Loading...
HomeMy WebLinkAboutContract 56638-AR1CSC No. 56638-AR1 FORT WORTH,. City of Fort Worth Construction Allowance Request Project Name 12018 Bond Year 3 -Contract 6 City Sec # 156638 Client Project #(s) I 101452-2 Project This is a combined street paving improvements and water and sanitary sewer main replacements project Description Contractorl Texas Materials dba Texas Bit I CA #I 1 I Datel 6/13/2023 City Project Mgr.I Jose A. Orozco I City Inspectorl Steve Cisneros UNIT or DEPT Original Contract Amount Extras to Date Credits to Date Current Contract Amount JAmount of Proposed Allocation Original Allowance Available to Allocation Allowance Funds Previously Allocated Revised Allowance Balance Water -UNIT 1 $2,079,497.19 $251,571.95 $0.00 Sewer -UNIT 2 $3,115,607.22 $968,328.21 $211.09 Paving -UNIT 3 $1,997,562.10 $175,843.41 $0.00 I Totals $7,192,666.51 $1,395,743.57 $211.09 $2 331 069.14 $4 083 724.34 1 $2173 405.51 $8 588198.99 $0.00 $0.00 $3137.58 $0.00 $3137.58 $80,000.00 $5,328.76 $100,000.00 $5,376.19 $100,000.00 $10,704.72 $280,000.00 $21,409.67 $74,671.24 $94,623.81 $86,157.70 $0.00 1 $255452.75 JUSTIFICATION (REASONS) FOR CONSTRUCTIO OWANCE IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACTOR SHALL: Furnish all labor and material as per the proposed Construction allowance. This allowance will add 2 new bids item to install Thermoplastic Contrast Markings for yield legend symbols (12"x18") and Crosswalk bars at the pedestrian crosswalk along Overton Park East to improve pedestrian safety at this location. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Texas Materials dba Texas Bit I Jamie Greenway Jun 16, 2023 Inspector/Inspection Supervisor 9 Date Project and Contract Compliance Manager Date Jun 16, 2023 - Jun 16, 2023 Program Manager Date Senior Capital Project Officer Date Jun 16, 2023 -,.--; -.•- Jun 16, 2023 Assistant Director (Dept) Date Director, Contracting Department (Dept) Date 7' 7�+ti—a.+t Jun 18, 2023 X -_ Jun 19, 2023 Assistant City Attorney L Date lAssistant City Manager Date 1B h I Jun 20 2023 Jun 22, 2023 ATTEST: gm..W.A _)i_ Jannette Goodall, City Secretary gd44Uan� 0 � FO lo.000 dd lg P� 0 Ovo o=e° °aa p ly a�TEZASoQp nnaau'd'O' OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Construction Allowance SUMMARY Page 1 of 4 FORTWORT_H City of Fort Worth • Construction Allowance Additions Project Name 1 2018 Bond Year 3 - Contract E I City Sec # I b6638 I Client Project # I 101452-2 1 Contractorl Texas Materials dba Texas Bit I PM1 Jose A. Orozco I Inspector Steve Cisneros Construction Allowance Submittal # 0 Date 1 6/13/2023 1 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 3217.1016 Preformed Thermoplastic Contrast Markings — III-88 Legend Yield Symbol (12"x18" ) Paving -UNIT 3 30.00000000 EA $47.25 $1,417.50 3217.0502 Preformed Thermoplastic Contrast Markings - 24" III-89 Crosswalk Paving -UNIT 3 72.00000000 LF $23.89 $1,720.08 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Water- )NIT 1 0.001 Sewer- )NIT 2 0.001 Paving- JNIT3 $3,137.581 $0.001 Total Additions $3,137.581 Construction Allowance Additions Page 2 of 4 FORT WORTH. City of Fort Worth Construction Allowance Value Project Name 1 2018 Bond Year 3 - Contract 6 I City Sec # 1 56638 Client Project # 1 101452-2 1 Contractor Texas Materials dba Texas Bit I PM1 Jose A. Orozco I Inspector) Steve Cisneros Construction Allowance Submittal # Date 1 6/13/2023 1 CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total III-66 Pavinq Construction Allowance 0.03 LS $100,000.00 $3,137.58 Construction Allowance Value 3of4 M/SBE for this Construction Allowance Request M/SBE Sub I Type of Service I Amount for this CAR Total $0.00 Previous Construction Allowance Requests CAR # DATE AMOUNT Total 1 $0.00 I Construction Allowance MSBE Data Page 4 of 4 FORT WORTH Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: 2018 CIP Year 3 Contract 6 —Construction Allowance #1 M&C CPN 101452-2 CSO # 56638 DOC# DATE: 06-13-2023 TO: INITIALS DATE OUT 1. Ilianisse Figueroa Aponte - Review Jun 16, 2023 2 Jamie Greenway - signature J u n 1 2023 iamie.areenwava3exasBit.com 7 3. Steve Cisneros - signature SC Jun 16, 2023 4. Jose Orozco - signature Z 0 JAO Jun 16, 2023 5. Mary Hanna - signatures Jun 16, 2023 6. Michael Owen - signature M Jun 18, 2023 7. Lauren Prieur - signature &e- Jun 19, 2023 8. Doug Black - signature Jun 20, 2023 9. William Johnson - signature 14- Jun 22, 2023 10. Jannette Goodall - signature 1 — Jun 22, 2023 11. TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑ Yes ❑ No RUSH: ❑ Yes ❑ No SAME DAY: ❑ Yes ❑ No NEXT DAY: ❑ Yes ❑ No ROUTING TO CSO: ❑ Yes ❑ No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: Please calITPW Contracts at ext. 7233 for pick up when completed. Thank you.