58 ADDITIONAL IRRIGATION GERDY MEDIAN 1 LS $846.15 $846.15 1 $846.15 (CO#9) 59 ADDITIONAL LANDSCAPE&IRRIGATION 1 LS $12,664.01 $12,664.01 1 $12,664.01 HARLEY(CO#9) 60 HMAC PAVEMENT&LEVE UP HARLEY(CO#9) 15 TN $382.07 $5,731.05 15 $5,731.05 -------------------------------------- Sub-Total of Previous Unit $1,410,162.32 $1,410,162.32 STREET LIGHT Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 2"CONDT PVC SCH 80(CO 1,2,3) 935 LF $16.00 $14,960.00 935 $14,960.00 4 NO 4 INSULATED ELEC CONDR(CO 1,2) 14520 LF $3.61 $52,417.20 14520 $52,417.20 5 NO 10 BARE ELEC CONDR(CO 1,2) 7260 LF $0.95 $6,897.00 7260 $6,897.00 6 GROUND BOX TYPE B W/APRON(CO#1) 9 EA $779.35 $7,014.15 9 $7,014.15 7 FURNISH/INSTALL TYPE 33BARM 3 EA $4,107.40 $12,322.20 3 $12,322.20 8 FURNISHANSTALL 120-240 VOLT SINGLE 1 EA $7,655.07 $7,655.07 1 $7,655.07 PHASE 9 FURNISHANSTALL 10'44'WASHINGTON 8 EA $7,473.04 $59,784.32 8 $59,784.32 STANDARD Tuesday,August 17,2021 Page 4 of 7 City Project Numbers 100570 DOE Number 0570 Contract Name HARLEY AVE&TRAIL DRIVE Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 8/6/2020 Project Funding 10 FURNISHANSTALL LED LIGHTING FIXTURE 3 EA $5,608.92 $16,826.76 3 $16,826.76 11 FURNISHANSTALL LED LIGHTING FIXTURE 8 EA $4,957.16 $39,657.28 8 $39,657.28 12 RDWY ILLUM FOUNDATION 3 EA $2,389.11 $7,167.33 3 $7,167.33 13 RDWY ILLUM FOUNDATION(CO#1) 15 EA $2,389.02 $35,835.30 15 $35,835.30 14 FURNISH/INSTALL RDWY ILLUM 3 EA $4,107.40 $12,322.20 3 $12,322.20 15 6-6-6 TRIPLEX ALUM ELEC CONDUCTOR(CO 495 LF $14.50 $7,177.50 495 $7,177.50 1,3) 16 250-250-3/0 TRIPLEX ALUM ELEC 690 LF $28.02 $19,333.80 690 $19,333.80 CONDUCTOR(CO#1) 17 RECONNECT CONDUCTOR(CO#1) 36 EA $2,019.23 $72,692.28 36 $72,692.28 18 RELOCATE STREET LIGHT POLE(CO#1) 7 EA $3,407.59 $23,853.13 7 $23,853.13 19 RELOCATE 120/240V SINGLE PHASE PAD I EA $1,078.82 $1,078.82 1 $1,078.82 MOUNT 20 3"CONDT RM(RISER)(CO#1) 60 LF $25.55 $1,533.00 60 $1,533.00 21 3"CONDT PVC SC#80(CT)(CO 1,2) 530 LF $18.58 $9,847.40 530 $9,847.40 22 SALVAGE STREET LIGHT POLE(CO#1) 2 EA $580.63 $1,161.26 2 $1,161.26 23 3"CONDT PVC SCH 80(B)(CO#2) 240 LF $23.23 $5,575.20 240 $5,575.20 24 4"CONDT PVC SCH 80(T)(CO#5,9) 1059 LF $17.25 $18,267.75 1059 $18,267.75 25 1 1/4"CONDT PVC SCH 90(T)(CO#9) 137 LF $15.95 $2,185.15 137 $2,185.15 26 4"CONDT PVC SCH 80(B)(CO#9) 196 LF $38.50 $7,546.00 196 $7,546.00 27 CONDUrr BOX(CO#9) 2 EA $5,000.00 $10,000.00 2 $10,000.00 24* 5"CONDT PVC SCH 80(T)(CO#9) 320 LF $16.25 $5,200.00 320 $5,200.00 --------------- - ---------------------- Sub-Total of Previous Unit $458,310.10 $458,310.10 - --- - ---------------------- Tuesday,August 17,2021 Page 5 of 7 City Project Numbers 100570 DOE Number 0570 