Loading...
HomeMy WebLinkAboutContract 56972-A1AMENDMENT No . 1 CSC No. 56972-A1 TO CITY SECRETARY CONTRACT No. 56972 WHEREAS, the City of Fort Worth (CITY) and Plummer Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 56972, (the CONTRACT) which was authorized by M&C 21-0995 on the 14th day of December, 2021 in the amount of $405,642.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2020, WSM-I; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $49,464.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $455,106.00. 0 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas [WSSS Repl. Contract 2020 WSM-2] Prof Services Agreement Amendment Template [103382] Revision Date: November 23, 2021 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth b�ru� 8�,u�rGuJrr� Dana Burghdoff Assistant City Manager DATE: OCt 2, 2023 APPROVAL RECOMMENDED: Christopher H rder (Sep 28, 202313:13 CDT) Christopher Harder, P. E. Director, Water Department Contract Compliance Manager: ENGINEER Plummer Associates, Inc. ,&tip-= V�z4 Clete Martin, P.E. Principal DATE: r r By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 1 ov� j04,1 Liam Conlon Project Manager APPROVED AS TO FORM AND LEGALITY: p I DBlack (Oct 2, 2023 13:38 CDT) Douglas W. Black Sr. Assistant City Attorney F go4�nn� Qry4t......ORT �LaO Os 0 ATTEST: ono ° °°9°0 PVo a=d <�A�.r,� /� aa�4 nEXASoap Jannette Goodall City Secretary M&C: N/A Date: N/A Form 1295: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 2 of 2 [W&SS Repl. Contract 2020 WSM-I] (1033821 PLUMMER 7�W September 18, 2023 Mr. Liam Conlon City of Fort Worth Water Department - Engineering Services Division 311 W. 10th Street Fort Worth, Texas 76102 Re: WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020, WSM-I, CPN 103420 Contract Amendment No. 1. Design Services for Replacement of 24-Inch Waterline. Plummer Project #0318-072-01 Dear Mr. Conlon: This Contract Amendment No. 1 is provided for additional service related to Water and Sanitary Sewer Replacements Contract 2020, WSM-I. The detailed scope is described below. This amendment is necessary to allow Plummer Associates, Inc (Plummer) to provide additional design, bid phase and construction phase services. The scope of work adds 1,200 linear feet of 24-inch waterline replacement along Willis Dr. to the intersection with Penrose Ave. 1) Additional Project Management, Design and Coordination of 24-inch Waterline: a) Perform Topographic survey of the additional pipeline route. b) Perform the design of 1,200 LF of 24-inch Cast Iron pipe to be removed and replaced in the same trench. c) Perform the utility coordination review with the City of Fort Worth Utility Coordinator. This amendment compensation summary is as follows: No. I Description Amount 1 Additional Design Services (30, 60, 90 and Final) of 24-inch WL $ 49,464 Total (Lump Sum) $ 49,464 1320 South University Drive, Suite 300 Fort Worth, Texas 76107 Phone 817.806.1700 Fax 817.870.2536 plummer.com Page 1 of 2 TBPE Firm No. 13 Conlon 09/18/2023 The following table identifies the original contract, and amendments. Amount Original Contract $405,642 Amendment 1 $49,464 Contract Council Approved Amount $405,642 12/14/2021 $455,106 If you have any questions concerning this Amendment, please