Loading...
HomeMy WebLinkAboutContract 55431-FP1FORTWORTH. TRANSPORTATION AND PUBLIC WORKS NOTICE OF PROJECT COMPLETION City Secretary No: 55431 +P1 Date Received:3/6/2023 City Project Nu: 102974 Regarding contract 55431 or North Hill LN & Greenfield Rd Drainage Improvements as required by the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on 01/12/2021 through M&C 21-0031 the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the recommendation of the Assistant Director of the Transportation & Public Works Department has accepted the project as complete. Original Contract Prices: Amount of Approved Change Orders: Revised Contract Amount: Total Cost Work Completed: Less Deductions: Liquidated Damages: Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: Less Previous Payments: Final Payment Due Recommended for Acceptance Asst. Director, TPW - Capital Delivery Lauren Prieur (Mar3, 202315:01 CST) Accepted Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT Client Department William Johnson (Maf6, 2023 08:19 CS Asst. City Manager Comments: $ 925,172.88 $113,487.69 NO 2 $1,038,660.57 $1,038,660.57 0 Days @ $650.00/ Day $0.00 $1,038,660.57 $986,727.54 $51,933.03 Nov 11, 2022 Date Mar 3, 2023 Date Mar 6, 2023 Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX C-620 Signal— Page Contractor's Application for Payment Invoice No. Final To(Onner) City Of Fort Worth Inwteingi'eriod(I--To): Invoice Data; b•;nal 1010022 P'O• FW020-0000005839 Fran(Come.ster); Remit to(IfNol Automatic Deposit): Herat— Reliable timing, Ina Neal: 102974 Comrscloes CFW Venda No.: 0000021973 Reliable Pavia Imo 1903N.Y en Dv.Arlinlurr TX76WI City Saessarycantracl 55431 contract North Hill & Greenfield Road Drainage Improvements Number: Name: Appllullon For Pa)menl A raved Chan IOrdea Number Additions Witter, 1 $192,197.12 $93,037.42 2 S50,936.70 $36,608.71 3 4 5 6 7 8 TOTALS NET CHANGEBY CHANOEORDERS $243.133.82 $129.646.13 S113,487.69 The Contractor.,Ii0n pith the submittal of this document and associated Payment Reretpl Submittal on No City of Fost Worth Busunr system gist to the best of dnir Lnmdedge: (n 111 Prmiom Progress payments received firm Osmef on aecaunt or Work done under the Contract hive been applied on account to discharge Contraetoes legi(inmle obligations irreurred in connection mitt Wod:covered by Prior Applicalions for Pa)menl; (2) lille ofall Work, materials sad ecruiprnenl incorporated in sstd West, or othemise listed in or covered by Ibis Application for Paymem %%ill Pass m Onner el time of payment rise and clear ofall Liens, vourily interests and encumbrances, (except such as are covered by a Bond ac"plable to Ounce indemnifying Ouner appinst any rush Liem, security interest or enaanbranc ea); and (3) all Work covered by this Application for Payment is in accordance with the Damages S650.00z day Q_e cGrl— Quentin Smith (Oct 31, 2022 15:50 CDT) (®R . ORIGINAL CONTRACT PRICE........................................................... S S92SA72,88 . NeI dsange by Change Orden.................................................................. S S113.487.69 . Current Contract Price (Line 112)......................................................... S S1,038,660.57 . TOTAL COMPLETED AND STOREDTODATE (Proven Estimate, Cass rucllan Allmsance and Change Orden).,..... S $1,038,660.57 . RETAINAGE, a. X S1.035.660.57 Work Cantpleled..,.,.... S b. X Net Used S a. Total Retalnage(Line 5a+Line Sb)................................ S I. AMOUNT ELIGIBLE TO DATE(Ltnc 4-Line 5.)............................. S S1,038,660.57 �. LESS PREVIOUS PAYMENTS (Line 6(rom prior Application)........ S S986,727.54 I. AMOUNT DUE THIS APPLICATION............................. ............ ,....... S S5I,933.03 I. DALANCE TO FINISH, PLUS RETAINAGE (Column G on Proems, E+llnealeF CA+Cot + Line S above)..,,...,,..,. S 50.00 10. CONTRACTT(blEs is, Days Awarded 120 b. Day, Added by CO 100 w Total Dap 220 it. Days Charged 130 e. Daya Rematntng 90 This document has been modified from Its odg'nal (am as an EJCDC document and the user did net highlight the modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to Its execution. s f , ,_,�_►__�,►_,_Nq�►q►N�►�►N.t I ►J BS,S►8►8►yS►M►.'di13►S18Iem►VqN ������ �,�_�, ►�_�_,►N�w��q YiN'+Iql N wuH.. �► a � o $ ; x 1 1 1 �8e'mVlgN>iWiH.