Contract Name HARLEY AVE&TRAIL DRIVE Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 8/6/2020 Project Funding Contract Information Summary Original Contract Amount $1,491,695.05 Change Orders Change Order Number 1 ($14,990.41) Change Order Number 2 $38,134.90 Change Order Number 3 $7,047.15 Change Order Number 4 $52,010.56 Change Order Number 5 $9,391.67 Change Order Number 6 $277,043.73 Change Order Number 7 $61,199.55 Change Order Number 8 $124,576.50 Change Order Number 9 $63,831.97 Total Contract Price $2,109,940.67 Total Cost of Work Completed $2,109,940.67 Less %Retained $0.00 Net Earned $2,109,940.67 Earned This Period $2,109,940.67 Retainage This Period $0.00 Less Liquidated Damages Days @ /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $2,109,940.67 Tuesday,August 17,2021 Page 6 of 7 City Project Numbers 100570 DOE Number 0570 Contract Name HARLEY AVE&TRAIL DRIVE Estimate Number I Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 8/6/2020 Project Funding Project Manager NA City Secretary Contract Number Inspectors CORDOVA / HICKMAN Contract Date Contractor SCOTT DENNETT CONSTRUCTION,INC. Contract Time 1001 CD 2808 W.7TH ST.,#B Days Charged to Date 1243 CD FORT WORTH, TX 76107 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded ------ ---- ---------------------------- Total Cost of Work Completed $2,109,940.67 Less %Retained $0.00 Net Earned $2,109,940.67 Earned This Period $2,109,940.67 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $2,109,940.67 Tuesday,August 17,2021 Page 7 of 7 §) kt GS; Qg § q -0 2 m j x g) { o.. a 2) ^ / j§ % G m ; ® § m m m - mj , @ §§ G a S © k i q§ §§ >2 } / /§ >§ § ` ` /] > /§ o [ . S S k) ( { $ / ) m > 2 w § 2 . p o I a m e / ± o \ v \ § § ( . CD m > .. m $ ; 7 \ \ \ \ m \ } \ a « \ o ij < \o 4 R \ $ 2 > co o / \ # 0 ) E § \ \ / ( � � ® \ § { { ¢ + o 00 § ƒ \ g \ § w 0 3 0 © § n \ - � k \ co co / [} \ 5 m $ o \ ) § 2 g § » 2 ) § § ou d d m | � q2 { / § )y � Z \ 2 a k § k § $ -E - ^ F © !o ) S cD \2 . en a o 0 < c (o o w n a m o m 0 - N m O H n m v .Oi NN.. N .� r yy NN _ Z •D-i .. "C a i N O 00 J 0] VI W Ol UI A W N = A A N (O Dl O> Ut A W O l0 W N N M _m m W 3 O p ;t m ul a 0 W N N W W W W W W W W W N N (D W W W W W W W W W 0 0 0 W W W W W W W W n S A 01 al A -Cl A A A A A A ��aa a)O (p j N N N N N -�N N N WC) �00 j A j j j j A 00 c0 -+000o C) VI Ut N V1 (D 0I W W W O (O UI N N N N O G1 W W W W W W W W f+l 00000000000-+CD O O O O O NIJ Ut o 0 N A A A W N A A A 0 o O W W O)N W O N N w N N 7 O N N O O O O O 0 0 0 0 0 0 0�O V t UI O O O O O O O O O 0 0 0 0 •1 N A N j W W N Ul V Ut m Ul Ut Ol Ul O]-+ O V O)O O O A UI--�co A A W(O m F � N O O O � 01 W Nrn�> V Nv<� N j A W D ., UITHT