Loading...
HomeMy WebLinkAboutContract 42494-CO4 (2)CITY SECRETARY a q _ �,, II City of Fort Worth CONTRACT N0. Change Order Request Change Order No. Date TPW Project No. Funding (FAC) 4 (four) 02/28/2012 C 285 541200 803490121580 Facility and Project Description City Secretary Contract No. RD Evans Community Center Renovation 42494 ORIGINAL CONTRACT AMOUNT................................................................ $232,542 EXTRASTO DATE..................................................................... $ 42,736 CREDITS TO DATE.................................................................... $ 0 CONTRACT COST TO DATE.................................................................................................. $ 275,278 AMOUNT OF PROPOSED CHANGE ORDER............................................................................ $ 15,308 REVISED CONTRACT AMOUNT............................................................................................. $ 290,586 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS............................................................ $ 58,135 REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS......................................................... $ 91, ADDITIONAL FUNDING (IF NECESSARY)................................................................................ 0 IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Provide all labor and materials as per attached PCR's: PCR-18 Revised- Reface cabinets, install new upper cabinets, paint walls and install new floor tile in After School room. TOTAL ADD $ 15,308 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order Contractors Name Dennett Construction Original Contract Time Additional Approved Time To Date Approved Contract Time To Date Additional Time For This Change Order 45 cd 45 cd 90 cd cd 14 Contractor- ennett construction Date Director �14L t L Date Architectural Services Manager Date TCicworks , Date A 6A7c✓l2 Projecthacoecti Art ei n Architects Date Assis ant Manager Date N/Iii %I- - dllfi r �,......�_ .3/9/z -- —z Assis a ity Attorney D to Council Action (If Required) Date ❑ Approved ❑ Disapproved ❑ Other a Distribution: File Construction Manager Project Manager Contractor r� U Attiested cr F 0�000 Mazy J. K i r, G oS�d� o �o o� �r Av OFFICIAL RECORD 0 OR TPW Facilities Management Division � a ° .°pOOo°i o4y CITY SECRETARY Change Order Form (12/19/01) 441ZAn�4p4� FT. WORTH, TX Proposed Change Request Description: After School Room #50 Project RD Evans PM / Supt SM / NH Date Change Request Number: 018 24-Feb Scope of Work Unit Cost Total After School Room Install new VCT as described in email dated 2/15/12 $ 2,352 Paint as described in SPD proposal $ 3,260 Millwork as described below Field labor demo existing 4 mh $ 57 $ 228 Plywood for new door / drawer fronts 4 sh $ 78 $ 312 MDF for new P-lam top @ existing cabinets 2 sh $ 69 $ 138 Laminate for doors, drawers, and cab faces 4 sh $ 86 $ 344 Laminate for new countertop & splash 2 sh $ 86 $ 172 Shop labor to build new doors / drawers 24 mh $ 45 $ 1,080 Field labor to re -face existing cabinets 36 mh $ 57 $ 2,052 New book shelves on west wall Omitted New upper cabinets (Reduced Scope) 16 If $ 155 $ 2,480 New uppers above existing millwork only, no adj shelves on end Misc electrical relocate as necessary for countertop replacement $ 250 Relocate TV By others Paint additional doors in dance room 10 ea $ 60 $ 600 Lock for operable partition 1 ea $ 150 $ 150 Modify Stainless handrails for restrooms $ 250 Please add 14 days to the contract for this work Subtotal- $ 13,668 Overhead & profit $ 1,367 Bond $ 273 Tax exempt Total $ 15,308 OENNETT CONSTRUCTION