-lo► I ► I g I I I ��1��8 ',S Sy 8 8 i <; i iba g r yQ� : I� 3 331�3���� N z� 2' 4 pl "vi wl gI 5 3• aaE e2L3¢� 2 S,' �3� C <s E5§�5I a ZI Ivll B�t'3'. v� 1 e - Zia r 83-_Z;_____CLO__ S S_ tj Z' r t: d ti %S L"�_ Y, - w:aGW abt3� lid F U,W�N-=L'L'o8Gtiodo Se-- e- .w,o oSo oN '�'C Q yl —�1Dnl7717 I I I I I I i� I I I {1 ; I i' 11 � �I� i �I� l i i NK l I�IT g i Nr1NT lN<N 'I i-yil l Z(tT i j i l i ri1 �il�li�li ' i � }�/i i �iI'�ii 1 11n11n► �ml l l l i j DD I �y�SirnSrii O 1 I 1 I I , l �ii Sii 1 i fi �n G 1 ► rn I'Gl'«i i m il 7Iq I S { {1 11 I I w, 111'$1 gI:�1' lg l �l �l ooilI �q(,lIhvtllI i agf, 8, �i e w I ti- d ' a I I i I'bggsl 8l s i8E$3I.S8I1'8�S la o'�'o�lII �wg888 o f � � iyial �71 D i l l I � i IN INI I I IN►,Im loi�gl�r����l"sl�'�''�:i'�'�`�� � �lrul�il�i i i �I(.�i }^i�i l N.N I �� ►�► x .xl � { I �$IS'S�S;SI�!6!S y! k1i31I3t $ 4aISi ':S 8i818�8.8:8 8 8�$:0:$181SjE1S $iSi8.S S ,$,88 1I1I 1'' 1Ii II 1111 �tIWg�P'I� I I t I► kl !oIj xi � l l � IwIN N �I x� mNIl w �Sw _w lt�u 4� �S I�I:�81N8�1iIN8>►I!N�$S1.III81I:5�,1 S1l���,t��Hg.^ a BSI.'�q�.�oS,i"IIIwS >'3n 88biul SS I It 1, ! (I Ci {I1 ; I� I;$ I' Iti I IR aI V '.a I.i " xI,I S. 8 8S w S S 8 �8 S.S.bgBg S gg88 S 8 8$� g, S '588 8gSgS as .'z 5888.$8 888 S I oS, SSSggoB 8888Sa�ooS:&8 8 So oBSI 8 1 S;BS Iig'1 Ix ! I�Irol �I ICIIi��, .Sl�i �olo�il I$� i35I',6' I$ tatl� 8 t3�8t� $09 g O�t�Ig'jq S $, $ SIB fH S 8 $ & iS YdS o { I I t I ,►I I , , �({II I I I I � I I I I TTHI I11 �yy77i Sm''Nuoci; o o Si :88 S.8 S, g8'BgSoSwo"dva' N x R t' R S 858,88a1 U HE. S "' tr $ I B 9z 8�, 8I I ! I I I f ► ! (l I I I �� s I CC I I II' I11Nii I I 1 i NNI x-a!1iS� too mog �Um� �x S�d$�BxRi SY31 x N S'S'8 ICI '�S1wN�omoo 8. Sw 2 c�SS S 85888 1 F ► ► i SS ► 8S'SS S .b000SSSSSS I ( I I a a''-�K Ix�;�x'iX. •a' t KR xz^r a' xaKa°XMa�''I n K �bboMga,,X o 0 1 I+ I g i43 I I' Ixl jilts !$18 G I I I I I I I I I I i I I I I I{► . II d a I I I I I I li I I I II I,i � it ail I I I 1 I I c i I l � l i ( f ! I I i► I� !I I I '►� I! i �� II `I I ( It l I I I` i ,I'►I 'I I I, i I I ,II I �� I ►; ► I i �I�� I ►' ' � ' l II i I I I I I I IIII I � 1 1 i ; I I i. B`� fiq ! 1 I i I I 11 I II I I I it I I ^ I c III � I►I' III, I, III ',� !{II �� I � I I I�I II►I II IIII ' 1 I `i` II' I e` I► i (� li i ,, I i l l I I� I I� I l i l! I I I I I I I I � {I � ►I � I III III, I III C,� I I �) I �I �Jd 7 n I e•I I i,l I I l, i I IiI• I� I I � 5 z j',jllil illl oLxllg6^oE Ij IsssegQsp o E! v Sir^ n E y j � .• I I � u > O III III I III III ( III II III II I III �' G. II I11111 II1111 11 _ lO gs �gQQ+ �Bg'4g8 ;,Q$$s g�g°IiLg'.Qwoo +$Sg i k,R�§y$ Iggl �I� � g 6g I ( I �I S•g IV$o$S cI of 3 > I lo� i c I� rg,o s �$ lu l� a �� �o � �� ►o �o s �g o �o � �� U i 11 I I I I I I I I I Io I Q. ., g`o oO'w io g moo z� SSIo �IjI I II o 1 o 16 to o Is y $ f I Ig 1 to to 'S IN to s G" E 8 n I 16. ' + 1 I I I � I►! � � I i � l I� � I$ �$ � I I� < I ►„�I�I f g Ig Is Io � — imp to R � I 1� �S $ la � I> �s k Is f$ !$ I + i j i +( I I I I i I' I, y I '' I„ Ic i I ,. ►N' € i 1 i I I oI �� AI sls $is Is 9A s;w a I I ` I I III I I III IIIIIII! I i!. i N 6 ja �$ gg ffi 0 l8 r IS 8I8 ►$ to I - is Io Io I� la i �I 1 IliI�I`�� itry III Y III l ` 7Igo i 0 I�0 III III II �'i �I III!j,IIII Z9 o i ly n P � o 3 I I ! I I I I Nll�llil I1111�{IIIIIIIII�IIIII 117 11II II�II III I Iilll II 11� III���I�I�o�I� 2p �11 c I l I ! ! g I II I II I I III iN1 I Ill II IiRs iL 0.lo F III I. I I I I I I I I I 1111 I I I I I I l I s I�I�'i�111'�Illi illi'Ililllllilili'�e'',00< i I I �I 1111�,�111�111 1 I III�IIII �y - I I t i nR - $ I i I I NI � I aye F. A iX F F Fix I I I m T I� f� g E fyii! 7 v0 f� III 'II i 1111 II di8.. ' . I I'I ICI �iTI III ',.I e F N -� 0 Si' n 0 9 m ,+ m a D 3 r. m 3 m �_ 'o N N Zl N 9� 7 w m D O (1) (A O N O 00 N CD ID N N O O O O A A (0 W .:]LT MI pI�-OI- n G� p d (`� p 0 0 Q 3 by 0 °' C 0 N 5� r'F Q Cl) D 3 � 3 b 3 m a � B N = a = � o � fn y y 0 O O O co co W b ro � b o m a' z d C d c I 0 N A O Z N O � N N Q 00 m z m FORTWORTH,, City of Fort Worth Change Order Request Project Name North Hill Lane and Greenfield Road Drainage Improvements Cty Sec # 1 55431 ClionlPfolecill(s)l CPN 102974 I Installation of Storm Drain and Repaving of North Hill Lane and Greenfield Road along with related utility adjustments and grading work. Contrartoll Reliable Paving, Inc. Change Order II i Dale 12115/2021 City Project Mgr. Michael Nallbaum City Inspectorl Eddie Walker Dept. act I TPW I I I I Totals I Cont (CD', Original Contract Amount Extras to Dale Credits to Dale Pending Change Orders (in M&C Process) Contract Cost to Date Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS So OF ORIGINAL CONTRACT 10.72% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+ 25%) $1,156,466.10 ;hangs order provides for regrading and adding driveway culverts to the south side of North Hill Lane and addresses flooding concerns by residents. The initial design y with one -foot contours indicated the area along lire south side of North Hill Lane drained to the south. Driveway culverts had sifted over the years to the point that were visible or discovered by survey. Ran during construction and interviews with residents confirmed the roadside flooding and maintenance problems with silted and I driveway culverts. These issues will be corrected with this change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or Incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she Is the person responsible for the monitoring and administration of this contract, Including ensuring all performance and -nnrrinp rPnnlrPments Contractofscompany Name Contractor Name Contracts nature Date Reliable Paving, Inc Isteven lancaster JDec20, 2021 InspedloT/Inspec0cm Supervisor Date Pro sot and Contraot Compliance Manager Dale 1r.I..11', Dec20,2021 %: tl,/_ Dec 20,2021 Pnifiram Manager Dale Senior Capital Pro ectOfficer Data "a-1r,,, Dec 22, 2021 ,,,,1,. ir:,Y Dec 22, 2021 Assistant Direotor De 1 Date Director, Contracting Department (Dept) Dale Dec 22 2021 ,-- Dec 23, 2021 Assistant City Attorney Dale lAssislant C ManNor I Date Dec 23, 2021 8, ,, Dec 27, 2021 Council Action i(r Uired M&C Number I N/A M&C Date Approved N/A ATTEST: 7��utAFf9,S, gdDf�itiG . nn ,; t:FS fc7A:ll1�`« t1, roa illt�l (SI) Jannette Goodall, City Secretary on -04.ppUUn�t! ri0 �40 r�o��d0 V° p~o $Zd Po p�0 4 00000000 d OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CSC No. 55431-COl I_o t1' NVOIt'I'1I City of Fort Worth Change Order Additions Project Name Noith Hill Lane and Greenfield Road Drainage Itarovemente City Sec $1 55431 Client Project# C NNI02974 Contraclor Reliable Paving, Inc. PMI Michnel Wellbaum InspeclorF Eddie Welker Change Order Submittal Date 215/2021 AUUI IIUNS _ 1 �:�1----- r� I 1 1 rr Iii��� r•M�MMMyrS.�'.r/Y1`�11r�,,7� �317• 1 1Embon'Knient by Plan .rr 3 1'1'11'1'1'1'I��YYYY • 1 rl r .•� • . 1 Ilir� 1 � rrrrrlry ���'Ylneulllw �001 ribs", .1 rl 1 m iL'a ''' "' ' . • ` •YL'� 1 11 rrrr •1 �� . I rl �; 1�1 1�1'1 f� rl , , •. r�,'�l•r— 1 1'1'1'11'1'I'1 am ' 1 rI �YKY/hllhll ' • , • 1'1'11 r e fly— 11'1'1'1'1'1'1'1 11'1 �ii�i 1 'I�l��1i����� 1 1'1 �•Y11/l111111 R 1 1 �MMIN 11ENIMEN 01010216r,INUNIN 0100011 '"•• 1'1'1'1 WENOMMI IllllllllllllllRll:flgC111:1:1:C11NEWi UZ, MENEM111F11111 1 E�Jjjjjjml III 10010011 ----- ----- — 1 ----- MESON I 1 1 Irr WENEMMIill� :�I1I�MMUNINIMERM,- EN- 1 • I • I 1 ,1 11.� r•r--il Sr"U"" KYNGI r la I I • .' I'11'1'1'1'1'I�i�YCLYE♦ElH .. , 1'Irl . . 1 . r�lr- 1.11'1'1'1'1.1 �� �' 1.1. 1.1'1 1'1 III 11 `r .,� r .. r pl ly n ... • r—�:1L'CC111:I:C11�� 1'1 1 1 1 1'1 r .. n . •• r 11'1'1'1'PI'1 �.� : 1 ro �S ..1 11 1Y4'1'1'1'11 1 11'1 11 ONE! UWAUM W" — ----- MEMEMI ----- - --_-- ----- — —MENOMONEE —NNNN ----- — ----- - ----- —MENEM----- — ----- _ ----- MMMMMI ----- - ----- - ---_- - ----- ----- - ----- — ----- �Yt:Yal:r�Y! Change Order Additions Page 2 of 4 FonrlVomit City of Fort Worth " i� Change Order Deletions Propd Namo I No th Hill Lane and Cveanfield Road Drainage Inifxovements City Sec 11 I Client Project N I CPN 102974 Contractor Ro6abb Paviig, Inc. I'MI Micheal Wellbaum InsNclor Eddio Wake, Change OnlerSubmilloW F--T--1 Date DELL: I IONS S1imin=IMMMIR 64, __ r. r•r rrrrrrrr ��omamMEMOIR ri rrrrrrPr����li .,mmm 'i9 �001 rr rrrrrr �'��'L r n r rr IMEMEM AMMEMNEMIMMEME ���� MEN MENOMINEE MENOMINEE MMMM MEME ..MEM Change Order Deletlons Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO N/A Total $0.00 FORTWOI TK. City of Fort Worth CSC No. 55431-CO2 Change Order Request Protect Namal North HIII & Greenfield Road Drainage Improvmonts City Sec Il 1 55431 Client Prquotfl(a) 102974 Protect Installation of Storm Drain and Repaving of North HIII Lane and Greenfield Road along with related utility adjustments and grading work. DescrIpgoni I Contractor Reliable Paving Change Order 11 2 Dato 6/1612022 City Project Mgr. Michael Wollbaum City Inspector Eddie Walker Dopt. TPW Totals Original Contract Amount $925,172.08 92571 Extras to Date $192,197.12 $192,1 Credits to Data $93,037.42 f93.0 Pending Change Orders (in M&C Prooess) $0.00 Contract Cost to Date $1,024,332.68 $1.024.3 Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 12,27% MAXALLOWADLECONTRACT AMOUNT (ORIGINAL CONTRACT COST+25%) $1,156,466.10 change order provides for additional costs associated with changing HMAC drive approaches to Concrete drive approaches consistent with recent TPW policy changes. change order Is also a recondlleton change order to address quantity overruns and underruns on this protect. All of the Items in this change order reflect changes In itties to previously approved pay items. The quantities have been reviewed by the Protect Manager and Inspector and appear reasonable for the additional work Ired. Prior to approving pay requests by the contractor, actual quantities will be field verifled, It Is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or Incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she Is the person responsible for the monitoring and administration of this contract, Including ensuring all performance and reaortine reauirements, Contractor's Company Name Contractor Name Contract SI nature Date Reliable Paving Inc Quentin Smith trs Sep 6, 2022 In8pectodInspectlon3u rvisor Date Proectand ContractCom IanceManager Data <rr.., 4e — Sep 6, 2022 i',;-1r.,:1 . Sep 6, 2022 Program Manager Date Senior Capital Project Othcer Date Sep 7, 2022 444 Sep 9, 2022 Assistant Director (DopQ Date Director Contracting De artrnent (Dept) Date ya Sep 12, 2022 Sep 12, 2022 Assistant City Attorney Data Assistant City Manager Date AWL ep 12, 2022 ep 12, 2022 Council Action(if required) M&C Number I MC 22-0574 M&C Dale Approved F 8/9/2022 ATTEST: 1�aebs�,t-61 :'n. Jannette Goodall, City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Follr Wolc I ll City of Fort Worth v--- Chango Qrdor Addltiona plo ed Norco Nodh HIII 8 Greangold Road DmIno a Im rovmanla city Soo 11 65431 CllenlProjodN 1 102974 contra'A011 Reliable Paving PMj Mlchool Wollbaum Inspadol Eddlo Welkor Ghana OrdorSubmlilelll Dalo 6119l2022 AUUI I IUNS �IL9(� 1 t+• • 1 � �nau��'II�S'L���Lill��L'i�l� PP14'1' CI `yj'PYI l'1 - / 1'1'1 , ` , r4 ♦ ' '':W:i� dl'1'1'1'1'1'1 la le MINI 111 : 1 111'1'1'1'1'1 1 1 i Pill •, 11Y9 t ' Change OrderAdditlon5 Poge2oO FoI!cwo i City of Fort Milli --91 Chango Ordor Dolotlons MactNama I North Hill & Or0en6ald Rand Dinlnpflo lm roymonla Cty Soctl E 6643 Chant prof d N 502014 Conlrador Ralloble paNnp PM Mkhnel Wal!bnum Inapnda EM. Walker Chango Ordar Sabmlllol it ® Dale 6/1012022 1 �!l3fi� � "• . � . �n� �S:i1��{ll' i�fs�mtri��Li{�� i� 1 1 r • :: i �-�I;I����t1ac�11:n�sexracn �i�'!'''''r' � • • � Iliu��"ir� +"n�au�xn�yill�'illYSa'176]I �1'1 : •rq1, i ."��—ii�lh;la:la;l;ll�'!.f!!IAI;11 �1:g!111:11 �� 1 1 ":: 1 : : •:. • •a •:. .: �� 1 rrrl'rl�l � J� : n rl : rl rl -Kk111.11i11!:IAI'!::1i41T571!7YGR:!IIi:hR111R n : i ma'mrm!�616rii61:a•�—�1,1��'�YY1��4YI�Il4U �l!1!{!HIIp:Cl/N..T77�Iff7:*(IiA�7711rbT1!_TRf:TS153!7.1:17ri1G1��— 1 rPl �� - 1 1'PI r! ��1IK1!1M111 talt!t:{cl!1!:{rn t� amnunsti'•tm:� ! PI: Change Order Deletlons Page 3 of 3 City of Fort Worth, Texas Mayor and Council Communication DATE: 08/09/22 M&C FILE NUMBER: M&C 22-0574 LOG NAME: 20SWM NORTH HILUGREENFIELD PH 3 CHANGE ORDER 2 SUBJECT (CD 2) Authorize Execution of Change Order No. 2 in the Amount of $14,327.99 and the Addition of 15 Calendar Days to a Contract with Reliable Paving, Inc., for the North Hill Lane and Greenfield Road Drainage Improvements Project, Phase 3 for a Revised Contract Amount of $1,038,660.57 RECOMMENDATION: It is recommended that the City Council authorize execution of Change Order No. 2 in the amount of $14,327.99 and the addition of 15 calendar days to a contract with Reliable Paving, Inc., for the North Hill Lane and Greenfield Road Drainage Improvements Project, Phase 3 for a revised contract amount of $1,038,660.57 (City Project No. 102974). DISCUSSION: On January 12, 2021, Mayor and Council Communication (M&C) 21-0031, the City Council authorized a construction contract in the amount of $925,172.88 with Reliable Paving, Inc. (City Secretary Contract No. 55431) for the North Hill Lane and Greenfield Road Drainage Improvements Project, Phase 3 (City Project No. 102974). The contract was subsequently revised by Change Order No. 1 in the amount of $99,159.70 and an additional 85 calendar days, administratively authorized December 15, 2021, to provide for additional grading and driveway culverts to address additional flooding concems reported by residents. This Change Order No. 2 will provide for concrete drive approaches rather than asphalt drive approaches to conform to current Transportation & Public Works (TPW) policy and a reconciliation of pay item quantities to complete the project. City Council approval is being sought for this Change Order because it will result in the total amount of all Change Orders for this contract exceeding $100,000.00. Staff has reviewed and verified the quantities for the additional work under this Change Order No. 2. Additionally, to complete this work, staff recommends that the contract time be extended by 15 calendar days. Funding is budgeted in the TPW Dept Highway & Streets Department's Stormwater Capital Projects Fund for the purpose of funding the Greenfield Acres Drainage Ph3 project, as appropriated. This project is located in COUNCIL DISTRICT 2, Mapsco 461- 46R. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Stormwater Capital Projects Fund for the Greenfield Acres Drainage Ph3 project to support the approval of the above recommendation and execution of the change order. Prior to an expenditure being incurred, the Transportation & Public Works Department has the responsibility to validate the availability of funds. Submitted for City Manager's Office by: Dana Burghdoff 8018 Originating Business Unit Head: William Johnson 7801 Additional Information Contact: Linda Young 2485 Expedited FORT WORTH,,,) TRANSPORTATION AND PUBLIC WORKS October 27, 2022 RELIABLE PAVING 1903 PEYCO DRIVE ARLIMGTON,TX 76001 RE: Acceptance Letter Project Name: NORTH HILL & GREENFIELD RD DRAINAGE IMPROVMENTS Project Type: DRAINAGE IMPROVMENTS City Project No.: 102974 To Whom It May Concern: On May 3, 2022 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on October 27, 2022. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on October 27, 2022, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-7343. Sincerely, / Michael Wellbaum, Project Manager Cc: Eddie Walker, Inspector Mike Glover, Inspection Supervisor Daniel Roy, Senior Inspector Linda Young, Program Manager James DeOtte Engineering,lnc., Consultant Reliable Paving, Contractor N/A, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 1903 N. Peyco • Arlington, Texas 76001 'RELIABLE Phone lNumber779 82633FAX 17) 467-9148 rM Proposal RETAIL I COMMERCIAL I INDUSTRIAL I SELF STORAGE I PAVING Proposal Date: Oct 13, 2022 Page: 1 City of Fort Worth NORTH HILL & GREENFIELD ROAD 200 Texas St. DRAINAGE Fort Worth, Tx 76102 Fort Worth, TX 76102 Description Amount CHANGE ORDER #2 3 EA - 4" 2-WAY CLEANOUT 1,440.00 3 EA-4" SEWER SERVICE, RECONNECTIONS 3,060.00 1.5 MO - TRAFFIC CONTROL 1,552.50 256 SY - 2" ASPHALT PAVEMENT TYPE D 2,618.88 4210 SF - 6" CONCRETE DRIVEWAY 39,321.40 56 LF - 7" CONCRETE CURB AND GUTTER 1,599.92 16 LF - 12" RCP CLASS III 1,344.00 -1 LS - AS BUILD SURVEY -1,800.00 -4621 SF - 6" ASPHALT DRIVEWAY -24,537.51 Subtotal Continued Sales Tax Continuedl TOTAL PROPOSAL AMOUNT I Continuedl I. GENERAL TERMS Unless Reliableand the customer have expressty agreedthat a lump sun fixed price is to be paid the customer understands that the above quoted sun and quantities are estimated only. If Reliableand the customer have not agreed to such a li customer agrees to Fay Reliable based upon stated prices and actual work performed. Payment is die immediately upon receipt of Re able's invoice. If Reliable has agreed to the payment of progress draws, then these payments shall be made weekly based on the pemmtage of wcrkcompleted by Reliable the previous week If the work perfamed by Reliable continues for more than me month, then the customer agrees to make payments on or before the 10th day of the month, based on the wank performed in the prior month. Such payments shall be based on the e: All payments to Reliable Paving, Inc shall be made to 1903 N. Peyco Drive Arlington, TX 76001. If the custoner fails to remit payment bythe die date, interest at the maximum rate allowed by law will accrue on the unpaid balance until the outstanding balance and interest are received by Reliable. If Reliable is requred to engage an attorney to collect amounts due hereunder, the customer shall be responsible for rensonableattomey's fees and the mst of collection. The cost of City Permits (if applicable) are not induded in the total cost and will be paid bythe customer. I.RES PON SIB ILITES Reliable Paving, Inc is dedicated toserving you, the customer. Accordingly, all work is to be completed in a workmanlike manner according to standard practices. However, there are certain situations far whch Reliable will not be responsible. Rel iablewill not be responsible foranydelays