let me know. Sincerely yours, Geol- geah George I Farah, P.E., TX 97448 Project Manager Plummer Associates, Inc. Attachment cc: Clete Martin, P.E. Principal in Charge, Plummer Associates, Inc. Page 2 of 2 f:\projects\0318\072-01\1 Contracts\1-1 Client\Amendment 1\Amendment_Itr Ldocx Task No. Task Description 1.0 Project Management 1.1 Managing the Team 1.1.1 Internal Team Plummer Coordination 1.1.2 QA/QC 1.2 Communications and Reporting 1.2.1 Scopinq / Pre -Design Coordination Meeting (3) 12 Monthly Project Update Meetings (Design 1.2.2 Phase only) (Not Included) Design Submittal Review Meetings (3 @ 2 hrs. 1.2.3 ea. 3 ppl) & Notes 1.2.4 Prepare Baseline Schedule Prepare Monthly Progress Reports with 1.2.5 Schedule (30 Mon 1 hr./mon.) Prepare Monthly MBE/SBE Reports (Not 1.2.6 Included) 1.2.7 Invoicing 1.3 Review and Direct Survey 2.0 Conceptual Design (30-Percent) 2.1 Data Collection/Review 2.2 One Site Visit Subsurface Utility Engineering, and Deliverable 2.3 Review ( 2 Level A, Selective level B) 2.4 Design Drawings (30%) (3 new sheets) 2.4A Update G-Sheets M 2.7 Construction Estimate 2.8 Coordination Meetings (2 @ 1 Hrs./Ea. 2 P) 3.0 Preliminary Design (60 Percent) 3.1 Preliminary Design Drawings (3 sheets) 3.2 Utility Clearance Coordi�(ation aqa Backcheck 3.3 Contract Documents and Specifications 14.0 Final Design 1 14.1 Final Draft (90%) Construction Plans 1 14.3 Final (100%) Plans 1 14.8 Contract Documents and Specifications Updates 1 17.0 +ROW/Easement Services 1 18.0 'Survey 1 8.1 Design Survey Topographic ;9.0 ;Permitting I Totals 1 Water line Footage Sewer line Footage Summary Fee Water Fee Sewer Fee I otal Fee Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2020, WSM-1 City Project No. 103382 (09/19/2023) Labor (hours) I Expense Project Project Project Surve Field Total Labor Cost Subconsultant Non-MWBE CADD Administrative Travel Reproductior J 1 1 Y Director Manager Engineer Specialist Tech II MWBE IS 0 1; 4 0 0 0 0 $1,220 $0 $0 $0 $ $0 $0 $0 I I $0 I I $0 $0 $0 I I I I $0 $0 1200I 100%I 0 0%1 1200 100% $49,464.00� $0.00 $49.464.00 I I 41 1 1 1 1 1 311 39 1 0 I 0 1 12 21 2 1 91 41 21 21 I 151 61 61 31 10; 61 4 0 0 0 60 16 I 21 14 14 26 14 1 8 41 0 ; 4 1 4 0 83 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 F:\projects\0318\072-01\1 Contracts\1-1 Client\Amendment 1\LOE Spreadsheets —Typical Design V2 09142023 I I I 0 0 I I I 0 0 I I 0 0 0 0 0 0 0 0 I I $01 I I 11 $5,707 1 $770 $1,090 I 41 $9,163 I $Ol I S01 $01 21 $5,588 1 I 1 $1,990 I I 1 21 $1,5851 7; $10,7471 $0 $01 $0 31 $5,4031 I 41 $3,6161 I 1 $1,7281 1 1 01 $0; $01 $01 $01 01 $768; $01 $7,6501 $01 1 $7681 $7,6501 1 r Oi $0' $0 $Ol $0 131 $41,431.00 $0 $7,6501 $0 Total Expense Cost I Task Sub Total 1 $0 $1,220 $0 $0� $ , $0 $6 $01 I $0 $01 $0 $01 $0 $0 $0 $0 $01 $1, $0 $19, $0 $3, $0 $1, $0 $0 $6, $0 $5, $0 $ $0 $1, $0� $0l $9,163 $0 $5,588 $0 $1,990 1 Sol $1,585 i $ol $01 $10,747 1 $01 $5,403 I $01 $3,616 1 $01 $1,728 r $o1 $01 $0 $Ol $7,650; $8,418 1 $7,6501 $8,418 i $0; $01 $0 $01 $7,6501 $49,081.00 Project Summary Total Hours 188 Total Labor $ 41,431.00 Total Expense $ 7,650.00 1 MBE Subconsultant $ - Non MBE Subconsultantl $ 7,650.00 5% SubMarkupl$ 383.00 IMBE/SSE Participationl 0% Total Project Costl $ 49,464.00 1 of 1