J N W W n Zni O G 3 (i1 �T1 ((ii11 ((7711 �(TT11 ((ii1� D(TTI� ��TT11 N D 'm T D T ril A D T Fn T ' F rr 'm I D T D 'mn -C { -( T T D D T { T D T m T D T y T Z -i 0 9 S lv N (n O� D W Np ,9(7 N N (Jj S S Q N (n W O n O z z Z 0)N 'D N w a 3 3 N N OD'o (moo o � 0��00 O� 3 :; 0 m o � ANC �� ca dZpv0 (D Wo> >ZZ -�n -n m33mw A3 � (n? :� -<'N m cp Z D 3 x 3 o w c c -' m n m o ° a n t7 0 3 v A m m qp Ul(o o D 'O x c T x m w v '0 (�m o n m o .� o m o o(7 cni m o o m 'D 3 c maann oaw (n0 - avw@vnOO n- � cuw o C m, m to v 3 0: D O w voi n a n n d m m A r(n r o 3 a c mmul(n o a m m� m n c o m m li w o m m o m m O O a- F < CD 1 0 -- o O n n = _ 4�'�d 3 m m ? Q' < uNi vi ro a' 0•m 1 m o d m o o-o{Do o O M CDn CD c a m W N G)3 � ro cn c ro O n J 7 n n v (o m o (D C. a a ni O D D 0 r r r r En 'En Ln��W N Hi G9 N V�69 69 1fl A� Ut W yi v)U)E(i�1 69 EA bf ffl Ui W N(H�� Z O)M N A m A W O W W N Ol 1 O� CVJI(OD UI V V(VIN O Ut N A j j(D V W O N W Ln co (Nll V N O O Ul AW w w' W W W W 0 co m W !O N f W (ND W N (O (D(D N m' 00 V W 0)O 01 m L� Vjl H3 fA 4fl In j Eli^ 69�� Eif 69 69 b� ro !fl fA N SN b� 1 t�f� Efl En j b9 j(fl Hi (�EA(f3 UI C*. W O W p N v O1 q W A 61 W 0,(W�W A UAI A A V O J O A W O v W V V to O OO w W o W N W? ?O -•W? W W W p W W V O W N(D W V O o O o Ol OJ O W DO W ..a(D (O V(D N (WJ1 0 Q N D IJ to O Vl v 0 Ul O N(J N O O CO Oo W Vi U1 W pl O Oo lD m Ul V(n W co O N W(p N O�• O(j r UI 0 0 0 O UI O O N Vl Vl 00 O A O Dl Ut N O O O A �Ol O O O --� O 0 W D fD N I i r ;u fn N � O o z N 0 N Zl O n D m m X z o w m m m c o O y O 7 ° m c " O m w a no o v D r 3 N 3 C y o r� o A y w O ' c m a m Gl a a o v� w °o u0 y ym < ? m Q O 0 Gm' Spoyj O ON �7 q G 6. ID Z3 O ° 0 b J m 0 x a 7 ` 3 w 5 0 p 10, L7 a �. `Z ° d 3 m ° ' 5 w G O 1 b � a o zr p o � `o' a a H _n o` o y ' zi J O fJ O ° tp O j 'O n t] N y Q C W O 0 0, 3 B _. a a a o c' n y 4 O ° p a m m = o y a m o a a o o' c O G I a 3 a o ti y m G ,'0 rn G �• a „ a .� w ro m j C n OO G C O D o m p o a a m ° 21, rn � w 3 q y C o O ` j a � S s a c rb c A j a o 3 Z In O O A n O° w i c 0 p j Q j 'C° n N tp y a N o' cn `o' o zi ti � e o ran 2 m n R, r o a U (� ° G 7 O O O 7. O j Ipi D 0 � w W y J C n O co c7 p Q m n chi o� m m c N 0 O O m' O 1 � w ' G J� w � O S y S n w d o r v w 10 _ƒ 0 $ £ 0 g § 2 ) 2 2 m > x g > o ; § m 0 ; 7 2 ? § ^ ) / 2 § 0 3 ) Q m a m m # m m w m / § 20 G 0/ )a /4 ° 2 § § /0 7 mm m \ » ` c (§ ( z> m m -i k --I ) S » o o(A )§ / $( { m > ° ° 0 0 § E 00 a w % ( ) ) \ § § E ¥ e o o m » ( ) ) \ § g ( } / / m n / \ \ \ \ \ \ / 0 \ \_ § \ 00 m : / ° > m m @ > � I 2 * 0 0 ) \ o [ {. G G z $ © 2 § { / § } e no 3 < m o / § \ 40 0 § ; ) / J } C)3 co j mj ° » 2 \ \ j / § § \ m6\ m§ § m _ ) k ) (/ � qz