in the completion of work due tolaborstrikes, inclement weather, acts of God or any other wants beyond the control of Reliable. Reliable is not responsible for the consequences of soil expansion o informing Reliable of any conditions which might affect the work and Reliable shall not be liable forthe consequences of undisclosed and/or unknown conditions. The customer is responsible forthe provision and maintenance of ary necessary insurance. The customer shall be responsible for locating, dearly identifying, and marking all buried utility lines and strictures priorto Reliable beginning work. If the customer does cleerly mark and iclontifyall utility lines and structures, and Reliable damag ass me the responsibility for any repair costs associated with fixing thedamages. Through theacceptance of this proposal, the customer agrees toindemrify and to hold Reliable harmless forall claims, including reasonable attorneys fees in — damages toany utility line or structure not dearly marked by thecustomer Please note that the Stateof Texas provides free line location services. This is available bycalling 1-877-778-8111 ar visiting waw.texas811.org <http://—w.t.as811.oi made a least 72 hours prior to any excavation. Waiver of Consumer Rights: By axecuti ng this contract, the customer agrees to waive his or her rights under the Deceptive Trade Practices -Consumer Protection Act, Section4. et seq., of the Texas Business & Commerce code. III. COMPLETE AGREEMENT Upon acceptance of this mntract, Reliable and the customeragree and understand that this contract represents the full and mmpleteagreement between the parties, including all terms and conditions set forth herein, and that no oral agreement supplement this mntract in anyway. ACCEPTED, and ,made a part pf this agreement, on this date, the __day of 20 Reliable Paving, Inc. _ Note: This proposal may be withdrawn by us if not accepted within 15 days. 1903 N. Peyco • Arlington, Texas 76001 QELIABLE Phone lNumber779 82633FAX 17) 467-9148 rM Proposal RETAIL I COMMERCIAL I INDUSTRIAL I SELF STORAGE I PAVING Proposal Date: Oct 13, 2022 Page: 2 City of Fort Worth NORTH HILL & GREENFIELD ROAD 200 Texas St. DRAINAGE Fort Worth, Tx 76102 Fort Worth, TX 76102 Description Amount -11 EA - CURB ADDRESS PAINTING -660.00 -3 EA - WATER VALVE BOX ADJUST W/ COLLAR -1,800.00 -1 EA - MISCELLANEOUS STRUCTURE ADJUSTMENTS, WATER METER BOX -420.00 -1 LS -ALLOWANCE FOR ADDITIONAL IRRIGATION/BACKFLOW PREVENTOR -7,391.20 Subtotal Sales Tax 14,327.99 TOTAL PROPOSAL AMOUNT 1 14,327.99 I. GENERAL TERMS Unless Reliableand the customer have expressly agreedthat a lump sun fixed price is to be paid the customer understands that the above quoted sun and quantities are estimated only. If Reliableand the customer have not agreed to such a li customer agrees to Fay Reliable based upon stated prices and actual work performed. Payment is die immediately upon receipt of Re able's invoice. If Reliable has agreed to the payment of progress draws, then these payments shall be made weekly based on the pemmtage of wcrkcompleted by Reliable the previous week If the work perfamed by Reliable continues for more than me month, then the customer agrees to make payments on or before the 10th day of the month, based on the wank performed in the prior month. Such payments shall be based on the e: All payments to Reliable Paving, Inc shall be made to 1903 N. Peyco Drive Arlington, TX 76001. If the custoner fails to remit payment bythe die date, interest at the maximum rate allowed by law will accrue on the unpaid balance until the outstanding balance and interest are received by Reliable. If Reliable is requred to engage an attorney to collect amounts due hereunder, the customer shall be responsible for rensonableattomey's fees and the mst of collection. The cost of City Permits (if applicable) are not induded in the total cost and will be paid bythe customer. I.RES PON SIB ILITES Reliable Paving, Inc is dedicated toserving you, the customer. Accordingly, all work is to be completed in a workmanlike manner according to standard practices. However, there are certain situations far whch Reliable will not be responsible. Rel iablewill not be responsible foranydelays in the completion of work due tolaborstrikes, inclement weather, acts of God or any other wants beyond the control of Reliable. Reliable is not responsible for the consequences of soil expansion o informing Reliable of any conditions which might affect the work and Reliable