Loading...
HomeMy WebLinkAboutContract 56185-CO1CSC No. 56185-CO1 FOR-r W0P rH City of Fort Worth Change Order Request Project Name:I Westside 2 to Weslside 3 Pressure Plane Transfer Project I City Sec No.: I 56185 i Project No,(s):i C01466 1 DOE No. I N/A i Cily Proj, No,: I C01468 i Project Descriplion;l Water system improvements on the west side of Fort Worth to allevlale low water pressure Issues, These improvements Include multiple pressure reducing valve stations to allow the transfer of portions of WS2 pressure plane to the WS3 pressure piano. Conlraclor I William J Schultz Inc. dba Circle C Construction Co, Change Order # I 1 i Dale; 1/25/2023 City Project Mgr.I Liam Conlon I City Inspector: I John Robinson i Phone Number:I 817-392-6824 I Phone Number:I 817-879-9818 i Dept, Original Contract Amount Extras to Date Credits to Data Pending Change Orders (in M&C Process) Contract Cost to Dale !Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Water Sewer ,M, 24,=.25 $7,72012.25 $0.00 $7,724,012.26 $239,427.00 $239,427.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 259o) JUSTIFICATION (REASONS) FOR CHANGE'ORDER Totals Contract Time (Calendar days) $7,724,012,26 - 540 47,7241012,26 540 $7,710.00 300 4,012.26 840 $239,427.00 $239,427.00 0,00% $9,655,015.31 Change Order No.1 will provide for the following: • Revisions to five PRV electrical cabinets and site to accomodate current city standards. The old standards were applicable at the time the project was advertised for bid, • Adjustments) Replacements of manhole collars, valve collars and concrete meter boxes that were encountered during construction. I • Replacement of bollards at Z. Boaz Part( I Increased quantities of milling, 2-inch asphalt pavement and cement to accomodate additional pavement i replacement on the project. i i • Deletion of pay item quantities that are no longer needed on the project Staff concurs with the contractors request for 300 additional calendar days on the project for part delivery and i for the electrical subcontractor to make the necessary revisions to the pressure reducing valves in order to meet current city standards, )t is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment In full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contraotor Name _--.Contractor Signature Date pv I I �Wllllam J Schultz Inc, dba Circle C Construction Co, Teri Skelly %a I f_ - zG - Z 3 Inspeotor Dale I ProjectMappger Date_ Director(Wolef Dept) DEtle Ccllon Supervisor Da� Jan 27, 2023 (. t 1—) - 23 Senior Assistant Clty. Attorney pate I Assistant CJity, Manager pate tom„ Jan 27, 2023 T�Qir2 8i�eosTiteLL Jan 27, 2023 Councll Action (If Reduirad)- M&C Number NIA i M&C Date Approved NIA OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Ft R']C WC� H City of Fort Worth Change Order Additions Project Name I Westside 2 to Wes(side 3 Pressure Plane Transfer Project I City Sac No,; 1 56185 1 Project No,(s): I C01468 I DOE No,1 N/A I City Proj. No,: I C01468 YYGIGI J�'Jl\II11 II 11'IIVVvI11U111J UII IYIG Protect - I�uJI JIU�i VI I Vll YY V, Ili lV GIIGYI❑IG IVYY - YYGl01 'IIGJJUIG IJJuvU. - IIIGJV III I�IIVYC"iI11VIItJ I Include multiple pressure reducing valve stations to allow the transfer of portions Description �1 of WS2 pressure plane to the WS3 Contractor I William J Schultz Inc, dba Circle C Construction Co, I Change Order:[' Date:1 1/25/2023 1 City Project Mgr. I Liam Conlon City Inspector I John Robinson ADDITIONS I'(kM UESUhIf ,C1Uly DEPT 4ty Unit Unit Cost l Total 84 2" Surface Milling Water 575.00 SY $3.60 $2,012.50 85 2" Asphalt Pvmt Type D Water 575.00 SY $14.60 $8,337.60 98 Cement 26#ISY Water 40.00 TN $450.00 $18,000.00 99 Concrete Collar (Valve) Water 10.00 EA $350.00 $3,500,00 100 Concrete Collar (Manhole) Water 35.00 EA $700.00 $24,500.00 101 Concrete Meter Box Replacement Water 16.00 EA $200.00 $3,200.00 102 Shoulder -Up Edge Joyce Water 720.00 LF $5.00 $3,600,00 103 Z Boaz Park - Bollards Water 12.00 EA $1,200,00 $14,400.00 104 Electrical Panel Changes Water 5.00 EA $6,703.20 $33,516,00 105 Electrical Panel Concrete Pad Modifications Water 5.00 EA $1,500.00 $7,500.00 106 Electrical Panel Post Depth Adjustment Water 5.00 EA $2,000.00 $10,000.00 I I I I I I I I I I I I I Water �$128,566.00 Sewer Page 2 of 4 Additions Sub Total 1$126,566.00 FORT' WOR'FH City of Fort Worth Change Order deletions Project Name Westside 2 to Weslside 3 Pressure Plane Transfer Project ! City Sec No.: 56185 Project No,(s): C01468 I DOE No, I N/A City Proj, No.: 001468 Project Description Water system improvements on the west side of Fort Worth to alleviate low water pressure issues. These Improvements include multiple pressure reducing valve stations to allow the transfer of portions of WS2 pressure Contractor I William J Schultz Inc, dba Circle C Construction Co. I Change Order: F-1 ] Date I 1125/2023 City Project Mgr, Liam Conlon City Inspector: I John Robinson DELETIONS ITEM DESCRIPTION DEPT City Unit UnitCost Total 86 2" Asphalt Pvmt Type B Water 3,175.00 SY $14.00 $44,450.00 87 Pavement Pulverization Water 3,175.00 SY $12.75 $40,481.25 97 Contingency Water 0.2908984 LS $160,000.00 $43,634.75 Water $128,666.00 Sewer Page 3 of 4 Deletions Sub Total $12.8,566.00 MWBE Sub Same as original Contract MIWBE Breakdown for this Change Order Type of Service Miscellaneous Amount for this CO $26,400.00 Total $25,400.00 Previous Change Orders CO# DATE AMOUNT 1 - 2 3 Total $0.00 Page 4 of 4 1/26/2023 Westside 2 to Westside 3 Pressure Plane Transfer Project CPN 01468 Change Order 1 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. .Contract Compliance Manager By signing 1 acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Q `'1' Signature Liam Conlon Name of Employee Project Manager Title ATTEST: dvo S=P. Cho ooc� °°°°°°°°° a Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX