Loading...
HomeMy WebLinkAboutContract 36316-A3 r i ._ NO yam... AMENDMENT NO. 3 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT t WHEREAS, the City of Fort Worth (City) and DMJM Aviation, Inc (Engineer) made and entered into City Secretary Contract No. 36316 (the Contract) which was authorized by the City Council by M&C C- 22531 on the 27th day of November, 2007; and WHEREAS, the Contract involves engineering services for the following project: Engineering Service For: Phase 6 Under On-Cali Engineering Services Contract for Design of Airfield Signs, Airport Beacon Relocation, Airfield Lighting Control and Monitoring System and Construction Phase Services for Projects at Fort Worth Alliance Airport, Contract No. 36316. WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to change Engineer to AECOM USA Group, Inc.; WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Engineer is changed from DMJM Aviation, Inc. to AECOM USA Group, Inc. 2. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 11, 2009, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be perfonned by Mas- Tek Engineering & Associates, Inc. totals $ 5,846.00 with a Not To Exceed ailnotint of $71000.00. Y-'lei.'�Y••?•J'y.11Li LJAL4R'T HY.+"R+M n '" L'HECORD I I 111 9 WORTHY`T' � tt>� r 3. Article II of the Contract is amejided to Provide for an increase in the nnaxiinum fee to be Paid to Engineer for all work acid services perforined under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sun of$177,998.55. 4. All other Provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the VA� day of 3 2009 Fort worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: R • Kenneth L. Penny, A.A.E. T. M. Higgins Airport System Director Assistant City Manager AECOM USA Group, Inc. ATTEST: ENGINEER s w Marty Hendri City Secretary By: J y e tan, P.E. Authorization: _ Date: wu. .,..�.. F APPROVED AS TO FORM AND LEGALITY: { RECORD a Aizy Ramsey `*�l croYSECWARY Assistant City Attorney TX i F ' -.....:'x; '�'7.'�40«-s..pr{OC7t0:•WRrrnn.... t 4*1 4 i r MAs-TEK Engineering & Associates, Inc. May 13, 2009 Mr. Larry Gaines, P.E. AECOM Transportation 1200 Summit Avenue, Suite 320 Fort Worth, Texas 76102 Re: CMT Testing Proposal Fort Worth Alliance Airport Miscellaneous Electrical Improvements Fort North, Texas Mas-Tek Proposal No. 5-02-C (Rz v i_e-3) Mas-Tek Engineering & Associates is delighted to submit this Estimated proposal for the following Construction Material Testing Services on the above referenced project: • Structural Foundation and Civil backfill Testing • Drilled Pier Inspections & Testing • Concrete Testing & Reinforcing Inspections Total "NTE" Amount-----------$7 , 000 . 00 We appreciate the opportunity to serve you_ If you have any questions please contact our office. Sincerely yours, Mas-Tek Engineering & Assoc. , INC. r-, anon Cotton Jr. OFFi ,RECORD' Director of Operations/Sr. P.M. '"ITY% " <.. WORTH.,TY t Attachment: Schedule of Fees Geotechnical Consulting & Materials Testing 5132 Sharp Street Dallas,Texas 75247 972 709-7384 1 MAS-TEK Engineering &Associates,Inc. SCHEDULE OF FEES FOR CONSTRUCTION MATERIALS ENGINEERING&TESTING Fort Worth Alliance Airport Misc.Elect Improvements,Ft Worth,Texas MTE PROPOSAL NO.:5-0_2-C DESCRIPTION OF SERVICES QUANTITY UNIT FEE UNIT FEE A. STRUCTURAL FOUNDATION AND CIVIL BACK FILL TESTING&INSPECTION - Moisture/Density Relationship of Soils(ASTM D-698) 3 @ $153.00 each $465.00 -Atterberg Limits 3 @ $45.00 each $135.00 * Field Gradations 4 @ $15.00 each $60.00 Lime Depth Test 4 @ $15.00 each $60.00 - In-Place Density Test*(ASTM D2922) 25 @ $20.00 each $500.00 -Sr.Engineering Tech to perform testing Inspection 32 @ $39.50 hour $1,264.00 - Project Manager(Qa/Qc) 4 @ $75.00 hour $300.00 -Trip Charge 8 @ $30.00 trip $240.00 Sub-Total $3024.00 B. DRILLED SHAFT INSPECTION&TESTING * Full Time Eng.Technician for 1 days of drilling 8 @ $39.50 hour $316.00 - Concrete Test Cylinders(4 cyi.per day) 4 @ $15.00 each $60.00 - Geotechnical Project Manager(QA/QC) 4 c@ $95.00 hour $380.00 -Project Manager(Qa/Qc) 2 @ $75.00 hour $150.00 -Trip Charge 2 @ $30.00 trip $60.00 Sub-Total $966.00 C. CONCRETE&REINFORCING TESTING&INSPECTION Sr.Engineering Tech to perform Concrete testing 20 @ $39.50 hour $790.00 Sr.Engineering Tech to perform Prepour Inspections 8 @ $39.50 hour $316.00 Concrete Cylinders(4 per set) 20 @ $15.00 each $300.00 - Project Manager(Qa/Qc) 4 @ $75.00 hour $300.00 -Trip Charge 5 @ $30.00 trip $150.00 Sub-Total $1,856.00 ESTIMATED TOTAL $5,846.00 NOTES: 1. All laboratory test fees are F.O.B.our laboratory,additional charge for sample pickup may apply. 2. Any additional tests will be billed on a hourly rate and charged at the applicable rate,portal-to-portal. 3. Additional test not specitied in this proposal will tie quoted upon request at the above unit rates. 4. This proposal does not include any technician stand-by,non-readiness charges,and/or trips or re-tests of the previous failing tests. =CRETA R a 2ORTH .�rw�L'1S/�.f^Ttnrx'.'T-•'�'+VTr-"B:�'.'.IfY'�rn.^','��.r '