shall not be liable forthe consequences of undisclosed and/or unknown conditions. The customer is responsible forthe provision and maintenance of ary necessary insurance. The customer shall be responsible for locating, dearly identifying, and marking all buried utility lines and strictures priorto Reliable beginning work. If the customer does cleerly mark and iclontifyall utility lines and structures, and Reliable damag ass me the responsibility for any repair costs associated with fixing thedamages. Through theacceptance of this proposal, the customer agrees toindemrify and to hold Reliable harmless forall claims, including reasonable attorneys fees incun damages toany utility line or structure not dearly marked by thecustomer Please note that the Stateof Texas provides free line location services. This is available bycalling 1-877-778-8111 ar visiting waw.texas811.org <http:llwww.t.as811.oi made a least 72 hours prior to any excavation. Waiver of Consumer Rights: By axecuti ng this contract, the customer agrees to waive his or her rights under the Deceptive Trade Practices -Consumer Protection Act, Section4. et seq., of the Texas Business & Commerce code. III. COMPLETE AGREEMENT Upon acceptance of this mntmct, Reliable and the customeragree and understand that this contract represents the full and mmpleteagreement between the parties, including all terms and conditions set forth herein, and that no oral agreement supplement this mntract in anyway. ACCEPTED, and ,made a part pf this agreement, on this date, the __day of 20 Reliable Paving, Inc. _ Note: This proposal may be withdrawn by us if not accepted within 15 days. FORTWORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Change Order Request No. 2 M&C: 22-0574 CPN: 102974 CSO: 55431 DOC#: N/A Date: To: 1 08/29/2022 I Name Quentin Smith (quentin@reliablepaving.com) I Department Contractor Initials QS Date Out Sep 6, 2022 2. I Eddie Walker I TPW - Inspector �E,, Sep 6, 2022 3. I Michael Wellbaum TPW - Project Manager tl;vW Sep 6, 2022 4. I Linda Young TPW - Program Manager Sep 7, 2022 5. I Lissette Acevedo TPW — Interim Sr. CPO of Sep 9, 2022 6. I Martin Phillips TPW - Interim Assistant Director 1,1„PMAP Sep 12, 2022 7. I Lauren Prieur TPW - Interim Director 1-L PP Sep 12, 2022 8. I Doug Black Legal - Assistant City Attorney d,.,d Sep 12, 2022 9. I William Johnson, Asst. CM CMO —Assistant City Manager Sep 12, 2022 10. Mellisa Brunner, City Sec. CSO — City Secretary �� Sep 12, 2022 11. I Jannette Goodall, City Sec I JSG Sep 12, 2022 DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ❑No SAME DAY: []YES ❑No NEXT DAY: []YES []No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts@FortWorthTexas.gov at ext. 7233 for pick up when completed. Thank you! FORTWORTH® City of Fort Worth CSC No. 55431-CO2 09""� Change Order Request Project Name North Hill & Greenfield Road Drainage Improvments City Sec # 55431 Client Project #(s) 102974 Project Installation of Storm Drain and Repaving of North Hill Lane and Greenfield Road along with related utility adjustments and grading work. Description Contractor Reliable Paving Change Order # 2 Date 5/16/2022 City Project Mgr. Michael Wellbaum City Inspector Eddie Walker Dept. TPW Contract Time Totals I ICDI Original Contract Amount $925,172.88 $925,172.88 120 Extras to Date $192,197.12 $192,197.12 85 Credits to Date $93,037.42 $93,037.42 Pending Change Orders (in M&C Process) $0.00 Contract Cost to Date $1,024,332.58 $1,024,332.58 205 Amount of Proposed Chanqe order $14,327.99 $14.327.99 15 220 Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 12.27% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $1,156,466.10 This change order provides for additional costs associated with changing HMAC drive approaches to Concrete drive approaches consistent with recent TPW policy changes. This change order is also a reconciliation change order to address quantity overruns and underruns on this project. All of the items in this change order reflect changes in quantities to previously approved pay items. The quantities have been reviewed by the Project Manager and Inspector and appear reasonable for the additional work required. Prior to approving pay requests by the contractor, actual quantities will be field verified. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Company Name7l Contractor (Name)v Contract Sign ture Date Reliable Paving Inc Quentin Smith Sep 6, 2022 upervisor Date Project and Contract Compliance Manager Date cw4a,�,. Sep 6, 2022 �. �. ,.,__ Sep 6, 2022 ro ram Manager Date Senior Capital Project Officer Date L Sep 7, 2022 on Sep 9, 2022 t P Date Sep 12, 2022nP Dire ment (Dept) �� Date Sep 12, 2022 Date Sep 12, 2022 Assistant Cit Mana Date Sep 12, 2022 Council Action if required) M&C Number MC 22-0574 M&C Date Approved 8/9/2022 ATTEST: Jannette Goodall, City Secretary FORT WORTH City of Fort Worth 1T-- Change Order Additions Project Name North Hill & Greenfield Road Drainage Im rovments City Sec # 55431 Client Project # 102974 Contractor Reliable Paving PM Michael Wellbaum Inspector Eddie Walker Change Order Submittal # Date 511612022 ADDITIONS 1 ••rYr-MMMMIIIIIIIIIIIIIIII SEEK,�: 11I I I I11111 '1 1 11 EMERM,I:III1II 111 � 1111111 ��' '1 11 ��ubi#.i11 3212.0302 2" Asphalt Pavement - 1 . IIIIIIII��IYI:ifl:1:1 I 1 - Driveway 1 11111111 ��rkRYTi[[11 M.1 1 • . 1 1 • 1 Change Order Additions Page 2 of 3 FORTWORTH City of Fort Worth IV--- Change Order Deletions Project Name I North Hill & Greenfield Road Drainage Im rovments City Sec # 55431 Client Project # 102 774 Contractor Reliable Paving PM Michael Wellbaum Inspector Eddie Walker Change Order Submittal # 0 Date 5/16/2022 MONISM 1 1 1 - III III IIMMRMIM:1111 :1 111 �....000 .-inch Asphalt Driveway•/��-�-�[:Yi[IIIIIIIIIIII, IIMMUi�". i �Wl!!.'XiL'SI M 11 . .. - . • r�r- III III I I �' '.. 111 '... I I I M 1 1 /r, - �. - •I��-MEMEL,-�'omm;YIII 1III ��YlR illlU1, 1 1 1: � • /'. � " " •• r� 11111111 � '� III '+ 1 11 MIZIMM •••• IIII . -'. •.. . ,.. . . • - - ., WMMIMIMIMMMM R.➢f'AUIqMMUMIM03U 1IIW�YIK1 1 ----- ----- ----- IMMINIM ----- MU I - - .ns $I:iYIlifl Change Order Deletions Page 3 of 3 City of Fort Worth, Texas Mayor and Council Communication DATE: 08/09/22 M&C FILE NUMBER: M&C 22-0574 LOG NAME: 20SWM NORTH HILL/GREENFIELD PH 3 CHANGE ORDER 2 SUBJECT (CD 2) Authorize Execution of Change Order No. 2 in the Amount of $14,327.99 and the Addition of 15 Calendar Days to a Contract with Reliable Paving, Inc., for the North Hill Lane and Greenfield Road Drainage Improvements Project, Phase 3 for a Revised Contract Amount of $1, 038, 660.57 RECOMMENDATION: It is recommended that the City Council authorize execution of Change Order No. 2 in the amount of $14,327.99 and the addition of 15 calendar days to a contract with Reliable Paving, Inc., for the North Hill Lane and Greenfield Road Drainage Improvements Project, Phase 3 for a revised contract amount of $1,038,660.57 (City Project No. 102974). DISCUSSION: On January 12, 2021, Mayor and Council Communication (M&C) 21-0031, the City Council authorized a construction contract in the amount of $925,172.88 with Reliable Paving, Inc. (City Secretary Contract No. 55431) for the North Hill Lane and Greenfield Road Drainage Improvements Project, Phase 3 (City Project No. 102974). The contract was subsequently revised by Change Order No. 1 in the amount of $99,159.70 and an additional 85 calendar days, administratively authorized December 15, 2021, to provide for additional grading and driveway culverts to address additional flooding concerns reported by residents. This Change Order No. 2 will provide for concrete drive approaches rather than asphalt drive approaches to conform to current Transportation & Public Works (TPW) policy and a reconciliation of pay item quantities to complete the project. City Council approval is being sought for this Change Order because it will result in the total amount of all Change Orders for this contract exceeding $100,000.00. Staff has reviewed and verified the quantities for the additional work under this Change Order No. 2. Additionally, to complete this work, staff recommends that the contract time be extended by 15 calendar days. Funding is budgeted in the TPW Dept Highway & Streets Department's Stormwater Capital Projects Fund for the purpose of funding the Greenfield Acres Drainage Ph3 project, as appropriated. This project is located in COUNCIL DISTRICT 2, Mapsco 46L-46R. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Stormwater Capital Projects Fund for the Greenfield Acres Drainage Ph3 project to support the approval of the above recommendation and execution of the change order. Prior to an expenditure being incurred, the Transportation & Public Works Department has the responsibility to validate the availability of funds. Submitted for City Manager's Office b� Dana Burghdoff 8018 Originating Business Unit Head: William Johnson 7801 Additional Information Contact: Linda Young 2485 Expedited