Loading...
HomeMy WebLinkAboutContract 56049-CO1 CSC No.56049-COI FORT WORTH City of Fort Worth Change Order Request Project Name 2021 Bridge Rehabilitation Contract 2 City Sec# 56049 Client Project#(s) 103097 Project Description Bridge Rehabilitation at Eight Locations Contractor Ragle,Inc. Change Order# 1 Date 5/10/2022 City Project Mgr. Tariqul Islam City Inspector Ozzie Ouimette Contract Time Dept. TPW Totals (CD) Original Contract Amount $446,675.84 $446,675.84 150 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $446,675.84 $446,675.84 150 Amount of Proposed Change Order $2,972.70 $2,972.70 47 Revised Contract Amount $449,648.54 $449,648.54 197 Original Funds Available for Change Orders $25,000.00 $25,000.00 Remaining Funds Available for this CO $25,000.00 $25,000.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.67% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $558,344.80 JUSTIFICATION(REASONS)FOR CHANGE ORDER This change order is to add$2,972.70 to contract#56049. During construction it was identified that the slope protection work at Trinity Blvd bridge over Hurricane Creek required to install Turbidity Barrier on creek for protection of debris to flow into the creek water.This item was missing in the plan.A quote of$2,972.70 is received from contractor to install turbidity barrier and remove the same after construciton work is complete.Staff considered contractor's quote for this item is reasonable.The quote is attached to this document as reference. This change order is also to add 47 calendar days to the contract. During construciton the following delays were encountered: 1.Fort Worth Stock Show prohibited any lane closure on N.University Dr which caused dealy to start construction on N.University Dr bridge-20 days 2.A live street light elctric cable was identified inside handrail during handrail repair work of W.Lancaster bridge.The issue was addressed by City crew and caused delay-15 days 3.Additional structural patch work was identified during construction at Maddox Ave bridge which caused delay-12 days The documentation to support these delays have been documented and staff recommended adding these days to the contract. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company1W Contractor(Name) I Contract Signature Date Ragle,Inc. Samuel Bach `famwC3ayh May 24,2022 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date �aC�G O�h9ette May 18,2022 All May 19,2022 ko ma«a m Program Managero Date Senior Capital3Project Officer Date May 24,2022 May 25,2022 Assistant Director(Dept) 6 Date Director,Contracting Department(Dept) Date 1ar2 ge May 28,2022 W Jun 9,2022 Date Assistant City Manager Date WA J u n 15,2022 Jun 15,2022 nor Council Action(if required) IL M&C Number M&C Date Approved ATTEST: 4a��onn� Apt Von?.a i....ms.oaaa.i i. s.xxxuas con Fyy OO"00000 Jannette Goodall,City Secret ary pro op�.��� OFFICIAL RECORD ° d 00oo z f CITY SECRETARY as o tt°°Fza°q p FT. WORTH, TX s a I 5 4 a �nU-,a- FORT WORTH City of Fort Worth Change Order Additions Project Name 2021 Bridge Rehabilitation Contract 2 City Sec# 56049 ### Client Project# 103097 Contractor Bndge Rehabilitation at Eight Locations PM Tariqul Islam Inspector Ozzie Ouimette Ragle,Inc. O1 Date 5/10/2022 4/28/2022 ADDITIONS ITEM DESCRIPTION DEPT City Unit Unit Cost Total ew I urbidity Barrier Install 32-New Turbidity Barrier Remove TPW 30.00000000 LF $18.48 TPW S2.972.70 Sub Total Additions S . Change Order Additions Page 2 of 4 FORTWORTH City of Fort Worth Change Order Deletions Project Name 2021 Bridge Rehabilitation Contract 2 City Sec# 56049 ### Client Project# 103097 Contractor Bridge Rehabilitation at Eight Locations PM Tariqul Islam inspector Ozzi e Ouimette Ragle,Inc. O1 Date 5/10/2022 4/28/2022 DELETIONS ty Unit Unit Cost I ota TPW S0.00 Sub Total Deletions S 177. Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO 2021 Bridge Rehabilitation Contract 2 103097 Bridge Rehabilitation at Eight Locations Total $0.00 Ragle, Inc. Previous Change Orders Co# DATE AMOUNT Total $0.00 RA GLE Control: Project: CoFW Bridgea Reha Reha /NC. Highway: Trinity Blvd BUILDING HIGHWAYS AND BRIDGES County: Tarrant FOR AMERICA Date: 21-Jan-22 Change Order 7 Item Description Quantity UM Bid Price Amount 1 Turbidity Barrier Install 30.000 LF $ 80.61 $ 2,418.30 2 Turbidity Barrier Remove 30.000 LF 1 $ 18.48 $ 554.40 $ - Total $ 2,972.70 Page 1 of 1 5/18/2022 12:57 PM