ED o m t Ej ® m | 10 / f e $ \ \ \ j / § d m § m « 7\ a§ � � n e J � I i o { < [Dn � o � c a 0 m Z o m' T D N O m O H Di No ;u m m O z _m m 3 w mo ID a m O o CD0 o � m o � F O C N o � b Z g O ] ] O O N N C. N O W W co W W W C.W -i 0) 3 3 n olm A m (a(O NON N ((��11 W W n n O O j � O (O co O O A O { o Z o a p o p cn(n. (n m io A w (n con ;.CD (Di o u a o a w w w o 0 0 0 0 0 0 0 0 'o O O j A 00 m N W O 7 N N O O O O O O 0 0 0 -1 m m (I( V N O co O N m --� N(O Ul m � ]. c o - e Pa �. j b C3 j. O U C A O (WO m V al ACL r� 0 0. p^ p o ti o 0 N- r r r r r (n W W W W W r r c t7 ] 0 ] 0 3 y c, b m` a Ccb C a cb 4 O 7 C N Cl a 0. p O C lc O a n j q i ] Q 1 ' raj b ] N >( K m� a O G cl p N G N C.) 'CD � .N.. O O O 3 S 3 W Q p Po n Z p n co j T N C O C O Q O p p 0.�, 3 v W N ZZ-� Z x o m a I rnn mm n O 0 m Q <<(D C)RP 0 m I a n �^ '�-U o a c)(0 'D n I F. f1l 3 m m =2 n S (D rD .. m = inm -0 o m o o Q o o D z ZT n c a- c m n m (0o j o rD H CL n � a F (D - m � � a - y � � 3 c m y O O O y � I N Q N(n to CY) 0 m m N(m0 (pwpn N p .0 Q W co -' O C.OD co m d0 W W '— co rn } n W Wo- A W m .A Ol V i W dm U A Co N V N V O V(O N Qmj V m pp N O(0 m w D ((.no o �' o o wm�onwim rn °�DONo"rn r I v v m N A m ro a 0 N N O Z -1 3 Cu m m m — m:I ¢ p o e ' o a` n o z co a ti S z m m� v < a 16 F ID I � a m I � n n D ti tDt y its � I a m z G � C o� a N_ 2 U o n N ul S v I N t0 N W A A 0 A m A 'U Z 71 (n 0 z m � (n F m D -1 D O ; a o � co zb � � z � mmm C —ziO r o " -( 0 0 0 —I V 'D O ^� A M v m A o 0 0 m -1 z 0 m00 a m m z .. m m --1-1 � o N zo > 0 -o 0I m i z dz a x z x �� 0 cZi A �D7 c a m a -4 0 1 0 0 a m z A z I CD o m0 TUl(D � X o o m NCD :4 y( J> O O W N 0 (p O c 9 O O in N J (D O In D m O O p (D O CD (DO w D L CD C o fail � � .D v o o w o n A 0 0 < -1 < a n c n o O �' d m 0 o t o v p N V - r J V J fP m " N o I? O D O ~ (D O O �' T 0 0 = (D m N < W Ln D 0 0 0 0 o (D D 0 0 � N ' � 0 0 n m �^ �^ A 7' r' W w w �' N N (D CD C -0 o o 3 O L. 0 m (o° n (DD n M m D 3 0 0 of o z o v D co w z 1p oNo a Gzl -A J m co N p~j p Vs ti J z W CD O 0 1D m w v 'W`{ n Zi NP �J �I O co ((DD { m no h' cn m A N < VI V1 " A O O O � y a 2 N 10 e m C) = 0 A z o m m NNN 00 pOppp N G 00 •♦ N 0 o O N 0 o v m � rt� r I x 0 N ooL4 N Dz �0 0 { N n -i T w (D 2 ® ( CL e ] 0 - k § / § � § \ g „ / / § m \ £ g _ 2 y m A - o ED z R E J q m q #LO °ƒ » R\ m %% » ® ? j = 1 1 a J / ( § ( ( { k . } [ . % K { { \ § G ; ƒ 0\ ) } . \ \( } o \ ® \ \ ) � Q ] ( } (D Cb_OL \ - ® m m m \ - \ z 2 > ; ( ( § 2 \ � / 2 { ) $ 1® § jZb \ r ! { S % ( a } \ \ \ t 0 > q A m o /® ; a z \ % } c n »/ f m t \ ; G 222 W \ ® ( @A /& ; \ ; \ 0 «[E ; d t » } e z = 0 2 10 > - ? . ) �(D / CL & ]m } \ \ \ \ �± ± �\ ( m ) \ %®- e & \ \ { /{/\ /\ j J m A 3O A " 0 � A Fo z m OC� % O -u ZO vZm ` m ja 5 m -D N oz 0 o --1 oO U D O n I o 0 Mai o D O O M Mm C4 D c) m n m m m -1 Z ao � m m cN ZZD = > 0co oz m m mt D I Z m m � 3 i o A O O m c z A -1 o o o m cn >< Z ID u < 41 N O) M N O O N 0 o o o W J O 4 y fD N c 00 CO p 'O NO O CD (n D 4 T 0 CD N N D O O C 41 A C IT! o o o n A zr C o o < -I C c (7 0 0 �. 