HomeMy WebLinkAboutContract 55217-AR1 CSC No.55217-AR1 FORT WORTH. City of Fort Worth Construction Allowance Request Project Name West 7th Street City Sec# 55217 Client Project#(s) 34018-0200431-5740010-101555-002380-9999-18010199 Project West 7th Street from University Drive to Trinity River Bridge Street Improvements Description Contractor Reyes Group,LTD CA# 1 Date 10/21/2021 City Project Mgr. Leon Wilson City Inspector Ozzie Ouimette UNIT or DEPT TPW Water Sewer Storm Water Totals Contract Time CD Original Contract Amount $4,937,193.00 4,937,193.00 300 Extras to Date $712,861.52 $712,861.52 Credits to Date Current Contract Amount $5,650,054.52 $5,650,054.52 300 Amount of Proposed Allocation $64,513.85 $0.00 0.00 0.00 64,513.85 Original Allowance Available to Allocation $200,000.00 $200,000.00 300 Allowance Funds Previously Allocated S0.00 $0.00 Revised Allowance Balance $135,486.15 $0.00 1 $0.00 $0.00 1 $135,486.15 JUSTIFICATION(REASONS)FOR CONSTRUCTION ALLOWANCE IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACT SHALL: Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments): Utility conflicts including:36"water line,12"water,gas,and telecommunication lines were discovered during construction. The depth and necessary horizontal clearances of the existing utilities were in conflict with the drilled shaft foundations,so spread footings were used to avoid the conflicts. The concrete volume for the spread footings is significantly more than the volume required by the drilled shafts. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Reyes Group LTD Jaison Cherian 777 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date E Ouimette Oct 25,2021 Oct 25,2021 Program Manager Date Senior Capital Project Officer Date a-. Oct 25,2021 Oct 25,2021 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date uaure,prourNov 1,2021 Nov 1,2021 Assistant City Atto Date Assistant City Manager Date n Nov 1,2021 a"A'Sw,� p, Nov 2,2021 ATTEST: ,/!,""P00 ai FORt��a Ronald P.Gonzales,Acting City Secretary ��0 �b p�o Poo c=� ° o° d *°°°°000000 °°° A, OFFICIAL RECORD Ay NixP" 4z0 CITY SECRETARY FT. WORTH, TX Construction Allowance SUMMARY Page 1 of 4 FORT WORTH,., City of Fort Worth Construction Allowance Additions Project Name I West 7th Street JCity Sec# Client Project# 1 101555 Contractorl Reyes Group,LTD PMF Leon Wilson I Inspectorl Ozzie Ouimette Construction Allowance Submittal# © Date ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total New Additional Cost for TY1 Signal Foundation TPW 6.00000000 EA ew ionsCost or RUVVY Illum oun a Ion New Add itions I U 03t Tor I I I um ou nd a Ion I Y J,b,b,an TPW $64,513.85 Water $0.00 Sewer $0.00 Storm Water $0.00 Total Additions $64,513.85 Construction Allowance Additions Page 2 of 4 FORT WORTH.. City of Fort Worth ` — Construction Allowance Value Project Name I West 7th Street City Sec# Client Project# 1 101555 Contractor Reyes Group,LTD PMJ Leon Wilson InspeGtorl Ozzie Ouimette Construction Allowance Submittal# © Date CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total 35 TPW Construction Allowance $64,513.85 EA $1.00 $64,513.85 Construction Allowance Value 3of4 M/SBE for this Construction Allowance Request M/SBE Sub Type of Service Amount for this CAR Total $0.00 Previous Construction Allowance Requests CAR# DATE AMOUNT Total Construction Allowance MSBE Data Page 4 of 4 Request for Information — Initiation Form Project Name: West 7th Street RFI#: 5 Project No. (CPN): 101555 Date Submitted: 4-22-2021 Contractor: Response Needed by (NLT): 4-23-2021 City Project Manager: Ronak Rekani, PE, PMP Design Engineer: HDR RFI Title: Attachments Image ❑ Document RFI Reference Data (If Applicable): Specification Section No. Spec Page No. Paragraph No. Drawing Sheet No. Drawing Detail Title: Other:Attached PDF RFI: 1. The foundations were surveyed based off of the CAD files given to the Reyes Group. There are many issues with the current location of the surveyed foundations. To include: in conflict with existing trees, existing electrical, existing irrigation, existing 48" Water Main. Please see attached PDF. Please advise if field adjustments can be made in order to place the foundations in the field based off COFW standards and/or the best practical location. Does the Contractors Recommended Solution require a Change Order? : Yes ❑ No Potential Impact to the City of Fort Worth (Schedule, Scope, Cost): Is This RFI Stopping ALL work on the project? Yes ❑ No ❑ Close If yes,why was this issue not foreseen and sufficient response time provided? Request for Information — Initiation Form Project Name: West 7th Street RFI #: 6 Project No. (CPN): 101555 Date Submitted:4.22.2021 Contractor: Reyes Group Response Needed by(NLT): 4.13.21 City Project Manager: Ronak Rekani, PE, PMP Design Engineer: RFI Title: Spread Footing Design request for illumination Attachments Image ❑ Document RFI Reference Data (If Applicable): Specification Section No. Spec Page No. Paragraph No. N/A Drawing Sheet No. Drawing Detail Title: Other: N/A RFI : Please provide a spread footing design for illumination and Traffic signal foundations to use as needed for scenarios where a traditional foundations will not be feasible. City Inspector will be notified of such scenarios and foundation changes will be red lined for the as built once approved. Does the Contractors Recommended Solution require a Change Order? : Yes ❑ No Potential Impact to the City of Fort Worth (Schedule, Scope, Cost): Is This RFI Stopping ALL work on the project? Yes ❑ No If yes,why was this issue not foreseen and sufficient response time provided? E § 6 ƒ § \ § » r6 g@a \ \ ^ \ \ / Co ° Co j � oc % 2 m - \ oc k z z z 2 z [ \ \ o /9 = � 3 b / k cz � z 5 � - � ƒ 4 » ® 2 6 & \ 2 \ r \ 2 / \ ) 0 \ /_ CDt ^ \ \ \ r yg e \ a � � 4 § - & ■ % / z z _ e r 4co § / G 7 f \ a (