0 o n V o 03 O J V - r V J . m " w o o p U O o CDD C) O l o o �. m m R m w anm 0 N N 0 C) D 9 0 p O O D 0 0 a �, D (n O w n ID o N A 0 0 u w N N K {� "^ o o 3 O � � I < m o m c� 0 0 o n D � -I o v O Z O n m y I co D co co i1 m N N c z (C) .r 90 N vui N -4 mn O 41 N O O p i O O � to 0 0 D � Z ,vNi in to N � D O O T 00 0o t' w m D -• �ii ut m N A w 0 0 N < o o O N V m 0 A g n m O 1 n 0 z O O -4N n -i V 6! O (D m § « , z § _ « ? _> § n 0 \ & kA2 »» 3 } 3 0 z ( / k co \ { }( - j 3 ( \ § ID { _ `o s ; ƒ /IQ rn « , 3 / ID \ ( z o s (/ { \ \ _ _ - $ \© )m \ { - Q © \ � CX ITITIrCo -n - g \ / (\ J CD \ G EIL � m � k q � & - ~_ ) ; m a w / ) � � 0 (ID 2 \ a \] PR/ oa R 76 � = 0C) G \ 2 ƒ � ƒ\ k ( § ° - GG§ ° / I / � S ) / co'o � 27 § p/%7 \ co0eArQ A /\/§/e a $ 2« / \ \ \ $ \ i / £ G G 2 Q � 2 m w r x g ) o ) j § / § % m / \ ® ) { 2 o « ) § § \ m ) 0 � ^ \ \ } m ® m e d o ; 2 / / m j / ; 7§ [ / ; ) 2 2 / .. 2 0 § .. > / 2§ / / > \ \ # ; p § ) � > � j 0 j ~ y m 0 a ° ° m . $ - \ \ ) m § \ } J m > . .. ! ) ) 2 \ w § \ :1 _ 2 \ / \ 0) / \ / ® , m / \ Ul \ � \ « < / 0m 3 m > k ) � o o ) \ ® § ) ) \ rn / 0 ) \ c , Q 2 q m \ z z $ ® o 0 0 g % kk \ \) ! o co co f 2 ( w ) ) § \ \ \ « % I i { _ , /y 4 § / q ; ;0 � 2 � & f $ \ ` m> _ 2 \ 2 0 { \ F\ § |@ ! m . § § n \ o} 0 0 )/ � w , / A ;u o 0 < C m Vl 0 m a O v 'o z ° O (n (7 _ (D N ° 0 O n -0 N 0 -� o l�D dN A y { a Z m x G� m m o A o z 0 v m o 3 m p O n ,'0 n A T 03 0 � o o c m o m m m m D(D o w w o 0 0 ° 61 C) z. (D(D(D(°co(°j N N N (D GI 0 n ° (DM (D(D tD(D j j i •� S � C �' C � U (D(D(D(°(D(D m W m � fJ r df j 0 0 0 0 0 0 0 0 W `O 0 0 0 0 0 0 N O � o A D�a m y y i o000000 1 D) C N 11j Z P C1 W N-+O(D D7 UI 0 0 0 m 0 D n b m m D b n m (p T to i ° 0 G 7 N ID m-6 D ° 0 m ,. Po 0 I y ((b y m ID a o 0 (n N ! = I Ge F a 3 _ n n " o' 01 m w C M.0- o � o 3D, 0 .D m nem 3 xQ'�< o0 o ID <zru] 3A° f'D� mo mD 0, o om 3 3 ° CD C)o m < om N C1 y .ZJ N D d < 10•'7[�0 n Cl) C 3 v m C 3 s o 0 m D _m G) 3 _ z _ A o v A C 1 z m 0 D 3 . a j -gyp 4b < oa n N CD 'ma (' m m' m �7 n x < a m C)0� O ' 0 o ° m ° O N O -1 D r S -(h A Ul m W W cow0 co0)w A m v'to E En cq 67 N W�N N6969 1 A m W ? (D o w oD W A R A N o�.V..au O W N i� A V W m O N O r N O fD N m ,m 4 G g ; ¥ -0 2 2 $ 2 ® n m © -0 \ \ ; m 2 g (% G * % ® ) \ 1 o m Q ® / §j ® g g $ / § \ § § 2) e ] § } ) / / 22 » % / § 0 !0] ) [ § ® / } .. \ \ j \ - U ] \)) ) ` / % % ® ) Q g/3 # ) ® _ / § / \ § ® 000 � \ \ » e §\ ) / ) $ ~ \ & / m _ \ j § f\ _ m SD U \ @ o (D 2 � ® § q ) y0 0 / \ ) } } $ 7 2 .. .. / g / / § » -� e \ \ co com § 0 § \ ) � `_ / . 0 14 62 ee ww e ` § ) - ) / k /? ; [/ m 00 m \ \ \ ( ( f , % �\ } I i - U - \ / ` \ ) \ @ * m 2 , J 2 S $ \ ( \ \ ) 22 B e as m ) 7 § > 6 ) \ ( / co - $ § f ( \ \ : g \ ( 0� m ( � cz \} ) ; » o , m o e m m ¥ x o G o ! )) // :% \ \ /§ ym 0 -0 m - *// ] m m m -0 m) , m% \§ / o %) -u , G o \ / {oo2 / zJ § / m 0 m MO ) § $ G ` mm o2] Qa m / % ® / G \ [ ) ®) ) /c / ; /om ® / ( o 8 ID 0 \ \ ; G m » (D \ \ \ \ \ ( ( \ -A \ § \ @ < § 7J _ m � m { � / w co Cl) j o \ m ) \ \ \\ \ / j om .. .. / y \ �\ \ j \ / \ 00 co § za ) \ � \ \ \ j2 \ \ -4 _ m _ e; ~ ~ ° k 2 : \o \ ° }j { { { } , \ � § o 2 , . 0 § § \ ( § � " o) \j k z { } ) _ ) § ( m ` } z § ( § k f � � § -4 #t 2. m _ ! | 0 S o z E z co I , ; ma } a 3 � _ $ _ \ � \ UJ 2 % X. :o - [ ; R33 d ( \ } / 3t : | ® S § ; - § 0 ` ) \ � g / 69 69 ) / § 4 2 § § ) § ] ƒ) / m / / ° a # , c ] ] 7 2 G/ § f §\ , d § o % -u 'U / 0 2 , - Jo > 2 E/ ( f m .. - o 2\\ : ® / \� m m % ) k § k » / % % ® ) Q ;)) / ` / « q i. , ] 2 @ e a § ± ( 0< % % ± % d )j ( \ m _ \ « \= 7 / m . (/ � � u q Ga \ZT \ ) / \\ \ ) " \ \ §\ ` 2 { / \ \ § § ) £ / .4 e2 ® . m; § 2 2§ m ` ( ( ( \ ( ( ! [) ; � A m C N fD d Q N O7 O C QN a 'm a 1 0 m N rn (Nn -f o m w N rn3 D A m D a m _ j m z i tit 77 p o 3 O S ri m O O 0 Z T O (7 o fiat n N O, (D N O wO' c iO top (0O l00 (0O (0O 0(O (0O 0N0 000 A0 01 W0 0O00 O 0 00 N 0 0 0 0 0 0 0 0 W W O N .ZCI Z Q N m Q N W O (O W J W W OOi W (pll N O O N N O O % O O m a N C z jo Oa b n :3 a m c 01 m ` n ID m c O n a m c � rrrmcn ((TT11 ul mtorO < Z O O D T T T Z W (n (n -< -G Y O � 3 ID m � o � ^ m C W m T a d T m •'- A m c m !Zyy m rn W N C a a D o m m a n 3 W . b a CA') p n n d o W A r W 0 A 3 � f v > o" 0O c pO m a � o 3 m n m3 Z -0 > Ooo m� p-1 � 4 < -0 -1� 1 o o d co m (n c)(n n 3 m m v < c n g H o ox O (n o ? w 2 W C m n obi c. m a �c •• x O 7 ` -1 Z m j m a c m mm m o m � ca O y a � O= 69 d (n Qr W Nm W(An(-Jn`(-n-� wW�(uAnlI 6NO(O9(n 69 69 b) Dr (WJn cm W Wm A W --A m p Op op, O ( ( N 0 w ANN ( A W w Cl) mWV O(n J OW 0) co U m (O M O ti (n W (n En (n J M' J fn A O 4 HI di ffi .� N(11 W Vl N 69 A J -+l0 O (n J m CO m m J J V A w W -i W j a A W O O j m A W 0 (O N N"A N Vl O (A Vl r O m (n O O A m N N N J �1 (D A . m W o 0 a) O O -�O W O O t0 A A J A. A (D CON A O O J N O O N O N N Vl 0 (O N O Vl W (O 0 0 O O T N O N N FORTWORTH. TRANSPORTATION AND PUBLIC WORKS August 17, 2021 Scott Dennett Construction 2313 Cullen Street Fort Worth,Texas 76107 RE: Acceptance Letter Project Name: Harley Avenue &Trails Drive Project Type: Paving, Drainage, Water, Sewer, and Street Lighting City Project No.: 100570 To Whom It May Concern: On July 17, 2020 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on August 6, 2020. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on August 6, 2020, which is the date of the punch list completion and will extend of two (2)years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 291-9135. Sincerely, �GLGl�47Glq �/ F15 KhaI Jaafari P.E.(Aug 24,202118:54 CDT) Khal Jaafari, Project Manager Cc:Jeremy Hickman, Inspector Ron Cordova, Inspection Supervisor Gary Deyon, Senior Inspector Victor Tornero, Program Manager Jonathan Russell, Consultant Scott Dennett, Contractor Mike Groomer, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev.8/20/19 = o == Document Glob — 1994 Contractor's Affidavit of Payment of Debts and Claims PROJECT: (Nance and address) ARCHITECT'S PROJECT NUMBER: OWNER: ❑ Harley Ave&Trail Drive ARCHITECT: ❑ Fort Worth,TX CONTRACT FOR: General Construction CONTRACTOR: ❑ TO OWNER: (Name and address) CONTRACT DATED: 02/15/2017 SURETY: ❑ City of Fort Worth OTHER: ❑ 200 Texas Street Fort Worth,TX 76102 STATE OF: Texas COUNTY OF: Tarrant The undersigned hereby certifies that,except as listed below,payment has been made in full and all obligations have otherwise been satisfied for all materials and equipment furnished,for all work,labor,and services performed,and for all known indebtedness and claims against the Contractor for damages arising in any manner in connection with the performance of the Contract referenced above for which the Owner or Owner's property might in any way be held responsible or encumbered. EXCEPTIONS: None SUPPORTING DOCUMENTS ATTACHED HERETO: CONTRACTOR: (Name and address) 1. Consent of Surety to Final Payment. Whenever Scott Dennett Construction,L.C. Surety is involved,Consent of Surety is 2313 Cullen Street required. AIA Document G707,Consent of Fort Worth;TX 76107 Surety,may be used for this purpose Indicate Attachment ® Yes ❑ No BY: The following supporting documents should be attached ji'ie nat reofauthorized epresentative) hereto if required by the Owner: Buchana , roject Manager 1. Contractor's Release or Waiver of Liens, (Printed name and title) conditional upon receipt of final payment. 2. Separate Releases or Waivers of Liens from Subscribed and sworn to before me on this date: Subcontractors and material and equipment I r 1 suppliers,to the extent required by the Owner, accompanied by a list thereof. Notary Public:Janelle McElyea 3. Contractor's Affidavit of Release of Liens(AIA My Commission Expires: August 21,2022 Document G706A). 1-( r �r� .lANELLE MCELYEA Q`ArrP s Notary Public, State of Texas '• ip= Comm.Expires 08-21-2022 4i�fi`�` Notary ID 12431D183 AIA Document G706"—1994.Copyright©1970 and 1994 by The American Institute of Architects.All rights reserved.The"American Institute of Architects," "AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission.This document was produced by AIA 1 software at 10:20:36 ET on 09/16/2020 under Order No.1549873776 which expires on 09104/2021.is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documentse Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (3B9ADA67) AIADocument G706A — 1994 Contractor's Affidavit of Release of Liens PROJECT: (Name and address) ARCHITECT'S PROJECT NUMBER: OWNER: ❑ Harley Ave&Trail Drive ARCHITECT: ❑ Fort Worth,TX CONTRACT FOR: General Construction CONTRACTOR: ❑ TO OWNER: (Name and address) CONTRACT DATED:02/15/2017 SURETY: ❑ City of Fort Worth 200 Texas Street OTHER: ❑ Fort Worth,TX 76102 STATE OF: Texas COUNTY OF. Tarrant The undersigned hereby certifies that to the best of the undersigned's knowledge,information and belief, except as listed below,the Releases or Waivers of Lien attached hereto include the Contractor, all Subcontractors,all suppliers of materials and equipment,and all performers of Work,labor or services who have or may have liens or encumbrances or the right to assert liens or encumbrances against any property of the Owner arising in any manner out of the performance of the Contract referenced above. EXCEPTIONS: None SUPPORTING DOCUMENTS ATTACHED HERETO: CONTRACTOR: (Name and address) 1. Contractor's Release or Waiver of Liens, Scott Dennett Construction,LC conditional upon receipt of final payment. 2313 Cullen Street Fort Worth,zi�R� 2, Separate Releases or Waivers of Liens from BY: Subcontractors and material and equipment (Sigi at re of authorized suppliers,to the extent required by the Owner, reps set tive) accompanied by a list thereof, ie Buchanan, roject Manager (Printed name and title) Subscribed and sworn to before me on this date: Notary Public:Janelle McElyea My Commission Expires: Au ust 21,2022 �t ,uu+u JANELLE MCELYEA pY PV9�i ^Notar Public, State of Texas y Comm. Expires(]B 21 2022 OF Notary 10 124310163 11610, AEA Document G708A——1994.Copyright©1982 and 1994 by The American Institute of Architects.All rights reserved.The"American Institute of Architects," "AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission.This document was produced by AIA software at 10:21:44 ET on 09/16/2020 under Order No.15498737M which expires on 09I0412021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documentse Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (3E39ADA78)